CN201695689U - One-step forming system of shear wall of high apartment building hidden with air conditioning condensed water pipeline - Google Patents

One-step forming system of shear wall of high apartment building hidden with air conditioning condensed water pipeline Download PDF

Info

Publication number
CN201695689U
CN201695689U CN2010202436879U CN201020243687U CN201695689U CN 201695689 U CN201695689 U CN 201695689U CN 2010202436879 U CN2010202436879 U CN 2010202436879U CN 201020243687 U CN201020243687 U CN 201020243687U CN 201695689 U CN201695689 U CN 201695689U
Authority
CN
China
Prior art keywords
shear wall
standpipe
air
molded cannula
water conduit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010202436879U
Other languages
Chinese (zh)
Inventor
袁军军
秦国平
任刚
王双林
王锦华
王骞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaanxi No5 Construction Engineering Co
Original Assignee
Shaanxi No5 Construction Engineering Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shaanxi No5 Construction Engineering Co filed Critical Shaanxi No5 Construction Engineering Co
Priority to CN2010202436879U priority Critical patent/CN201695689U/en
Application granted granted Critical
Publication of CN201695689U publication Critical patent/CN201695689U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses a one-step forming system of a shear wall of a high apartment building hidden with an air conditioning condensed water pipeline. The one-step forming system comprises a shear wall forming structure which is arranged at two adjoining layers of floor faceplates, wherein the shear wall forming structure comprises a forming template, a steel bar net frame, a vertical pipe which is arranged in the steel bar net frame before pouring the concrete, a forming sleeve which is arranged on the vertical pipe and is externally and previously provided with a pipe outer interface, and a support pipe which is arranged on the outer interface of the pipeline after pouring the concrete; the vertical pipe, the forming sleeve and the support pipe are formed into the air conditioning condensed water pipeline; the inner end part of the forming sleeve is connected with the vertical pipe, and the outer end part of the forming sleeve is extended out of the outer side of the steel bar net frame; and the arrangement position of the forming sleeve corresponds to the installation position of an air conditioning cabinet. The one-step forming system is simple in structure, reasonable in design, and simple in construction step, and completes the installation of the air conditioning condensed water pipeline and the construction of the structure of the building main body for once, thereby not only reducing the construction investment, shortening the work period, and greatly improving the impression quality of the surface of the outer wall.

Description

Secretly bury the high-rise residential building shear wall one-shot forming system of air-conditioning condensing water conduit
Technical field
The utility model belongs to high-rise residential building shear wall agent structure and air-conditioning condensing water conduit technical field of construction, especially relates to a kind of high-rise residential building shear wall one-shot forming system of secretly burying the air-conditioning condensing water conduit.
Background technology
At present, in the high-rise residential building work progress, when the air-conditioning condensing water conduit is installed, all adopt bright dress mode to install usually.But, when adopting bright dress mode to install an air-conditioner condensing water conduit, need after the concrete pouring construction of shear wall agent structure is finished, can carry out, thereby the construction period is longer, and when on building the shear wall of finishing, installing an air-conditioner condensing water conduit, difficulty of construction is big and engineering cost is higher, wastes time and energy.
The utility model content
Technical problem to be solved in the utility model is at above-mentioned deficiency of the prior art, a kind of high-rise residential building shear wall one-shot forming system of secretly burying the air-conditioning condensing water conduit is provided, it is simple in structure, reasonable in design and construction sequence simple, easy construction, make the installation exercise and disposable the finishing of residential building main structure construction engineering of air-conditioning condensing water conduit, not only having reduced construction drops into, shorten the duration of a project, and increased substantially the impression quality of exterior wall concrete work.
For solving the problems of the technologies described above, the technical solution adopted in the utility model is: a kind of high-rise residential building shear wall one-shot forming system of secretly burying the air-conditioning condensing water conduit, comprise the shear wall molding structure that is laid between the neighbouring two floors panel, described shear wall molding structure comprises the forming panel that is used for the described shear wall of moulding and is laid in the interior bar frame of forming panel, the forming cavity structure of described forming panel is corresponding with the structure that needs the moulding shear wall, it is characterized in that: be laid in the interior standpipe of described bar frame before also comprising concreting, be installed on the standpipe and the outer end is reserved with the arm that is installed in after the one-tenth molded cannula of pipeline external tapping and concreting are finished on the described pipeline external tapping, described standpipe with become molded cannula to be straight tube, and standpipe, become molded cannula and arm to form the air-conditioning condensing water conduit that circulates for the air-conditioning condensate water; Described standpipe for vertically to lay and become molded cannula be level to laying, the inner end that becomes molded cannula is with standpipe joins and the outer end extend out to the described bar frame outside, the corresponding pipe joint that supplies into the molded cannula installation that is provided with on the described standpipe; The installation position of described one-tenth molded cannula is corresponding with the installation site that the described shear wall outside is installed an air-conditioner.
Described one-tenth molded cannula is installed in the top or the bottom of standpipe, and being installed in the one-tenth molded cannula of riser upper and the vertical distance between the next level deck panels is 400mm ± 20mm, and being installed in the one-tenth molded cannula of standpipe bottom and the vertical distance between following first floor deck panels is 150mm ± 20mm.
Described standpipe is formed by the top tube and down tube overlap joint that with described pipe joint is the boundary.
Described going up between pipe, following pipe and the one-tenth molded cannula connects by tee piece, and becomes the level of molded cannula and tee piece to join to interface.
Described standpipe, tee piece and arm are hot dip galvanizing pipe.
Described arm is a bend pipe.
Carry out colligation by the bundle silk between described standpipe and the described bar frame and fix, and the colligation point between standpipe and the described bar frame is no less than 3 places.
Described one-tenth molded cannula is connected between interface threadably with the level of tee piece.
The caliber of described standpipe is 32mm, and the caliber of arm is 25mm.
Described pipeline external tapping is close on the inwall of forming panel and becomes the inwall of molded cannula and forming panel perpendicular.
The utility model compared with prior art has the following advantages:
1, simple in structure, rationally novel in design and installation is laid conveniently, and construction sequence is simple.
2, result of use is good, in residential building shear wall main structure construction process, the air-conditioning condensate pipe is installed in advance the bar frame that is used for the moulding shear wall, make the installation exercise and disposable the finishing of shear wall main structure construction engineering of air-conditioning condensing water conduit, even getting the construction of air-conditioning condensing water conduit carries out simultaneously with main structure construction, shortened the whole duration of engineering, realized the concealed installation construction of air-conditioning condensing water conduit, not only having reduced construction drops into, and shortened the duration of a project, and increased substantially the impression quality of concrete work.
3, avoid in the pipeline construction repeatedly using and hang the hurdle, reduced difficulty of construction and engineering cost.
Maintenance cost no longer takes place in 4, piping erection one-time-reach-place.
5, economic benefit and obvious social benefit, when shortening the duration of a project, a large amount of expenses have also been saved, and increased substantially the aesthetic measure of skin, and after the air-conditioning condensing water conduit finished of constructing is delivered for use, the condensate water that resident family produces in using air-conditioning process is directly entered in grey water system or the storm-water system by main riser, it is attractive in appearance to have avoided the direct row of condensate water to influence very much the dwelling house periphery to outdoor and its aproll, and the utilization of condensate water or concentrated being emitted on have met the requirement of country aspect environmental protection to a certain extent.In addition, the utility model is that a new road has been explored in the construction of air-conditioning condensing water conduit, has prolonged the application life of condensate pipe pipeline, has reduced maintenance frequency, helps the enhancing of construction enterprises' technical level and competitive strength.
6, popularizing application prospect is extensive, is applicable to the installing engineering of civil high-rise buildings air-conditioning condensing water conduit.
In sum, the utility model is simple in structure, reasonable in design and construction sequence simple, easy construction, make the installation exercise and disposable the finishing of residential building main structure construction engineering of air-conditioning condensing water conduit, not only having reduced construction drops into, shorten the duration of a project, and increased substantially the impression quality of exterior wall concrete work.
Below by drawings and Examples, the technical solution of the utility model is described in further detail.
Description of drawings
Fig. 1 is a structural representation of the present utility model.
After Fig. 2 finishes by the concreting of the utility model shear wall the structural representation of installation arm.
Description of reference numerals:
The 1-forming panel; 2-floor panel; 3-vertical shear wall reinforcing bar;
The 4-transverse reinforcement; 5-assembling reinforcement bar; The 6-standpipe;
The 7-tee piece; 8-becomes molded cannula; The 9-arm;
10-shear wall decorative cover.
The specific embodiment
As shown in Figure 1 and Figure 2, the utility model comprises the shear wall molding structure that is laid between the neighbouring two floors panel 2, described shear wall molding structure comprises forming panel 1 that is used for the described shear wall of moulding and the bar frame that is laid in the forming panel 1, and the forming cavity structure of described forming panel 1 is corresponding with the structure that needs the moulding shear wall.Simultaneously, the utility model also comprises the standpipe 6 that is laid in before the concreting in the described bar frame, be installed on the standpipe 6 and the outer end is reserved with the arm 9 that is installed in after the one-tenth molded cannula 8 of pipeline external tapping and concreting are finished on the described pipeline external tapping, described standpipe 6 with become molded cannula 8 to be straight tube, and standpipe 6, the air-conditioning condensing water conduit that becomes molded cannula 8 and arm 9 to form for the circulation of air-conditioning condensate water.Described standpipe 6 for vertically to lay and become molded cannula 8 be level to laying, the inner end that becomes molded cannula 8 is with standpipe 6 joins and the outer end extend out to the described bar frame outside, correspondence is provided with the pipe joint that supplies into molded cannula 8 installations on the described standpipe 6; The installation position of described one-tenth molded cannula 8 is corresponding with the installation site that the described shear wall outside is installed an air-conditioner.
In the present embodiment, described one-tenth molded cannula 8 is installed in the top of standpipe 6, and the vertical distance that is installed in 2 of the one-tenth molded cannula 8 on standpipe 6 tops and next level deck panels is 400mm ± 20mm.During actual installation, described one-tenth molded cannula 8 also can be installed in the bottom of standpipe 6, and the vertical distance that is installed in 2 of the one-tenth molded cannula 8 of standpipe 6 bottoms and following first floor deck panels is 150mm ± 20mm.
Described standpipe 6 is formed by the top tube and down tube overlap joint that with described pipe joint is the boundary.Described going up between pipe, following pipe and the one-tenth molded cannula 8 connects by tee piece 7, and becomes the molded cannula 8 and the level of tee piece 7 to join to interface, and described one-tenth molded cannula 8 is connected between interface threadably with the level of tee piece 7.Described standpipe 6, tee piece 7 and arm 9 are hot dip galvanizing pipe, and described arm 9 is a bend pipe, and the caliber of described standpipe 6 is 32mm, and the caliber of arm 9 is 25mm.Carry out colligation by the bundle silk between described standpipe 6 and the described bar frame and fix, and the colligation point between standpipe 6 and the described bar frame is no less than 3 places.Described pipeline external tapping is close on the inwall of forming panel 1 and becomes molded cannula 8 perpendicular with the inwall of forming panel 1.
In the present embodiment, two row vertical shear wall reinforcing bars 3 and colligations were at the multiple tracks transverse reinforcement 4 of 3 of two row's vertical shear wall reinforcing bars about described bar frame comprised, described vertical shear wall reinforcing bar 3 and transverse reinforcement 4 are vertical laying and the two to carry out colligation by assembling reinforcement bar 5 and fix.
In the practice of construction process, when the shear wall main structure construction, utilize the good bar frame of colligation, with standpipe 6, tee piece 7 with become molded cannula 8 to be fixed in advance on the described bar frame, and utilize magnetic force to go offline to hang down and tape measure is controlled the verticality of standpipe 6 well, should guarantee vertical being close to of inwall of described pipeline external tapping and forming panel 1 simultaneously, the outside mouth of pipe of described pipeline external tapping must not deflection.And during envelope mould (being shaping mould plate 1), the pipeline external tapping that becomes molded cannula 8 outer ends to reserve is carried out shutoff, and, paint and carry out sign, be convenient to follow-up this pipeline external tapping of digging out smoothly at pipeline external tapping place.Like this, the installation exercise of air-conditioning condensing water conduit can be finished with the construction works of shear wall agent structure is disposable.In addition, also should do water filling test before the envelope mould.After water filling test is qualified, with messenger wire and invar tape the verticality of standpipe 6 is carried out straightening, the perpendicularity deviation of standpipe 6 must not surpass 1mm.
Actual to pipeline fixedly the time; after earlier described standpipe 6 and tee piece 7 being installed and fixed and treat that the two fixedly finishes; again the level of tee piece 7 is carried out shutoff and protection to interface; specifically be to seal with adhesive tape earlier; be installed in the level of tee piece 7 on interface with the one-tenth molded cannula of making 8 again; and fill in in the molded cannula 8 with plugging material; to become molded cannula 8 cross colligations on tee piece 7 with pricking silk subsequently; and seal becoming molded cannula 8 with adhesive tape, carry out mark with red paint at last.Afterwards, just can carry out the concrete pouring construction of shear wall.
Treat that concrete pouring construction is finished and after forming panel 1 removes, to in time clean out the level of tee piece 7 to interface, and clear up into the plugging materials of being clogged in the molded cannula 8, again with invar tape measure arm 9 setting height(from bottom) the particular location of molded cannula 8, the elbow of arm 9 is not less than 40mm apart from the distance of shear wall decorative cover 10, and the elbow mouth of arm 9 should be up, and to seal elbow with plug suitable for reading temporarily, in order to avoid foreign material are fallen in the arm 9 during civil engineering.In addition, in the plugging material of being clogged in clearing up into molded cannula 8, reply is brushed oily anti-corrosion to level to the silk of interface inboard mouthful (be arm 9 with 7 of tee pieces be threaded mouthful) and is handled, and guarantees the not corrosion of silk mouth.
The above; it only is preferred embodiment of the present utility model; be not that the utility model is imposed any restrictions; everyly any simple modification that above embodiment did, change and equivalent structure are changed, all still belong in the protection domain of technical solutions of the utility model according to the utility model technical spirit.

Claims (10)

1. high-rise residential building shear wall one-shot forming system of secretly burying the air-conditioning condensing water conduit, comprise the shear wall molding structure that is laid between the neighbouring two floors panel (2), described shear wall molding structure comprises the forming panel (1) that is used for the described shear wall of moulding and is laid in the interior bar frame of forming panel (1), the forming cavity structure of described forming panel (1) is corresponding with the structure that needs the moulding shear wall, it is characterized in that: be laid in the interior standpipe (6) of described bar frame before also comprising concreting, be installed in that standpipe (6) is gone up and the outer end is reserved with the arm (9) that is installed in after the one-tenth molded cannula (8) of pipeline external tapping and concreting are finished on the described pipeline external tapping, described standpipe (6) with become molded cannula (8) to be straight tube, and standpipe (6), become molded cannula (8) and arm (9) to form the air-conditioning condensing water conduit that circulates for the air-conditioning condensate water; Described standpipe (6) is for being that level is to laying to laying and becoming molded cannula (8) vertically, the inner end that becomes molded cannula (8) is with standpipe (6) joins and the outer end extend out to the described bar frame outside, and described standpipe (6) is gone up correspondence and is provided with the pipe joint that supplies into molded cannula (8) installation; The installation position of described one-tenth molded cannula (8) is corresponding with the installation site that the described shear wall outside is installed an air-conditioner.
2. according to the described high-rise residential building shear wall one-shot forming system of secretly burying the air-conditioning condensing water conduit of claim 1, it is characterized in that: described one-tenth molded cannula (8) is installed in the top or the bottom of standpipe (6), and being installed in the one-tenth molded cannula (8) on standpipe (6) top and the vertical distance between next level deck panels (2) is 400mm ± 20mm, and being installed in the one-tenth molded cannula (8) of standpipe (6) bottom and the vertical distance between following first floor deck panels (2) is 150mm ± 20mm.
3. according to claim 1 or 2 described high-rise residential building shear wall one-shot forming systems of secretly burying the air-conditioning condensing water conduit, it is characterized in that: described standpipe (6) is formed by the top tube and down tube overlap joint that with described pipe joint is the boundary.
4. according to the described high-rise residential building shear wall one-shot forming system of secretly burying the air-conditioning condensing water conduit of claim 3, it is characterized in that: described going up between pipe, following pipe and the one-tenth molded cannula (8) connects by tee piece (7), and becomes the molded cannula (8) and the level of tee piece (7) to join to interface.
5. according to claim 1 or 2 described high-rise residential building shear wall one-shot forming systems of secretly burying the air-conditioning condensing water conduit, it is characterized in that: described standpipe (6), tee piece (7) and arm (9) are hot dip galvanizing pipe.
6. according to claim 1 or 2 described high-rise residential building shear wall one-shot forming systems of secretly burying the air-conditioning condensing water conduit, it is characterized in that: described arm (9) is a bend pipe.
7. according to claim 1 or 2 described high-rise residential building shear wall one-shot forming systems of secretly burying the air-conditioning condensing water conduit, it is characterized in that: carry out colligation by the bundle silk between described standpipe (6) and the described bar frame and fix, and the colligation point between standpipe (6) and the described bar frame is no less than 3 places.
8. according to the described high-rise residential building shear wall one-shot forming system of secretly burying the air-conditioning condensing water conduit of claim 4, it is characterized in that: described one-tenth molded cannula (8) is connected between interface threadably with the level of tee piece (7).
9. according to the described high-rise residential building shear wall one-shot forming system of secretly burying the air-conditioning condensing water conduit of claim 6, it is characterized in that: the caliber of described standpipe (6) is 32mm, and the caliber of arm (9) is 25mm.
10. according to claim 1 or 2 described high-rise residential building shear wall one-shot forming systems of secretly burying the air-conditioning condensing water conduit, it is characterized in that: described pipeline external tapping is close on the inwall of forming panel (1) and becomes molded cannula (8) perpendicular with the inwall of forming panel (1).
CN2010202436879U 2010-06-29 2010-06-29 One-step forming system of shear wall of high apartment building hidden with air conditioning condensed water pipeline Expired - Fee Related CN201695689U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010202436879U CN201695689U (en) 2010-06-29 2010-06-29 One-step forming system of shear wall of high apartment building hidden with air conditioning condensed water pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010202436879U CN201695689U (en) 2010-06-29 2010-06-29 One-step forming system of shear wall of high apartment building hidden with air conditioning condensed water pipeline

Publications (1)

Publication Number Publication Date
CN201695689U true CN201695689U (en) 2011-01-05

Family

ID=43396928

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010202436879U Expired - Fee Related CN201695689U (en) 2010-06-29 2010-06-29 One-step forming system of shear wall of high apartment building hidden with air conditioning condensed water pipeline

Country Status (1)

Country Link
CN (1) CN201695689U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110206312A (en) * 2019-06-18 2019-09-06 中国五冶集团有限公司 A kind of concrete wall pipeline construction method
CN112942639A (en) * 2021-04-07 2021-06-11 碧源建工有限公司 Construction method for embedding temporary water supply pipe and temporary power main cable shear wall

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110206312A (en) * 2019-06-18 2019-09-06 中国五冶集团有限公司 A kind of concrete wall pipeline construction method
CN112942639A (en) * 2021-04-07 2021-06-11 碧源建工有限公司 Construction method for embedding temporary water supply pipe and temporary power main cable shear wall

Similar Documents

Publication Publication Date Title
CN102182265B (en) A kind of Multifunctional die wallboard structural system for fast house building
CN101818541A (en) Precast composite wallboard with door/window holes and manufacturing method thereof
CN201874128U (en) Open-type back-bolted stone curtain wall system
CN201738494U (en) Prefabricated composite wall slab with door/window opening
CN106121231A (en) A kind of skyscraper interts cross construction method
CN103089014A (en) Construction method of through floor pipe
CN104846978A (en) Cast-in-situ house drainage system quasi-industrialized construction method
KR101018566B1 (en) A construction method of artificial stone with durability
CN201695468U (en) Air-conditioner condensed water pipe embedded in shear wall of high-rise building
CN201695689U (en) One-step forming system of shear wall of high apartment building hidden with air conditioning condensed water pipeline
CN101962982B (en) Process for mounting splicing type low-carbon heat insulating energy-saving plate
CN101906858B (en) Seamless installation process for polyline artistic GRC (Glass-fiber Reinforced Composite) board
CN106368445A (en) Existing building reinforcing and self-supporting thermal insulation integrated system and construction method
CN206428768U (en) A kind of plumbing steel-pipe assembly sleeve pipe
CN110805185A (en) Installation method of large-span curved surface special-shaped stone curtain wall
CN202324155U (en) Adjustable corrugated prestress anti-pollution drainage culvert
CN211313074U (en) Integrated building external wall panel convenient to install
CN204282528U (en) A kind of prefabricated balcony structure
CN204418728U (en) A kind of precast monolithic washroom
CN207646861U (en) A kind of prefabricated air-conditioning harden structure with drain function
CN201810005U (en) Simple steel structure car parking shed
CN209066871U (en) A kind of Pipe installing standard element of Preembedded of tier building
CN111636603A (en) Curtain wall system applied to staggered effect of glass bricks and metal bricks of outer wall
CN206189916U (en) Bathroom room
CN206189908U (en) Bathroom room

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110105

Termination date: 20160629