Double-wall steel cofferdam construction multifunctional platform and construction method thereof Download PDF

Info

Publication number
CN103397649B
CN103397649B CN201310359394.5A CN201310359394A CN103397649B CN 103397649 B CN103397649 B CN 103397649B CN 201310359394 A CN201310359394 A CN 201310359394A CN 103397649 B CN103397649 B CN 103397649B
Authority
CN
China
Prior art keywords
platform
steel cofferdam
rail
steel
drilling platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310359394.5A
Other languages
Chinese (zh)
Other versions
CN103397649A (en
Inventor
田继开
傅战工
宋小三
马涛
郑大超
刘润泽
何加江
赵小静
李陆平
张耀
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Major Bridge Engineering Group Co Ltd MBEC
Original Assignee
China Railway Major Bridge Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Major Bridge Engineering Co Ltd filed Critical China Railway Major Bridge Engineering Co Ltd
Priority to CN201310359394.5A priority Critical patent/CN103397649B/en
Publication of CN103397649A publication Critical patent/CN103397649A/en
Application granted granted Critical
Publication of CN103397649B publication Critical patent/CN103397649B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a double-wall steel cofferdam construction multifunctional platform which adopts the scheme that a bottom isolation cabin is arranged at the bottom of the inner side of the steel cofferdam; a plurality rows of uprights vertical to the upper surface of the bottom isolation cabin are arranged on the bottom isolation cabin; a horizontal track beam is mounted at the tops of each row of the uprights; a steel rail parallel to each track beam is mounted at the top of each track beam; a moving joist barrow is arranged on each steel rail; a plurality of horizontal bearing beams are arranged on the inner wall of the steel cofferdam; drilling platform main beams are erected at the tops of the bearing beams, and are erected at the tops of the track beams; a plurality of vertical steel casings are mounted on the drilling platform main beams. According to the invention, the uprights and track beams fixed at the tops of the uprights are arranged inside the steel cofferdam, and a mud suction platform and a drilling platform can be erected on the track beams in sequence, so that mud suction platform dismantling time can be shortened, and drilling platform mounting time can be reduced; besides, the use quantity of steel materials can be reduced and manufacturing cost is reduced as the mud suction platform and the drilling platform can be combined.

Description

Double-wall steel cofferdam construction multifunctional platform and construction method thereof
Technical field
The present invention relates to cofferdam, be specifically related to double-wall steel cofferdam construction multifunctional platform and construction method thereof.
Background technology
Cofferdam refers in hydraulic engineering construction, for building permanent water conservancy projects, and the provisional building enclosure of building.Its effect be prevent water and soil from entering building build position so that at cofferdam internal drainage, excavation pit, builds building.Generally be mainly used in waterwork, except the part as formal building, cofferdam is generally removed after being finished.During the pile foundation in water plinth construction first cofferdam rear platform construction method of employing, need to arrange on steel cofferdam and inhale mud platform, inhale mud and make sinking of cofferdam to design altitude.After sinking of cofferdam to design altitude, inserted to play steel pile casting, installs drilling platform girder, forms drilling platform.Traditional way inhales mud platform and drilling platform need be provided separately, very inconvenient, and rolled steel dosage is large, and operating expenses is high.
Summary of the invention
Technical problem to be solved by this invention solves in hydraulic engineering cofferdam construction to inhale mud platform with drilling platform need be provided separately, very inconvenient, and rolled steel dosage is greatly, the problem that operating expenses is high,
In order to solve the problems of the technologies described above, the technical solution adopted in the present invention is to provide a kind of double-wall steel cofferdam construction multifunctional platform, steel cofferdam inside bottom is provided with end separation, separation of the described end is provided with the column of many rows perpendicular to its upper surface, column in described often row is uniformly distributed, row and row be arranged in parallel, described top of often arranging column is provided with a horizontally disposed track girder, the top of described every root track girder is provided with 1 rail parallel with it, described rail is provided with mobile purlin car, described steel cofferdam inwall is provided with many horizontally disposed bearing beams, the inwall that the two ends of described bearing beam are fixed on described steel cofferdam is parallel to each other, described bearing beam top is erected with drilling platform girder, described drilling platform girder is erected on the top of described track girder simultaneously, described drilling platform erection of main beam has multiple vertically disposed steel pile casting.
In such scheme, described mobile purlin car comprises purlin car owner's beam, distribution beam, aisle beam, case backbar out of shape, case out of shape and multiple electric block, described case out of shape slides and is arranged at the upper surface of described rail, described box top out of shape is provided with case backbar out of shape, described purlin car owner's beam is vertically fixed on described case backbar top out of shape and is horizontally disposed with, described aisle beam is fixed on bottom the car owner's beam of described purlin, described electric block is installed on the beam of described aisle, and described distribution beam is installed on the car owner's beam of described purlin.
In such scheme, described each mobile purlin car is provided with 3 electric blocks.
In such scheme, described column is two rows, and described mobile purlin car is 3, and the quantity of described bearing beam is 4.
Present invention also offers a kind of construction method utilizing double-wall steel cofferdam construction multifunctional platform as claimed in claim 1, comprise the following steps: at track back, portion sets up rail, rail is installed mobile purlin car, formed and inhale mud platform, utilize mobile purlin car lifting mud-sucking device to move on rail and carry out suction mud, drop to according to steel cofferdam the height set in advance and remove mobile purlin car and rail successively, plug-in mounting steel pile casting, the inwall of steel cofferdam arranges the bearing beam paralleled with described track girder, drilling platform girder is set up at the top of track girder and bearing beam in position according to steel pile casting, form drilling platform, carry out drilling construction.
The present invention, because be provided with many root posts and be fixed on the track girder at its top in steel cofferdam, suction mud platform and drilling platform can successively be set up on track girder, thus reduce the suction mud platform removal time, also reduce the drilling platform set-up time simultaneously, inhale mud platform to combine with drilling platform, can also rolled steel dosage be reduced, reduce cost.
Accompanying drawing explanation
Fig. 1 is the schematic diagram inhaling mud platform in the present invention;
Fig. 2 is the schematic top plan view of inhaling mud platform in the present invention;
Fig. 3 is the schematic side view of inhaling mud platform in the present invention;
Fig. 4 is the schematic side view of mobile purlin car in the present invention;
Fig. 5 is the generalized section of mobile purlin car in the present invention;
Fig. 6 is the schematic diagram of drilling platform in the present invention;
Fig. 7 is the schematic side view of inhaling mud platform in the present invention;
Fig. 8 is the schematic top plan view of inhaling mud platform in the present invention;
In figure: 1-steel cofferdam, 2-end separation, 3-column, 4-track girder, 5-mobile purlin car, 51-purlin car owner's beam, 52-distribution beam, 53-aisle beam, 54-case backbar out of shape, 55-drive case out of shape, 6-rail, 7-drilling platform girder, 8-bearing beam.
Detailed description of the invention
Below in conjunction with accompanying drawing, the present invention is described in detail.
As shown in Figure 1, Figure 2, shown in Fig. 3, Fig. 6, Fig. 7, Fig. 8, Double-Wall Steel Boxed Cofferdam 1 provided by the invention is constructed multifunctional platform, steel cofferdam 1 inside bottom is provided with end separation 2, end separation 2 is provided with the column 3 of 2 rows perpendicular to its upper surface, and the column 3 often in row is uniformly distributed, and row and row be arranged in parallel, the top of often arranging column 3 is provided with a horizontally disposed track girder 4, the top of every root track girder 4 is provided with 1 rail 6 parallel with it, and rail 6 is provided with mobile purlin car 5, and mobile purlin car 5 is 3.Steel cofferdam 1 inwall is provided with 2 horizontally disposed bearing beams 8, parallel with track girder 4 on the inwall that the two ends of bearing beam 8 are fixed on steel cofferdam 1, bearing beam 8 top is erected with drilling platform girder 7, drilling platform girder 7 is erected on the top of track girder 4 simultaneously, and drilling platform girder 7 is provided with multiple vertically disposed steel pile casting.
As shown in Figure 4, Figure 5, mobile purlin car 5 comprises purlin car owner's beam 51, distribution beam 52, aisle beam 53, case backbar 54 out of shape, case out of shape 55 and multiple electric block, case out of shape slides and is arranged at the upper surface of rail 6, drives case out of shape, mobile purlin car 5 can be made to move along rail 6.Box top out of shape is provided with case backbar out of shape, and purlin car owner's beam 51 is vertically fixed on case backbar top out of shape and is horizontally disposed with, and aisle beam 53 is fixed on bottom purlin car owner's beam 51, and electric block is installed on aisle beam 53, and distribution beam 52 is installed on purlin car owner's beam 51.Each mobile purlin car 5 is provided with 3 electric blocks.
During construction, first set up rail 6 at the top of track girder 4, then on rail 6, install mobile purlin car 5, mobile purlin car 5 can move along rail 6, is formed and inhales mud platform.Then utilize mobile purlin car 5 to promote suction mud equipment to move on rail 6, inhale mud on a large scale, steel cofferdam 1 is sunk fast.After steel cofferdam 1 sinks down into design altitude, remove mobile purlin car 5, inserted to play steel pile casting, steel cofferdam 1 borehole wall arranges bearing beam 8, then lay drilling platform girder 7 according to the position of steel pile casting, track girder 4, bearing beam 8 provide fulcrum for drilling platform girder 7, form drilling platform.The present invention, because be provided with many root posts 3 and be fixed on the track girder 4 at its top in steel cofferdam 1, suction mud platform and drilling platform can successively be set up on track girder 4, thus reduce the suction mud platform removal time, also reduce the drilling platform set-up time simultaneously, inhale mud platform to combine with drilling platform, can also rolled steel dosage be reduced, reduce cost.
The present invention is not limited to above-mentioned preferred forms, and anyone should learn the structure change made under enlightenment of the present invention, and every have identical or close technical scheme with the present invention, all falls within protection scope of the present invention.

Claims (5)

1. double-wall steel cofferdam construction multifunctional platform, steel cofferdam inside bottom is provided with end separation, it is characterized in that,
Separation of the described end is provided with the column of many rows perpendicular to its upper surface, column in described often row is uniformly distributed, row and row be arranged in parallel, described top of often arranging column is provided with a horizontally disposed track girder, the top of described every root track girder is provided with 1 rail parallel with it, described rail is provided with mobile purlin car
Described steel cofferdam inwall is provided with many horizontally disposed bearing beams, parallel with described track girder on the inwall that the two ends of described bearing beam are fixed on described steel cofferdam, described bearing beam top is erected with drilling platform girder, described drilling platform girder is erected on the top of described track girder simultaneously, and described drilling platform erection of main beam has multiple vertically disposed steel pile casting.
2. double-wall steel cofferdam construction multifunctional platform as claimed in claim 1, it is characterized in that, described mobile purlin car comprises purlin car owner's beam, distribution beam, aisle beam, case backbar out of shape, case out of shape and multiple electric block, described case out of shape slides and is arranged at the upper surface of described rail, described box top out of shape is provided with case backbar out of shape, described purlin car owner's beam is vertically fixed on described case backbar top out of shape and is horizontally disposed with, described aisle beam is fixed on bottom the car owner's beam of described purlin, described electric block is installed on the beam of described aisle, described distribution beam is installed on the car owner's beam of described purlin.
3. double-wall steel cofferdam construction multifunctional platform as claimed in claim 2, it is characterized in that, described each mobile purlin car is provided with 3 electric blocks.
4. double-wall steel cofferdam construction multifunctional platform as claimed in claim 1, it is characterized in that, described column is two rows, and described mobile purlin car is 3, and the quantity of described bearing beam is 2.
5. utilize the construction method of double-wall steel cofferdam construction multifunctional platform as claimed in claim 1, it is characterized in that, comprise the following steps:
At track back, portion sets up rail, and rail is installed mobile purlin car, is formed and inhales mud platform, and utilize mobile purlin car lifting mud-sucking device to move on rail and carry out suction mud, the steel cofferdam falling head according to setting in advance removes mobile purlin car and rail successively,
Plug-in mounting steel pile casting, the inwall of steel cofferdam arranges the bearing beam paralleled with described track girder, and drilling platform girder is set up at the top of track girder and bearing beam in the position according to steel pile casting, forms drilling platform, carries out drilling construction.
CN201310359394.5A 2013-08-16 2013-08-16 Double-wall steel cofferdam construction multifunctional platform and construction method thereof Active CN103397649B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310359394.5A CN103397649B (en) 2013-08-16 2013-08-16 Double-wall steel cofferdam construction multifunctional platform and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310359394.5A CN103397649B (en) 2013-08-16 2013-08-16 Double-wall steel cofferdam construction multifunctional platform and construction method thereof

Publications (2)

Publication Number Publication Date
CN103397649A CN103397649A (en) 2013-11-20
CN103397649B true CN103397649B (en) 2015-04-29

Family

ID=49561344

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310359394.5A Active CN103397649B (en) 2013-08-16 2013-08-16 Double-wall steel cofferdam construction multifunctional platform and construction method thereof

Country Status (1)

Country Link
CN (1) CN103397649B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103835300B (en) * 2014-01-22 2015-12-23 中铁大桥局集团第五工程有限公司 Without inner support double-walled fore shaft steel boxed cofferdam construction method and cofferdam thereof
CN106638688B (en) * 2016-11-16 2018-11-02 上海建工二建集团有限公司 Purlin vehicle type closure construction system and its construction method
CN112663647B (en) * 2020-12-18 2022-07-01 中铁大桥局集团有限公司 Modular platform for open caisson soil borrowing construction and using method thereof

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006249685A (en) * 2005-03-08 2006-09-21 Jfe Engineering Kk Cofferdam construction method for underwater structure, and structure for cofferdam
CN101182718A (en) * 2007-12-05 2008-05-21 中铁大桥局股份有限公司 Under water putting down construction method of large-sized double-walled steel suspension box-cofferdam
CN201292533Y (en) * 2008-08-25 2009-08-19 中铁大桥局股份有限公司 Composite type casing box cofferdam
CN101974913A (en) * 2010-10-15 2011-02-16 中铁三局集团有限公司 Parallel construction method of bridge deepwater foundation bored pile and cofferdam
CN201883444U (en) * 2010-11-11 2011-06-29 中铁十三局集团有限公司 Double-wall steel cofferdam for underwater low pile cap
CN102251530A (en) * 2011-04-27 2011-11-23 中铁二十局集团第二工程有限公司 Construction process of double-wall steel cofferdam for construction of pier bearing platform in main river water of Yellow River
CN202577325U (en) * 2012-05-16 2012-12-05 科达集团股份有限公司 Cofferdam collaborative operation device of steel pipe pile platform and steel board pile
CN102817342A (en) * 2012-08-27 2012-12-12 中铁九桥工程有限公司 Construction technology of in-situ assembly under pile foundation construction platform of double-wall steel cofferdam
CN103243726A (en) * 2013-05-20 2013-08-14 中铁大桥局集团第一工程有限公司 Construction method for integrally and downward putting cofferdam ring beams by means of continuous jack method

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006249685A (en) * 2005-03-08 2006-09-21 Jfe Engineering Kk Cofferdam construction method for underwater structure, and structure for cofferdam
CN101182718A (en) * 2007-12-05 2008-05-21 中铁大桥局股份有限公司 Under water putting down construction method of large-sized double-walled steel suspension box-cofferdam
CN201292533Y (en) * 2008-08-25 2009-08-19 中铁大桥局股份有限公司 Composite type casing box cofferdam
CN101974913A (en) * 2010-10-15 2011-02-16 中铁三局集团有限公司 Parallel construction method of bridge deepwater foundation bored pile and cofferdam
CN201883444U (en) * 2010-11-11 2011-06-29 中铁十三局集团有限公司 Double-wall steel cofferdam for underwater low pile cap
CN102251530A (en) * 2011-04-27 2011-11-23 中铁二十局集团第二工程有限公司 Construction process of double-wall steel cofferdam for construction of pier bearing platform in main river water of Yellow River
CN202577325U (en) * 2012-05-16 2012-12-05 科达集团股份有限公司 Cofferdam collaborative operation device of steel pipe pile platform and steel board pile
CN102817342A (en) * 2012-08-27 2012-12-12 中铁九桥工程有限公司 Construction technology of in-situ assembly under pile foundation construction platform of double-wall steel cofferdam
CN103243726A (en) * 2013-05-20 2013-08-14 中铁大桥局集团第一工程有限公司 Construction method for integrally and downward putting cofferdam ring beams by means of continuous jack method

Also Published As

Publication number Publication date
CN103397649A (en) 2013-11-20

Similar Documents

Publication Publication Date Title
CN101418573B (en) Caisson structure and method for smoothly and accurately sinking caisson structure into earth surface
CN105155549A (en) Partition support system for large-area deep foundation pit under forward and backward working condition, and construction method thereof
CN204343301U (en) A kind of Metro station excavation excavation supporting structure
CN103397649B (en) Double-wall steel cofferdam construction multifunctional platform and construction method thereof
CN104480803A (en) Medium-and-low speed magnetic levitation railway low route continuous arched supporting rail beam structure and construction method
CN203654294U (en) Foundation pit supporting structure used in reverse building method
CN203021923U (en) Big cantilever bent cap steel truss construction platform
CN103541371B (en) Bearing platform for heating pipe channels to stride reserved subway station and construction method thereof
CN204715366U (en) A kind of large-area deep foundation pit subregion is along the support system under inverse operating mode
CN203475465U (en) Sinking type tower crane foundation
CN205100119U (en) Steel form device in self -propelled
CN104195956A (en) Scaffolding type water area continuous beam cast-in-situ supporting frame and erection method thereof
CN204282399U (en) A kind of subway space enclosing structure
CN107975017B (en) Locking method and structure of tailrace water tunnel maintenance gate
CN202125061U (en) Scaffold of large-space concrete structure
CN203834487U (en) Section steel inner brace and Lassen pile support for excavation of dumbbell-shaped deep and large foundation pit
CN204174854U (en) A kind of vertical fragmentation Assembled rotary cat ladder
CN102535535B (en) Construction method of pre-building supported and settled foundation on ground and fixing after pre-pressing for high-rise building with basement
CN204780941U (en) Foundation ditch envelope
CN201176597Y (en) Sinking well structure
CN104278689B (en) Box-type substation and wind generator facility mutual foundation device and construction method thereof
CN203769826U (en) Lateral type tunnel fan erecting device
CN105370307A (en) Support technology for coal face to pass through superelevation section
CN103590591B (en) Construct to face and build save land section steel platform and construction method thereof
CN204304374U (en) For laying the cable passage of transformer station's outlet high-tension cable

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: GROUP CO., LTD., ZHONGTIE DAQIAO BUREAU

Free format text: FORMER OWNER: CHINA ZHONGTIE MAJOR BRIDGE ENGINEERING CO., LTD.

Effective date: 20150529

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 430074 WUHAN, HUBEI PROVINCE TO: 430050 WUHAN, HUBEI PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20150529

Address after: 430050 Hanyang Road, Hanyang District, Hubei, No. 38, No.

Patentee after: Group Co., Ltd., Zhongtie Daqiao Bureau

Address before: 430074 Hubei province Wuhan Dongxin East Lake New Technology Development Zone Road SBI Venture Street No. 6 Building 12 layer

Patentee before: China Zhongtie Major Bridge Engineering Co., Ltd.