CN109537443A - Bridge pier anticollision device, collision-prevention device and its construction method - Google Patents

Bridge pier anticollision device, collision-prevention device and its construction method Download PDF

Info

Publication number
CN109537443A
CN109537443A CN201811623722.7A CN201811623722A CN109537443A CN 109537443 A CN109537443 A CN 109537443A CN 201811623722 A CN201811623722 A CN 201811623722A CN 109537443 A CN109537443 A CN 109537443A
Authority
CN
China
Prior art keywords
wall body
bridge pier
collision
several
prevention device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811623722.7A
Other languages
Chinese (zh)
Inventor
种爱秀
田雨金
韩治忠
陈建荣
汤叶帅
陈子阳
周胜国
杨帆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Second Harbor Engineering Co
CCCC SHEC Fourth Engineering Co Ltd
Original Assignee
CCCC Second Harbor Engineering Co
CCCC SHEC Fourth Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Second Harbor Engineering Co, CCCC SHEC Fourth Engineering Co Ltd filed Critical CCCC Second Harbor Engineering Co
Priority to CN201811623722.7A priority Critical patent/CN109537443A/en
Publication of CN109537443A publication Critical patent/CN109537443A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/02Piers; Abutments ; Protecting same against drifting ice
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/20Equipment for shipping on coasts, in harbours or on other fixed marine structures, e.g. bollards
    • E02B3/26Fenders
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/02Restraining of open water
    • E02D19/04Restraining of open water by coffer-dams, e.g. made of sheet piles
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/30Adapting or protecting infrastructure or their operation in transportation, e.g. on roads, waterways or railways

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Architecture (AREA)
  • Environmental & Geological Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a kind of bridge pier anticollision device, collision-prevention device and its construction methods, belong to bridge auxiliary equipment field, anticollision device, collision-prevention device includes the wall body enclosed around bridge pier one, wall body outer wall is provided with several shield strings, wall body is the double-layer structure for including exterior panel and inside panel, is connected and is supported by several supporting beams between inside and outside siding, and the interlayer space between inside and outside siding is circumferentially separated into several compartments by several partition panels along wall body, and each compartment lower part is poured concrete, top fills sand.Construction method successively includes construction pier cap steel cofferdam;Steel cofferdam sinks;It is poured bottom concrete and cushion cap;Bridge Pier Construction finishes, the wall body of steel cofferdam and thereon anticollision device, collision-prevention device of the shield string as bridge pier.The present invention had not only had good anti-collision effect, but also greatly reduced itself steel construction investment, reduced installation cost, mitigated lifting weight, and improve construction effect.

Description

Bridge pier anticollision device, collision-prevention device and its construction method
Technical field
The invention belongs to bridge auxiliary equipment field more particularly to bridge pier anticollision device, collision-prevention devices.
Background technique
As transportation develops, the number of navigation ship and bridge is all greatly increased, the probability of ship from colliding bridge In the trend of cumulative year after year, the design of bridge anti-collision device is necessary.
Conventional anti-collision facility design considers itself steel construction of the anti-collision body of special steel construction mainly to resist ship impact force, steel Structural collision protection body structure size is big, and processing and scene decentralization project amount are larger.
Summary of the invention
It is an object of the invention to: it proposes a kind of bridge pier anticollision device, collision-prevention device and its construction method, has both had good anti- Effect is hit, and greatly reduces itself steel construction investment, reduces installation cost, mitigates lifting weight, and improve construction effect, separately The external bearing platform construction phase, anticollision device, collision-prevention device can be used as water-retaining cofferdam come using.
The object of the invention is realized by following technical proposals:
A kind of bridge pier anticollision device, collision-prevention device construction method, successively the following steps are included:
A. construct pier cap steel cofferdam, steel cofferdam includes enclosing outer Monday closed wall body, inner support wall body it is several Several shield strings of several guiding devices and the setting of wall body outer wall of steel pipe support and the setting of wall body inner wall;Wall body be include outer wall The double-layer structure of plate and inside panel is connected between inside and outside siding by several supporting beams and is supported, and the interlayer between inside and outside siding is empty Between be separated into several compartments by several partition panels along wall body is circumferential, and each compartment lower part is poured concrete, and top fills sand;
B. steel cofferdam sinks;
C. bottom concrete and cushion cap are poured;
E. Bridge Pier Construction finishes, the wall body of steel cofferdam and thereon anticollision device, collision-prevention device of the shield string as bridge pier.
In the present invention program, traditional bridge pier anticollision mentality of designing is abandoned, anti-collision facility has been applied with cushion cap is used for The steel jacket box of work combines, by the steel cofferdam of script makeshift device, innovative design and as the anticollision of permanent installation fill Set, the device can the cofferdam as makeshift device and the anticollision device, collision-prevention device as permanent installation, both have both effect, at one stroke Two.Device uses main pier anticollision double-walled steel jacket box structure, creative in crash-proof steel bushing box design process to propose that " double-wall steel encloses In weir fill sand+casing outside be arranged shield string " structural measure, guarantee cover box structure energy dissipating while increase steel construction it is integrally rigid Degree greatly reduces itself steel construction investment, reduces installation cost, simultaneously because dead load is greatly reduced, alleviate lifting Weight, processing and scene decentralization project amount are greatly reduced, and achieve good economic effect.
Alternatively, in step b, guiding device one end is resisted against on several steel pile castings inside steel cofferdam, passes through guiding The guiding of device, steel cofferdam is sunk.In the program, guiding device is accurate for steel cofferdam, steadily sinks in place.
Alternatively, in step c, after being poured bottom concrete, steel pile casting exposure bottom concrete part is cut off, cuts off and leads To device, successively placement layer by layer cushion cap.
Alternatively, the linker being additionally provided on the wall body of steel cofferdam inside and outside connection wall body.
Alternatively, guiding device is equipped at least two layers along short transverse, and steel pipe support is equipped at least two layers along short transverse, And it is connected and fixed between the support of upper and lower level steel pipe also by vertical steel tube stay.In the program, overall structure is more stable and reliable.
A kind of bridge pier anticollision device, collision-prevention device, including the wall body enclosed around bridge pier one, wall body outer wall is provided with several shield strings, wall Body is the double-layer structure for including exterior panel and inside panel, is connected and is supported by several supporting beams between inside and outside siding, inside and outside siding Between interlayer space be separated into several compartments by several partition panels along wall body is circumferential, and each compartment lower part is poured coagulation Soil, top fill sand.
In the present invention program, each compartment lower part casting concrete is convenient for steel cofferdam sinking, while guarantor is played in counter blade foot position Shield effect, steel construction is destroyed when avoiding, and the antiseepage after destruction.Wall body top fills sand and had both increased steel construction entirety Rigidity, at the same when hitting again can effective energy dissipating, wall body outer wall setting shield string be further ensured that set box structure energy dissipating, lead to It crosses which and steel construction dosage is greatly reduced.The design of the structure of compartment and supporting beam, it is reliable not only to further ensure structure, but also Play the role of energy dissipating and Global Macros.
Alternatively, shield string is along the arranged circumferentially spaced lopping of wall body, and several circles are arranged in wall body short transverse.It should In scheme, shield string in the horizontal direction with comprehensive protection can be provided in short transverse.
As further selection, is filled in wall body and protect the whole that string covers bridge pier in wall body short transverse outside sand and wall body High-low water level constant interval.In the program, fills sand and shield string covers range of stage, regardless of water level changes, Dou Nengyou Effect protection bridge pier.
Alternatively, the supporting beam between inside and outside siding is using zigzag head and the tail connection arrangement.In the program, effectively take into account Structure is reliable and energy dissipating acts on.
Alternatively, shield string be rubber material, horizontal section be in hollow trapezoid shape, including towards two outside extend bottom edge, Inclined waist and the top margin parallel with bottom edge.In the program, the shield string of special designing being capable of most effectively energy dissipating.
The foregoing main solution of the present invention and further alternatives thereof can be freely combined to form multiple schemes, be this Invention can be used and claimed scheme;And it is of the invention, between (each non conflicting selection) selection and between other selections It can also be freely combined.Those skilled in the art, which can be illustrated after understanding the present invention program according to the prior art and common knowledge, to be had Multiple combinations are the claimed technical solution of the present invention, do not do exhaustion herein.
Beneficial effects of the present invention: not only having good anti-collision effect, but also greatly reduces itself steel construction investment, reduces Installation cost mitigates lifting weight, and improves construction effect.
Detailed description of the invention
Fig. 1 is the planar structure schematic diagram of the embodiment of the present invention;
Fig. 2 is the 1-1 schematic cross-sectional view of Fig. 1;
Fig. 3 is the planar structure schematic diagram of the shield string of the embodiment of the present invention;
1 it is wherein steel pipe support, 2 is guiding device, 3 is shield string, 31 is bottom edge, 32 is waist, and 33 be top margin, and 4 be wall body, 41 For exterior panel, 42 be inside panel, 5 is linker, 6 is supporting beam, 7 is partition panel, 8 is compartment, 9 is concrete, 10 is sand, 11 It is bottom concrete for steel pile casting, 12,13 be first layer cushion cap, 14 is second layer cushion cap.
Specific embodiment
Following non-limiting examples are for illustrating the present invention.
Embodiment 1:
Shown in 3, wherein left-half is cofferdam decentralization arrangement signal in Fig. 2, and right half part is bearing platform construction Arrangement signal, a kind of bridge pier anticollision device, collision-prevention device construction method, successively the following steps are included:
A. construction pier cap steel cofferdam, steel cofferdam include enclosing closed wall body 4 outer Monday, internal horizontal, longitudinal bracing wall Several guiding devices 2 of several 1 and 4 inner wall of the wall body setting of body 4 and several shield strings 3 of 4 outer wall of wall body setting;With reference to Fig. 3 Shown, shield string 3 is rubber material, and horizontal section is in hollow trapezoid shape, including the bottom edge 31 extended towards two outsides, inclined waist 32 And the top margin 33 parallel with bottom edge 31.Guiding device 2 is equipped at least two layers along 4 short transverse of wall body, and steel pipe support 1 is along height side It is connected and fixed to equipped at least two layers, and between upper and lower level steel pipe support 1 also by vertical steel tube stay 1.Refering to what is shown in Fig. 2, this reality It applies guiding device 2 in example to be equipped with two layers along short transverse, steel pipe support 1 is equipped with two layers along short transverse.Wall body 4 be include exterior panel 41 and inside panel 42 double-layer structure, the linker 5 being additionally provided on wall body 4 inside and outside connection wall body 4, between inside and outside siding 42,41 It is connected and is supported by several supporting beams 6, refering to what is shown in Fig. 1, the supporting beam 6 between inside and outside siding 42,41 is connected using zigzag head and the tail Connect arrangement.Interlayer space between inside and outside siding 42,41 is circumferentially separated into several compartments by several partition panels 7 along wall body 4 8, and 8 lower part of each compartment is poured concrete 9, top fills sand 10;
B. steel cofferdam sinks: 2 one end of guiding device is resisted against on several steel pile castings 11 inside steel cofferdam, is filled by guiding The guiding for setting 2, steel cofferdam is sunk.
C. bottom concrete 12 and cushion cap are poured: after casting bottom concrete 12, cutting off 11 exposure back cover coagulation of steel pile casting Native 12 parts, cut off guiding device 2, are successively poured first layer cushion cap 13 and second layer cushion cap 14.
E. Bridge Pier Construction finishes, the wall body 4 of steel cofferdam and thereon anticollision device, collision-prevention device of the shield string 3 as bridge pier.
Embodiment 2:
Shown in 3, a kind of bridge pier anticollision device, collision-prevention device, including the wall body 4 enclosed around bridge pier one, 4 outer wall of wall body Be provided with several shield strings 3, wall body 4 is the double-layer structure for including exterior panel 41 and inside panel 42, between inside and outside siding 42,41 by Several connections of supporting beam 6 support, and the interlayer space between inside and outside siding 42,41 is circumferentially divided by several partition panels 7 along wall body 4 Several compartments 8 are divided into, and 8 lower part of each compartment is poured concrete 9, top fills sand 10.Shield string 3 is set circumferentially-spacedly along wall body 4 It is set to circle, and several circles are set in 4 short transverse of wall body, is filled in wall body 4 and protects string 3 outside sand 10 and wall body 4 in 4 height of wall body Whole high-low water level constant intervals of bridge pier are covered on direction.Refering to what is shown in Fig. 1, steel cofferdam surrounds octagon, protect in the circumferential The substantially uniform distribution of string 3.Refering to what is shown in Fig. 2, arranging 3 layers in short transverse shield string 3.
Embodiment 3:
The present embodiment and embodiment 2 are almost the same, it is characterized in that: refering to what is shown in Fig. 1, between inside and outside siding 42,41 Supporting beam 6 uses zigzag head and the tail connection arrangement, effectively takes into account structure and reliably acts on energy dissipating.
Embodiment 4:
The present embodiment and embodiment 2 are almost the same, it is characterized in that: refering to what is shown in Fig. 3, shield string 3 is rubber material, water Flat section is in hollow trapezoid shape, including the bottom edge 31 extended towards two outsides, inclined waist 32 and the top margin 33 parallel with bottom edge 31. The shield string 3 of structure design being capable of most effectively energy dissipating.
The aforementioned embodiment of the present invention can be freely combined to form multiple embodiments, be that the present invention can be used and require to protect The embodiment of shield, does not do exhaustion herein, skilled person will appreciate that there is numerous combinations.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all in essence of the invention Made any modifications, equivalent replacements, and improvements etc., should all be included in the protection scope of the present invention within mind and principle.

Claims (10)

1. a kind of bridge pier anticollision device, collision-prevention device construction method, it is characterised in that successively the following steps are included:
A. construction pier cap steel cofferdam, steel cofferdam include outer Monday enclosing closed wall body, several steel pipes of inner support wall body Several shield strings of several guiding devices and the setting of wall body outer wall of support and the setting of wall body inner wall;Wall body be include exterior panel and The double-layer structure of inside panel is connected between inside and outside siding by several supporting beams and is supported, the interlayer space edge between inside and outside siding Wall body is circumferential to be separated into several compartments by several partition panels, and each compartment lower part is poured concrete, and top fills sand;
B. steel cofferdam sinks;
C. bottom concrete and cushion cap are poured;
E. Bridge Pier Construction finishes, the wall body of steel cofferdam and thereon anticollision device, collision-prevention device of the shield string as bridge pier.
2. bridge pier anticollision device, collision-prevention device construction method as described in claim 1, it is characterised in that: in step b, guiding device one End is resisted against on several steel pile castings inside steel cofferdam, and by the guiding of guiding device, steel cofferdam is sunk.
3. bridge pier anticollision device, collision-prevention device construction method as described in claim 1, it is characterised in that: in step c, casting back cover is mixed After solidifying soil, steel pile casting exposure bottom concrete part is cut off, cuts off guiding device, successively placement layer by layer cushion cap.
4. bridge pier anticollision device, collision-prevention device construction method as described in claim 1, it is characterised in that: also set on the wall body of steel cofferdam There is the linker inside and outside connection wall body.
5. bridge pier anticollision device, collision-prevention device construction method as described in claim 1, it is characterised in that: guiding device is along short transverse Equipped at least two layers, steel pipe support is equipped at least two layers along short transverse, and also by vertical steel tube stay between the support of upper and lower level steel pipe It is connected and fixed.
6. a kind of bridge pier anticollision device, collision-prevention device, it is characterised in that: including the wall body enclosed around bridge pier one, if wall body outer wall is provided with Dry shield string, wall body are the double-layer structure for including exterior panel and inside panel, are connected and are supported by several supporting beams between inside and outside siding, Interlayer space between inside and outside siding is circumferentially separated into several compartments, and each compartment lower part by several partition panels along wall body It is poured concrete, top fills sand.
7. bridge pier anticollision device, collision-prevention device as claimed in claim 6, it is characterised in that: shield string along wall body it is arranged circumferentially spaced at Circle, and several circles are set in wall body short transverse.
8. bridge pier anticollision device, collision-prevention device as claimed in claim 7, it is characterised in that: fill shield string outside sand and wall body in wall body and exist Whole high-low water level constant intervals of bridge pier are covered in wall body short transverse.
9. bridge pier anticollision device, collision-prevention device as claimed in claim 6, it is characterised in that: the supporting beam between inside and outside siding uses Z Font head and the tail connection arrangement.
10. bridge pier anticollision device, collision-prevention device as claimed in claim 6, it is characterised in that: shield string is rubber material, horizontal section In hollow trapezoid shape, including the bottom edge extended towards two outsides, inclined waist and the top margin parallel with bottom edge.
CN201811623722.7A 2018-12-28 2018-12-28 Bridge pier anticollision device, collision-prevention device and its construction method Pending CN109537443A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811623722.7A CN109537443A (en) 2018-12-28 2018-12-28 Bridge pier anticollision device, collision-prevention device and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811623722.7A CN109537443A (en) 2018-12-28 2018-12-28 Bridge pier anticollision device, collision-prevention device and its construction method

Publications (1)

Publication Number Publication Date
CN109537443A true CN109537443A (en) 2019-03-29

Family

ID=65857348

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811623722.7A Pending CN109537443A (en) 2018-12-28 2018-12-28 Bridge pier anticollision device, collision-prevention device and its construction method

Country Status (1)

Country Link
CN (1) CN109537443A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111778837A (en) * 2020-06-24 2020-10-16 浙江博澳节能科技有限公司 Bridge ship collision prevention structure
CN112609718A (en) * 2020-12-18 2021-04-06 中铁大桥局武汉桥梁特种技术有限公司 Steel jacket box anti-collision system and construction method thereof
CN115492141A (en) * 2022-10-21 2022-12-20 中铁二院工程集团有限责任公司 Steel suspension box cofferdam structure and bottom plate and construction method thereof
RU2809049C1 (en) * 2023-03-21 2023-12-06 Акционерное общество "Дороги и Мосты" Method for constructing bridge support in water area

Citations (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101144262A (en) * 2007-10-25 2008-03-19 中交第二航务工程局有限公司 Crash-proof steel bushing box and use thereof
KR100862902B1 (en) * 2008-03-11 2008-10-13 (주)다산컨설턴트 Installation structure of cofferdam using pile
CN101358453A (en) * 2008-08-21 2009-02-04 中铁大桥局股份有限公司 Composite boxed cofferdam and building method thereof
KR20090037114A (en) * 2007-10-11 2009-04-15 현대건설주식회사 Cofferdam, its construction method using sheet file and wale and construction method for underwater structure using the cofferdam
CN101649621A (en) * 2009-07-16 2010-02-17 招商局重庆交通科研设计院有限公司 Technology for constructing anti-collision bridge pier by steel cofferdam
CN101962954A (en) * 2010-09-27 2011-02-02 中铁大桥局集团第一工程有限公司 Cylindrical steel boxed cofferdam and construction method thereof
CN201883444U (en) * 2010-11-11 2011-06-29 中铁十三局集团有限公司 Double-wall steel cofferdam for underwater low pile cap
JP2011208389A (en) * 2010-03-29 2011-10-20 Nippon Steel & Sumikin Metal Products Co Ltd Self-standing cofferdam structure and self-standing cofferdam method
CN202482801U (en) * 2011-12-30 2012-10-10 南京工业大学 Buffering energy-absorbing type web reinforced composite material anti-collision device
CN103696400A (en) * 2014-01-02 2014-04-02 南京工业大学 Rotatable ship collision prevention device with fin plate energy dissipation type
CN103835300A (en) * 2014-01-22 2014-06-04 中铁大桥局集团第五工程有限公司 Inner-support-free double-wall locking mouth steel bushing box cofferdam construction method and cofferdam
CN204000695U (en) * 2014-07-14 2014-12-10 中国电建集团华东勘测设计研究院有限公司 Pier anticollision structure
CN204551266U (en) * 2015-01-27 2015-08-12 武汉二航路桥特种工程有限责任公司 One assembledly can recycle Double-Wall Steel Boxed Cofferdam without inner support
CN206204886U (en) * 2016-11-02 2017-05-31 西安中交土木科技有限公司 A kind of fixed flexible protection device for also serving as construction cofferdam
CN206204965U (en) * 2016-11-02 2017-05-31 西安中交土木科技有限公司 A kind of enhanced floating type flexible protection device of the outer wall for also serving as construction cofferdam
CN109056508A (en) * 2018-08-29 2018-12-21 中铁大桥局武汉桥梁特种技术有限公司 The construction method of the bridge pier of basic protection against erosion, bridge and underwater foundation protection against erosion
CN209703282U (en) * 2018-12-28 2019-11-29 中交二航局第四工程有限公司 Bridge pier anticollision device, collision-prevention device

Patent Citations (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20090037114A (en) * 2007-10-11 2009-04-15 현대건설주식회사 Cofferdam, its construction method using sheet file and wale and construction method for underwater structure using the cofferdam
CN101144262A (en) * 2007-10-25 2008-03-19 中交第二航务工程局有限公司 Crash-proof steel bushing box and use thereof
KR100862902B1 (en) * 2008-03-11 2008-10-13 (주)다산컨설턴트 Installation structure of cofferdam using pile
CN101358453A (en) * 2008-08-21 2009-02-04 中铁大桥局股份有限公司 Composite boxed cofferdam and building method thereof
CN101649621A (en) * 2009-07-16 2010-02-17 招商局重庆交通科研设计院有限公司 Technology for constructing anti-collision bridge pier by steel cofferdam
JP2011208389A (en) * 2010-03-29 2011-10-20 Nippon Steel & Sumikin Metal Products Co Ltd Self-standing cofferdam structure and self-standing cofferdam method
CN101962954A (en) * 2010-09-27 2011-02-02 中铁大桥局集团第一工程有限公司 Cylindrical steel boxed cofferdam and construction method thereof
CN201883444U (en) * 2010-11-11 2011-06-29 中铁十三局集团有限公司 Double-wall steel cofferdam for underwater low pile cap
CN202482801U (en) * 2011-12-30 2012-10-10 南京工业大学 Buffering energy-absorbing type web reinforced composite material anti-collision device
CN103696400A (en) * 2014-01-02 2014-04-02 南京工业大学 Rotatable ship collision prevention device with fin plate energy dissipation type
CN103835300A (en) * 2014-01-22 2014-06-04 中铁大桥局集团第五工程有限公司 Inner-support-free double-wall locking mouth steel bushing box cofferdam construction method and cofferdam
CN204000695U (en) * 2014-07-14 2014-12-10 中国电建集团华东勘测设计研究院有限公司 Pier anticollision structure
CN204551266U (en) * 2015-01-27 2015-08-12 武汉二航路桥特种工程有限责任公司 One assembledly can recycle Double-Wall Steel Boxed Cofferdam without inner support
CN206204886U (en) * 2016-11-02 2017-05-31 西安中交土木科技有限公司 A kind of fixed flexible protection device for also serving as construction cofferdam
CN206204965U (en) * 2016-11-02 2017-05-31 西安中交土木科技有限公司 A kind of enhanced floating type flexible protection device of the outer wall for also serving as construction cofferdam
CN109056508A (en) * 2018-08-29 2018-12-21 中铁大桥局武汉桥梁特种技术有限公司 The construction method of the bridge pier of basic protection against erosion, bridge and underwater foundation protection against erosion
CN209703282U (en) * 2018-12-28 2019-11-29 中交二航局第四工程有限公司 Bridge pier anticollision device, collision-prevention device

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
张发祥: "《铁路桥涵工程施工技术(上册)》", 中国铁道出版社, pages: 128 - 133 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111778837A (en) * 2020-06-24 2020-10-16 浙江博澳节能科技有限公司 Bridge ship collision prevention structure
CN112609718A (en) * 2020-12-18 2021-04-06 中铁大桥局武汉桥梁特种技术有限公司 Steel jacket box anti-collision system and construction method thereof
CN115492141A (en) * 2022-10-21 2022-12-20 中铁二院工程集团有限责任公司 Steel suspension box cofferdam structure and bottom plate and construction method thereof
CN115492141B (en) * 2022-10-21 2024-01-30 中铁二院工程集团有限责任公司 Steel suspended box cofferdam structure, bottom plate thereof and construction method
RU2809049C1 (en) * 2023-03-21 2023-12-06 Акционерное общество "Дороги и Мосты" Method for constructing bridge support in water area

Similar Documents

Publication Publication Date Title
CN109537443A (en) Bridge pier anticollision device, collision-prevention device and its construction method
CN209703282U (en) Bridge pier anticollision device, collision-prevention device
JP5760208B2 (en) Evacuation device from emergency such as tsunami and flood
CN105239594A (en) Prestressed pipe pile upright
JP2010156191A (en) L-shaped reinforcing structure, and reinforcing construction and method installed with the l-shaped reinforcing structure
CN103866693A (en) Installing method of reinforced concrete bowstring rod arch bridge arch ribs and hanging auxiliary bridge
JP2020101182A (en) Offshore platform for supporting wind turbine, and offshore facility accompanied therewith
CN104153311B (en) A kind of highway barrier bracing means and reinforcement means thereof
CN103967018B (en) Deep big foundation pit angle support level shear structure
CN106223355A (en) A kind of high bearing platform supported on piles in deep water Hold Hoop method has device and the construction method of end steel jacket box
JP5688040B2 (en) Partition structure
CN203113222U (en) Integral protective device of pier of bridge of highroad or railroad
CN203429661U (en) Basement with additional downward layers
CN205636830U (en) Take light -duty well point and vibration prevention plate's damping trench
CN108442394A (en) A kind of novel double-wall steel boxed cofferdam and construction method
CN101565937A (en) Construction method for Chinese character 'ri' combined dike
CN205116206U (en) Stress tube stake stand in advance
JP5688039B2 (en) Partition structure
CN209277187U (en) A kind of straight column type Rock Bolt Foundation of angle steel bias insertion
CN205475300U (en) Utilize foundation pit retaining structure's tower crane foundation cushion cap
CN108978481B (en) Box-body jacking in place after anti-collapse method
CN207672595U (en) Set builds foundation structure of building
CN205636658U (en) Crashproof structure of inland river intake
CN217267517U (en) Foundation pit support structure
CN216949740U (en) Protective outer wall with embedded horizontal beam

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination