CN110067384A - A kind of pvc pipe wears template provided pipe hole cavity construction method - Google Patents
A kind of pvc pipe wears template provided pipe hole cavity construction method Download PDFInfo
- Publication number
- CN110067384A CN110067384A CN201810060888.6A CN201810060888A CN110067384A CN 110067384 A CN110067384 A CN 110067384A CN 201810060888 A CN201810060888 A CN 201810060888A CN 110067384 A CN110067384 A CN 110067384A
- Authority
- CN
- China
- Prior art keywords
- template
- pvc pipe
- hole
- pipe
- wears
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G15/00—Forms or shutterings for making openings, cavities, slits, or channels
- E04G15/06—Forms or shutterings for making openings, cavities, slits, or channels for cavities or channels in walls of floors, e.g. for making chimneys
- E04G15/061—Non-reusable forms
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
A kind of pvc pipe wears template provided pipe hole cavity construction method, characterized by the following steps: a, sample, production concrete beam forms or wall form are turned over according to drawing progress template, b, the template made is numbered, make the 1st template for side in wall room, 2nd template is used for wall outside, c, keep the absolute altitude of the 1st template reserved location hole-opening 3-5cm higher than the 2nd template in the reserved location hole-opening of the road template Shang Yu according to drawing requirement;D, after the completion of concrete muscle is bound, the 1st template and the 2nd template is implemented into envelope mould in place respectively, e, pour concrete in the 1st template and the 2nd template, completed pvc pipe and wear the construction of template provided pipe hole.Pvc pipe of the invention wears template provided pipe hole cavity construction method and wears that plate device structure is simple, setting is convenient with pvc pipe, and pore hole is reserved to be accurately positioned, the concreting later period no longer need to punch the effect with cost efficiency the advantages of.
Description
Technical field
The present invention relates to a kind of threading wall or the method for obligating for the pipeline hole for wearing beam, specifically, being a kind of pvc pipe
Wear template provided pipe hole cavity construction method.
Background technique
Usual exhaust pipe hole, smoke exhaust pipe hole, air-conditioner pipe hole need to synchronize when main house body is constructed reserved.
Normal practice is that binding seals mould after-pouring in concrete on the reinforcing bar of corresponding position after sealing at pvc pipe both ends with adhesive tape.But
Due to shifting of vibrating during various factors, such as construction personnel's omission, placement location deviation, concrete placings in practice of construction
Position etc., causes pore hole to be reserved ineffective, can only punch again in the later period, virtually considerably increase construction cost.
Therefore known pore hole reservation mode there are problems that it is above-mentioned various inconvenient and.
Summary of the invention
The purpose of the present invention is to propose that a kind of safe and reliable pvc pipe wears template provided pipe hole cavity construction method.
To achieve the above object, the technical solution of the invention is as follows:
A kind of pvc pipe wears template provided pipe hole cavity construction method, it is characterised in that the following steps are included:
A, template is carried out according to drawing turn over sample, production concrete beam forms or wall form;
B, the template made is numbered, makes the 1st template for side in wall room, the 2nd template is used for wall outside;
C, make the absolute altitude ratio of the 1st template reserved location hole-opening in the reserved location hole-opening of the road template Shang Yu according to drawing requirement
The 2nd high 3-5cm of template;
D, after the completion of concrete muscle is bound, the 1st template and the 2nd template are implemented into envelope mould in place respectively, the 1st template and the 2nd template add
Gu after the completion of, pvc pipe is worn in the 1st template and the 2nd template reserving hole, and pvc pipe is made to expose the 1st template and the 2nd mould respectively
The outside of plate, pvc pipe bared end length >=100mm;
E, concrete is poured in the 1st template and the 2nd template, is completed pvc pipe and is worn the construction of template provided pipe hole.
Pvc pipe of the invention wears template provided pipe hole cavity construction method can also be using technical measures below come further
It realizes.
Method above-mentioned, wherein described hole diameter is matched with pvc pipe.
Method above-mentioned, wherein wedgewise is done convenient for wearing template in described pvc pipe one end.
Method above-mentioned, wherein being careful not to block hole when the 1st template and 2 formwork reinforcement.
It is had the advantage that after adopting the above technical scheme, pvc pipe of the invention wears template provided pipe hole cavity construction method
1, pvc pipe wears that plate device structure is simple, setting is convenient;
2, the reserved accurate positionin in pore hole, it is easy for construction, guarantee exhaust hole, smoke evacuation hole, the reserved satisfaction figure in the air-conditioner pipe hole hole Deng Guan
Paper requirement;
3, the concreting later period no longer needs to punch, the significant effect of cost efficiency.
Detailed description of the invention
Fig. 1 is that the pvc pipe of the embodiment of the present invention wears beam arragement construction schematic diagram;
Fig. 2 is the pvc pipe arragement construction schematic diagram through walls of the embodiment of the present invention;
Fig. 3 is that the pvc pipe of the embodiment of the present invention wears template provided pipe hole concreting molding structure schematic diagram.
In figure: 1 the 1st side template, 2 reinforcing bars, 3 the 2nd side templates, 4PVC pipe, 5PVC pipe bared end, 6 concrete.
Specific embodiment
With reference to embodiments and its attached drawing further explains the present invention.
Embodiment 1
Pvc pipe of the invention wears template provided pipe hole cavity construction method, includes the following steps.
Referring now to Fig. 1 and Fig. 2, Fig. 1 is that the pvc pipe of the embodiment of the present invention wears beam arragement construction schematic diagram, and Fig. 2 is this hair
The pvc pipe of bright embodiment arragement construction schematic diagram through walls.
A, template is carried out according to drawing turn over sample, production concrete beam forms or wall form.
B, the template made is numbered, makes the 1st template for side in wall room, the 2nd template is used for wall outside.
C, make the mark of the 1st template reserved location hole-opening in the reserved location hole-opening of the road template Shang Yu according to drawing requirement
The high 5cm of 2 template of Gao Bi.Template is careful not to get number wrong when turning over use.
D, after the completion of concrete muscle is bound, the 1st template and the 2nd template are implemented into envelope mould, the 1st template and the 2nd mould in place respectively
After the completion of plate is reinforced, pvc pipe is worn in the 1st template and the 2nd template reserving hole, and pvc pipe is made to expose the 1st template and the respectively
The outside of 2 templates, pvc pipe bared end length are 100mm;Described hole diameter is matched with pvc pipe.Described pvc pipe one end is made into
Wedge shape is convenient for wearing template.It is careful not to block hole when the 1st template and 2 formwork reinforcement.
E, concrete is poured in the 1st template and the 2nd template, is completed pvc pipe and is worn the construction of template provided pipe hole.Fig. 3 is this hair
The pvc pipe of bright embodiment wears template provided pipe hole concreting molding structure schematic diagram.
The present invention has substantive distinguishing features and significant technological progress, and pvc pipe of the invention is worn template provided pipe hole and applied
Work method changes traditional pipe hole method for obligating, wears template method for obligating using pvc pipe, is accurately positioned, easy for construction, guarantees row
Gas hole, smoke evacuation hole, the air-conditioner pipe hole hole Deng Guan are reserved and meet drawing requirement, and the later period no longer needs to punch, to play cost efficiency
Effect.
Above embodiments are used for illustrative purposes only, rather than limitation of the present invention, the technology people in relation to technical field
Member, without departing from the spirit and scope of the present invention, can also make various transformation or variation.Therefore, all equivalent
Technical solution also should belong to scope of the invention, should be limited by each claim.
Claims (4)
1. a kind of pvc pipe wears template provided pipe hole cavity construction method, it is characterised in that the following steps are included:
A, template is carried out according to drawing turn over sample, production concrete beam forms or wall form;
B, the template made is numbered, makes the 1st template for side in wall room, the 2nd template is used for wall outside;
C, make the absolute altitude ratio of the 1st template reserved location hole-opening in the reserved location hole-opening of the road template Shang Yu according to drawing requirement
The 2nd high 3-5cm of template;
D, after the completion of concrete muscle is bound, the 1st template and the 2nd template are implemented into envelope mould in place respectively, the 1st template and the 2nd template add
Gu after the completion of, pvc pipe is worn in the 1st template and the 2nd template reserving hole, and pvc pipe is made to expose the 1st template and the 2nd mould respectively
The outside of plate, pvc pipe bared end length >=100mm;
E, concrete is poured in the 1st template and the 2nd template, is completed pvc pipe and is worn the construction of template provided pipe hole.
2. pvc pipe as described in claim 1 wears template provided pipe hole cavity construction method, which is characterized in that described hole diameter
It is matched with pvc pipe.
3. pvc pipe as described in claim 1 wears template provided pipe hole cavity construction method, which is characterized in that described pvc pipe one end
Wedgewise is done convenient for wearing template.
4. pvc pipe as described in claim 1 wears template provided pipe hole cavity construction method, which is characterized in that the 1st template and
It is careful not to block hole when 2 formwork reinforcement.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810060888.6A CN110067384A (en) | 2018-01-22 | 2018-01-22 | A kind of pvc pipe wears template provided pipe hole cavity construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810060888.6A CN110067384A (en) | 2018-01-22 | 2018-01-22 | A kind of pvc pipe wears template provided pipe hole cavity construction method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110067384A true CN110067384A (en) | 2019-07-30 |
Family
ID=67364781
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810060888.6A Pending CN110067384A (en) | 2018-01-22 | 2018-01-22 | A kind of pvc pipe wears template provided pipe hole cavity construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110067384A (en) |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101392560A (en) * | 2008-09-25 | 2009-03-25 | 陕西省第三建筑工程公司 | Construction method once and for all for installing pipe sleeve pipe for construction |
CN204343326U (en) * | 2014-12-11 | 2015-05-20 | 中铁四局集团第三建设有限公司 | Pipe spreading shutoff leakage preventing structure in the pre-buried pvc pipe cover of a kind of concrete wall |
CN204435867U (en) * | 2014-12-26 | 2015-07-01 | 重庆辉钻贸易有限公司 | Air-conditioning duct preformed hole exempts from form removal tool |
-
2018
- 2018-01-22 CN CN201810060888.6A patent/CN110067384A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101392560A (en) * | 2008-09-25 | 2009-03-25 | 陕西省第三建筑工程公司 | Construction method once and for all for installing pipe sleeve pipe for construction |
CN204343326U (en) * | 2014-12-11 | 2015-05-20 | 中铁四局集团第三建设有限公司 | Pipe spreading shutoff leakage preventing structure in the pre-buried pvc pipe cover of a kind of concrete wall |
CN204435867U (en) * | 2014-12-26 | 2015-07-01 | 重庆辉钻贸易有限公司 | Air-conditioning duct preformed hole exempts from form removal tool |
Non-Patent Citations (1)
Title |
---|
唐洁云等: "钢筋混凝土墙预留洞施工工艺改进", 《建筑技术开发》 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105459253A (en) | Large-volume lining model pouring device for tunnel model test and method of large-volume lining model pouring device | |
CN104532985B (en) | Shear wall cast with tenon-and-mortise precast concrete blocks replacing formworks and construction method thereof | |
CN204343463U (en) | A kind of waterproof construction of prefabricated reinforced concrete composite wallboard piece | |
CN206495501U (en) | A kind of cast-in-place concrete floor reserving hole template | |
CN109676748A (en) | A kind of production method of the concrete prefabricated frame of distribution box | |
CN110067384A (en) | A kind of pvc pipe wears template provided pipe hole cavity construction method | |
CN205259460U (en) | Extrusion sleeve leads nipple | |
CN105041348B (en) | A kind of underground space tunneling construction method of use compound roof | |
CN205677235U (en) | A kind of prefabricated anti-bank constructing structure applied in toilet | |
CN108266206A (en) | A kind of bored tunnel corrugated steel-mixed mud composite lining structure | |
CN108756016A (en) | A kind of construction method for making secondary structure beam form with U-shaped building block | |
CN203689815U (en) | Teaching simulation body for tunnel micro-step method technology | |
CN207959937U (en) | Construct column template | |
CN106337530A (en) | Construction method for plugging construction joint of frame beam | |
CN206256626U (en) | A kind of wall tie bar service sleeve | |
CN106150084A (en) | A kind of mold method wearing muscle template and formwork erecting structure thereof | |
CN207419752U (en) | One kind can the anti-bank of assembled precast concrete | |
CN107386633A (en) | A kind of multifunctional building template system | |
CN108915248A (en) | The continuous construction method of fiber is realized in concrete structure seam crossing using mold | |
CN207277370U (en) | Cast-in-place and single storehouse pipe gallery node of prefabricated combination | |
CN106555598B (en) | A kind of two lining of just branch leaves a blank separate structure and its external mold and buffer layer applies method | |
CN216076481U (en) | Concrete side wall hole shutoff construction equipment | |
CN201214758Y (en) | Tie-rod arch bridge abutment template | |
CN205742259U (en) | One lower channel side wall assembled template over long distances | |
CN207538459U (en) | A kind of support device suitable for masonry wall constructional column |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190730 |
|
RJ01 | Rejection of invention patent application after publication |