CN101392560A - Construction method once and for all for installing pipe sleeve pipe for construction - Google Patents

Construction method once and for all for installing pipe sleeve pipe for construction Download PDF

Info

Publication number
CN101392560A
CN101392560A CNA2008101511121A CN200810151112A CN101392560A CN 101392560 A CN101392560 A CN 101392560A CN A2008101511121 A CNA2008101511121 A CN A2008101511121A CN 200810151112 A CN200810151112 A CN 200810151112A CN 101392560 A CN101392560 A CN 101392560A
Authority
CN
China
Prior art keywords
sleeve pipe
sleeve
pipe
construction
carry out
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA2008101511121A
Other languages
Chinese (zh)
Inventor
黄昌学
谢家录
李军伟
韩秦平
刘永新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANXI THIRD ENGINEERING Co Ltd
Original Assignee
SHANXI THIRD ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANXI THIRD ENGINEERING Co Ltd filed Critical SHANXI THIRD ENGINEERING Co Ltd
Priority to CNA2008101511121A priority Critical patent/CN101392560A/en
Publication of CN101392560A publication Critical patent/CN101392560A/en
Pending legal-status Critical Current

Links

Abstract

The invention relates to a construction method for installing a building pipeline sleeve at one stroke. The adopted method comprises the following steps: during the main construction process, the pipeline sleeve is precast at one stroke before concrete pouring so as to ensure that the position of the pipeline sleeve is precast correctly at one stroke. The method which has simple construction and easy operation simplifies the working process, saves materials and manpower, reduces the project cost, and improves the project quality. By the method, the pipeline can be installed at one stroke without installing a fixing sleeve at the second time during the process of installing vertical pipes for water downflow and upflow, heating, and the like, thereby avoiding patching around the sleeve and leakage, and simplifying the construction process.

Description

Construction method once and for all for installing pipe sleeve pipe for construction
Technical field
The present invention relates to the construction of field of civil engineering pipe sleeve, particularly construction method once and for all for installing pipe sleeve pipe for construction.
Background technology
The requirement of building installation engineering job specfication need be installed pipe sleeve additional for the erect riser of water, heating etc. up and down that passes in the concrete flaggy, is convenient to install the flexible of back pipeline and reaches the maintenance after engineering is handed over and change pipeline.Traditional way is that reservation cavity, major project add tubing after finishing when adopting the concreting flaggy when the pipe laying standpipe.And behind the casing repairing hole, repair the position and easily produce the crack, mass defects such as pipeline root seepage influence workmanship.
Summary of the invention
The present invention is in order to address the above problem, and the method for taking is in the main body construction journey, before the concreting, puts in place pipe sleeve is once pre-buried, and purpose is to guarantee that the pipe sleeve position is once pre-buried puts in place and accurately.This method easy construction, easy operating has been simplified operation, and economical with materials and artificial lowers engineering cost, has improved workmanship.
To achieve these goals, the job practices of pipe sleeve one-time-reach-place of the present invention may further comprise the steps:
1) in the formwork erection construction stage, reserve master drawing according to drawing design and sleeve pipe, with ruler along wall axis orientation measurement in length and breadth, the crosspoint is the sleeve pipe center, and on template, draw " a ten " word line and carry out mark, and carrying out pre-buriedly, this mark is defined as the position of bottom standpipe sleeve pipe;
2) be of a size of benchmark with bottom location standpipe sleeve pipe, on two layers of template, draw " ten " word line, determine the position of two layers of same standpipe, beat the 20MM hole at this place then, put into ceiling hammer on the central point of bottom sleeve pipe along the hole of being beaten, and carry out detection check with laser plummet and check, carry out sleeve pipe pre-buried again, and the like, finish determining of each layer sleeve position, the position that must put accurate sleeve pipe according to " ten " word center line when pre-buried guarantees that center line coincide up and down, just can carry out the fixing of sleeve pipe;
3) as adopting wooden form, adopt the inboard fixation of sleeve pipe, be about to pipe sleeve and place on template " ten " the word center line, fix in the inboard with screw, utilize screw rod with the closure plate nut screwing clamping above the sleeve pipe, guarantee the sleeve pipe fixation; As adopting steel form to do cast-in-place template die plate, fixedly employing " well " the font reinforcing bar of sleeve pipe is weldingly fixed on the reinforced mesh;
4) according to the position of service sleeve, to carry out pipe prefabrication and install, whole one-time-reach-place job practices leaves it at that.
By adopting the present invention, in the installation process of erect risers such as water, heating up and down, can once piping erection be put in place, no longer the secondary installing fixed sleeving has been avoided repairing, seepage to the sleeve pipe periphery, has simplified working procedure.
The specific embodiment
The making processing of sleeve pipe:
According to drawing design, the casing diameter of various pipelines is greater than No. 2, pipeline, and concentrates and process.Washroom and kitchen sleeve pipe exceed decorative ground 50MM, and general ground through-flooring should exceed decorative cover 20MM.
The location of sleeve pipe:
Determining of bottom standpipe sleeve position: reserve auspicious figure according to drawing design and sleeve pipe, along wall axis orientation measurement in length and breadth, the crosspoint is the sleeve pipe center, and draws " a ten " word line and carry out mark on template with ruler.
Determining of two layers of same position standpipe sleeve pipe: be of a size of benchmark with bottom location vertical pipe sleeve tube hub, on two layers of template, draw " ten " word line, beat the 20MM hole at this place then, put into ceiling hammer on the central point of bottom sleeve pipe along the hole of being beaten, and carry out detection check with laser plummet and check, guarantee upper and lower sleeve tube hub point on same straight line, and the like, determining of each layer sleeve position finished.
Fixing of sleeve pipe:
As adopt wooden form, adopt the inboard fixation of sleeve pipe.Be about to pipe sleeve inner bottom plating center and place on template " ten " the word center line, be fixed on the wooden form, utilize screw rod, guarantee the sleeve pipe fixation the closure plate nut screwing clamping above the sleeve pipe with screw; As adopting steel form to do cast-in-place template die plate, fixedly employing " well " the font reinforcing bar of sleeve pipe is weldingly fixed on the reinforced mesh.
The shutoff of sleeve pipe on steel form and the board wall:
The polybag of filling sawdust is inserted in the sleeve pipe, guaranteed that the mouth of pipe is concordant, and use rubber belt sealing.

Claims (1)

1, construction method once and for all for installing pipe sleeve pipe for construction is characterized in that, realizes according to the following steps:
1) in the formwork erection construction stage, reserve master drawing according to drawing design and sleeve pipe, with ruler along wall axis orientation measurement in length and breadth, the crosspoint is the sleeve pipe center, and on template, draw " a ten " word line and carry out mark, and carrying out pre-buriedly, this mark is defined as the position of bottom standpipe sleeve pipe;
2) be of a size of benchmark with bottom location standpipe sleeve pipe, on two layers of template, draw " ten " word line, determine the position of two layers of same standpipe, beat the 20MM hole at this place then, put into ceiling hammer on the central point of bottom sleeve pipe along the hole of being beaten, and carry out detection check with laser plummet and check, carry out sleeve pipe pre-buried again, and the like, finish determining of each layer sleeve position, the position of putting accurate sleeve pipe according to " ten " word center line when pre-buried guarantees that center line coincide up and down, just can carry out the fixing of sleeve pipe;
3) as adopting wooden form, adopt the inboard fixation of sleeve pipe, be about to pipe sleeve and place on template " ten " the word center line, fix in the inboard with screw, utilize screw rod with the closure plate nut screwing clamping above the sleeve pipe, guarantee the sleeve pipe fixation; As adopting steel form to do cast-in-place template die plate, fixedly employing " well " the font reinforcing bar of sleeve pipe is weldingly fixed on the reinforced mesh;
4) according to the position of service sleeve, to carry out pipe prefabrication and install, whole one-time-reach-place job practices leaves it at that.
CNA2008101511121A 2008-09-25 2008-09-25 Construction method once and for all for installing pipe sleeve pipe for construction Pending CN101392560A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA2008101511121A CN101392560A (en) 2008-09-25 2008-09-25 Construction method once and for all for installing pipe sleeve pipe for construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA2008101511121A CN101392560A (en) 2008-09-25 2008-09-25 Construction method once and for all for installing pipe sleeve pipe for construction

Publications (1)

Publication Number Publication Date
CN101392560A true CN101392560A (en) 2009-03-25

Family

ID=40493054

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA2008101511121A Pending CN101392560A (en) 2008-09-25 2008-09-25 Construction method once and for all for installing pipe sleeve pipe for construction

Country Status (1)

Country Link
CN (1) CN101392560A (en)

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101841143A (en) * 2010-05-20 2010-09-22 朱成三 Assembly construction method for PVC wire pipe hidden lying
CN101892703A (en) * 2010-07-13 2010-11-24 朱成三 Construction method of PVC drain pipe in subsidence layer of bathroom and seepage-proofing treatment
CN101907201A (en) * 2010-08-09 2010-12-08 中建五局第三建设有限公司 Construction method for positioning sleeve by automatic leveling plumb method
CN102213006A (en) * 2010-04-02 2011-10-12 江苏天宇建设工程有限公司 UPVC (Unplasticized Polyvinyl Chloride) sleeve direct burying method
CN101899903B (en) * 2009-05-27 2012-06-06 五冶集团上海有限公司 Fixing device for embedded sleeves of fundamental roof of coke oven
CN102733601A (en) * 2012-06-30 2012-10-17 福州市第三建筑工程公司 Non-plugging vertical pipe slab penetrating embedment piece and construction method thereof
CN103485533A (en) * 2013-09-30 2014-01-01 上海建工七建集团有限公司 Terminal junction box installing die and method for utilizing die to install terminal junction box on masonry wall
CN103672181A (en) * 2014-01-03 2014-03-26 永升建设集团有限公司 Water supply and drainage pipeline sleeve pre-embedding construction method
CN104846978A (en) * 2015-05-26 2015-08-19 江苏南通二建集团有限公司 Cast-in-situ house drainage system quasi-industrialized construction method
CN105317230A (en) * 2014-08-01 2016-02-10 中天建设集团有限公司 Fixing method of beam and wall pre-embedded horizontal sleeve
CN106468075A (en) * 2015-08-18 2017-03-01 五冶集团上海有限公司 A kind of toilet pipe sleeve fixing meanss
CN107389041A (en) * 2017-08-03 2017-11-24 中国华西企业有限公司 A kind of device and its construction for aiding in sleeve pipe centering axle
CN108798031A (en) * 2018-05-31 2018-11-13 中联世纪建设集团有限公司 Kitchen and toilet lean on wall main riser PVC waterproof service sleeve construction methods
CN109000042A (en) * 2018-10-15 2018-12-14 北京城建集团有限责任公司 A kind of horizontal air hose system through walls and its construction method
CN110067384A (en) * 2018-01-22 2019-07-30 五冶集团上海有限公司 A kind of pvc pipe wears template provided pipe hole cavity construction method

Cited By (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101899903B (en) * 2009-05-27 2012-06-06 五冶集团上海有限公司 Fixing device for embedded sleeves of fundamental roof of coke oven
CN102213006A (en) * 2010-04-02 2011-10-12 江苏天宇建设工程有限公司 UPVC (Unplasticized Polyvinyl Chloride) sleeve direct burying method
CN102213006B (en) * 2010-04-02 2013-04-24 江苏天宇建设工程有限公司 UPVC (Unplasticized Polyvinyl Chloride) sleeve direct burying method
CN101841143B (en) * 2010-05-20 2012-09-26 朱成三 Assembly construction method for PVC wire pipe hidden lying
CN101841143A (en) * 2010-05-20 2010-09-22 朱成三 Assembly construction method for PVC wire pipe hidden lying
CN101892703A (en) * 2010-07-13 2010-11-24 朱成三 Construction method of PVC drain pipe in subsidence layer of bathroom and seepage-proofing treatment
CN101892703B (en) * 2010-07-13 2012-02-01 朱成三 Construction method of PVC drain pipe in subsidence layer of bathroom and seepage-proofing treatment
CN101907201A (en) * 2010-08-09 2010-12-08 中建五局第三建设有限公司 Construction method for positioning sleeve by automatic leveling plumb method
CN102733601A (en) * 2012-06-30 2012-10-17 福州市第三建筑工程公司 Non-plugging vertical pipe slab penetrating embedment piece and construction method thereof
CN102733601B (en) * 2012-06-30 2015-05-13 福州市第三建筑工程公司 Non-plugging vertical pipe slab penetrating embedment piece and construction method thereof
CN103485533B (en) * 2013-09-30 2015-10-21 上海建工七建集团有限公司 Line box installation mold and utilize the method for this mould hookup wire box on masonry wall
CN103485533A (en) * 2013-09-30 2014-01-01 上海建工七建集团有限公司 Terminal junction box installing die and method for utilizing die to install terminal junction box on masonry wall
CN103672181A (en) * 2014-01-03 2014-03-26 永升建设集团有限公司 Water supply and drainage pipeline sleeve pre-embedding construction method
CN105317230A (en) * 2014-08-01 2016-02-10 中天建设集团有限公司 Fixing method of beam and wall pre-embedded horizontal sleeve
CN104846978A (en) * 2015-05-26 2015-08-19 江苏南通二建集团有限公司 Cast-in-situ house drainage system quasi-industrialized construction method
CN106468075A (en) * 2015-08-18 2017-03-01 五冶集团上海有限公司 A kind of toilet pipe sleeve fixing meanss
CN107389041A (en) * 2017-08-03 2017-11-24 中国华西企业有限公司 A kind of device and its construction for aiding in sleeve pipe centering axle
CN107389041B (en) * 2017-08-03 2019-11-12 中国华西企业有限公司 A kind of device and its construction assisting casing centering axis
CN110067384A (en) * 2018-01-22 2019-07-30 五冶集团上海有限公司 A kind of pvc pipe wears template provided pipe hole cavity construction method
CN108798031A (en) * 2018-05-31 2018-11-13 中联世纪建设集团有限公司 Kitchen and toilet lean on wall main riser PVC waterproof service sleeve construction methods
CN108798031B (en) * 2018-05-31 2021-04-23 中联世纪建设集团有限公司 Construction method of PVC waterproof embedded sleeve of main stand pipe close to wall in kitchen and toilet
CN109000042A (en) * 2018-10-15 2018-12-14 北京城建集团有限责任公司 A kind of horizontal air hose system through walls and its construction method
CN109000042B (en) * 2018-10-15 2024-03-05 北京城建集团有限责任公司 Horizontal air duct wall penetrating system and construction method thereof

Similar Documents

Publication Publication Date Title
CN101392560A (en) Construction method once and for all for installing pipe sleeve pipe for construction
CN102127968B (en) Method for grouting floor slab bushing hole reservation preembedding die and grouting die
CN103672181A (en) Water supply and drainage pipeline sleeve pre-embedding construction method
CN107588243B (en) The construction method of concordant type flexibility wall bushing structure
CN204492159U (en) A kind of for concrete wall seam areas formwork seal bracing means
CN103089014A (en) Construction method of through floor pipe
CN101691772B (en) Fabricated novel installation process for drain pipe
CN102383593A (en) Support formwork device and construction method for one-step formed flange concrete in kitchens and toilets
CN106049862A (en) Inflatable adjustable type construction mold for reserved hole in concrete structure plate, and construction method
CN103821280A (en) Construction method for steel tube confined concrete composite columns
CN203729322U (en) Precast concrete pipeline foundation
CN105887887A (en) Underwater concrete grouting pile top elevation control construction method
CN207298095U (en) Concordant type flexibility wall bushing structure
CN103088843A (en) Comprehensive pipe gallery pre-buried iron piece installing construction method
CN201908439U (en) Reserved embedded grouting die for floor sleeve holes
CN101392597B (en) Construction electric switch box construction method once and for all
CN101781935B (en) Method for substituting pre-embedded waterproof casing pipe in concrete structure
CN206189855U (en) Reserve continuous auxiliary positioning device in entrance to a cave between concrete floor
CN102213006B (en) UPVC (Unplasticized Polyvinyl Chloride) sleeve direct burying method
CN208534040U (en) A kind of location structure positioned for controlling pre-buried vertical casing
JP6835510B2 (en) Reinforcement material for building civil engineering, concrete structure using this, concrete slab structure and its construction method and reinforcement method
CN210421921U (en) Auxiliary tool for installing and positioning riser sleeve
CN209066871U (en) A kind of Pipe installing standard element of Preembedded of tier building
CN201116396Y (en) Die for manufacturing building pipeline preformed pore
CN203113788U (en) Adjustable reserved sleeve capable of penetrating floorslab

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Open date: 20090325