CN209066871U - A kind of Pipe installing standard element of Preembedded of tier building - Google Patents

A kind of Pipe installing standard element of Preembedded of tier building Download PDF

Info

Publication number
CN209066871U
CN209066871U CN201821621992.XU CN201821621992U CN209066871U CN 209066871 U CN209066871 U CN 209066871U CN 201821621992 U CN201821621992 U CN 201821621992U CN 209066871 U CN209066871 U CN 209066871U
Authority
CN
China
Prior art keywords
pipe installing
standard element
ontology
installing standard
preembedded
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821621992.XU
Other languages
Chinese (zh)
Inventor
田昌凤
林杉
张强
杨培芬
李健鹏
戴桃红
周杨佳
魏雄雄
罗浩
子丽天
陈佺
张宏
王思尧
彭泽森
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yunnan Construction Investment Fifth Construction Co Ltd
Yunnan Construction and Investment Holding Group Co Ltd
Original Assignee
Yunnan Construction Investment Fifth Construction Co Ltd
Yunnan Construction and Investment Holding Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yunnan Construction Investment Fifth Construction Co Ltd, Yunnan Construction and Investment Holding Group Co Ltd filed Critical Yunnan Construction Investment Fifth Construction Co Ltd
Priority to CN201821621992.XU priority Critical patent/CN209066871U/en
Application granted granted Critical
Publication of CN209066871U publication Critical patent/CN209066871U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sewage (AREA)

Abstract

The utility model discloses a kind of Pipe installing standard element of Preembedded of tier building, including floor structure plate face, Pipe installing standard element ontology is installed above the floor structure plate face, extend in the surrounding bottom of Pipe installing standard element ontology to outer ring and be equipped with fixing piece, the fixing end of fixing piece is fixedly connected with Pipe installing standard element ontology;The free end of fixing piece is flexibly connected by locking member with floor structure plate face.The utility model improves the construction technology in construction work and reduces cost, avoid disposable pre-buried PVC pipe, and save a large amount of hole patch work labour costs, and can ensure that in conjunction with Setting-out Technique and install lower vertical, block-water effect is good, simultaneously, it can be realized the expenditure for directly or indirectly saving project, meanwhile a large amount of time also is saved for subsequent pipe fitting, indirectly push the installment work of the water supply and sewerage pipeline and fire protection pipeline in entire installing engineering.

Description

A kind of Pipe installing standard element of Preembedded of tier building
Technical field
The utility model relates to a kind of standard elements, relate particularly to a kind of pipeline of Preembedded of tier building Standard element is installed, which is suitable for the way that indoor water supply and drainage standpipe passes through structure plate face, and it is solid to be disposably implanted into this Determine standard element, is installed more particularly, to skyscraper indoor water supply and drainage pipe-in-pipe, can adapt to the coagulation of various material templates Disposable drainpipe implantation installation when soil pours.
Background technique
With the development of society, tier building is seen everywhere in life.In general, during main body construction, erector The pre-buried reserved casing for wearing building construction plate face in journey must carry out in main body construction, in case secondary chisel causes structure It influences.In the project, reserving hole nearly up to ten thousand of water supply and sewerage pipeline, fire protection pipeline, be a sizable project amount.Together When, the pipeline of threading face floor must add waterproof steel sleeve.
In actual construction work, a Preembedded steel sleeve, process may be comparatively laborious, and the technology is to construction Personnel have higher operation requirement.If misoperation, it just will appear the phenomenon that floor is deviated at bar casing tube up and down.If again The casing for handling offset, can be more serious to the destruction of plate face, and required artificial and cost will increase.Thus, for primary The operation of Preembedded steel sleeve, the technology has higher requirement to installation personnel.It, can meanwhile if constructed using the technology To reduce the use of plastic bushing, cost of labor and construction material cost can be reduced, is accelerated construction progress.On the whole, one Secondary Preembedded steel sleeve, no matter all being run well than pre-buried plastic sheath on sense organ or in actual construction.Pre-buried steel casing When, it is proposed that a Preembedded whether economically or on the time can be saved more.
Conventional pipelines installation need to install disposable PVC casing, and the later period needs to remove, and repeatedly repairs to hole, construction Cumbersome and consumptive material is more, disposable to be implanted into fixed steel casing, installs more particularly, to skyscraper indoor water supply and drainage pipe-in-pipe, energy Enough adapt to disposable sleeve implantation installation when the concreting of various material templates.
Currently, pre-buried two steps that are generally divided into of common steel sleeve: first is pre- in plate face pre-buried period in building trade Plastic bushing is buried, or uses other method reserving holes;Second is to take out pre-buried plastic bushing before doing plumbing, Reserved hole is found, straight processing is repaired at hole, then messenger wire pre-buried steel casing, second pouring mixed mud.Now using this normal The built-in process of rule can mainly have the following problems: first is that taking plastic bushing to need to spend centainly artificial, especially in mixed mud After soil solidification, plate face can also be damaged;Second is that pre-buried steel casing needs to hang mould again, exhaust many labor hour and Filling-up hole hangs necessary material (such as: template, iron wire etc.) when mould;Third is that second pouring steel sleeve, the mixed mud with first time casting Soil linking is bad, can there is the phenomenon that leak.There is likely to be lower dipped ring is whole, perception is influenced;Fourth is that if the project is taken Conventional method for obligating, it will a large amount of artificial and construction cost is caused to increase.
Therefore, the drainpipe of Preembedded of tier building that is a kind of practical and improving construction efficiency need to be developed Casing installation standard element is the key point for solving above-mentioned technical problem.
Summary of the invention
For many shortcomings and deficiencies present in above-mentioned background technique, the utility model is improved and has been created to this Newly, disposable Preembedded drain bushing installation standard element is proposed, it is intended to improve the construction technology in construction work and subtract Few cost avoids disposable pre-buried PVC pipe, and saves a large amount of hole patch work labour costs, and combines Setting-out Technique can Ensure to install lower vertical, block-water effect is good.
Another goal of the invention of the utility model is that by the expenditure for directly or indirectly saving project, together When, a large amount of time also is saved for subsequent pipe fitting, has indirectly pushed the plumbing in entire installing engineering The installment work of pipeline and fire protection pipeline.
In order to solve the above problem and reach above-mentioned goal of the invention, a kind of the utility model Preembedded of tier building Pipe installing standard element be to be realized by using following design structure and using following technical solution:
The improvement of Pipe installing standard element as a kind of the utility model Preembedded of tier building, the pipeline Installing standard element includes floor structure plate face (1), and Pipe installing sizing structure is equipped with above the floor structure plate face (1) Part ontology (2) extends to outer ring in the surrounding bottom of Pipe installing standard element ontology (2) and is equipped with seal ring, seal ring Fixing end is fixedly connected with Pipe installing standard element ontology (2);The free end of seal ring passes through locking member and floor structure plate Face (1) is flexibly connected.
The improvement above-mentioned as the utility model, the Pipe installing standard element ontology (2) generally inner hollow Up big and down small steel truncated cone-shaped component.
The further improvement above-mentioned as the utility model, it is described to be fixedly connected as being welded to connect or being machined directly to Integrated formed structure forms the cup type component of generally steel.
The further improvement above-mentioned as the utility model, the annular steel disc of the seal ring generally steel, at this Ring steel on piece offers multiple fixation holes (211), and fixation hole (211) penetrates through the front and back sides of seal ring.
The further improvement above-mentioned as the utility model, the fixation hole (211) are screw hole, the sum of screw hole Amount is set as four, and the spacing between adjacent screw hole is identical;Locking member pass through the screw hole after with floor structure plate face (1) It is detachably connected;The locking member is screw either rivet.
The further improvement above-mentioned as the utility model, the Pipe installing standard element further include being provided with and pipeline Standard element ontology (2) Pipe installing that mutually work is completed in collocation is installed to be formed auxiliary part ontology (3), Pipe installing sizing is auxiliary Member bodies (3) are helped to be sheathed on Pipe installing standard element ontology (2).
The again further improvement above-mentioned as the utility model, Pipe installing sizing auxiliary part ontology (3) are whole Body is the steel cylinder component of inner hollow, is between the steel cylinder component and Pipe installing standard element ontology (2) The detachable socket connection of activity.
The again again further improvement above-mentioned as the utility model, Pipe installing sizing auxiliary part ontology (3) Overall diameter and the road installation standard element ontology (2) interior diameter kissing match.
As the utility model it is above-mentioned again be more further improved again, Pipe installing standard element ontology (2) and stop The outer surface of water ring and Pipe installing sizing auxiliary part ontology (3) is coated with coloured coating either antirust Layer, antirust coat includes epoxy zinc rich primer and chlorinated rubber finish.
It is also more further improved as the utility model is above-mentioned, the coating is black paint, it is made to be not easy to get rusty Corrosion, prolongs the service life;The antirust coat further includes the epoxy cloud between epoxy zinc rich primer and chlorinated rubber finish Iron intermediate coat.
Working principle is: after the completion of concreting, upper layer cannula center, which is selected to draw using laser level alignment, orders iron plate Successively drawn by first layer and (glass plate branch can be put on casing in order to facilitate the operation and put instrument).Upper layer is carried out again disposably to plant Enter the fixed installation of casing, until main structure is completed.Removable tubing is by fixinig plate (also serve as draw upper fixinig plate), cupuliform (secondary access tube uses function according to room for casing (length of steel pipe is determined according to the thickness of structural slab) and the short sleeve of secondary access Can determine that) composition.
Utility model has the following beneficial effects compared with the prior art: the utility model is done compared to traditional construction Method avoids disposable pre-buried PVC pipe, and saves a large amount of hole patch work labour costs, and can ensure that in conjunction with Setting-out Technique To install lower vertical, block-water effect is good, meanwhile, casing need to be removed simultaneously by also avoiding traditional method using PVC casing box out The repeatedly trouble at repairing hole, to save construction cost.
Detailed description of the invention
Specific embodiment of the present utility model is described in further detail with reference to the accompanying drawing, in which:
Fig. 1 is the first design structure form of the utility model;
Fig. 2 is the decomposition texture schematic diagram of second of design structure form of the utility model;
Fig. 3 is the overall structure diagram of Pipe installing sizing auxiliary part ontology (3) component of the utility model;
The use state of Fig. 4 the utility model is with reference to one of figure;
Wherein, figure label: 1-floor structure plate face, 11-concrete;
2-Pipe installing standard element ontologies, 21-seal rings, 211-fixation holes;
3-Pipe installings sizing auxiliary part ontology.
Specific embodiment
In order to make technological means of the utility model, create feature, reach purpose and effect is easy to understand, under Further detailed description is made to the technical solution of the utility model in conjunction with attached drawing and specific embodiment in face, needs to illustrate , in the absence of conflict, the features in the embodiments and the embodiments of the present application can be combined with each other.Below with reference to Simultaneously the utility model is described in detail in conjunction with the embodiments in attached drawing.
A kind of Pipe installing standard element of Preembedded of tier building as shown in Figure of description, including floor Structure plate face 1 is equipped with Pipe installing standard element ontology 2 in the top of the floor structure plate face 1, in Pipe installing sizing structure The surrounding bottom of part ontology 2 extends to outer ring is equipped with seal ring, the fixing end and Pipe installing standard element ontology 2 of seal ring It is fixedly connected;The free end of seal ring is flexibly connected by locking member with floor structure plate face 1.
Further, the up big and down small steel truncated cone-shaped structure of the generally inner hollow of Pipe installing standard element ontology 2 Part.
Further, it is fixedly connected as being welded to connect and is either machined directly to integrated formed structure, form generally steel The cup type component of system.
Further, the annular steel disc of seal ring generally steel offers multiple fixation holes in the ring steel on piece 211, fixation hole 211 penetrates through the front and back sides of seal ring.
Further, fixation hole 211 is screw hole, and the total quantity of screw hole is set as four, between adjacent screw hole Spacing it is identical;Locking member is detachably connected with floor structure plate face 1 after the screw hole;The locking member be screw or Person is rivet.
Further, which further includes being provided with to arrange in pairs or groups with 2 phase of Pipe installing standard element ontology The Pipe installing sizing auxiliary part ontology 3 of work is completed, Pipe installing sizing auxiliary part ontology 3 is sheathed on Pipe installing On standard element ontology 2.
Specifically, the steel cylinder component of Pipe installing sizing auxiliary part ontology 3 generally inner hollow, the steel It is the detachable socket connection of activity between cylinder component and Pipe installing standard element ontology 2.
Even more, the overall diameter of Pipe installing sizing auxiliary part ontology 3 installs the interior of standard element ontology 2 with road Diameter kissing is matched.
Specifically, in Pipe installing standard element ontology 2 and seal ring and Pipe installing sizing auxiliary part ontology 3 Outer surface is coated with coloured coating either antirust coat, and antirust coat includes epoxy zinc rich primer and chlorinated rubber face Paint.
Even more, coating is black paint, it is made to be not easy corrosion, is prolonged the service life;The antirust coat is also Including the epoxy micaceous iron intermediate coat between epoxy zinc rich primer and chlorinated rubber finish.
In conclusion more specifically embodiment is the utility model:
Embodiment 1 need to carry out the construction of installation sizing using Pipe installing standard element ontology 2
Fig. 1 is the first design structure form of the utility model;As shown, when work, firstly, Pipe installing is formed Before member bodies 2 are pre-buried, by the length of the Pipe installing standard element ontology 2 and size by code requirement with dedicated Pipe cutter is cut.In general, the length of Pipe installing standard element ontology 2 is specifically contemplated that thickness and the completion of structure plate face The thickness in face and the height of Pipe installing standard element ontology 2 are higher by 3~5cm of finished surface, Pipe installing standard element ontology 2 Pipe diameter size is typically greater than 2 grades of drainage pipeline caliber, and the casing cut and seal ring 21 are welded;Then in strict accordance with Design drawing looks for point location in first layer plate face with steel tape and unwrapping wire targeted duct position in conjunction with live plate face;Then, The Pipe installing standard element ontology 2 being welded is fixed in the template 4 for finding point, fixation can using iron nail, screw, Steel wire either rivet binding and fixing hole 211, or directly by Pipe installing standard element ontology 2 and plate face reinforcement welding one It rises, but must assure that the level of Pipe installing standard element ontology 2, do not move partially, concrete 11 pours completion, form removable Afterwards, self-assembling formation reserving hole;In this embodiment, when second layer floor structure plate face is pre-buried, it is necessary to pour completion The pre-buried Pipe installing standard element ontology 2 of next floor structure plate face combines, and pours from first layer floor structure plate face The face suitable for reading of Pipe installing standard element ontology 2 find central point accurately, be then fixed in first using an infrared equipment The face center point suitable for reading for the Pipe installing standard element ontology 2 that layer has poured, from the Pipe installing standard element sheet poured The face center upper layer plate face suitable for reading of body 2 is looked for a little;And then, after determining better position, with nail from i.e. by pre-buried plate Positioning is knocked out below face, then from nail position messenger wire, see whether the Pipe installing standard element ontology 2 poured just Center;And then, the nail that positioning is found from next level layer structure plate face, using nail as determining pre-buried Pipe installing The central point of type member bodies 2, pre-buried Pipe installing standard element ontology 2;First floor layer structure plate face is often encountered, by this side Method, and so on, until the floor structure plate face of top layer;Finally, pvc pipe passes through Pipe installing from one layer after being installed After the installation to top layer of standard element ontology 2, ointment or Bituminous hemp fiber are used between pvc pipe and Pipe installing standard element ontology 2 It is blocked.
Embodiment 2 is needed using Pipe installing standard element ontology 2 and Pipe installing sizing 3 phase of auxiliary part ontology collocation Carry out the construction of installation sizing
Fig. 2 and Fig. 3 is second of design structure form of the utility model, as shown, when work, firstly, pipeline is pacified Set type member bodies 2 it is pre-buried before, the length of the Pipe installing standard element ontology 2 and size are used by code requirement Dedicated pipe cutter is cut.In general, the length of Pipe installing standard element ontology 2 is specifically contemplated that the thickness of structure plate face And the thickness of finished surface and the height of Pipe installing standard element ontology 2 are higher by 3~5cm of finished surface, Pipe installing standard element The pipe diameter size of ontology 2 is typically greater than 2 grades of drainage pipeline caliber, and the casing cut and seal ring 21 are welded;Then In strict accordance with design drawing, in conjunction with live plate face, with steel tape and unwrapping wire targeted duct position, it is a little fixed to look in first layer plate face Position;Then, the Pipe installing standard element ontology 2 being welded is fixed in the template 4 for finding point, fixation can use iron Nail, screw, steel wire either rivet binding and fixing hole 211, or directly by Pipe installing standard element ontology 2 and plate face reinforcing bar Welding together, but must assure that the level of Pipe installing standard element ontology 2, does not move partially, concrete 11 pours completion, After form removable, self-assembling formation reserving hole;In the implementation installation process, when structural ornament face is thicker, Pipe installing is formed When the mounting height of member bodies 2 is lower than decoration panel, installed using Pipe installing sizing 3 phase of auxiliary part ontology collocation Sizing construction;At this point, when second layer floor board face structure is pre-buried, it is necessary to pre-buried with next floor board face structure for pouring completion Pipe installing standard element ontology 2 combine, the Pipe installing standard element ontology 2 poured from first layer floor board face structure Central point is found in face suitable for reading accurately, is then fixed in the Pipe installing sizing structure that first layer has poured using an infrared equipment The face center point suitable for reading of part ontology 2, from the face center upper layer building suitable for reading of Pipe installing standard element ontology 2 poured Layer board face structure is looked for a little;It is then determined that positioning is knocked out from floor board face structure lower section that i.e. will be pre-buried with nail behind better position, Then it from nail position messenger wire, whether sees in the center of the Pipe installing standard element ontology 2 poured;And then, from The nail of positioning is found in upper laminate face, using nail as i.e. by the central point of pre-buried Pipe installing standard element ontology 2, in advance Bury Pipe installing standard element ontology 2;First floor layer board face structure is often encountered, according to said method, and so on, until the building of top layer Layer structure plate face;Finally, pvc pipe passes through Pipe installing standard element ontology 2 from one layer and installs to top layer after being installed Afterwards, it is blocked between pvc pipe and Pipe installing standard element ontology 2 using ointment or Bituminous hemp fiber.
The utility model is compared with traditional built-in process, and one time Preembedded steel sleeve has the advantage that
1, one-time-concreting forms, and can have preferable cementability with concrete, when can repair straight to avoid secondary pre-buried hole Board face structure is damaged, influences the quality of building indirectly;
2, one-time-concreting forms, can reduce unnecessary artificial and necessary material caused by secondary pre-buried period Material, fundamentally reduces the cost of construction;
3, common built-in process, before Pipe installing, hole is repaired directly, and second of pre-buried steel casing is essential Program.One-time-concreting molding, can save hole and repair directly, and the time of secondary pre-buried steel casing promotes work to accelerating construction progress There is good help in phase;
4, one-time-concreting forms, because steel sleeve and once-pouring of concrete are in plate face, cementability number can drop significantly The case where hypotonic water leak;Meanwhile in perception, can also there be preferable impression to people.
In the project, a Preembedded steel sleeve construction technology.Pass through practice, it was demonstrated that its practicability and can grasp The property made greatly reduces the cost of labor of construction and saves a large amount of material.Directly or indirectly save the branch of project Out, meanwhile, also save a large amount of time for subsequent pipe fitting, indirectly pushed in entire installing engineering to The installment work of drainage pipeline and fire protection pipeline.
Meanwhile by person it was verified that the work of common secondary pre-buried steel casing needs is as follows: 110 drainpipe Road, 1 person/day can repair hole filling-up hole 40~50;And labor wage is calculated by 150 yuan/day;Filling-up hole needs template and iron wire general 1 yuan/, 2 yuan/of sealing agent;Filling-up hole can't one-pass molding, it is necessary to assure secondary treatment grouting.It needs to move ladder after demoulding Sub and lower dipped ring needs secondary 1 person/day of repairing to can handle 100, hole, and same labor wage is calculated by 150 yuan/day. Calculating is got off, the direct economy cost that a reserved opening needs are as follows: 150/50+1+2+150/100=7.5 member.
One-time-concreting molding is realized, directly saves more economic expenditures for engineering project.
Finally, it should be noted that the above descriptions are merely preferred embodiments of the present invention, is not to this Utility model makees the limitation of other forms, and any person skilled in the art adds possibly also with the technology contents of the disclosure above To change or be modified as equivalent variations of equivalent embodiments.But it is all without departing from the content of the technical scheme of the utility model, foundation The technical essence of the utility model any simple modification, equivalent variations and remodeling to the above embodiments, still fall within this reality With the protection scope of new technique scheme.

Claims (10)

1. a kind of Pipe installing standard element of Preembedded of tier building, including floor structure plate face (1), feature exists In: above the floor structure plate face (1) Pipe installing standard element ontology (2) is installed, in Pipe installing standard element The surrounding bottom of ontology (2) extends to outer ring is equipped with seal ring, the fixing end and Pipe installing standard element ontology of seal ring (2) it is fixedly connected;The free end of seal ring is flexibly connected by locking member with floor structure plate face (1).
2. a kind of Pipe installing standard element of Preembedded of tier building according to claim 1, feature exist In: the up big and down small steel truncated cone-shaped component of the Pipe installing standard element ontology (2) generally inner hollow.
3. a kind of Pipe installing standard element of Preembedded of tier building according to claim 1, feature exist In: it is described to be fixedly connected as being welded to connect or being machined directly to integrated formed structure, form the cup type structure of generally steel Part.
4. a kind of Pipe installing standard element of Preembedded of tier building according to claim 1, feature exist In: the annular steel disc of the seal ring generally steel offers multiple fixation holes (211), fixation hole in the ring steel on piece (211) front and back sides of seal ring are penetrated through.
5. a kind of Pipe installing standard element of Preembedded of tier building according to claim 4, feature exist In: the fixation hole (211) is screw hole, and the total quantity of screw hole is set as four, the spacing phase between adjacent screw hole Together;Locking member is detachably connected with floor structure plate face (1) after the screw hole;The locking member is screw either riveting Nail.
6. a kind of Pipe installing standard element of Preembedded of tier building according to claim 1, feature exist In: the Pipe installing standard element further includes being provided with mutually to arrange in pairs or groups with Pipe installing standard element ontology (2) to complete the pipe of work Road installation sizing auxiliary part ontology (3), Pipe installing sizing auxiliary part ontology (3) are sheathed on Pipe installing standard element sheet On body (2).
7. a kind of Pipe installing standard element of Preembedded of tier building according to claim 6, feature exist In: the steel cylinder component of Pipe installing sizing auxiliary part ontology (3) generally inner hollow, the steel cylinder It is the detachable socket connection of activity between component and Pipe installing standard element ontology (2).
8. a kind of Pipe installing standard element of Preembedded of tier building according to claim 7, feature exist In: the overall diameter of Pipe installing sizing auxiliary part ontology (3) and the interior diameter of road installation standard element ontology (2) Kissing is matched.
9. a kind of Pipe installing standard element of Preembedded of tier building according to claim 6, feature exist In: it is equal in the outer surface of Pipe installing standard element ontology (2) and seal ring and Pipe installing sizing auxiliary part ontology (3) It is coated with coloured coating either antirust coat, antirust coat includes epoxy zinc rich primer and chlorinated rubber finish.
10. a kind of Pipe installing standard element of Preembedded of tier building according to claim 9, feature exist In: the coating is black paint, so that it is not easy corrosion, prolongs the service life;The antirust coat further includes being located at epoxy Epoxy micaceous iron intermediate coat between zinc rich primer and chlorinated rubber finish.
CN201821621992.XU 2018-09-30 2018-09-30 A kind of Pipe installing standard element of Preembedded of tier building Expired - Fee Related CN209066871U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821621992.XU CN209066871U (en) 2018-09-30 2018-09-30 A kind of Pipe installing standard element of Preembedded of tier building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821621992.XU CN209066871U (en) 2018-09-30 2018-09-30 A kind of Pipe installing standard element of Preembedded of tier building

Publications (1)

Publication Number Publication Date
CN209066871U true CN209066871U (en) 2019-07-05

Family

ID=67094189

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821621992.XU Expired - Fee Related CN209066871U (en) 2018-09-30 2018-09-30 A kind of Pipe installing standard element of Preembedded of tier building

Country Status (1)

Country Link
CN (1) CN209066871U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115233983A (en) * 2022-08-31 2022-10-25 中国十七冶集团有限公司 Fixing method and fixing structure for hydroelectric installation embedded sleeve

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115233983A (en) * 2022-08-31 2022-10-25 中国十七冶集团有限公司 Fixing method and fixing structure for hydroelectric installation embedded sleeve

Similar Documents

Publication Publication Date Title
CN106088148B (en) Pipe gallery template and its application
CN205062838U (en) Combination cabin concrete structure is assembled to shallow utility tunnel of burying
CN204898721U (en) Steel construction city utility tunnel
CN106285074A (en) A kind of design specification of Logistics Park
CN101392560A (en) Construction method once and for all for installing pipe sleeve pipe for construction
CN105113543A (en) Assembled and combined cabin concrete structure of shallow-buried 0815-type underground comprehensive pipe gallery
CN110485468B (en) Permanent circular working well with water-rich stratum preset jacking pipe door opening and construction method thereof
CN209066871U (en) A kind of Pipe installing standard element of Preembedded of tier building
CN207998860U (en) A kind of assembled pipe gallery
CN204401650U (en) Square longitudinally connection prestressed assembly formula underground pipe gallery
CN206143899U (en) Crossover node structure suitable for sewer line incorporates utility tunnel in
CN110295624A (en) Crossroad underground pedestrian walk and pipe gallery build structure and its construction method jointly
CN210950229U (en) Embedded device for gas inlet pipe sleeve in indoor shear wall
CN211257080U (en) Novel communication inspection well of utility tunnel communication branch mouth play branch line
CN209892228U (en) Underground comprehensive pipe gallery structure constructed by adopting underground excavation method
CN208857972U (en) Built-in fitting
CN206667756U (en) Vertical crane span structure built-in fitting
CN207194008U (en) A kind of underground pipe gallery for municipal integration engineering
CN205742481U (en) A kind of rain, the upper and lower combined inspection shaft of sewage size pit shaft
CN210766884U (en) Underground cover plate ditch suitable for pipeline collection
CN114197866A (en) Construction method for reserved hole of drainage vertical pipe
CN106368211A (en) Rectangular concrete piles used for constructing side wall of pipe gallery
CN112900493A (en) From waterproof uncovered piping lane
CN101122174A (en) Architecture pipeline preformed hole production method
CN206205289U (en) Roof drain direct-burried bracing means

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190705