CN104652815A - Construction method for pouring water-stopping upstanding beams in kitchens and toilets - Google Patents
Construction method for pouring water-stopping upstanding beams in kitchens and toilets Download PDFInfo
- Publication number
- CN104652815A CN104652815A CN201510067762.8A CN201510067762A CN104652815A CN 104652815 A CN104652815 A CN 104652815A CN 201510067762 A CN201510067762 A CN 201510067762A CN 104652815 A CN104652815 A CN 104652815A
- Authority
- CN
- China
- Prior art keywords
- stopping
- construction method
- mould holder
- concrete
- construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Abstract
The invention discloses a construction method for pouring water-stopping upstanding beams in kitchens and toilets. The construction method comprises the following steps: manufacturing a hoisting die bracket, wherein the hoisting die bracket is of a similarly n-shaped structure, and connection holes are formed in two sides of the hoisting die bracket; mounting a die plate, wherein the bottom of the hoisting die bracket is connected to a wall body through an oppositely-pulled bolt, two sides of the hoisting die bracket are connected to square timbers through connection holes, a ring beam is arranged in the middle of the hoisting die bracket, and the ring beam is tied and fixed to steel bars of a floor; and pouring concrete, firstly pouring the concrete of the ring beam and the floor for 20-40 minutes, then pouring the concrete of the water-stopping upstanding beam when the concrete is free of fluidity; and disassembling the die and maintaining. The construction method has the advantages that the construction sequence is reasonable, the construction period is shortened, the cost is reduced, the construction process is safe and reliable, the construction efficiency is high, the problem of the water leakage at the root of the water-stopping upstanding beam is solved, the operability is high, and the construction cost is reduced.
Description
Technical field
The present invention relates to a kind of construction techniques, in particular, relate to the construction method that a kind of kitchen toilet water-stopping reversed beam is built.
Background technology
The construction method of traditional kitchen toilet water-stopping reversed beam is for first to complete collar tie beam and concrete floor slab placement; formwork on flooring again after to be solidified; carry out the construction of sealing reversed beam; seep water in easy like this sealing reversed beam and the former concrete junction of causing; sealing reversed beam and original structure are not an entirety in addition, easily water leakage situation occur, thus affect engineering construction quality; often there will be the situation of maintenance of doing over again, increase construction cost.
Summary of the invention
The present invention is directed to the deficiencies in the prior art, and provide a kind of simple to operate, sequence of construction rationally, can the reduction of erection time, the construction method that reduces costs, improve engineering construction quality, prevent a kind of kitchen toilet water-stopping reversed beam leaked from building.
In order to achieve the above object, this invention takes following technical scheme:
The construction method that kitchen toilet water-stopping reversed beam is built, comprises the steps:
Step one: make and hang mould holder;
The described mould holder that hangs for " η " shape structure, described in hang mould holder dual-side offer connecting hole;
Step 2: set up template;
Be fixedly connected on body of wall hang bottom mould holder by split bolt, hang mould holder dual-side and be fixedly connected with the lumps of wood by bolt, then template is fixed on hangs on mould holder; Described bottom of hanging mould holder is provided with collar tie beam, and the reinforcing bar binding of described collar tie beam and floor is fixed;
Step 3: concreting;
First build the concrete of collar tie beam and floor, solidify 20-40 minute to concrete without mobility, then build the concrete of sealing reversed beam;
Step 4: form removal maintenance;
Complete in concreting, after reaching strength of mould stripping, stripping, carries out maintenance to concrete.
The length of hanging the short side of mould holder in described step one is identical with the anti-depth of beam of sealing.
The anti-depth of beam of described sealing is 300mm.
The described mould holder that hangs is made up of channel-section steel.
Described circle depth of beam is 240mm.
Beneficial effect of the present invention: (1) sequence of construction is reasonable, can shorten construction period, improves efficiency of construction, reduces construction cost; (2) work progress is safe and reliable, eliminates safe hidden trouble; (3) sealing reversed beam root seepy question is solved, workable.
Accompanying drawing explanation
Fig. 1 is structural representation of the present invention;
Fig. 2 is the enlarged drawing hanging mould holder and template binding site of the present invention;
Fig. 3 is the structural representation hanging mould holder of the present invention;
In figure: hang mould holder 1, connecting hole 2, collar tie beam 3, template 4, sealing reversed beam 5, floor 6, the lumps of wood 7, split bolt 8.
Detailed description of the invention
Below in conjunction with accompanying drawing, construction method of the present invention is described in further detail.
The construction method that kitchen toilet water-stopping reversed beam is built, is characterized in that, comprise the steps:
Step one: make and hang mould holder 1;
The described mould holder 1 of hanging for " η " shape structure, described in hang mould holder 1 dual-side offer connecting hole 2; The described mould holder 1 that hangs is made up of 5# channel-section steel;
Step 2: set up template;
Be fixedly connected on body of wall hang bottom mould holder 1 by split bolt 8, hang mould holder 1 dual-side and be fixedly connected with the lumps of wood 7 by bolt, then template 4 is fixed on hangs on mould holder 1; Described bottom of hanging mould holder 1 is provided with collar tie beam 3, and the reinforcing bar binding of described collar tie beam 3 and floor 6 is fixed;
Step 3: concreting;
First build the concrete of collar tie beam 3 and floor 6, solidify 20-40 minute to concrete without mobility, then build the concrete of sealing reversed beam 5;
Step 4: form removal maintenance;
Complete in concreting, after reaching strength of mould stripping, stripping 4, carries out plastic film covering water conservation, insulated curing to concrete.
The length of hanging the short side of mould holder 1 in described step one is identical with the height of sealing reversed beam 5.
The height of described sealing reversed beam 5 is 300mm.
The height of described collar tie beam 3 is 240mm.
The concreting of collar tie beam 3 and floor 6 in two steps, first completes, has certain degree of hardness to concrete, when not flowing by construction method concreting of the present invention, then builds sealing reversed beam 5, can carry out cross construction mode, form continuous productive process.
Claims (5)
1. a kitchen toilet water-stopping reversed beam construction method of building, is characterized in that, comprise the steps:
Step one: make and hang mould holder (1);
The described mould holder (1) that hangs for " η " shape structure, described in hang mould holder (1) dual-side offer connecting hole (2);
Step 2: set up template;
Be fixedly connected on body of wall hang mould holder (1) bottom by split bolt (8), hang mould holder (1) dual-side and be fixedly connected with the lumps of wood (7) by bolt, then template (4) is fixed on hangs on mould holder (1); Described bottom of hanging mould holder (1) is provided with collar tie beam (3), and the reinforcing bar binding of described collar tie beam (3) and floor (6) is fixed;
Step 3: concreting;
First build the concrete of collar tie beam (3) and floor (6), solidify 20-40 minute to concrete without mobility, then build the concrete of sealing reversed beam (5);
Step 4: form removal maintenance;
Complete in concreting, after reaching strength of mould stripping, stripping 4, carries out maintenance to concrete.
2. a kind of kitchen toilet water-stopping reversed beam according to claim 1 construction method of building, it is characterized in that, the length of hanging mould holder (1) short side in described step one is identical with the height of sealing reversed beam (5).
3. a kind of kitchen toilet water-stopping reversed beam according to claim 1 and 2 construction method of building, it is characterized in that, the height of described sealing reversed beam (5) is 300mm.
4. a kind of kitchen toilet water-stopping reversed beam according to claim 1 and 2 construction method of building, is characterized in that, described in hang mould holder (1) and be made up of channel-section steel.
5. a kind of kitchen toilet water-stopping reversed beam according to claim 1 construction method of building, it is characterized in that, the height of described collar tie beam (3) is 240mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510067762.8A CN104652815A (en) | 2015-02-10 | 2015-02-10 | Construction method for pouring water-stopping upstanding beams in kitchens and toilets |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510067762.8A CN104652815A (en) | 2015-02-10 | 2015-02-10 | Construction method for pouring water-stopping upstanding beams in kitchens and toilets |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104652815A true CN104652815A (en) | 2015-05-27 |
Family
ID=53244399
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510067762.8A Pending CN104652815A (en) | 2015-02-10 | 2015-02-10 | Construction method for pouring water-stopping upstanding beams in kitchens and toilets |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104652815A (en) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105464367A (en) * | 2015-12-31 | 2016-04-06 | 四川航天建筑工程有限公司 | Reinforcing device for concrete upstand string formwork |
CN107083840A (en) * | 2017-04-21 | 2017-08-22 | 北京首钢建设集团有限公司 | A kind of anti-bank one-shot forming formwork erection method in toilet |
CN107100285A (en) * | 2017-05-24 | 2017-08-29 | 中国十七冶集团有限公司 | A kind of prefabricated toilet water seepage prevention construction method |
CN107514141A (en) * | 2016-06-16 | 2017-12-26 | 中国十七冶集团有限公司 | A kind of prefabricated prefabricating technique construction technology of superimposed sheet sealing reversed beam |
CN107891510A (en) * | 2017-12-11 | 2018-04-10 | 安徽海龙建筑工业有限公司 | A kind of split type prefabricated components toilet mould and its into mold technique |
CN109723186A (en) * | 2019-01-05 | 2019-05-07 | 中国十七冶集团有限公司 | A kind of prefabricated components of sealing reversed beam and the construction method of sealing reversed beam |
CN109930703A (en) * | 2019-04-02 | 2019-06-25 | 浙江力唯装饰设计工程有限公司 | A kind of construction technology of toilet warterproof beam |
CN110821156A (en) * | 2019-11-13 | 2020-02-21 | 广西建工集团第五建筑工程有限责任公司 | Sinking type toilet hanging die structure and construction method thereof |
CN113482354A (en) * | 2021-08-03 | 2021-10-08 | 中国建筑第二工程局有限公司 | Large-area dense upper reversed beam construction equipment |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH09310420A (en) * | 1996-05-24 | 1997-12-02 | Onoda:Kk | Water stopping construction method for concrete placing joint part |
CN201738479U (en) * | 2010-07-16 | 2011-02-09 | 中国一冶集团有限公司 | Roof expansion joint integrated cover plate waterproof structure |
CN203113782U (en) * | 2013-02-06 | 2013-08-07 | 山河建设集团有限公司 | Reversed beam erecting formwork stationary fixture |
CN103883052A (en) * | 2014-04-08 | 2014-06-25 | 山东金城建设有限公司 | Upturned beam and cast-in-place slab overall pouring construction method |
CN203924704U (en) * | 2014-06-19 | 2014-11-05 | 晟通科技集团有限公司 | Aluminum alloy pattern plate system |
-
2015
- 2015-02-10 CN CN201510067762.8A patent/CN104652815A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH09310420A (en) * | 1996-05-24 | 1997-12-02 | Onoda:Kk | Water stopping construction method for concrete placing joint part |
CN201738479U (en) * | 2010-07-16 | 2011-02-09 | 中国一冶集团有限公司 | Roof expansion joint integrated cover plate waterproof structure |
CN203113782U (en) * | 2013-02-06 | 2013-08-07 | 山河建设集团有限公司 | Reversed beam erecting formwork stationary fixture |
CN103883052A (en) * | 2014-04-08 | 2014-06-25 | 山东金城建设有限公司 | Upturned beam and cast-in-place slab overall pouring construction method |
CN203924704U (en) * | 2014-06-19 | 2014-11-05 | 晟通科技集团有限公司 | Aluminum alloy pattern plate system |
Non-Patent Citations (1)
Title |
---|
文档998分享: "厨、卫止水反梁与楼面砼一次浇筑施工工法", 《豆丁》 * |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105464367A (en) * | 2015-12-31 | 2016-04-06 | 四川航天建筑工程有限公司 | Reinforcing device for concrete upstand string formwork |
CN107514141A (en) * | 2016-06-16 | 2017-12-26 | 中国十七冶集团有限公司 | A kind of prefabricated prefabricating technique construction technology of superimposed sheet sealing reversed beam |
CN107514141B (en) * | 2016-06-16 | 2019-06-21 | 中国十七冶集团有限公司 | A kind of prefabricated prefabricating technique construction technology of superimposed sheet sealing reversed beam |
CN107083840A (en) * | 2017-04-21 | 2017-08-22 | 北京首钢建设集团有限公司 | A kind of anti-bank one-shot forming formwork erection method in toilet |
CN107100285A (en) * | 2017-05-24 | 2017-08-29 | 中国十七冶集团有限公司 | A kind of prefabricated toilet water seepage prevention construction method |
CN107891510A (en) * | 2017-12-11 | 2018-04-10 | 安徽海龙建筑工业有限公司 | A kind of split type prefabricated components toilet mould and its into mold technique |
CN109723186A (en) * | 2019-01-05 | 2019-05-07 | 中国十七冶集团有限公司 | A kind of prefabricated components of sealing reversed beam and the construction method of sealing reversed beam |
CN109723186B (en) * | 2019-01-05 | 2020-11-24 | 中国十七冶集团有限公司 | Prefabricated part of water-stop back beam and construction method of water-stop back beam |
CN109930703A (en) * | 2019-04-02 | 2019-06-25 | 浙江力唯装饰设计工程有限公司 | A kind of construction technology of toilet warterproof beam |
CN110821156A (en) * | 2019-11-13 | 2020-02-21 | 广西建工集团第五建筑工程有限责任公司 | Sinking type toilet hanging die structure and construction method thereof |
CN113482354A (en) * | 2021-08-03 | 2021-10-08 | 中国建筑第二工程局有限公司 | Large-area dense upper reversed beam construction equipment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104652815A (en) | Construction method for pouring water-stopping upstanding beams in kitchens and toilets | |
CN104631512B (en) | Hang modulus method after-pouring band beam-slab construction method | |
CN201443203U (en) | Mold of preformed hole of cast-in-place reinforced concrete slab | |
CN104975716A (en) | Construction method for employing dismounting-free formwork in casting constructional column and ring beam concrete | |
CN104453224A (en) | Formwork support structure of basement exterior wall and construction method of formwork support structure | |
CN207616844U (en) | Foundation platform precast concrete side form and molding machine | |
CN203441100U (en) | Formwork structure of constructional column | |
CN105275097A (en) | A post-cast strip water-stop steel plate and demolition-free template net installing method | |
CN108532796A (en) | Assembly concrete shear wall and face inner beam rigid connection node and construction method | |
CN102787684A (en) | Steel wire net rack demolition-free formwork system and manufacturing method thereof | |
CN106285002A (en) | Cast-in-place walls difference of height tool-type hoisting die construction method | |
CN208343121U (en) | Prefabricated assembled steel structure concrete wallboard mould | |
CN102635230B (en) | The formwork for placing of large methane tank body and casting method | |
CN102912977A (en) | Mold used for pouring shaped stair | |
CN204898612U (en) | Mould with adjustable be used for pouring ditch | |
CN204238550U (en) | A kind of device for clamping masonry ring beam template | |
CN203668894U (en) | Concrete prefabricated form structure allowing rapid installation | |
CN204081483U (en) | A kind of structure of rotten when preventing pouring reinforcement concrete post suspension column | |
CN102322022B (en) | Construction method for concrete of decorative housing of cable stayed bridge | |
CN205476468U (en) | Non - design, can all rotary die plate bodys be prefabricated staircase bench template | |
CN205259419U (en) | Cavity body and hollow floor | |
CN108104466A (en) | Cast-in-place structural moulding integrated construction dedicated templates and mold method | |
CN203905326U (en) | Construction form for construction of roof exhaust pipe piers | |
CN112411798A (en) | Synchronous construction method for prefabricated guide wall and main structure of toilet | |
CN203755682U (en) | Secondary pouring form board constructing structure for small opening of concrete structure floor slab |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20150527 |
|
WD01 | Invention patent application deemed withdrawn after publication |