CN101392560A - Construction method once and for all for installing pipe sleeve pipe for construction - Google Patents
Construction method once and for all for installing pipe sleeve pipe for construction Download PDFInfo
- Publication number
- CN101392560A CN101392560A CNA2008101511121A CN200810151112A CN101392560A CN 101392560 A CN101392560 A CN 101392560A CN A2008101511121 A CNA2008101511121 A CN A2008101511121A CN 200810151112 A CN200810151112 A CN 200810151112A CN 101392560 A CN101392560 A CN 101392560A
- Authority
- CN
- China
- Prior art keywords
- sleeve pipe
- sleeve
- pipe
- construction
- carry out
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The invention relates to a construction method for installing a building pipeline sleeve at one stroke. The adopted method comprises the following steps: during the main construction process, the pipeline sleeve is precast at one stroke before concrete pouring so as to ensure that the position of the pipeline sleeve is precast correctly at one stroke. The method which has simple construction and easy operation simplifies the working process, saves materials and manpower, reduces the project cost, and improves the project quality. By the method, the pipeline can be installed at one stroke without installing a fixing sleeve at the second time during the process of installing vertical pipes for water downflow and upflow, heating, and the like, thereby avoiding patching around the sleeve and leakage, and simplifying the construction process.
Description
Technical field
The present invention relates to the construction of field of civil engineering pipe sleeve, particularly construction method once and for all for installing pipe sleeve pipe for construction.
Background technology
The requirement of building installation engineering job specfication need be installed pipe sleeve additional for the erect riser of water, heating etc. up and down that passes in the concrete flaggy, is convenient to install the flexible of back pipeline and reaches the maintenance after engineering is handed over and change pipeline.Traditional way is that reservation cavity, major project add tubing after finishing when adopting the concreting flaggy when the pipe laying standpipe.And behind the casing repairing hole, repair the position and easily produce the crack, mass defects such as pipeline root seepage influence workmanship.
Summary of the invention
The present invention is in order to address the above problem, and the method for taking is in the main body construction journey, before the concreting, puts in place pipe sleeve is once pre-buried, and purpose is to guarantee that the pipe sleeve position is once pre-buried puts in place and accurately.This method easy construction, easy operating has been simplified operation, and economical with materials and artificial lowers engineering cost, has improved workmanship.
To achieve these goals, the job practices of pipe sleeve one-time-reach-place of the present invention may further comprise the steps:
1) in the formwork erection construction stage, reserve master drawing according to drawing design and sleeve pipe, with ruler along wall axis orientation measurement in length and breadth, the crosspoint is the sleeve pipe center, and on template, draw " a ten " word line and carry out mark, and carrying out pre-buriedly, this mark is defined as the position of bottom standpipe sleeve pipe;
2) be of a size of benchmark with bottom location standpipe sleeve pipe, on two layers of template, draw " ten " word line, determine the position of two layers of same standpipe, beat the 20MM hole at this place then, put into ceiling hammer on the central point of bottom sleeve pipe along the hole of being beaten, and carry out detection check with laser plummet and check, carry out sleeve pipe pre-buried again, and the like, finish determining of each layer sleeve position, the position that must put accurate sleeve pipe according to " ten " word center line when pre-buried guarantees that center line coincide up and down, just can carry out the fixing of sleeve pipe;
3) as adopting wooden form, adopt the inboard fixation of sleeve pipe, be about to pipe sleeve and place on template " ten " the word center line, fix in the inboard with screw, utilize screw rod with the closure plate nut screwing clamping above the sleeve pipe, guarantee the sleeve pipe fixation; As adopting steel form to do cast-in-place template die plate, fixedly employing " well " the font reinforcing bar of sleeve pipe is weldingly fixed on the reinforced mesh;
4) according to the position of service sleeve, to carry out pipe prefabrication and install, whole one-time-reach-place job practices leaves it at that.
By adopting the present invention, in the installation process of erect risers such as water, heating up and down, can once piping erection be put in place, no longer the secondary installing fixed sleeving has been avoided repairing, seepage to the sleeve pipe periphery, has simplified working procedure.
The specific embodiment
The making processing of sleeve pipe:
According to drawing design, the casing diameter of various pipelines is greater than No. 2, pipeline, and concentrates and process.Washroom and kitchen sleeve pipe exceed decorative ground 50MM, and general ground through-flooring should exceed decorative cover 20MM.
The location of sleeve pipe:
Determining of bottom standpipe sleeve position: reserve auspicious figure according to drawing design and sleeve pipe, along wall axis orientation measurement in length and breadth, the crosspoint is the sleeve pipe center, and draws " a ten " word line and carry out mark on template with ruler.
Determining of two layers of same position standpipe sleeve pipe: be of a size of benchmark with bottom location vertical pipe sleeve tube hub, on two layers of template, draw " ten " word line, beat the 20MM hole at this place then, put into ceiling hammer on the central point of bottom sleeve pipe along the hole of being beaten, and carry out detection check with laser plummet and check, guarantee upper and lower sleeve tube hub point on same straight line, and the like, determining of each layer sleeve position finished.
Fixing of sleeve pipe:
As adopt wooden form, adopt the inboard fixation of sleeve pipe.Be about to pipe sleeve inner bottom plating center and place on template " ten " the word center line, be fixed on the wooden form, utilize screw rod, guarantee the sleeve pipe fixation the closure plate nut screwing clamping above the sleeve pipe with screw; As adopting steel form to do cast-in-place template die plate, fixedly employing " well " the font reinforcing bar of sleeve pipe is weldingly fixed on the reinforced mesh.
The shutoff of sleeve pipe on steel form and the board wall:
The polybag of filling sawdust is inserted in the sleeve pipe, guaranteed that the mouth of pipe is concordant, and use rubber belt sealing.
Claims (1)
1, construction method once and for all for installing pipe sleeve pipe for construction is characterized in that, realizes according to the following steps:
1) in the formwork erection construction stage, reserve master drawing according to drawing design and sleeve pipe, with ruler along wall axis orientation measurement in length and breadth, the crosspoint is the sleeve pipe center, and on template, draw " a ten " word line and carry out mark, and carrying out pre-buriedly, this mark is defined as the position of bottom standpipe sleeve pipe;
2) be of a size of benchmark with bottom location standpipe sleeve pipe, on two layers of template, draw " ten " word line, determine the position of two layers of same standpipe, beat the 20MM hole at this place then, put into ceiling hammer on the central point of bottom sleeve pipe along the hole of being beaten, and carry out detection check with laser plummet and check, carry out sleeve pipe pre-buried again, and the like, finish determining of each layer sleeve position, the position of putting accurate sleeve pipe according to " ten " word center line when pre-buried guarantees that center line coincide up and down, just can carry out the fixing of sleeve pipe;
3) as adopting wooden form, adopt the inboard fixation of sleeve pipe, be about to pipe sleeve and place on template " ten " the word center line, fix in the inboard with screw, utilize screw rod with the closure plate nut screwing clamping above the sleeve pipe, guarantee the sleeve pipe fixation; As adopting steel form to do cast-in-place template die plate, fixedly employing " well " the font reinforcing bar of sleeve pipe is weldingly fixed on the reinforced mesh;
4) according to the position of service sleeve, to carry out pipe prefabrication and install, whole one-time-reach-place job practices leaves it at that.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNA2008101511121A CN101392560A (en) | 2008-09-25 | 2008-09-25 | Construction method once and for all for installing pipe sleeve pipe for construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNA2008101511121A CN101392560A (en) | 2008-09-25 | 2008-09-25 | Construction method once and for all for installing pipe sleeve pipe for construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN101392560A true CN101392560A (en) | 2009-03-25 |
Family
ID=40493054
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNA2008101511121A Pending CN101392560A (en) | 2008-09-25 | 2008-09-25 | Construction method once and for all for installing pipe sleeve pipe for construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101392560A (en) |
Cited By (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101841143A (en) * | 2010-05-20 | 2010-09-22 | 朱成三 | Assembly construction method for PVC wire pipe hidden lying |
CN101892703A (en) * | 2010-07-13 | 2010-11-24 | 朱成三 | Construction method of PVC drain pipe in subsidence layer of bathroom and seepage-proofing treatment |
CN101907201A (en) * | 2010-08-09 | 2010-12-08 | 中建五局第三建设有限公司 | Casing positioning construction method by automatic leveling plumb method |
CN102213006A (en) * | 2010-04-02 | 2011-10-12 | 江苏天宇建设工程有限公司 | UPVC (Unplasticized Polyvinyl Chloride) sleeve direct burying method |
CN101899903B (en) * | 2009-05-27 | 2012-06-06 | 五冶集团上海有限公司 | Fixing device for embedded sleeves of fundamental roof of coke oven |
CN102733601A (en) * | 2012-06-30 | 2012-10-17 | 福州市第三建筑工程公司 | Non-plugging vertical pipe slab penetrating embedment piece and construction method thereof |
CN103485533A (en) * | 2013-09-30 | 2014-01-01 | 上海建工七建集团有限公司 | Terminal junction box installing die and method for utilizing die to install terminal junction box on masonry wall |
CN103672181A (en) * | 2014-01-03 | 2014-03-26 | 永升建设集团有限公司 | Water supply and drainage pipeline sleeve pre-embedding construction method |
CN104846978A (en) * | 2015-05-26 | 2015-08-19 | 江苏南通二建集团有限公司 | Cast-in-situ house drainage system quasi-industrialized construction method |
CN105317230A (en) * | 2014-08-01 | 2016-02-10 | 中天建设集团有限公司 | Fixing method of beam and wall pre-embedded horizontal sleeve |
CN106468075A (en) * | 2015-08-18 | 2017-03-01 | 五冶集团上海有限公司 | A kind of toilet pipe sleeve fixing meanss |
CN107389041A (en) * | 2017-08-03 | 2017-11-24 | 中国华西企业有限公司 | A kind of device and its construction for aiding in sleeve pipe centering axle |
CN108798031A (en) * | 2018-05-31 | 2018-11-13 | 中联世纪建设集团有限公司 | Kitchen and toilet lean on wall main riser PVC waterproof service sleeve construction methods |
CN109000042A (en) * | 2018-10-15 | 2018-12-14 | 北京城建集团有限责任公司 | A kind of horizontal air hose system through walls and its construction method |
CN110067384A (en) * | 2018-01-22 | 2019-07-30 | 五冶集团上海有限公司 | A kind of pvc pipe wears template provided pipe hole cavity construction method |
-
2008
- 2008-09-25 CN CNA2008101511121A patent/CN101392560A/en active Pending
Cited By (23)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101899903B (en) * | 2009-05-27 | 2012-06-06 | 五冶集团上海有限公司 | Fixing device for embedded sleeves of fundamental roof of coke oven |
CN102213006A (en) * | 2010-04-02 | 2011-10-12 | 江苏天宇建设工程有限公司 | UPVC (Unplasticized Polyvinyl Chloride) sleeve direct burying method |
CN102213006B (en) * | 2010-04-02 | 2013-04-24 | 江苏天宇建设工程有限公司 | UPVC (Unplasticized Polyvinyl Chloride) sleeve direct burying method |
CN101841143B (en) * | 2010-05-20 | 2012-09-26 | 朱成三 | Assembly construction method for PVC wire pipe hidden lying |
CN101841143A (en) * | 2010-05-20 | 2010-09-22 | 朱成三 | Assembly construction method for PVC wire pipe hidden lying |
CN101892703A (en) * | 2010-07-13 | 2010-11-24 | 朱成三 | Construction method of PVC drain pipe in subsidence layer of bathroom and seepage-proofing treatment |
CN101892703B (en) * | 2010-07-13 | 2012-02-01 | 朱成三 | Construction method of PVC drain pipe in subsidence layer of bathroom and seepage-proofing treatment |
CN101907201A (en) * | 2010-08-09 | 2010-12-08 | 中建五局第三建设有限公司 | Casing positioning construction method by automatic leveling plumb method |
CN102733601A (en) * | 2012-06-30 | 2012-10-17 | 福州市第三建筑工程公司 | Non-plugging vertical pipe slab penetrating embedment piece and construction method thereof |
CN102733601B (en) * | 2012-06-30 | 2015-05-13 | 福州市第三建筑工程公司 | Non-plugging vertical pipe slab penetrating embedment piece and construction method thereof |
CN103485533B (en) * | 2013-09-30 | 2015-10-21 | 上海建工七建集团有限公司 | Line box installation mold and utilize the method for this mould hookup wire box on masonry wall |
CN103485533A (en) * | 2013-09-30 | 2014-01-01 | 上海建工七建集团有限公司 | Terminal junction box installing die and method for utilizing die to install terminal junction box on masonry wall |
CN103672181A (en) * | 2014-01-03 | 2014-03-26 | 永升建设集团有限公司 | Water supply and drainage pipeline sleeve pre-embedding construction method |
CN105317230A (en) * | 2014-08-01 | 2016-02-10 | 中天建设集团有限公司 | Fixing method of beam and wall pre-embedded horizontal sleeve |
CN104846978A (en) * | 2015-05-26 | 2015-08-19 | 江苏南通二建集团有限公司 | Cast-in-situ house drainage system quasi-industrialized construction method |
CN106468075A (en) * | 2015-08-18 | 2017-03-01 | 五冶集团上海有限公司 | A kind of toilet pipe sleeve fixing meanss |
CN107389041A (en) * | 2017-08-03 | 2017-11-24 | 中国华西企业有限公司 | A kind of device and its construction for aiding in sleeve pipe centering axle |
CN107389041B (en) * | 2017-08-03 | 2019-11-12 | 中国华西企业有限公司 | A kind of device and its construction assisting casing centering axis |
CN110067384A (en) * | 2018-01-22 | 2019-07-30 | 五冶集团上海有限公司 | A kind of pvc pipe wears template provided pipe hole cavity construction method |
CN108798031A (en) * | 2018-05-31 | 2018-11-13 | 中联世纪建设集团有限公司 | Kitchen and toilet lean on wall main riser PVC waterproof service sleeve construction methods |
CN108798031B (en) * | 2018-05-31 | 2021-04-23 | 中联世纪建设集团有限公司 | Construction method of PVC waterproof embedded sleeve of main stand pipe close to wall in kitchen and toilet |
CN109000042A (en) * | 2018-10-15 | 2018-12-14 | 北京城建集团有限责任公司 | A kind of horizontal air hose system through walls and its construction method |
CN109000042B (en) * | 2018-10-15 | 2024-03-05 | 北京城建集团有限责任公司 | Horizontal air duct wall penetrating system and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101392560A (en) | Construction method once and for all for installing pipe sleeve pipe for construction | |
CN102127968B (en) | Method for grouting floor slab bushing hole reservation preembedding die and grouting die | |
CN103672181A (en) | Water supply and drainage pipeline sleeve pre-embedding construction method | |
CN107588243B (en) | The construction method of concordant type flexibility wall bushing structure | |
CN204492159U (en) | A kind of for concrete wall seam areas formwork seal bracing means | |
CN103089014A (en) | Construction method of through floor pipe | |
CN101691772B (en) | Fabricated novel installation process for drain pipe | |
CN203729322U (en) | Precast concrete pipeline foundation | |
CN103821280A (en) | Construction method for steel tube confined concrete composite columns | |
CN106049862A (en) | Inflatable adjustable type construction mold for reserved hole in concrete structure plate, and construction method | |
CN105887887A (en) | Underwater concrete grouting pile top elevation control construction method | |
CN207298095U (en) | Concordant type flexibility wall bushing structure | |
CN101781935B (en) | Method for substituting pre-embedded waterproof casing pipe in concrete structure | |
CN103088843A (en) | Comprehensive pipe gallery pre-buried iron piece installing construction method | |
CN201908439U (en) | Reserved embedded grouting die for floor sleeve holes | |
CN101392597B (en) | Construction electric switch box construction method once and for all | |
CN209066871U (en) | A kind of Pipe installing standard element of Preembedded of tier building | |
CN206189855U (en) | Reserve continuous auxiliary positioning device in entrance to a cave between concrete floor | |
CN102213006B (en) | UPVC (Unplasticized Polyvinyl Chloride) sleeve direct burying method | |
JP6835510B2 (en) | Reinforcement material for building civil engineering, concrete structure using this, concrete slab structure and its construction method and reinforcement method | |
CN210421921U (en) | Auxiliary tool for installing and positioning riser sleeve | |
CN201116396Y (en) | Die for manufacturing building pipeline preformed pore | |
CN203113788U (en) | Adjustable reserved sleeve capable of penetrating floorslab | |
CN102587654A (en) | Construction method of PVC drainage direct-buried pipe fitting | |
CN101122174A (en) | Architecture pipeline preformed hole production method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Open date: 20090325 |