CN105862892A - Double-walled steel cofferdam - Google Patents

Double-walled steel cofferdam Download PDF

Info

Publication number
CN105862892A
CN105862892A CN201610375079.5A CN201610375079A CN105862892A CN 105862892 A CN105862892 A CN 105862892A CN 201610375079 A CN201610375079 A CN 201610375079A CN 105862892 A CN105862892 A CN 105862892A
Authority
CN
China
Prior art keywords
double
cofferdam
concrete
walled steel
steel cofferdam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610375079.5A
Other languages
Chinese (zh)
Inventor
李�荣
郑宇�
刘有伟
何驰
沈杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mechanization Engineering Co Ltd Of Group Of Zhongtie No5 Bureau
China Railway No 5 Engineering Group Co Ltd
Mechanisation Engineering Co Ltd of China Railway No 5 Engineering Group Co Ltd
Original Assignee
Mechanization Engineering Co Ltd Of Group Of Zhongtie No5 Bureau
China Railway No 5 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mechanization Engineering Co Ltd Of Group Of Zhongtie No5 Bureau, China Railway No 5 Engineering Group Co Ltd filed Critical Mechanization Engineering Co Ltd Of Group Of Zhongtie No5 Bureau
Priority to CN201610375079.5A priority Critical patent/CN105862892A/en
Publication of CN105862892A publication Critical patent/CN105862892A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/02Restraining of open water
    • E02D19/04Restraining of open water by coffer-dams, e.g. made of sheet piles

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The invention discloses a double-walled steel cofferdam. A concrete reinforcing block (2) is arranged at a crossed region (1) of a transverse cofferdam (5) of the double-walled steel cofferdam and an inner supporting rod (3). The concrete reinforcing block (2) is produced by filling C25 concrete. The concrete reinforcing block is arranged at the crossed position of the double-walled steel cofferdam and the supporting rod and the stress on the region can be reduced, so that the strain of a rod part is reduced, and the phenomenon that regional stress is too great, caused by strain diffusion, is prevented; and section sizes of main stressing rod parts of vertical ribs and flat ribs of other regions of the double-walled steel cofferdam are reduced and the steel use amount of the double-walled steel cofferdam is reduced. The concrete reinforcing block is formed at the crossed region by filling the C25 concrete, so that partial compression strength can be enhanced, the stressing requirements are met and the whole stability is guaranteed.

Description

A kind of Double-Wall Steel Boxed Cofferdam
Technical field
The present invention relates to a kind of mixed structure Double-Wall Steel Boxed Cofferdam.
Background technology
In the past, for ensureing the strength and stability of steel cofferdam support point position internal force large area rod member, use and increase rod member quantity and strengthen the mode of rod member model, reduce and dispersive stress, thus reduce strain dispersion, reduce Deformation Member around, to ensure the stability of steel cofferdam.This mode causes huge rod member to waste, and also increases the work such as welding, increases the risk that the integral rigidity of steel cofferdam is inadequate, so the problem that new stress dispersing mode solves to exist must be designed, to improve Double-Wall Steel Boxed Cofferdam reliability and economy.
Summary of the invention
The technical problem to be solved in the present invention is: provide a kind of mixed structure Double-Wall Steel Boxed Cofferdam, this reasonable in design, simple and practical and make full use of the existing concrete in building site, can effectively solve the internal force large area existence of support point position, conventional steel cofferdam is affected big problem by welding quality, overcome its work progress complicated, waste the deficiencies such as material.
The technical scheme is that at the transverse cofferdam of Double-Wall Steel Boxed Cofferdam with the intersection region of internal overarm support, concrete boss is set.
Concrete boss uses fills C25 concrete for making.
At Double-Wall Steel Boxed Cofferdam and strut crossover location, concrete boss is set, this regional stress can be reduced, thus reduce rod member strain, stop the regional stress caused because of strain diffusion excessive, reduce other regions of Double-Wall Steel Boxed Cofferdam whereby and erect rib, flat rib main stressed member sectional dimension, reduce Double-Wall Steel Boxed Cofferdam steel using amount.
Form concrete boss by filling C25 concrete at intersection region, by increasing capacitance it is possible to increase local compressed strength, meet stress needs, it is ensured that stability in the large.
Therefore, the present invention successfully solves steel cofferdam support point position internal force large area, and the regional stress caused because of strain diffusion is excessive, reduces perpendicular rib, flat rib main stressed member sectional dimension simultaneously, reduce cofferdam steel using amount and welding job amount, it is ensured that construction quality, safety.
Accompanying drawing explanation
Fig. 1 is the structural representation of the present invention, top view;
Fig. 2 is the structural representation of the present invention, left view.
Detailed description of the invention
Embodiments of the invention: at the transverse cofferdam 5 of Double-Wall Steel Boxed Cofferdam and the intersection region 1 of internal overarm support 3, concrete boss 2 is set.
When processing Double-Wall Steel Boxed Cofferdam in factory, according to the partition panel 4 of design drawing welded and installed intersection region 1, as the template of concrete boss;After Double-Wall Steel Boxed Cofferdam 5 sinks to putting in place, carry out the concrete boss 2 at bottom concrete 6 and intersection region 1 and construct;Bottom concrete 6 intensity reaches to draw water after design requires;Draw water below Double-Wall Steel Boxed Cofferdam internal overarm support 3 elevation location about 1 meter time, carry out internal overarm support 3 between Double-Wall Steel Boxed Cofferdam and construct, now, the interior outer support system of whole steel cofferdam is fully completed.

Claims (3)

1. a Double-Wall Steel Boxed Cofferdam, it is characterised in that: at transverse cofferdam (5) and intersection region (1) place of internal overarm support (3) of Double-Wall Steel Boxed Cofferdam, concrete boss (2) is set.
Double-Wall Steel Boxed Cofferdam the most according to claim 1, it is characterised in that: internal overarm support (3) uses steel pipe manufacturing.
Double-Wall Steel Boxed Cofferdam the most according to claim 1, it is characterised in that: concrete boss (2) uses fills C25 concrete for making.
CN201610375079.5A 2016-05-31 2016-05-31 Double-walled steel cofferdam Pending CN105862892A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610375079.5A CN105862892A (en) 2016-05-31 2016-05-31 Double-walled steel cofferdam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610375079.5A CN105862892A (en) 2016-05-31 2016-05-31 Double-walled steel cofferdam

Publications (1)

Publication Number Publication Date
CN105862892A true CN105862892A (en) 2016-08-17

Family

ID=56641782

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610375079.5A Pending CN105862892A (en) 2016-05-31 2016-05-31 Double-walled steel cofferdam

Country Status (1)

Country Link
CN (1) CN105862892A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111206606A (en) * 2020-01-09 2020-05-29 海达建设集团有限公司 Construction method of deep water foundation pit cofferdam of large-scale foundation of bridge

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101368389A (en) * 2008-09-24 2009-02-18 中铁大桥局集团第五工程有限公司 Single and double-wall combined steel cofferdam construction method and its single and double-wall combined steel cofferdam
CN201713824U (en) * 2010-06-22 2011-01-19 中交武汉港湾工程设计研究院有限公司 Detachable reusable double-wall steel cofferdam
CN201883444U (en) * 2010-11-11 2011-06-29 中铁十三局集团有限公司 Double-wall steel cofferdam for underwater low pile cap
CN203701117U (en) * 2014-02-28 2014-07-09 中铁八局集团第一工程有限公司 Integrated double-layer thin-wall cofferdam
CN204000905U (en) * 2014-06-16 2014-12-10 中交武汉港湾工程设计研究院有限公司 A kind of Double-Wall Steel Boxed Cofferdam with binder deep water bearing platform construction
CN205035815U (en) * 2015-07-16 2016-02-17 中铁大桥局集团有限公司 Steel reinforced concrete combination cofferdam
CN205134342U (en) * 2015-09-09 2016-04-06 上海城建市政工程(集团)有限公司 Large -tonnage list double -walled combines steel cofferdam

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101368389A (en) * 2008-09-24 2009-02-18 中铁大桥局集团第五工程有限公司 Single and double-wall combined steel cofferdam construction method and its single and double-wall combined steel cofferdam
CN201713824U (en) * 2010-06-22 2011-01-19 中交武汉港湾工程设计研究院有限公司 Detachable reusable double-wall steel cofferdam
CN201883444U (en) * 2010-11-11 2011-06-29 中铁十三局集团有限公司 Double-wall steel cofferdam for underwater low pile cap
CN203701117U (en) * 2014-02-28 2014-07-09 中铁八局集团第一工程有限公司 Integrated double-layer thin-wall cofferdam
CN204000905U (en) * 2014-06-16 2014-12-10 中交武汉港湾工程设计研究院有限公司 A kind of Double-Wall Steel Boxed Cofferdam with binder deep water bearing platform construction
CN205035815U (en) * 2015-07-16 2016-02-17 中铁大桥局集团有限公司 Steel reinforced concrete combination cofferdam
CN205134342U (en) * 2015-09-09 2016-04-06 上海城建市政工程(集团)有限公司 Large -tonnage list double -walled combines steel cofferdam

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111206606A (en) * 2020-01-09 2020-05-29 海达建设集团有限公司 Construction method of deep water foundation pit cofferdam of large-scale foundation of bridge

Similar Documents

Publication Publication Date Title
CN203701296U (en) Y-shaped plane anti-buckling tubular joint of rectangular steel pipe structure
CN104912197A (en) Connecting node for steel pipe concrete post and outside U-shaped steel and concrete composite beam
CN203701297U (en) KT-shaped space buckling-resisting tubular joint of rectangular steel tube structure
CN203487698U (en) Web punching profiled steel sheet combination beam with stiffening ribs
CN102943536B (en) A kind of fabricated assembly overall shear wall
CN102877549B (en) A kind of steel core concrete column and the rigid connection node of girder steel
CN105862892A (en) Double-walled steel cofferdam
CN109610654A (en) Prefabricated assembled double steel plate concrete shear force wall connection component and its application method
CN207160270U (en) A kind of precast concrete shear wall profile steel joint attachment structure
CN203701298U (en) T-shaped plane buckling-resisting tubular joint of rectangular steel tube structure
CN108867885A (en) The damping energy dissipation assembly node and its construction method of prefabricated post and integral preform beam slab
CN104947802A (en) Node for connecting concrete-filled steel tube column and external wrapping U-shaped steel concrete composite beam
CN202672353U (en) Panel constraint type concrete filled steel tube composite column-steel beam joint
CN202299410U (en) Supporting structure of lower conical shell moldboard for large-tonnage inverted cone water tower water tank
CN111395548A (en) Reinforced steel column and ECC concrete combined joint and construction method thereof
CN204001741U (en) Clear-water concrete connects wall column formwork
CN206408758U (en) A kind of concrete-filled circular steel tube column connecting node construction
CN201614601U (en) Well lid structure
CN205045278U (en) But integral hoisting's spherical tank
CN205330003U (en) Carbon fiber thin wall steel tube concrete combination column of built -in FRP section bar
CN204570721U (en) Major diameter sill anchor constructs
CN212224233U (en) Reinforced steel column and ECC concrete combined node
CN107178149A (en) Fork-shaped steel reinforced concrete combining structure and its construction method
CN207499155U (en) The Core Walls Structure formwork erecting structure of built-in reinforcing bar
CN204454360U (en) A kind of tower crane

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20160817

RJ01 Rejection of invention patent application after publication