CN207646861U - A kind of prefabricated air-conditioning harden structure with drain function - Google Patents
A kind of prefabricated air-conditioning harden structure with drain function Download PDFInfo
- Publication number
- CN207646861U CN207646861U CN201721786718.3U CN201721786718U CN207646861U CN 207646861 U CN207646861 U CN 207646861U CN 201721786718 U CN201721786718 U CN 201721786718U CN 207646861 U CN207646861 U CN 207646861U
- Authority
- CN
- China
- Prior art keywords
- air
- conditioning plate
- conditioning
- prefabricated
- prefabricated air
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Building Environments (AREA)
Abstract
The utility model discloses a kind of prefabricated air-conditioning harden structures with drain function, including precast wall body, pre-embedded steel slab, prefabricated air-conditioning plate, fixed pan, aqueduct, three-way connection and water blocking edge, it is provided with insulating layer on the outside of the precast wall body, and exterior wall finish layer is provided on the outside of insulating layer, the pre-embedded steel slab is arranged in the inside of precast wall body, the prefabricated air-conditioning plate is arranged in the outside of precast wall body, and prefabricated air-conditioning plate is internally provided with air-conditioning plate main reinforcement, the fixed pan is arranged in the upper surface of prefabricated air-conditioning plate, and the surface of fixed pan is provided with gutter channel, the aqueduct is through prefabricated air-conditioning plate, the three-way connection is connected with the lower end of aqueduct.The prefabricated air-conditioning harden structure with drain function is provided with two groups of air-conditioning plate main reinforcements, and every group of air-conditioning plate main reinforcement is provided with two, and every group of air-conditioning plate main reinforcement is connected with fixed steel bars so that the structure of prefabricated air-conditioning intralamellar part is more firm.
Description
Technical field
The utility model is related to PC technical field of prefabricated, specially a kind of prefabricated air-conditioning with drain function is hardened
Structure.
Background technology
With economic prosperity, the continuous raising of people's living standard, the development of production technology is become better and better, people
The environment often made the life better using air-conditioning in life, substantially every household has all installed air-conditioning, for side
Just the placement of outdoor machine of air-conditioner, the cell house in present city have been substantially all air-conditioning plate prefabricated when building, and facilitate finishing with this
When outdoor machine of air-conditioner placement, traditional outdoor machine of air-conditioner places through being fixed to the outer of wall frequently with by metal frame or metal frame
Side, then outdoor machine of air-conditioner is placed in metal frame or in metal frame, it is taken time and effort during placement, after the time is permanent
Metal gets rusty easily corrosion, there is the danger fallen, and for existing air-conditioning plate, the drainage effect of air-conditioning plate is bad, holds
Easily there is the phenomenon that rain penetration metope.
Utility model content
The purpose of this utility model is to provide a kind of prefabricated air-conditioning harden structures with drain function, to solve the above-mentioned back of the body
It is taken time and effort in traditional outdoor machine of air-conditioner installation course currently on the market that scape technology proposes, metal is easy after the time is permanent
There is the danger fallen in corrosion, the drainage effect of air-conditioning plate is bad, the problem of being susceptible to rain penetration metope.
To achieve the above object, the utility model provides the following technical solutions:A kind of prefabricated air-conditioning with drain function
Harden structure, including precast wall body, pre-embedded steel slab, prefabricated air-conditioning plate, fixed pan, aqueduct, three-way connection and water blocking edge, it is described
It is provided with insulating layer on the outside of precast wall body, and is provided with exterior wall finish layer on the outside of insulating layer, the pre-embedded steel slab setting exists
The inside of precast wall body, the prefabricated air-conditioning plate be arranged in the outside of precast wall body, and prefabricated air-conditioning plate is internally provided with sky
Tuned plate main reinforcement, the air-conditioning plate main reinforcement are connected with pre-embedded steel slab, and are connected with fixed steel bars between air-conditioning plate main reinforcement,
The fixed pan is arranged in the upper surface of prefabricated air-conditioning plate, and the surface of fixed pan is provided with gutter channel, the aqueduct
Through prefabricated air-conditioning plate, and aqueduct is communicated with gutter channel, and the three-way connection is connected with the lower end of aqueduct, the gear
Water edge is arranged at the edge of prefabricated air-conditioning plate, and is provided with guardrail above water blocking edge.
Preferably, the prefabricated air-conditioning plate be concrete pouring structure, and the air-conditioning plate main reinforcement in prefabricated air-conditioning plate with
Pre-embedded steel slab is arranged in same level height, and is welding between air-conditioning plate main reinforcement and pre-embedded steel slab.
Preferably, the air-conditioning plate main reinforcement is provided with two groups, and every group of air-conditioning plate main reinforcement is provided with two, and every
It is connected with 9 fixed steel bars between group air-conditioning plate main reinforcement, and is welding between every group of air-conditioning plate main reinforcement and fixed steel bars.
Preferably, the gutter channel is provided with four altogether, and gutter channel is vertically arranged with one, is horizontally arranged with three,
And be connected between longitudinal gutter channel and lateral gutter channel, and longitudinal gutter channel is set lower than lateral flowing water
Slot.
Preferably, the aqueduct is arranged in longitudinal gutter channel one end, and aqueduct and longitudinal gutter channel lower end
It is connected.
Preferably, the width setting on the water blocking edge is more than the width of guardrail, and guardrail is arranged along water blocking edge prefabricated
The outer ledge of air-conditioning plate.
Compared with prior art, the utility model has the beneficial effects that:The prefabricated air-conditioning harden structure with drain function
Two groups of air-conditioning plate main reinforcements are provided with, and every group of air-conditioning plate main reinforcement is provided with two, and every group of air-conditioning plate main reinforcement connection
There are fixed steel bars, and be welding between every group of air-conditioning plate main reinforcement and fixed steel bars so that the structure of prefabricated air-conditioning intralamellar part
More firm, the air-conditioning plate main reinforcement in prefabricated air-conditioning plate is arranged with pre-embedded steel slab in same level height, and air-conditioning plate
It is welding between main reinforcement and pre-embedded steel slab, by concreting, will be connected between prefabricated air-conditioning plate and precast wall body
One entirety, the phenomenon that effectively preventing rain penetration wall, while but also prefabricated air-conditioning plate is more firm, it directly will be empty
It adjusts outer machine to be placed on above the fixed pan in prefabricated air-conditioning plate, improves the working efficiency of outdoor machine of air-conditioner installation, avoid
Cause prefabricated air-conditioning plate there is a situation where falling because metal rusting corrodes, gutter channel is provided with four altogether, and gutter channel is vertical
To being provided with one, three are horizontally arranged with, and be connected between longitudinal gutter channel and lateral gutter channel, and longitudinal
Gutter channel be set lower than lateral gutter channel so that be not easy ponding on prefabricated air-conditioning plate, further prevented rain penetration wall
Body.
Description of the drawings
FIG. 1 is a schematic structural view of the utility model;
Fig. 2 is the prefabricated air-conditioning intralamellar part structural schematic diagram of the utility model;
Fig. 3 is the prefabricated air-conditioning plate surface structure schematic diagram of the utility model;
Fig. 4 is the prefabricated air-conditioning plate side structure schematic view of the utility model.
In figure:1, precast wall body, 2, insulating layer, 3, exterior wall finish layer, 4, pre-embedded steel slab, 5, prefabricated air-conditioning plate, 6, air-conditioning
Plate main reinforcement, 7, fixed steel bars, 8, fixed pan, 9, gutter channel, 10, aqueduct, 11, three-way connection, 12, water blocking edge, 13, shield
Column.
Specific implementation mode
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work
The every other embodiment obtained, shall fall within the protection scope of the present invention.
- 4 are please referred to Fig.1, the utility model provides a kind of technical solution:Including precast wall body 1, insulating layer 2, exterior wall finish
Layer 3, pre-embedded steel slab 4, prefabricated air-conditioning plate 5, air-conditioning plate main reinforcement 6, fixed steel bars 7, fixed pan 8, gutter channel 9, aqueduct 10,
Along 12 and guardrail 13, the outside of precast wall body 1 is provided with insulating layer 2, and the outside setting of insulating layer 2 for three-way connection 11, water blocking
There are exterior wall finish layer 3, pre-embedded steel slab 4 to be arranged in the inside of precast wall body 1, prefabricated air-conditioning plate 5 is arranged in the outer of precast wall body 1
Side, and prefabricated air-conditioning plate 5 is internally provided with air-conditioning plate main reinforcement 6, prefabricated air-conditioning plate 5 is concrete pouring structure, and prefabricated
Air-conditioning plate main reinforcement 6 in air-conditioning plate 5 and pre-embedded steel slab 4 are arranged in same level height, and air-conditioning plate main reinforcement 6 with it is pre-buried
It is welding between steel plate 4 so that prefabricated air-conditioning plate 5 is more firm, and outdoor machine of air-conditioner is prevented to be placed on 5 top hair of prefabricated air-conditioning plate
Life is fallen, and air-conditioning plate main reinforcement 6 is connected with pre-embedded steel slab 4, and is connected with fixed steel bars 7, air-conditioning between air-conditioning plate main reinforcement 6
Plate main reinforcement 6 is provided with two groups, and every group of air-conditioning plate main reinforcement 6 is provided with two, and every group of air-conditioning plate main reinforcement 6 is connected with
9 fixed steel bars 7, and be welding between every group of air-conditioning plate main reinforcement 6 and fixed steel bars 7 so that inside prefabricated air-conditioning plate 5 more
Add firm, improves the load-bearing capacity of prefabricated air-conditioning plate 5, fixed pan 8 is arranged in the upper surface of prefabricated air-conditioning plate 5, and fixed
The surface of plane 8 is provided with gutter channel 9, and gutter channel 9 is provided with four altogether, and gutter channel 9 is vertically arranged with one, is laterally arranged
There are three, and be connected between longitudinal gutter channel 9 and lateral gutter channel 9, and longitudinal gutter channel 9 is set lower than cross
To gutter channel 9 so that the case where surface of prefabricated air-conditioning plate 5 is not easy ponding, effectively prevents rain penetration wall, aqueduct
10 through prefabricated air-conditioning plate 5, and aqueduct 10 is communicated with gutter channel 9, and aqueduct 10 is arranged in longitudinal 9 one end of gutter channel,
And aqueduct 10 is connected with longitudinal 9 lower end of gutter channel so that the water in gutter channel 9 is easier to be discharged from aqueduct 10,
Three-way connection 11 is connected with the lower end of aqueduct 10, and water blocking is arranged along 12 at the edge of prefabricated air-conditioning plate 5, and water blocking is along 12
Top be provided with 13 water blocking of guardrail along 12 width setting more than guardrail 13 width, and guardrail 13 along water blocking along 12 setting exist
The outer ledge of prefabricated air-conditioning plate 5 plays certain protective action, simultaneously to the outdoor machine of air-conditioner being placed on prefabricated air-conditioning plate 5
The effect of protection staff is also functioned to when installing outdoor machine of air-conditioner.
Operation principle:When using the prefabricated air-conditioning harden structure with drain function, it is necessary first to having draining work(
The overall structure of the prefabricated air-conditioning harden structure of energy is simply understood, and during wall construction, construction personnel is prefabricated
The good pre-embedded steel slab 4 of the positioned inside of wall 1, then air-conditioning plate main reinforcement 6 is welded together with pre-embedded steel slab 4, in every group of air-conditioning
Fixed steel bars 7 are welded between plate main reinforcement 6, in the position of the internal reservation of prefabricated air-conditioning plate 5 good gutter channel 9 and aqueduct 10
It sets, after reinforcing bar and mold all fix, precast wall body 1 and prefabricated air-conditioning plate 5 is poured so that prefabricated air-conditioning plate 5
Integral structure is poured with precast wall body 1, insulating layer 2 is laid in the outside of precast wall body 1, in the outside powder of insulating layer 2
Brush exterior wall finish layer 3, the upper three-way connection 11 of connection in the lower end of aqueduct 10, then will be in three-way connection 11 and water drainage pipe of air conditioner figure
Be not drawn into and downcomer figure in be not drawn into and be connected, guardrail 13 is fixed on water blocking along 12 top, after setting, is being pacified
Outdoor machine of air-conditioner can be placed on the fixed pan 8 in prefabricated air-conditioning plate 5 when filling air-conditioning, be not described in detail in this explanation
Content belongs to the prior art well known to professional and technical personnel in the field.
Although the utility model is described in detail with reference to the foregoing embodiments, those skilled in the art is come
Say, still can with technical scheme described in the above embodiments is modified, or to which part technical characteristic into
Row equivalent replacement, within the spirit and principle of the utility model, any modification, equivalent replacement, improvement and so on should all
It is included within the scope of protection of this utility model.
Claims (6)
1. a kind of prefabricated air-conditioning harden structure with drain function, including precast wall body(1), pre-embedded steel slab(4), prefabricated air-conditioning plate
(5), fixed pan(8), aqueduct(10), three-way connection(11)With water blocking edge(12), it is characterised in that:The precast wall body
(1)Outside be provided with insulating layer(2), and insulating layer(2)Outside be provided with exterior wall finish layer(3), the pre-embedded steel slab(4)
It is arranged in precast wall body(1)Inside, the prefabricated air-conditioning plate(5)It is arranged in precast wall body(1)Outside, and prefabricated air-conditioning plate
(5)Be internally provided with air-conditioning plate main reinforcement(6), the air-conditioning plate main reinforcement(6)With pre-embedded steel slab(4)It is connected, and air-conditioning
Plate main reinforcement(6)Between be connected with fixed steel bars(7), the fixed pan(8)It is arranged in prefabricated air-conditioning plate(5)Upper surface,
And fixed pan(8)Surface be provided with gutter channel(9), the aqueduct(10)Through prefabricated air-conditioning plate(5), and aqueduct
(10)With gutter channel(9)It communicates, the three-way connection(11)With aqueduct(10)Lower end be connected, the water blocking edge(12)If
It sets in prefabricated air-conditioning plate(5)Edge, and water blocking edge(12)Top be provided with guardrail(13).
2. a kind of prefabricated air-conditioning harden structure with drain function according to claim 1, it is characterised in that:It is described prefabricated
Air-conditioning plate(5)For concrete pouring structure, and prefabricated air-conditioning plate(5)Interior air-conditioning plate main reinforcement(6)With pre-embedded steel slab(4)Setting
In same level height, and air-conditioning plate main reinforcement(6)With pre-embedded steel slab(4)Between for welding.
3. a kind of prefabricated air-conditioning harden structure with drain function according to claim 1, it is characterised in that:The air-conditioning
Plate main reinforcement(6)It is provided with two groups, and every group of air-conditioning plate main reinforcement(6)It is provided with two, and every group of air-conditioning plate main reinforcement(6)
Between be connected with 9 fixed steel bars(7), and every group of air-conditioning plate main reinforcement(6)And fixed steel bars(7)Between for welding.
4. a kind of prefabricated air-conditioning harden structure with drain function according to claim 1, it is characterised in that:The flowing water
Slot(9)It is provided with four, and gutter channel altogether(9)It is vertically arranged with one, is horizontally arranged with three, and longitudinal gutter channel
(9)With lateral gutter channel(9)Between be connected, and longitudinal gutter channel(9)It is set lower than lateral gutter channel(9).
5. a kind of prefabricated air-conditioning harden structure with drain function according to claim 1, it is characterised in that:The water guide
Pipe(10)It is arranged in longitudinal gutter channel(9)One end, and aqueduct(10)With longitudinal gutter channel(9)Lower end is connected.
6. a kind of prefabricated air-conditioning harden structure with drain function according to claim 1, it is characterised in that:The water blocking
Edge(12)Width setting be more than guardrail(13)Width, and guardrail(13)Along water blocking edge(12)It is arranged in prefabricated air-conditioning plate
(5)Outer ledge.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721786718.3U CN207646861U (en) | 2017-12-20 | 2017-12-20 | A kind of prefabricated air-conditioning harden structure with drain function |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721786718.3U CN207646861U (en) | 2017-12-20 | 2017-12-20 | A kind of prefabricated air-conditioning harden structure with drain function |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207646861U true CN207646861U (en) | 2018-07-24 |
Family
ID=62877472
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721786718.3U Expired - Fee Related CN207646861U (en) | 2017-12-20 | 2017-12-20 | A kind of prefabricated air-conditioning harden structure with drain function |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207646861U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110424557A (en) * | 2019-09-05 | 2019-11-08 | 中建八局第二建设有限公司 | A kind of assembled architecture outer wall plate waterproof construction |
-
2017
- 2017-12-20 CN CN201721786718.3U patent/CN207646861U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110424557A (en) * | 2019-09-05 | 2019-11-08 | 中建八局第二建设有限公司 | A kind of assembled architecture outer wall plate waterproof construction |
CN110424557B (en) * | 2019-09-05 | 2024-03-22 | 中建八局第二建设有限公司 | Waterproof structure of assembled building external wall panel |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206174146U (en) | Assembly type structure's assembly node | |
CN209723052U (en) | The prefabricated plate advanced water-stopping of poured band of outer wall of basement backfills structure | |
CN109811878A (en) | The shell integrated structure of the cast-in-place coinsiding die of assembled architecture and construction method | |
CN106978823A (en) | Outer wall of basement advanced water-stop post-pouring zone construction method | |
CN210976328U (en) | Secondary structure capable of being assembled for construction | |
CN207646861U (en) | A kind of prefabricated air-conditioning harden structure with drain function | |
CN208168479U (en) | A kind of prefabricated rod structure in inspection hole | |
CN201473974U (en) | Novel steel plate water stopper | |
CN103046664A (en) | Energy-saving wall with connecting keys and recycled concrete wall panels holding insulation block masonry, and manufacturing method of energy-saving wall | |
CN106320601B (en) | Assembly concrete is whole without heat bridge board wall and its vertical connection method | |
CN210216493U (en) | Drainage type tower crane foundation structure | |
CN217326438U (en) | Kitchen bathroom stagnant water and structure integrated into one piece's construction structures | |
CN214940427U (en) | Swift effectual post-cast strip block | |
CN204703191U (en) | A kind of double preformed pile and top board node connecting structure doing structure outer | |
CN211923105U (en) | Precast concrete externally-hung wallboard seam waterproof construction | |
CN106638956A (en) | Concrete wallboard and ribbed slab dry type connection node | |
CN208293624U (en) | The steel plate for sealing water support construction of sole plate post-poured strip | |
CN202689365U (en) | Prefabricated reinforced concrete roof gutter | |
CN206245606U (en) | A kind of EPS composite heat-insulation roofs | |
CN111236452B (en) | Prefabricated post-cast strip for basement and installation method thereof | |
CN206784755U (en) | A kind of roofing waterproof heat insulation structure | |
CN106368391B (en) | A kind of EPS composite heat-insulation roof | |
CN206256587U (en) | Steel bar girder | |
CN221030735U (en) | Anti-bank antiseep of bathroom is pre-buried stagnant water steel band structure once | |
CN212104696U (en) | Rammed earth composite construction wall with door and window structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180724 Termination date: 20211220 |