CN106351441B - Chimney climbing formwork for construction device and construction method - Google Patents

Chimney climbing formwork for construction device and construction method Download PDF

Info

Publication number
CN106351441B
CN106351441B CN201610920087.3A CN201610920087A CN106351441B CN 106351441 B CN106351441 B CN 106351441B CN 201610920087 A CN201610920087 A CN 201610920087A CN 106351441 B CN106351441 B CN 106351441B
Authority
CN
China
Prior art keywords
chimney
climbing
pole
construction
hoisting frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610920087.3A
Other languages
Chinese (zh)
Other versions
CN106351441A (en
Inventor
林根杰
邵百晟
牟强
倪四勇
徐同柱
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Chemical Engineering Sixth Construction Co Ltd
Original Assignee
China National Chemical Engineering Sixth Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China National Chemical Engineering Sixth Construction Co Ltd filed Critical China National Chemical Engineering Sixth Construction Co Ltd
Priority to CN201610920087.3A priority Critical patent/CN106351441B/en
Publication of CN106351441A publication Critical patent/CN106351441A/en
Application granted granted Critical
Publication of CN106351441B publication Critical patent/CN106351441B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/06Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
    • E04G11/20Movable forms; Movable forms for moulding cylindrical, conical or hyperbolical structures; Templates serving as forms for positioning blocks or the like
    • E04G11/28Climbing forms, i.e. forms which are not in contact with the poured concrete during lifting from layer to layer and which are anchored in the hardened concrete
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G13/00Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/28Chimney stacks, e.g. free-standing, or similar ducts

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The invention discloses a kind of chimney climbing formwork for construction device and construction methods, the constructing device includes pole-climbing, hydraulic jack, the components such as hoisting frame and template, the pole-climbing build-in is on the basis of chimney wall, the hydraulic jack connects the hoisting frame and is threaded through together in the pole-climbing, the hoisting frame is one downward opening frame like structure, two vertical portions of the hoisting frame are located inside and outside the chimney wall basis, two vertical portions of the hoisting frame are also connected with curved plate by feed screw nut's assembly, it is connected with sliding rail on the curved plate, the sliding block being slidably connected with it is provided on the sliding rail, the sliding block is connected with template.The present invention has lower difficulty of construction, higher construction efficiency, the advantages that construction quality has also been taken into account while cost-effective.

Description

Chimney climbing formwork for construction device and construction method
Technical field
The present invention relates to architectural furniture and methods.It is more particularly related to a kind of chimney climbing formwork for construction dress It sets and construction method.
Background technology
Currently, the vertical construction method in the ground of chimney construction from the bottom to top to high-altitude.All front and back working procedures, must The construction of the previous processs such as palpus, the construction that lower road working procedure could be carried out after having checked and accepted, and entire work progress is vertical space The working space of construction operation, construction is limited, and construction safety coefficient is low, causes difficulty of construction big, measure for construction safety input compared with Greatly, the construction period is also longer.
Invention content
Present invention aim to address at least the aboves, and provide the advantages of at least will be described later.
In order to realize these purposes and other advantages according to the present invention, a kind of chimney climbing formwork for construction device is provided, Including following components:
Pole-climbing, lower end are mounted in chimney wall basis.
Hydraulic jack comprising an annular oil cavity, with the annular oil cavity cooperation annular piston and with the ring The hollow piston rod of shape piston connection, the pole-climbing from top to bottom sequentially pass through the annular oil cavity, the annular piston and institute State hollow piston rod, the center of the annular oil cavity, which is equipped with, clamping or to unclamp the upper chuck of the pole-climbing, the hollow piston Being equipped in bar clamping or can unclamp the lower clamp of the pole-climbing, and one is equipped between the upper chuck and the lower clamp on described Clamp and the lower clamp apply the spring of opposite direction active force.
Hoisting frame, is one downward opening frame like structure, and the hoisting frame passes through the logical of horizontal component center Hole passes through and the pole-climbing and offsets with the annular oil cavity top, and two vertical portions of the hoisting frame are located at described Inside and outside chimney wall basis, which is connected with the multiple and cigarette by multiple feed screw nut's assemblies respectively The matched curved plate in chimney barrel basis, multiple doughnut-shaped steel plates are from top to bottom arranged successively, and between adjacent curved plate also by Feed screw nut's assembly connects, the vertical rails being additionally provided with and the cunning being slidably connected with the vertical rails on the curved plate Block is connected with template on the sliding block.
Preferably, the pole-climbing at least three is uniformly distributed on the basis of chimney wall, the hydraulic jack and The hoisting frame number is corresponding with the pole-climbing number, and the horizontal component of the hoisting frame is connected in a tie-beam The heart, the direction of the tie-beam is consistent with the horizontal component direction of the hoisting frame, and the number of the tie-beam is carried with described It rises door frame number to correspond to, one end of the tie-beam is both connected on the annular girder in chimney wall, and the other end is both connected to cigarette On annular girder outside chimney barrel, plank is equipped between the two adjacent tie-beams so that people walks and stacks concrete.
It is further preferred that being provided with a strut on annular girder in the chimney wall, one is equipped at the top of the strut Pulley, hoist engine is provided on the place outside chimney wall, and the hoist engine is connected by the steel cable carried on a shoulder pole on the pulley One is suspended to the cage in derrick.
It is further preferred that the hoisting frame both sides are both provided with the tablet stood for construction personnel, the tablet passes through Steel cable is suspended under the tie-beam, and the string bag for hanging on tie-beam is provided with below the tablet.
It is further preferred that being provided with fence on annular girder outside the chimney wall.
It is further preferred that being provided with several hounds between the strut and the tie-beam.
A kind of chimney climbing formwork for construction method using the chimney climbing formwork for construction device.
The present invention includes at least following advantageous effect:
1, due to having from ability of climbing therefore the handling for being not required to hoisting machinery, reduce the Rigger of hoisting machinery in construction It measures.
2, it during climbing, only carries frame and does not carry mould, bad even drawing crack concrete surface will not be drawn, there is preferable construction Quality.
3, it relative to traditional chimney construction method, present invention saves scaffold lease, takes and tears quantities open, it is corresponding to take With decreasing.
4, the construction technology can by some original quality examinations can not be in place region also can completely check in place, reduce Construction quality omission factor has been accomplished completely without quality inspection blind area.
Part is illustrated to embody by further advantage, target and the feature of the present invention by following, and part will also be by this The research and practice of invention and be understood by the person skilled in the art.
Description of the drawings
Fig. 1 is the side structure schematic diagram of the present invention;
Fig. 2 is the vertical view of the present invention;
Specific implementation mode
Present invention will be described in further detail below with reference to the accompanying drawings, to enable those skilled in the art with reference to specification text Word can be implemented according to this.
It should be noted that in the description of the present invention, term " transverse direction ", " longitudinal direction ", "upper", "lower", "front", "rear", The orientation or positional relationship of the instructions such as "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outside" is based on attached drawing institute The orientation or positional relationship shown, is merely for convenience of description of the present invention and simplification of the description, and is not the dress of instruction or hint meaning It sets or element must have a particular orientation, with specific azimuth configuration and operation, therefore should not be understood as the limit to the present invention System.
As shown in Figure 1, the present invention provides a kind of chimney climbing formwork for construction device comprising following components:
Pole-climbing 1, lower end are mounted in chimney wall basis.The main function of the pole-climbing 1 is to do support and transmission rod, The reaction force that the weight of other devices in the present invention and process of climbing generate is passed into chimney raft.
Hydraulic jack 2 comprising an annular oil cavity, with the annular oil cavity cooperation annular piston and with the ring The hollow piston rod of shape piston connection, the pole-climbing 1 from top to bottom sequentially pass through the annular oil cavity, the annular piston and institute State hollow piston rod, the center of the annular oil cavity, which is equipped with, clamping or to unclamp the upper chuck of the pole-climbing 1, the hollow piston Being equipped in bar clamping or can unclamp the lower clamp of the pole-climbing 1, and one is equipped between the upper chuck and the lower clamp to described Upper chuck and the lower clamp apply the spring of opposite direction active force.The main function of the hydraulic jack 2 is to pass through liquid Pressure jacks the device connected in the hydraulic jack 2 to higher position.
Hoisting frame 3, is one downward opening frame like structure, and the hoisting frame 3 passes through horizontal component center Through-hole passes through the pole-climbing 1 and offsets with the annular oil cavity top, and two vertical portions of the hoisting frame 3 are located at Inside and outside chimney wall basis, two vertical portions respectively by multiple feed screw nut's assemblies 4 be connected with it is multiple with The matched curved plate 5 in the chimney wall basis, multiple doughnut-shaped steel plates are from top to bottom arranged successively, and adjacent curved plate 5 Between connected also by feed screw nut's assembly 4, the vertical rails that are additionally provided on the curved plate 5 and slided with the vertical rails The sliding block of connection is moved, template 6 is connected on the sliding block.The main function of the hoisting frame 3 is to be against institute by the template 6 The space constructed on the basis of chimney wall and pour concrete is stated, and after completing to pour, rises to another construction station.
When using chimney climbing formwork for construction device of the present invention, first first layer is laid on the basis of the chimney wall Inner and outer template 6, and the feed screw nut's assembly 4 is adjusted, the institute for making the sliding rail push against the sliding block and be connect with the sliding block First layer inner and outer template 6 is stated, concrete is poured between the first layer inner and outer template 6, after the concrete solidification a period of time poured again The feed screw nut's assembly 4 is adjusted, is made without mutual pressure between the sliding rail and the sliding block, then allows the hydraulic jack 2 The upper chuck clamping described in pole-climbing 1, buy oil into the annular oil cavity, the hydraulic jack 2 will drive described carry It rises door frame 3 to rise, while compressing the spring, after the hydraulic jack 2 completes a stroke, lower clamp pine described in clamping The upper chuck is opened, the hydraulic jack 2 and the hoisting frame 3 will be fixed in the pole-climbing 1, meanwhile, the bullet Spring will push the annular piston to reset, and repeatedly the action of hydraulic jack 2 described above is until the hoisting frame 3 The height for one piece of template 6 of climbing is laid with external mold in the second layer in 5 inside of the curved plate along first layer inner and outer template 6 Plate 6 adjusts the feed screw nut's assembly 4, the second layer for making the sliding rail push against the sliding block and be connect with the sliding block Inner and outer template 6 pours concrete between the second layer inner and outer template 6, repeatedly hoisting frame 3 climb until pour concrete Reach the chimney height of construction requirement, completes the chimney climbing formwork for construction device under being dismantled after constructing, wherein the concrete poured is solidifying It needs to remove the template 6 after Gu and cleans out the concrete of its surface attachment to reuse.Due to cigarette of the present invention Chimney climbing formwork for construction device has from ability of climbing therefore the handling for being not required to hoisting machinery, reduces the Rigger of hoisting machinery in construction It measures, and during climbing, only carries frame and do not carry mould, bad even drawing crack concrete surface will not be drawn, there is preferable construction matter Amount.
In another embodiment, the pole-climbing 1 at least three is uniformly distributed on the basis of chimney wall, the hydraulic pressure thousand Jin top 2 and 3 number of the hoisting frame are corresponding with 1 number of the pole-climbing, and the horizontal component of the hoisting frame 3 is connected to a company The center of beam 7 is connect, the direction of the tie-beam 7 is consistent with the horizontal component direction of the hoisting frame 3, the tie-beam 7 Number is corresponding with 3 number of the hoisting frame, and one end of the tie-beam 7 is both connected on the annular girder 8 in chimney wall, separately One end is both connected on the annular girder 9 outside chimney wall, and plank is equipped between the two adjacent tie-beams 7 for people's walking and heap Concrete is put, has not only ensured the safety of construction personnel, but also construction personnel is facilitated to take tool, improves construction efficiency.
In another embodiment, as depicted in figs. 1 and 2, it is provided with a strut on the annular girder 8 in the chimney wall 10,10 top of the strut is equipped with a pulley 11, and hoist engine 12, the hoist engine are provided on the place outside chimney wall 12 are suspended to the cage 13 in derrick by the steel cable connection one carried on a shoulder pole on the pulley 11, and the hoist engine 12 can be promoted described Cage 13 transports small-sized material, construction personnel and concrete.
In another embodiment, 3 both sides of the hoisting frame are both provided with the tablet 14 stood for construction personnel, described flat Plate 14 is suspended to 7 lower section of the tie-beam by steel cable, and 14 lower section of the tablet is provided with the string bag 15 for hanging on tie-beam 7, The setting, which eliminates, sets up scaffold, also ensures the safety of construction personnel, has saved scaffold lease, has taken and tear quantities open, phase The expense answered decreases.
In another embodiment, it is provided with fence 16 on the annular girder 9 outside the chimney wall, prevents construction personnel from height It drops at place.
In another embodiment, several hounds 17 are provided between the strut 10 and the tie-beam 7, to consolidate strut 10。
Using the construction method of the chimney climbing formwork for construction device, applied with traditional the vertical of ground from the bottom to top to high-altitude Work method is compared, and difficulty of construction is reduced, and improves construction efficiency, and construction quality has also been taken into account while cost-effective.
Although the embodiments of the present invention have been disclosed as above, but its is not only in the description and the implementation listed With it can be fully applied to various fields suitable for the present invention, for those skilled in the art, can be easily Realize other modification, therefore without departing from the general concept defined in the claims and the equivalent scope, the present invention is simultaneously unlimited In specific details and legend shown and described herein.

Claims (7)

1. a kind of chimney climbing formwork for construction device, which is characterized in that including following components:
Pole-climbing, lower end are mounted in chimney wall basis;
Hydraulic jack a comprising annular oil cavity is lived with the annular piston of annular oil cavity cooperation and with the annular Fill in connection hollow piston rod, the pole-climbing from top to bottom sequentially pass through the annular oil cavity, the annular piston and it is described in Empty piston rod, the center of the annular oil cavity, which is equipped with, clamping or to unclamp the upper chuck of the pole-climbing, in the hollow piston rod Equipped with clamping or the lower clamp of the pole-climbing can be unclamped, one is equipped between the upper chuck and the lower clamp to the upper chuck Apply the spring of opposite direction active force with the lower clamp;
Hoisting frame, is one downward opening frame like structure, and the hoisting frame is worn by the through-hole at horizontal component center It crosses the pole-climbing and offsets with the annular oil cavity top, two vertical portions of the hoisting frame are located at the chimney Inside and outside barrel basis, which is connected with the multiple and chimney barrel by multiple feed screw nut's assemblies respectively The matched curved plate in wall basis, multiple doughnut-shaped steel plates are from top to bottom arranged successively, and also by lead screw between adjacent curved plate Nut assembly connects, the vertical rails being additionally provided with and the sliding block being slidably connected with the vertical rails on the curved plate, It is connected with template on the sliding block.
2. chimney climbing formwork for construction device as described in claim 1, which is characterized in that the pole-climbing at least three is uniformly distributed On the basis of chimney wall, the hydraulic jack and the hoisting frame number are corresponding with the pole-climbing number, the promotion The horizontal component of door frame is connected to the center of a tie-beam, the horizontal component side in the direction of the tie-beam and the hoisting frame To consistent, the number of the tie-beam is corresponding with the hoisting frame number, and one end of the tie-beam is both connected to chimney barrel On annular girder in wall, the other end is both connected on the annular girder outside chimney wall, and wood is equipped between the two adjacent tie-beams Plate is for people's walking and stacks concrete.
3. chimney climbing formwork for construction device as claimed in claim 2, which is characterized in that set on the annular girder in the chimney wall It is equipped with a strut, a pulley is installed at the top of the strut, hoist engine, the elevator are provided on the place outside chimney wall Machine is suspended to the cage in derrick by the steel cable connection one carried on a shoulder pole on the pulley.
4. chimney climbing formwork for construction device as claimed in claim 2, which is characterized in that the hoisting frame both sides are both provided with confession The tablet that construction personnel stands, the tablet are suspended to by steel cable under the tie-beam, and suspension is provided with below the tablet In the string bag of tie-beam.
5. chimney climbing formwork for construction device as claimed in claim 2, which is characterized in that set on the annular girder outside the chimney wall It is equipped with fence.
6. chimney climbing formwork for construction device as claimed in claim 3, which is characterized in that be arranged between the strut and the tie-beam There are several hounds.
7. a kind of chimney climbing formwork for construction method using chimney climbing formwork for construction device as described in claim 1.
CN201610920087.3A 2016-10-21 2016-10-21 Chimney climbing formwork for construction device and construction method Active CN106351441B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610920087.3A CN106351441B (en) 2016-10-21 2016-10-21 Chimney climbing formwork for construction device and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610920087.3A CN106351441B (en) 2016-10-21 2016-10-21 Chimney climbing formwork for construction device and construction method

Publications (2)

Publication Number Publication Date
CN106351441A CN106351441A (en) 2017-01-25
CN106351441B true CN106351441B (en) 2018-07-31

Family

ID=57863516

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610920087.3A Active CN106351441B (en) 2016-10-21 2016-10-21 Chimney climbing formwork for construction device and construction method

Country Status (1)

Country Link
CN (1) CN106351441B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107091007B (en) * 2017-05-07 2021-03-05 云南建投第十三建设有限公司 Construction method for building reinforced concrete chimney with internal and external lifting templates
CN107435438B (en) * 2017-08-16 2020-03-10 黄晖 Chimney rollover construction device
CN112942116B (en) * 2021-01-30 2022-08-02 中铁九局集团第二工程有限公司 Highway bridge hollow high pier hydraulic creeping formwork construction device and use method

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5016906B1 (en) * 1970-06-30 1975-06-17
JP4292526B2 (en) * 1999-08-25 2009-07-08 五洋建設株式会社 Slip foam equipment
CN201411900Y (en) * 2009-05-21 2010-02-24 山东丰汇设备技术有限公司 Hydraulic die lifter for chimneys
CN104712143B (en) * 2015-03-12 2016-09-14 山东电力建设第三工程公司 A kind of circular steel reinforced concrete chimney wall reverse mould construction method
CN104727545A (en) * 2015-04-08 2015-06-24 中国十九冶集团有限公司 Hydraulic sliding-mode vertical transportation system and method for large water tower barrel
CN204826617U (en) * 2015-05-18 2015-12-02 中国十九冶集团有限公司 Chimney slip form handling system

Also Published As

Publication number Publication date
CN106351441A (en) 2017-01-25

Similar Documents

Publication Publication Date Title
CN104695337B (en) Self-lifting sliding and turnover construction system and construction method
CN104712143B (en) A kind of circular steel reinforced concrete chimney wall reverse mould construction method
CN106351441B (en) Chimney climbing formwork for construction device and construction method
CN106437130A (en) Inner roof external climbing type formwork construction platform for super high-rise building construction
CN1028556C (en) Building construction system
CN105839543B (en) Construction process for self-lifting outer frame turnover formwork of bridge high pier
CN105586833B (en) Stiff skeleton steel reinforcement cage global formation large-scale cast-in-place tall pier and thin wall construction method
CN102777030A (en) Method for building up formwork construction platform of lift shaft
CN104420640B (en) Abnormity chimney construction platform
CN106400951A (en) Synchronous construction method for horizontal and vertical structures of super high-rise building
CN108033367A (en) A kind of steel column drum rack alternating brace type steel platform and tower crane synchronous hoisting device and its method for improving
CN206233541U (en) A kind of interior top external climbing mould bases operation platform for construction of super highrise building
CN107795122A (en) Concrete stack shell constructing device and construction method
CN201703943U (en) Hydraulic climbing stair
CN106988299A (en) The pay-off method of assembled steel reinforced cage descending frame and steel reinforcement cage
CN205776167U (en) Levelling pile foundation steel bar cage downward putting device
CN107989361A (en) A kind of construction hydraulic formwork climbing device
CN202064281U (en) Slip form frame
CN104499706B (en) Hoistway formwork platform and construction method thereof
CN103953187B (en) A kind of sliding-mode platform system of band center vertical tube structure
CN205558915U (en) Portable operation device
CN211114737U (en) A construction operation platform in elevator well for tower crane promotes
KR102410298B1 (en) a zig device for installing the heavy matearials for structures and the heavy matearial installing method using thereof
CN202899608U (en) Climbing device of building construction hydraulic pressure template
CN209227391U (en) Self-propelled bridge-collision-avoidance wall form trolley

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant