CN201703943U - Hydraulic climbing stair - Google Patents

Hydraulic climbing stair Download PDF

Info

Publication number
CN201703943U
CN201703943U CN2010202496297U CN201020249629U CN201703943U CN 201703943 U CN201703943 U CN 201703943U CN 2010202496297 U CN2010202496297 U CN 2010202496297U CN 201020249629 U CN201020249629 U CN 201020249629U CN 201703943 U CN201703943 U CN 201703943U
Authority
CN
China
Prior art keywords
hydraulic pressure
stair
guide rail
wall
climb
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010202496297U
Other languages
Chinese (zh)
Inventor
苏亚武
王四久
万利民
任海波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN2010202496297U priority Critical patent/CN201703943U/en
Application granted granted Critical
Publication of CN201703943U publication Critical patent/CN201703943U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Types And Forms Of Lifts (AREA)

Abstract

The utility model provides a hydraulic climbing stair, in particular to a climbing device in high-rise building constriction. A climbing frame is arranged in the utility model and moves on a guide rail on a wall to drive an operation platform connected to the lower end of the device, a moving cross beam is arranged at the top of the climbing frame, and a hydraulic climbing device is arranged on one side of the climbing frame. The device has high construction safety, short construction period and less required material in high-rise building construction when serving as a temporary passage, and solves the problem of difficult temporary passage construction in high-rise building construction.

Description

The hydraulic pressure stair that climb
Technical field
The utility model relates to a kind of interim stair, the hydraulic pressure that the refers to a kind of high-building construction especially stair that climb.
Background technology
The hydraulic pressure climbing device is that a kind of frame that will climb is attached in the building structure, and the device that successively promotes along with structure construction is applicable to the construction of skyscraper cast-in-place concrete vertical structure.Traditional hydraulic pressure climbing device has hydraulic slip-form device, electronic climbing frame device, common climbing apparatus and turning-over, common climbing device needs the hanging device next driving surface that just can climb, and the guide rail and climbing frame can only climb can not climbing shuttering, complex structure, long construction period, Surface Quality of Concrete is bad, safety, operability is undesirable, the template consumption is more, and efficient is lower, and cost is higher.Traditional sliding form apparatus can not be interrupted construction, and concrete surface is coarse, and operating personal will possess higher expertise.
Summary of the invention
Main purpose of the present utility model provides a kind of hydraulic pressure stair that climb, solving the skyscraper template climbs and needs just can the climb problem of next driving surface of hanging device, and solving the tradition frame guide rail that can only climb that climbs, problem that can not climbing shuttering has also solved traditional template climbing device complex structure simultaneously, long construction period, safety, operability is undesirable, and the template consumption is more, efficient is lower, and the cost problem of higher.
For reaching above-mentioned purpose, the utility model provides a kind of hydraulic pressure stair that climb, comprise attached wall bonded assembly guide rail, with guide rail bonded assembly moving beam, the moving beam lower end bonded assembly hydraulic pressure climbing device and the frame that climbs, it is characterized in that: the lower end of the described frame that climbs hangs a service platform by a connecting device;
Described guide rail is connected with body of wall by a wall-attaching equipment, is evenly distributed with the piece of marking time on the guide rail;
Described hydraulic pressure climbing device further includes from top to bottom lifting case on the bonded assembly one, a hydraulic ram and lifting case once, the box inside face of upper and lower lifting case have one with the spill chute of guide rail sliding block joint; Climbing has a bearing pin between the casing both sides box wall of frame, bearing pin passes the pin-and-hole and the rotary handle at the center of force-bearing piece, the spigot surface of force-bearing piece is middle flat, the trapezoidal folding face that both sides are oblique, it is the right angle that two inclined-planes intersect with upper force-bearing plane and lower force-bearing plane respectively, force-bearing piece is captiveed joint by small clevis pin with head with rotary handle, is connected a spring between rotary handle and its casing outside.
Further improvement of the utility model is: described wall-attaching equipment comprises a plurality of attached wall sleeve pipes and attached wall spare, and wherein an end of attached wall sleeve pipe is embedded in the body of wall, successively upwards is provided with; Attached wall spare is fixed on the surface of body of wall successively by the attached wall sleeve pipe.
Further improvement of the utility model is: described service platform from top to bottom layering is set up stair step, half space, protection railing and safety guard net.
Further improvement of the utility model is: a side of described service platform is provided with track adjusting wheel.
Further improvement of the utility model is: described connecting device is that a round steel bar connects as bearing pin.
By above technical scheme, the hydraulic pressure that the utility model the provides stair that climb, it moves the frame that climbs to drive lower end bonded assembly service platform by the hydraulic pressure climbing device and moves on guide rail, overcome common climbing device and needed just can the climb trouble of next driving surface of hanging device, saved the tower crane of special transhipment, overall cost reduces.Of the present utility model acting as can make temporary access road working security height in the construction of super highrise building, and short construction period and saving in material have solved in the prior art construction of super highrise building temporary access road and set up the big problem of difficulty.
Description of drawings
Fig. 1 is the climb plan sketch of stair one preferred embodiment of the utility model hydraulic pressure;
Fig. 2 is the partial enlarged drawing of Fig. 1;
Fig. 3 is another partial enlarged drawing of Fig. 1;
Fig. 4 is climb force-bearing piece structural representation during stair of climbing of stair one preferred embodiment of the utility model hydraulic pressure;
Fig. 5 is climb force-bearing piece structural representation during guide rail of climbing of the another preferred embodiment of stair of the utility model hydraulic pressure;
Fig. 6 is the climb plan sketch of service platform in stair one preferred embodiment of the utility model hydraulic pressure; And
Fig. 7 is the climb upward view of following lifting case of stair one preferred embodiment of the utility model hydraulic pressure.
The specific embodiment
See also Fig. 1 to shown in Figure 3, be the utility model hydraulic pressure the climb plan sketch and the partial enlarged drawing of stair one preferred embodiment, as shown in the figure, this hydraulic pressure stair that climb comprise:
One guide rail 91, it is connected with body of wall 80 by a wall-attaching equipment 30, is evenly distributed with piece 70 (see figure 4)s of marking time on the guide rail 91, and guide rail 91 is provided with an outstanding projection 911 near the proximal portion of body of wall 80 1 sides;
One moving beam 12 is connected with guide rail 91, can move on guide rail 91, and be formed with a perforation 121 at the end near guide rail 91;
One hydraulic pressure climbing device 13, be arranged at the side of the lower end of moving beam 12 near body of wall 80, hydraulic pressure climbing device 13 further includes from top to bottom lifting case 131 on the bonded assembly one, one hydraulic ram 133 and lifting case 132 once, last lifting case 131 and down the box inside face of lifting case 132 have one and spill chute 68 (see figure 7)s of guide rail 91 sliding block joints;
One frame 11 that climbs is arranged at the lower end of moving beam 12, and the lower end of the frame 11 that climbs hangs a service platform 20 (see figure 6)s by a connecting device 111; Described connecting device 111 is that a round steel bar connects as bearing pin;
Described wall-attaching equipment 30 further comprises a plurality of attached wall sleeve pipes 31 and attached wall spare 32, and wherein an end of attached wall sleeve pipe 31 is embedded in the body of wall 80, successively upwards is provided with; Attached wall spare 32 is fixed on the surface of body of wall 80 successively by attached wall sleeve pipe 31, attached wall spare 32 is provided with a groove 321, laterally offer a perforation 322 on the attached wall spare 32, wherein be somebody's turn to do perforation 322 and above-mentioned perforation 121 corresponding settings, a gim peg 933 can pass perforation 121 and enter in the perforation 322;
Also be provided with a strut member 922 between described projection 911 and the attached wall spare 32, when guide rail 91 needs fixedly, at attached wall spare 32 upper ends one strut member 922, again the projection on the guide rail 91 911 is placed the upper end of strut member 922, guide rail 91 can be fixed on the attached wall spare 32;
On the described frame 11 that climbs an anti-fall device 115 is set also, it is arranged between moving beam 12 and the guide rail 91, can prevent that moving beam 12 from coming off when mobile on guide rail 91.
See also Fig. 4 and shown in Figure 5, be the utility model hydraulic pressure climb climb force-bearing piece structural representation during stair and the force-bearing piece structural representation when climbing guide rail of stair one preferred embodiment, as shown in the figure:
The spigot surface 611 of force-bearing piece 61 is middle flat, the trapezoidal folding face that both sides are oblique, it is the right angle that two inclined-planes intersect with upper force-bearing plane 612 and lower force-bearing plane 613 respectively, and force-bearing piece 61 centers have the big pin-and-hole 614 and the little pin-and-hole 615 that is used to be connected rotary handle 67 that is used to connect the lifting case casing.
Extremely shown in Figure 5 in conjunction with Fig. 1: that a bearing pin 62 is arranged between the casing both sides box wall of the frame 11 that climbs, bearing pin 62 passes the pin-and-hole 614 at the center of force-bearing piece 61, force-bearing piece 61 and rotary handle 67 are captiveed joint by small clevis pin with head, be connected a spring 64 (as Fig. 2) between rotary handle 67 and its casing outside, this spring 64 provides a pulling force, makes force-bearing piece 61 maintain the position that reclines mutually with the piece 70 of marking time among Fig. 3.
See also shown in Figure 6ly, be the climb plan sketch of service platform in stair one preferred embodiment of the utility model hydraulic pressure, as can be seen from the figure:
In the service platform 20 from top to bottom layering set up stair step 22, half space 23, (protection railing and safety guard net are prior art for protection railing and safety guard net, seldom do narration at this), be provided with a connecting device 21 at the top of stair step 22, itself and the connecting device 111 corresponding settings of frame 11 belows of climbing; Side in stair step 22 is provided with a track adjusting wheel 24 by the lower end, when connecting device 21 when connecting device 111 in the frame 11 that climbs is connected, track adjusting wheel 24 is collided with the surface of body of wall 80, makes service platform 20 be difficult for rocking, and prevents service platform 20 distortion; On service platform 20, also be provided with lateral keel 25 and vertical keel 26, play a part safety precaution, and constituted half space 23.
See also shown in Figure 7ly, be the climb upward view of following lifting case of stair one preferred embodiment of the utility model hydraulic pressure, the box inside face of following lifting case 132 have one with the spill chute 68 of guide rail 91 sliding block joints.
Extremely shown in Figure 7 in conjunction with Fig. 1: attached wall sleeve pipe 31 successively upwards is provided with, the one end is embedded in the body of wall 80, be fixed with attached wall spare 32 on the other end, attached wall spare 32 is provided with a groove 321, and guide rail 91 is attached on the attached wall spare 32 and be fixed on the groove 321 of attached wall spare 32;
This device is installed earlier before using, pre-buried attached wall sleeve pipe 31 is fixed on attached wall spare 32 on the attached wall sleeve pipe 31 earlier, and moving beam 12 links to each other with guide rail 91, the frame 11 that climbs is installed on moving beam 12, again the connecting device 21 of service platform 20 is linked to each other with connecting device 111 in the frame 11 that climbs; By lifting case 131 on the bonded assembly successively in the hydraulic pressure climbing device 13, hydraulic ram 133 and down lifting case 132 drive moving of the frame 11 that climbs, drive bonded assembly service platforms 20 by the frame 11 that climbs again and move;
When the frame 11 that climbs upwards climbs, guide rail 91 is fixed on the attached wall spare 32, rotary handle 67 rotates around bearing pin 62, and force-bearing piece 61 lower force-bearing planes 613 in the following lifting case 132 are pressed on the piece 70 of marking time of guide rail, provide thrust by spring 64; Hydraulic ram 133 protrudes upward, and jacking moving beam 12 upwards climbs thereby drive the frame 11 that climbs; The back that puts in place goes up that force-bearing piece 61 is pressed in marking time above the piece 70 of guide rail 91 in the lifting case 131, the frame 11 that the climbs height that rises; Hydraulic ram 133 shrinks, and promotes lifting case 132 down, and he is marked time above the piece 70 to last one, finishes a working cycle, and climbing up to the frame 11 that climbs puts in place.
When guide rail 91 upwards climbs, gim peg 933 inserted perforation 121 and bore a hole in 322, at this moment, moving beam 12 is fixed on the attached wall spare 32, rotary handle 67 upwards rotates around bearing pin 62, force-bearing piece 61 upper force-bearing planes 612 in the following lifting case 132 are pressed in the piece 70 times of marking time of guide rail, provide thrust by spring 64; Last lifting case 131 is motionless, and hydraulic ram 133 stretches up and down, contractile motion, drives guide rail 91 and promotes; After putting in place, force-bearing piece 61 supporting guides 91 in the last lifting case 131; Finish a working cycle, climbing up to guide rail 91 puts in place.

Claims (5)

1. hydraulic pressure stair that climb comprise attached wall bonded assembly guide rail, with guide rail bonded assembly moving beam, and the moving beam lower end bonded assembly hydraulic pressure climbing device and the frame that climbs, it is characterized in that: the lower end of the described frame that climbs hangs a service platform by a connecting device;
Described guide rail is connected with body of wall by a wall-attaching equipment, is evenly distributed with the piece of marking time on the guide rail;
Described hydraulic pressure climbing device further includes from top to bottom lifting case on the bonded assembly one, a hydraulic ram and lifting case once, the box inside face of upper and lower lifting case have one with the spill chute of guide rail sliding block joint; Climbing has a bearing pin between the casing both sides box wall of frame, bearing pin passes the pin-and-hole and the rotary handle at the center of force-bearing piece, the spigot surface of force-bearing piece is middle flat, the trapezoidal folding face that both sides are oblique, it is the right angle that two inclined-planes intersect with upper force-bearing plane and lower force-bearing plane respectively, force-bearing piece is captiveed joint by small clevis pin with head with rotary handle, is connected a spring between rotary handle and its casing outside.
2. the hydraulic pressure as claimed in claim 1 stair that climb, it is characterized in that: described wall-attaching equipment comprises a plurality of attached wall sleeve pipes and attached wall spare, wherein an end of attached wall sleeve pipe is embedded in the body of wall, successively upwards is provided with; Attached wall spare is fixed on the surface of body of wall successively by the attached wall sleeve pipe.
3. the hydraulic pressure as claimed in claim 1 stair that climb, it is characterized in that: described service platform from top to bottom layering is set up stair step, half space, protection railing and safety guard net.
4. the hydraulic pressure as claimed in claim 3 stair that climb, it is characterized in that: a side of described service platform is provided with track adjusting wheel.
5. the hydraulic pressure as claimed in claim 1 stair that climb, it is characterized in that: described connecting device is that a round steel bar connects as bearing pin.
CN2010202496297U 2010-07-06 2010-07-06 Hydraulic climbing stair Expired - Fee Related CN201703943U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010202496297U CN201703943U (en) 2010-07-06 2010-07-06 Hydraulic climbing stair

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010202496297U CN201703943U (en) 2010-07-06 2010-07-06 Hydraulic climbing stair

Publications (1)

Publication Number Publication Date
CN201703943U true CN201703943U (en) 2011-01-12

Family

ID=43441099

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010202496297U Expired - Fee Related CN201703943U (en) 2010-07-06 2010-07-06 Hydraulic climbing stair

Country Status (1)

Country Link
CN (1) CN201703943U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102068768A (en) * 2011-01-27 2011-05-25 鞍山拜尔自控有限公司 Follow-up clamp type climbing fire fighting rescue capsule
CN105417321A (en) * 2015-12-10 2016-03-23 山东恒堃机械有限公司 Lifting device for construction vehicle and machine
CN109467014A (en) * 2018-12-28 2019-03-15 中铁大桥局集团第五工程有限公司 Large-tonnage tower crane super large load attached wall structure in a kind of strong wind atmosphere
CN111481845A (en) * 2020-04-10 2020-08-04 江苏理工学院 Adjustable escape device and control method thereof
CN113550557A (en) * 2021-07-27 2021-10-26 中国建筑一局(集团)有限公司 Creeping formwork for high-rise building construction and hydraulic creeping formwork construction process
CN114715755A (en) * 2022-03-18 2022-07-08 四川华远建设工程有限公司 Tower crane standard section high-altitude steel platform structure and construction method
CN115012317A (en) * 2022-07-08 2022-09-06 广州城建职业学院 Climbing device for bridge erecting machine

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102068768A (en) * 2011-01-27 2011-05-25 鞍山拜尔自控有限公司 Follow-up clamp type climbing fire fighting rescue capsule
CN102068768B (en) * 2011-01-27 2012-05-30 鞍山拜尔自控有限公司 Follow-up clamp type climbing fire fighting rescue capsule
CN105417321A (en) * 2015-12-10 2016-03-23 山东恒堃机械有限公司 Lifting device for construction vehicle and machine
CN109467014A (en) * 2018-12-28 2019-03-15 中铁大桥局集团第五工程有限公司 Large-tonnage tower crane super large load attached wall structure in a kind of strong wind atmosphere
CN111481845A (en) * 2020-04-10 2020-08-04 江苏理工学院 Adjustable escape device and control method thereof
CN113550557A (en) * 2021-07-27 2021-10-26 中国建筑一局(集团)有限公司 Creeping formwork for high-rise building construction and hydraulic creeping formwork construction process
CN114715755A (en) * 2022-03-18 2022-07-08 四川华远建设工程有限公司 Tower crane standard section high-altitude steel platform structure and construction method
CN115012317A (en) * 2022-07-08 2022-09-06 广州城建职业学院 Climbing device for bridge erecting machine
CN115012317B (en) * 2022-07-08 2024-05-07 广州城建职业学院 Climbing device for bridge girder erection machine

Similar Documents

Publication Publication Date Title
CN201703943U (en) Hydraulic climbing stair
CN100387796C (en) Automatic hydraulic climbing shuttering
CN105263849B (en) Tower is jacked from setting up
CN106437130A (en) Inner roof external climbing type formwork construction platform for super high-rise building construction
CN102900022B (en) Cable stayed bridge leaning tower hydraulic climbing mould construction method
CN106400951B (en) A kind of level and vertical structure method for synchronously constructing of super high-rise building
CN102704674B (en) Vertical shaft hydraulic self-lifting template and construction method
CN104120877B (en) A kind of hydraulic climbing die block system and climbing form method
CN207998796U (en) Hydraulic automatic jumping mould bases
CN105839543B (en) Bridge High-pier rises outrigger over-form construction technique certainly
CN105908960B (en) Scaffold for large space construction
CN206233541U (en) A kind of interior top external climbing mould bases operation platform for construction of super highrise building
CN112727074B (en) Building machine and building construction method
CN106320713A (en) 3D construction printing operation platform
CN106869947B (en) Preliminary bracing stand operates trolley after a kind of tunnel tunnel face excavates
CN103806645A (en) Light intelligent hydraulic formwork climbing device with good wind and fire resistant performance
CN202850484U (en) Safety mechanism for building construction climbing template
CN106351441B (en) Chimney climbing formwork for construction device and construction method
CN108625800B (en) Multifunctional derrick for shaft construction
CN217761022U (en) Comprehensive operation trolley for construction of air cushion type surge chamber of hydropower station
CN110761796A (en) Deep inclined shaft expanding excavation supporting device and construction method
CN109252448B (en) Prepressing construction method of bridge tower column cross beam support
CN216662305U (en) Super high-rise tower crane bottom attached hydraulic self-climbing hard protection platform
CN214615339U (en) Combined type movable high-altitude working platform for construction
CN104612060B (en) Construction working stand under prefabricated side bar lateral roof

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Assignee: China Construction Industrial Equipment Installation Co., Ltd.

Assignor: China Construction Eighth Engineering Division Co., Ltd.

Contract record no.: 2011310000061

Denomination of utility model: Hydraulic climbing stair

Granted publication date: 20110112

License type: Exclusive License

Record date: 20110509

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110112

Termination date: 20170706