CN201865051U - Steel suspension box - Google Patents

Steel suspension box Download PDF

Info

Publication number
CN201865051U
CN201865051U CN2010206018631U CN201020601863U CN201865051U CN 201865051 U CN201865051 U CN 201865051U CN 2010206018631 U CN2010206018631 U CN 2010206018631U CN 201020601863 U CN201020601863 U CN 201020601863U CN 201865051 U CN201865051 U CN 201865051U
Authority
CN
China
Prior art keywords
steel box
construction
skeleton
model
box
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010206018631U
Other languages
Chinese (zh)
Inventor
熊仕伶
王艳华
吕延
刘海龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Road and Bridge Corp
China Communications Construction Co Ltd
Original Assignee
China Road and Bridge Corp
China Communications Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Road and Bridge Corp, China Communications Construction Co Ltd filed Critical China Road and Bridge Corp
Priority to CN2010206018631U priority Critical patent/CN201865051U/en
Application granted granted Critical
Publication of CN201865051U publication Critical patent/CN201865051U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

The utility model provides a steel suspension box which comprises a bottom plate and a wall board, and is characterized by further comprising a framework, an internal support and a main beam.

Description

A kind of steel box
Technical field
The utility model relates to the over-water construction technology, particularly relates to a kind of steel box that is applicable to subaqueous construction.
Background technology
Construct on over-water construction and the traditional road and compare, has the construction environment complexity, execution conditions are abominable, meteorological condition is changeable, unhandy shortcoming is especially for the pier stud construction of bearing large bridge, the large steel suspension box integral construction method that adopts at present, utilize the steel box construction of integral solder, transportation by driving, crane barge installation on the bank, can improve processing conditions.Improve efficiency of construction, improve construction quality.
The steel box is to realize the key structure of subaqueous construction to the over-water construction conversion as the water-bound that encloses of large span deep water bridge pile foundation highrise pile cap construction, and the bed rearrangement bridge construction is played crucial effects.Employing has end double-walled steel box to enclose water-bound as bearing platform construction, and its processing, transportation and installation quality are decision bearing platform construction key of success.
Summary of the invention
The purpose of this utility model is to provide a kind of steel box that is applicable to large steel suspension box integral construction method.
The technical solution of the utility model is as follows:
A kind of steel box, described steel box comprises base plate and wallboard, also comprises skeleton, interior support and girder.
Described skeleton comprises main framing and time skeleton.
The interior outside of described steel box is provided with support.
Technique effect of the present utility model is as follows:
The utility model provides a kind of novel steel box, by girder, main framing, inferior skeleton are set, and inside and outside support is set all, the rigidity of structure that can better adapt to large steel suspension box, adapt to and carry out integral body processing on the coast, then with the steel box finished through the water mode be transported to the job site and carry out installation, to improve construction speed, raise the efficiency.
Description of drawings
Figure 1 shows that structural representation of the present utility model.
The specific embodiment
Below in conjunction with accompanying drawing the utility model is described further.
Steel box 1 inside comprises girder 2, and main framing 3, inferior skeleton 4, supports 5 and outer the support in also including.
Its middle girder 2 can adopt the shaped steel preparation of big model, and is welded in the inside of steel box.Main framing 3 and time skeleton 4 can adopt the shaped steel preparation of model less than girder 2, and are weldingly fixed on the inside panel of steel box.

Claims (3)

1. steel box, described steel box comprises base plate and wallboard, it is characterized in that: described steel box also comprises skeleton, interior support and girder.
2. steel box as claimed in claim 1 is characterized in that: described skeleton comprises main framing and time skeleton.
3. steel box as claimed in claim 2 is characterized in that: the interior outside of described steel box is provided with support.
CN2010206018631U 2010-11-11 2010-11-11 Steel suspension box Expired - Fee Related CN201865051U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010206018631U CN201865051U (en) 2010-11-11 2010-11-11 Steel suspension box

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010206018631U CN201865051U (en) 2010-11-11 2010-11-11 Steel suspension box

Publications (1)

Publication Number Publication Date
CN201865051U true CN201865051U (en) 2011-06-15

Family

ID=44136211

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010206018631U Expired - Fee Related CN201865051U (en) 2010-11-11 2010-11-11 Steel suspension box

Country Status (1)

Country Link
CN (1) CN201865051U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103243727A (en) * 2013-05-28 2013-08-14 中交路桥华南工程有限公司 Vertical rotation method for cofferdam
CN103255775A (en) * 2013-05-28 2013-08-21 中交路桥华南工程有限公司 Method for installing cofferdam

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103243727A (en) * 2013-05-28 2013-08-14 中交路桥华南工程有限公司 Vertical rotation method for cofferdam
CN103255775A (en) * 2013-05-28 2013-08-21 中交路桥华南工程有限公司 Method for installing cofferdam

Similar Documents

Publication Publication Date Title
CN101798815B (en) Marine wind turbine foundation for steel-concrete combined structure
CN101761090A (en) Space truss multi-barrel base of offshore wind power unit
CN201679147U (en) Underpinning structure for superstructure shear wall during underground top-down construction of high-rise building
CN201722776U (en) Beam column nodal point suitable for square steel pipe column
CN103423093B (en) Platform floating type wind driven generator provided with suction caissons and used for sea surface of deep sea
CN201865051U (en) Steel suspension box
CN102852156A (en) Composite pile foundation structure
CN202227360U (en) Wide-span prestressed concrete pile beam plate structure used for grounds of buildings, workshops, etc.
CN201593193U (en) Space truss type multi-bucket foundation of seaborne wind-power generator unit
CN201713827U (en) Fan base structure of offshore wind power station
CN203066090U (en) Assembled bracing structure for steel sheet piling cofferdam construction
CN201794087U (en) Cylindrical foundation component
CN107795438B (en) A kind of construction method of assistance platform
CN102808419B (en) Combined pile foundation structure
CN203007965U (en) Steel hanging box system for underwater high-rise pile cap construction
CN201746847U (en) Combined multifunctional base of tower crane
CN206052562U (en) Thin-walled hollow pier capping beam profile steel bracket
CN101984203A (en) Technique for refurbishment and reconstruction of old buildings in old quarters
CN201554033U (en) Tower crane foundation for deep foundation ditch
CN202450543U (en) Foundation structure of novel guide frame-type marine anemometer tower
CN201187051Y (en) Deep water bridge foundation construction multifunctional drill platform top board
CN205134352U (en) Bored pile basis is united to only post of narrow ji ta
CN210827544U (en) Composite foundation for improving bearing performance of cylindrical foundation by using auxiliary piles
CN203684191U (en) Fan construction system of offshore intertidal zone
CN202430700U (en) Continuous lifting device for large-tonnage upper assembly block of ocean platform

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110615

Termination date: 20121111