CN201883444U - Double-wall steel cofferdam for underwater low pile cap - Google Patents
Double-wall steel cofferdam for underwater low pile cap Download PDFInfo
- Publication number
- CN201883444U CN201883444U CN2010206008146U CN201020600814U CN201883444U CN 201883444 U CN201883444 U CN 201883444U CN 2010206008146 U CN2010206008146 U CN 2010206008146U CN 201020600814 U CN201020600814 U CN 201020600814U CN 201883444 U CN201883444 U CN 201883444U
- Authority
- CN
- China
- Prior art keywords
- wall board
- cofferdam
- wall
- pile cap
- double
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
- Revetment (AREA)
Abstract
Description
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010206008146U CN201883444U (en) | 2010-11-11 | 2010-11-11 | Double-wall steel cofferdam for underwater low pile cap |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010206008146U CN201883444U (en) | 2010-11-11 | 2010-11-11 | Double-wall steel cofferdam for underwater low pile cap |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201883444U true CN201883444U (en) | 2011-06-29 |
Family
ID=44180982
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010206008146U Expired - Lifetime CN201883444U (en) | 2010-11-11 | 2010-11-11 | Double-wall steel cofferdam for underwater low pile cap |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201883444U (en) |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102425162A (en) * | 2011-12-13 | 2012-04-25 | 中交第二公路工程局有限公司 | Steel sleeve mechanism for construction of pile footing composite foundation reserved hole with soft soil foundation top-down construction method |
CN102493468A (en) * | 2011-12-13 | 2012-06-13 | 中交第二公路工程局有限公司 | Design method for construction cofferdam of bridge deepwater soft soil foundation |
CN102535349A (en) * | 2012-03-19 | 2012-07-04 | 董兰田 | Technology for building bridge by constructing tie beam and bearing beam underwater through flow cutoff of double-layer enclosing barrier |
CN103397649A (en) * | 2013-08-16 | 2013-11-20 | 中铁大桥局股份有限公司 | Double-wall steel cofferdam construction multifunctional platform and construction method thereof |
CN104499494A (en) * | 2014-12-22 | 2015-04-08 | 江苏省交通科学研究院股份有限公司 | Double-wall corrugated steel cofferdam |
CN105064381A (en) * | 2015-08-06 | 2015-11-18 | 中铁一局集团有限公司 | High-low cutting edge double-wall steel cofferdam reinforced concrete once bottom sealing construction method |
CN105862892A (en) * | 2016-05-31 | 2016-08-17 | 中铁五局集团有限公司 | Double-walled steel cofferdam |
CN107044118A (en) * | 2016-12-30 | 2017-08-15 | 上海建工七建集团有限公司 | Double-walled steel truss casing and its construction method |
CN108316151A (en) * | 2018-01-30 | 2018-07-24 | 石家庄铁道大学 | Cofferdam reaction rack equipment and construction method for deep-water bridge substructure construction |
CN109295990A (en) * | 2018-11-26 | 2019-02-01 | 中国铁建大桥工程局集团有限公司 | A kind of band opening blade foot has bottom steel boxed cofferdam |
CN109537443A (en) * | 2018-12-28 | 2019-03-29 | 中交二航局第四工程有限公司 | Bridge pier anticollision device, collision-prevention device and its construction method |
-
2010
- 2010-11-11 CN CN2010206008146U patent/CN201883444U/en not_active Expired - Lifetime
Cited By (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102425162B (en) * | 2011-12-13 | 2014-11-12 | 中交第二公路工程局有限公司 | Steel sleeve mechanism for construction of pile footing composite foundation reserved hole with soft soil foundation top-down construction method |
CN102493468A (en) * | 2011-12-13 | 2012-06-13 | 中交第二公路工程局有限公司 | Design method for construction cofferdam of bridge deepwater soft soil foundation |
CN102425162A (en) * | 2011-12-13 | 2012-04-25 | 中交第二公路工程局有限公司 | Steel sleeve mechanism for construction of pile footing composite foundation reserved hole with soft soil foundation top-down construction method |
CN102493468B (en) * | 2011-12-13 | 2014-06-11 | 中交第二公路工程局有限公司 | Design method for construction cofferdam of bridge deepwater soft soil foundation |
CN102535349A (en) * | 2012-03-19 | 2012-07-04 | 董兰田 | Technology for building bridge by constructing tie beam and bearing beam underwater through flow cutoff of double-layer enclosing barrier |
CN102535349B (en) * | 2012-03-19 | 2014-03-05 | 赤峰宏基建筑(集团)有限公司 | Method for building bridge by constructing tie beam and bearing beam underwater through flow cutoff of double-layer enclosing barrier |
CN103397649B (en) * | 2013-08-16 | 2015-04-29 | 中铁大桥局股份有限公司 | Double-wall steel cofferdam construction multifunctional platform and construction method thereof |
CN103397649A (en) * | 2013-08-16 | 2013-11-20 | 中铁大桥局股份有限公司 | Double-wall steel cofferdam construction multifunctional platform and construction method thereof |
CN104499494A (en) * | 2014-12-22 | 2015-04-08 | 江苏省交通科学研究院股份有限公司 | Double-wall corrugated steel cofferdam |
CN104499494B (en) * | 2014-12-22 | 2017-01-18 | 江苏省交通科学研究院股份有限公司 | Double-wall corrugated steel cofferdam |
CN105064381A (en) * | 2015-08-06 | 2015-11-18 | 中铁一局集团有限公司 | High-low cutting edge double-wall steel cofferdam reinforced concrete once bottom sealing construction method |
CN105862892A (en) * | 2016-05-31 | 2016-08-17 | 中铁五局集团有限公司 | Double-walled steel cofferdam |
CN107044118A (en) * | 2016-12-30 | 2017-08-15 | 上海建工七建集团有限公司 | Double-walled steel truss casing and its construction method |
CN108316151A (en) * | 2018-01-30 | 2018-07-24 | 石家庄铁道大学 | Cofferdam reaction rack equipment and construction method for deep-water bridge substructure construction |
CN109295990A (en) * | 2018-11-26 | 2019-02-01 | 中国铁建大桥工程局集团有限公司 | A kind of band opening blade foot has bottom steel boxed cofferdam |
CN109537443A (en) * | 2018-12-28 | 2019-03-29 | 中交二航局第四工程有限公司 | Bridge pier anticollision device, collision-prevention device and its construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201883444U (en) | Double-wall steel cofferdam for underwater low pile cap | |
CN101476326B (en) | Bearing platform prefabrication and construction method | |
CN103510529B (en) | Steel hanging box system for underwater high-rise pile cap construction and construction technology thereof | |
CN103195085B (en) | Downward story-adding basement and construction method thereof | |
CN101476327B (en) | Subaqueous bearing platform construction method | |
CN103452126B (en) | Light combined hanging box with recyclable baseplate steels and construction technology thereof | |
CN101144262A (en) | Crash-proof steel bushing box and use thereof | |
CN102140801A (en) | Cofferdam construction method in construction of deepwater pier bearing platform | |
CN201891123U (en) | Single-wall steel hanging box with concrete bottom plate | |
CN102493468B (en) | Design method for construction cofferdam of bridge deepwater soft soil foundation | |
CN202359566U (en) | Cofferdam for deep-water soft soil foundation construction of bridge | |
CN104499494B (en) | Double-wall corrugated steel cofferdam | |
CN204000905U (en) | A kind of Double-Wall Steel Boxed Cofferdam with binder deep water bearing platform construction | |
CN203238646U (en) | Casing box with built-in bottom board | |
CN202610780U (en) | Movable self-installing platform | |
CN203007965U (en) | Steel hanging box system for underwater high-rise pile cap construction | |
CN201037231Y (en) | Yacht dock (bateau bridge) | |
CN201187051Y (en) | Deep water bridge foundation construction multifunctional drill platform top board | |
CN202298649U (en) | Buttress structure with longitudinal beams | |
CN101984203A (en) | Technique for refurbishment and reconstruction of old buildings in old quarters | |
CN202416334U (en) | Thin-walled steel box | |
CN204385753U (en) | A kind of double-wall corrugated steel cofferdam | |
CN201865051U (en) | Steel suspension box | |
CN209277181U (en) | A kind of cofferdam | |
CN204000907U (en) | Floatable double-wall steel suspension box |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C56 | Change in the name or address of the patentee |
Owner name: CHINESE RAILWAY CONSTRUCTION BRIDGE ENGINEERING BU Free format text: FORMER NAME: CHINESE RAILWAY CONSTRUCTION 13TH BUREAU GROUP CO., LTD. Owner name: CHINESE RAILWAY CONSTRUCTION 13TH BUREAU GROUP CO. Free format text: FORMER NAME: CHINA RAILWAY 13TH BUREAU GROUP CO., LTD. |
|
CP01 | Change in the name or title of a patent holder |
Address after: 130033 science and Technology Department, China Railway thirteen Bureau, No. 2138 East Ling Road, Jilin, Changchun Patentee after: China thirteen Railway Construction Bureau Group Co.,Ltd. Address before: 130033 science and Technology Department, China Railway thirteen Bureau, No. 2138 East Ling Road, Jilin, Changchun Patentee before: CHINA RAILWAY 13TH BUREAU GROUP Co.,Ltd. |
|
CP03 | Change of name, title or address |
Address after: The Central West 300300 Tianjin Airport Economic Zone No. 32 Patentee after: CHINA RAILWAY CONSTRUCTION BRIDGE ENGINEERING BUREAU GROUP Co.,Ltd. Address before: 130033 science and Technology Department, China Railway thirteen Bureau, No. 2138 East Ling Road, Jilin, Changchun Patentee before: China thirteen Railway Construction Bureau Group Co.,Ltd. |
|
CX01 | Expiry of patent term |
Granted publication date: 20110629 |
|
CX01 | Expiry of patent term |