CN201952477U - Arsenic metal reforming furnace - Google Patents

Arsenic metal reforming furnace Download PDF

Info

Publication number
CN201952477U
CN201952477U CN2010206656882U CN201020665688U CN201952477U CN 201952477 U CN201952477 U CN 201952477U CN 2010206656882 U CN2010206656882 U CN 2010206656882U CN 201020665688 U CN201020665688 U CN 201020665688U CN 201952477 U CN201952477 U CN 201952477U
Authority
CN
China
Prior art keywords
silicon carbide
pipe
reforming
arsenic
recrystallized silicon
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2010206656882U
Other languages
Chinese (zh)
Inventor
张世才
王继荣
李显坪
李龙
潘晋
施如军
陈琦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yangzhou Crown New Materials Co Ltd
Original Assignee
Yangzhou Crown New Materials Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yangzhou Crown New Materials Co Ltd filed Critical Yangzhou Crown New Materials Co Ltd
Priority to CN2010206656882U priority Critical patent/CN201952477U/en
Application granted granted Critical
Publication of CN201952477U publication Critical patent/CN201952477U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Crystals, And After-Treatments Of Crystals (AREA)

Abstract

The utility model provides an arsenic metal reforming furnace, relating to the field of production technologies of high-purity arsenic. A heating layer is arranged outside a recrystallized silicon carbide reforming pipe. One end of the recrystallized silicon carbide reforming pipe is connected with a feeding pipe via a flange, while the other end of the recrystallized silicon carbide reforming pipe is connected with an aluminum storage tank via a recrystallized silicon carbide connecting pipe. In the utility model, the recrystallized silicon carbide pipe is used as the reforming pipe and also used as a connecting piece for connecting the aluminum storage tank; and the utility model has the advantages of high purity, corrosion resistance, no chemical reaction to the products produced in the production process of high-purity arsenic and long-term availability as well as good thermal conductivity and even thermal field, thus bringing a very large allowance to temperature control in the production process. Meanwhile, the arsenic metal reforming furnace can be conveniently machined into various required shapes to make equipment accessories easily connected and facilitate to increase production capacity and reforming efficiency. The aluminum storage tank, as a loader for products, can effectively prevent secondary pollution after reforming because aluminum has a good resistance to corrosion, and is also easy for processing and low in price.

Description

The metallic arsenic converter
Technical field
The utility model relates to the high purity arsenic production technical field.
Background technology
The various methods of purification of metallic arsenic all exist one metallic arsenic is converted into certain compound, utilize the physics of this kind compound or the process that the chemical property difference is carried out separating impurity then.Adopting quartz glass is done conversion tube and is used titanium alloy to do product carrier simultaneously before in the high purity arsenic purifying technique, is used for air-isolation and carry reaction medium.Because in this technological process, corrosion reaction is taking place more than 850 ℃ in reaction medium and silica tube, causes the main component SiO of silica tube 2In oxygen replaced by arsenic, silica tube is corroded very soon and appears, and cause medium to reveal, and medium arsenic wherein is oxidized, not only causes the technological process failure, also produces deleterious arsenic oxide arsenoxide, brings pressure for environmental protection and safety in production, has improved cost.Product after titanium alloy and the conversion has minor response in addition, scabs on inwall, is difficult to clean and cause secondary pollution.Because the quartz transition pipe is difficult to make flange, makes flange and also be difficult to be connected with equipment appurtenance because of hard fragility.These problems are a great problems of production process.
Summary of the invention
The utility model purpose is to design a kind of prevent to transform back secondary pollution, metallic arsenic converter durable, that be beneficial to the raising transformation efficiency.
The utility model comprises the re-crystallized silicon carbide conversion tube, outside described re-crystallized silicon carbide conversion tube, zone of heating is set, end at described re-crystallized silicon carbide conversion tube connects feed-pipe by flange, connects the aluminium storage tank at the other end of described re-crystallized silicon carbide conversion tube by the re-crystallized silicon carbide pipe connecting.
The utility model with the re-crystallized silicon carbide pipe as conversion tube, with the web member of re-crystallized silicon carbide pipe as connection aluminium storage tank, have purity height, process product react with corrosion-resistant, that do not produce with high purity arsenic, can life-time service characteristics, and have that heat conduction is good, the thermal field advantage of uniform concurrently, bring very big allowance for the temperature control of production process, simultaneously because it can be processed into the various shapes that need easily, make the equipment appurtenance ease of connection, be beneficial to the increasing turnout, improve transformation efficiency.The aluminium storage tank, does not react with product because the corrosion resistance of aluminium is good as the loader of product, can effectively prevent to transform the back secondary pollution, is easy to processing, low price.
In addition,, improve heat retaining property, also thermal insulation layer can be set outside zone of heating for conserve energy.
Description of drawings
Fig. 1 is a kind of structural representation of the present utility model.
Embodiment
As shown in Figure 1, the utility model is provided with the zone of heating of being made up of nichrome wire 2 outside re-crystallized silicon carbide conversion tube 1, thermal insulation layer 7 is set outside zone of heating 2.One end of crystalline silicon carbide conversion tube 1 connects feed-pipe 6 by flange 5, and the other end connects aluminium storage tank 4 by re-crystallized silicon carbide pipe connecting 3.

Claims (2)

1. metallic arsenic converter, it is characterized in that comprising the re-crystallized silicon carbide conversion tube, outside described re-crystallized silicon carbide conversion tube, zone of heating is set, end at described re-crystallized silicon carbide conversion tube connects feed-pipe by flange, connects the aluminium storage tank at the other end of described re-crystallized silicon carbide conversion tube by the re-crystallized silicon carbide pipe connecting.
2. according to the described metallic arsenic converter of claim 1, it is characterized in that outside described zone of heating, thermal insulation layer being set.
CN2010206656882U 2010-12-17 2010-12-17 Arsenic metal reforming furnace Expired - Lifetime CN201952477U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010206656882U CN201952477U (en) 2010-12-17 2010-12-17 Arsenic metal reforming furnace

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010206656882U CN201952477U (en) 2010-12-17 2010-12-17 Arsenic metal reforming furnace

Publications (1)

Publication Number Publication Date
CN201952477U true CN201952477U (en) 2011-08-31

Family

ID=44496598

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010206656882U Expired - Lifetime CN201952477U (en) 2010-12-17 2010-12-17 Arsenic metal reforming furnace

Country Status (1)

Country Link
CN (1) CN201952477U (en)

Similar Documents

Publication Publication Date Title
CN201952477U (en) Arsenic metal reforming furnace
CN102062488B (en) Combined condensation type straight-through heat collecting pipe and installation method thereof
CN102002604B (en) Metal arsenic reformer
CN201915043U (en) Heating element made of carbon materials
CN104028185B (en) A kind of preparation method being applicable to the micro passage reaction of high pressure-temperature reaction condition
CN103172067B (en) Cold wall fluidized bed and application thereof
CN102400214A (en) Quartz crucible with composite coating layers for preparing polycrystalline silicon ingot
CN201842894U (en) Composite coating quartz crucible for polycrystalline silicon ingot preparation
CN103122479A (en) Combined crucible for preparing polycrystalline silicon ingot
CN201770486U (en) Reduction furnace preheater
CN109112624A (en) It is a kind of for producing the polycrystalline furnace of solar level high-efficiency polycrystalline silicon wafer
CN202469274U (en) Corrosion resistance heat insulation pipeline
CN202131104U (en) Bell jar and chassis of polycrystalline silicon reduction furnace
CN102922791A (en) Ni-Al alloy honeycomb material and preparation method thereof
CN101570831B (en) Large-sized distillation furnace for producing high purity arsenic
CN207109143U (en) A kind of polycrystalline furnace for being used to produce solar level high-efficiency polycrystalline silicon chip
CN203625055U (en) Equipment for controlling temperature of hydrogenation furnace tail gas
CN203173826U (en) Cold wall fluidized bed
CN105617702A (en) Steam device for recovering waste heat at top of DPC reactive distillation tower
CN204251766U (en) A kind of insulation construction of crystalline silicon ingot casting furnace thermal field
CN203999919U (en) Quartz stove tube pressure detection interface
CN203513289U (en) Silicon tetrachloride to trichlorosilane reactor
CN104457340A (en) Heat exchanger of solar hydrogen production system
CN204234060U (en) The high voltage bearing quartz reactor of novel fire resistant
CN201495270U (en) Heat-insulating reactor for titanium sponge production

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20110831

Effective date of abandoning: 20120704