CN206428768U - A kind of plumbing steel-pipe assembly sleeve pipe - Google Patents

A kind of plumbing steel-pipe assembly sleeve pipe Download PDF

Info

Publication number
CN206428768U
CN206428768U CN201621409100.0U CN201621409100U CN206428768U CN 206428768 U CN206428768 U CN 206428768U CN 201621409100 U CN201621409100 U CN 201621409100U CN 206428768 U CN206428768 U CN 206428768U
Authority
CN
China
Prior art keywords
sleeve pipe
section
pipe
steel
stator
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621409100.0U
Other languages
Chinese (zh)
Inventor
王财泾
吴勇
李洪洲
罗加鹏
王建林
刘睿迪
吴启东
陈光瑜
浦仕亮
罗云龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yunnan Construction Investment Tenth Construction Co Ltd
Yunnan Construction and Investment Holding Group Co Ltd
Original Assignee
Yunnan Construction Investment Tenth Construction Co Ltd
Yunnan Construction and Investment Holding Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yunnan Construction Investment Tenth Construction Co Ltd, Yunnan Construction and Investment Holding Group Co Ltd filed Critical Yunnan Construction Investment Tenth Construction Co Ltd
Priority to CN201621409100.0U priority Critical patent/CN206428768U/en
Application granted granted Critical
Publication of CN206428768U publication Critical patent/CN206428768U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

A kind of plumbing steel-pipe assembly sleeve pipe, including stator, steel pipe sleeve pipe, short tube;Wherein stator is circular piece, and ring uniformly offers connecting hole in the circular piece;Steel pipe sleeve pipe includes this figure and the loudspeaker being connected with this figure section and the flared section being connected in loudspeaker section;The beneficial effects of the utility model are, using factory is customized, machining, finished product specification, simple and easy to do, safe and reliable.Stator steel pipe processing method is simple, with low cost, sleeve pipe fixation, levels on aluminum alloy pattern plate, which are drawn, a little facilitates accurate, one section is first implanted into concreting process, concreting accesses one section again after completing form removable, solves standpipe situation template fixture and blocks the problem that can not be installed.Sleeve pipe in concrete structure is disposably implanted into, and without secondary carry out filling-up hole, is not in the contraction fissure that the first after-pouring of concrete is caused, is not likely to produce with Seepage between boiled water room.

Description

A kind of plumbing steel-pipe assembly sleeve pipe
Technical field
The utility model belongs to plumbing standpipe sleeve structure technology in building water supply and drainage installing engineering, is building water supply and drainage peace Dress engineering wears structure there is provided the good installation fitting of a kind of simple, practicality, economy, barrier performance, indoors supplying drainage sleeve pipe During the disposable installation of floor, people, material, machine cost have been saved to greatest extent, project duration is effectively shortened, increased Strong construction quality, promotes environmental protection and civilized construction.
Background technology
At present, building trade plumbing standpipe sleeve pipe, which wears the conventional construction method of structural slab installation, is:In structural concrete Coordinate reserved opening in casting process, secondary installing sleeve pipe again when later stage plumbing standpipe is installed.This construction method wastes time and energy, It is secondary beat chisel, filling-up hole, implantation sleeve pipe, plate face and mend powder when, produce a large amount of rubbish influence civilized constructions, successively casting concrete shape Seepage is easily caused into contraction fissure, the central point of lower floor's sleeve pipe can not lead to upper strata plate face, and set pipe fixing method is easily caused Sleeve position is moved, and causes to do over again during pipeline is easy partially when plumbing standpipe is installed, construction quality and appearance are difficult to ensure that.
The content of the invention
In order to overcome existing plumbing standpipe to pass through defect of the structural slab sleeve pipe secondary installing on process form, this reality With a kind of Novel assembled sizing steel sleeve of new offer, the installation that the sleeve pipe can not only be met under various material templates is fixed, and And processing technology is simple and easy to apply, installation accuracy is high, simple and easy, and sleeve pipe first installs one section in cast-in-place concrete, and the later stage connects again Enter other one section to be blocked with ointment, without secondary filling-up hole, do not result in seepage.Effectively prevent to use Seepage between boiled water room.
The utility model solves the technical scheme that its technical problem used:
A kind of plumbing steel-pipe assembly sleeve pipe, the utility model is characterized in:Including stator, the steel on stator is fixed on Pipe-in-pipe, is socketed in the short tube on steel pipe sleeve pipe;Wherein, stator is circular piece, the uniform company of offering of ring in the circular piece Connect hole;Steel pipe sleeve pipe includes this figure and the loudspeaker being connected with this figure section, and the flared section being connected in loudspeaker section;Short tube Diameter it is identical with this figure diameter of steel pipe sleeve pipe, short tube puts in flared section and is inserted into along loudspeaker section at the top of this figure, The annulus formed between short tube and flared section is blocked using waterproofing unction.
The beneficial effects of the utility model are, using factory is customized, machining, finished product specification, simple and easy to do, safety can Lean on.Stator steel pipe processing method is simple, with low cost, and sleeve pipe fixation, levels on aluminum alloy pattern plate are drawn a little convenient accurate Really, one section is first implanted into concreting process, concreting accesses one section again after completing form removable, solves standpipe position Put formwork fixing part and block the problem that can not be installed.Sleeve pipe in concrete structure is disposably implanted into, without secondary carry out filling-up hole, Be not in the contraction fissure that the first after-pouring of concrete is caused, be not likely to produce with Seepage between boiled water room.
The utility model is further illustrated with reference to the accompanying drawings and examples.
Brief description of the drawings
Fig. 1 is the utility model dimensional structure diagram.
Embodiment
See Fig. 1, a kind of 1. plumbing steel-pipe assembly sleeve pipes, it is characterized in that:Including stator 1, it is fixed on stator 1 Steel pipe sleeve pipe 2, is socketed in the short tube 3 on steel pipe sleeve pipe 2;Wherein, stator 1 is circular piece, and ring is uniformly opened in the circular piece Provided with connecting hole 5;Steel pipe sleeve pipe 2 includes this figure 2.1 and the loudspeaker being connected with this figure 2.1 section 2.2, and is connected to loudspeaker Flared section 2.3 in section 2.2;The diameter of short tube 3 is identical with the diameter of this figure 2.1 of steel pipe sleeve pipe 2, and short tube 3 puts in flared section The top of this figure 2.1, the annulus 4 formed between short tube 3 and flared section 2.3 are inserted into 2.3 and along loudspeaker section 2.2 Blocked using waterproofing unction.
The utility model carries out steel plate in factory to be mechanically cut into stator, then diagonal cavity punching;By seamless steel pipe Cut-out carries out mechanical amplification into rim of a cup shape, then the cup steel-pipe welding processed on stator;In concreting Journey is first implanted into one section, and concreting completes after form removable (when standpipe is installed) and accesses other section short tube again;Two sections of short tubes Between gap using waterproofing unction complete closure.
The utility model installation method is:By stator (simultaneous to draw upper point), cup steel sleeve, common steel sleeve, instrument suppotr If center draw order iron plate composition, sleeve pipe install and use during 4 be one group, installed after the determination at first layer standpipe center Into passing through 1 infrared level vertical drawing.

Claims (1)

1. a kind of plumbing steel-pipe assembly sleeve pipe, it is characterized in that:Including stator (1), the steel pipe socket on stator (1) is fixed on Manage (2), be socketed in the short tube (3) on steel pipe sleeve pipe (2);Wherein, stator (1) is circular piece, and ring is uniform in the circular piece Offer connecting hole (5);Steel pipe sleeve pipe (2) includes this figure (2.1) and the loudspeaker being connected with this figure (2.1) section (2.2), with And it is connected to the flared section (2.3) in loudspeaker section (2.2);The diameter of short tube (3) is straight with this figure (2.1) of steel pipe sleeve pipe (2) Footpath is identical, and short tube (3) puts in flared section (2.3) and is inserted into along loudspeaker section (2.2) at the top of this figure (2.1), in short tube (3) The annulus (4) formed between flared section (2.3) is blocked using waterproofing unction.
CN201621409100.0U 2016-12-21 2016-12-21 A kind of plumbing steel-pipe assembly sleeve pipe Active CN206428768U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621409100.0U CN206428768U (en) 2016-12-21 2016-12-21 A kind of plumbing steel-pipe assembly sleeve pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621409100.0U CN206428768U (en) 2016-12-21 2016-12-21 A kind of plumbing steel-pipe assembly sleeve pipe

Publications (1)

Publication Number Publication Date
CN206428768U true CN206428768U (en) 2017-08-22

Family

ID=59586661

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621409100.0U Active CN206428768U (en) 2016-12-21 2016-12-21 A kind of plumbing steel-pipe assembly sleeve pipe

Country Status (1)

Country Link
CN (1) CN206428768U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TWI707077B (en) * 2019-05-13 2020-10-11 許文仁 Tube edge waterproofing tool
CN113027138A (en) * 2021-03-19 2021-06-25 云南省建设投资控股集团有限公司 Steel strand penetrating and guiding device

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TWI707077B (en) * 2019-05-13 2020-10-11 許文仁 Tube edge waterproofing tool
CN113027138A (en) * 2021-03-19 2021-06-25 云南省建设投资控股集团有限公司 Steel strand penetrating and guiding device
CN113027138B (en) * 2021-03-19 2022-09-23 云南省建设投资控股集团有限公司 Steel strand inserting and guiding device

Similar Documents

Publication Publication Date Title
CN103266767A (en) Construction method for preventing and treating cracks between concrete structure and filler wall
CN103321436A (en) Pre-installation construction method for wire box on building bricked body and pre-installation supporting frame thereof
CN202125074U (en) Double cone floorslab reserved-hole die
CN205841994U (en) A kind of new indoor drainage system combined water proof pipe collar
CN206428768U (en) A kind of plumbing steel-pipe assembly sleeve pipe
CN109322505A (en) A kind of roofing reserved opening concrete plugging device and preparation method thereof
CN106245654B (en) Deposited reinforced concrete pile exempts from inter-pile soil excavation construction method
CN104652815A (en) Construction method for pouring water-stopping upstanding beams in kitchens and toilets
CN111853347A (en) BIM-based construction process for advanced positioning direct-buried anchor bolt prefabricated pipeline bracket
CN105650357B (en) A kind of disposable embedded water stop joint of constructional engineering drain and its construction method
CN107065801B (en) Simulative construction method is automatically assembled using the section of track production line of BIM technology
CN206090634U (en) Steel sump pit apron
CN207123231U (en) A kind of positioning rule of embedded sleeve barrel and reserving hole channel after being used for prefabricated part hanging
CN104047423B (en) A kind of mould and construction method of wearing the accurate reserved opening of flooring plate
CN204098489U (en) A kind of mould making concrete floorslab preformed hole
CN201695468U (en) Air-conditioner condensed water pipe embedded in shear wall of high-rise building
CN203821521U (en) Soil stack connection piece for caisson type toilet
CN207775931U (en) A kind of suspension and support fastener inserts
CN103352568A (en) Method for building constructional column on foundation pad
CN103603492B (en) Wear floor pipeline preformed hole hole construction technology
CN112459266A (en) Secondary construction method of water-stop reverse beam
CN205261040U (en) Direct -burried breaking of contact formula sleeve pipe
CN203891028U (en) Supporting structure of reinforced steel sheet piles and core tube bracings in deep foundation pit
CN208251662U (en) A kind of prefabricated assembled member reinforcing steel bar locator
CN112982623A (en) Assembly type construction method for drainage pipeline of high-rise building

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant