CN102733601B - Non-plugging vertical pipe slab penetrating embedment piece and construction method thereof - Google Patents
Non-plugging vertical pipe slab penetrating embedment piece and construction method thereof Download PDFInfo
- Publication number
- CN102733601B CN102733601B CN201210221526.3A CN201210221526A CN102733601B CN 102733601 B CN102733601 B CN 102733601B CN 201210221526 A CN201210221526 A CN 201210221526A CN 102733601 B CN102733601 B CN 102733601B
- Authority
- CN
- China
- Prior art keywords
- standpipe
- shutoff
- embedded part
- halves
- flat deck
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Sink And Installation For Waste Water (AREA)
- Domestic Plumbing Installations (AREA)
Abstract
The invention discloses a non-plugging vertical pipe slab penetrating embedment piece and a construction method thereof. The slab penetrating embedment piece comprises a pipe body which penetrates through a slab; a water stop ring is arranged on the outer circumferential wall of the pipe body; an upper outward flange ring and a lower outward flange ring are arranged on upper and lower ports of the pipe body respectively; a pipe sleeve which is used for being adhered to the vertical pipe is arranged in an inner cavity of the pipe body; and an elastic membrane is arranged between the pipe body and the pipe sleeve, so that the pipe sleeve can do relative motion in the pipe body. According to the slab embedment piece, the inner diameter of the pipe body is greater than the outer diameter of the vertical pipe, so that the vertical pipe has certain movement room, and the construction errors are eliminated; and the slab embedment piece can be tightly combined with the slab, and is waterproof and reliable, convenient to construct and high in using value.
Description
Technical field
The present invention relates to one not shutoff standpipe through-flooring embedded part and construction method thereof.
Background technology
In building construction, especially in residence building, a large amount of standpipes is had to need passing through floors.In the engineering construction taking steel concrete as floor, usually when concreting, reserving hole, after standpipe installation, then carries out shutoff operation around standpipe.Often there are following two kinds of situations: one is that reserved hole has position deviation, or shape is mated with standpipe portion for this reason, need again to cut a hole and play reaming.Sometimes also can hinder by reinforcing bar, need bar cutting, affect the quality of floor slab structure; Two is that existing plugging material and technique are difficult to ensure that the hole after shutoff seepage can not occur, and often does over again, and time-consumingly takes material, and the satisfaction of user is low.
Summary of the invention
The object of the present invention is to provide one not shutoff standpipe through-flooring embedded part and construction method thereof, the internal diameter of tube body of this floorslab embedded part is greater than standpipe external diameter, standpipe is made to have certain move place, be conducive to overcoming construction error, and can combine closely with floor, waterproof is reliable, and easy construction, use value is high.
Technical program of the present invention lies in: one is shutoff standpipe through-flooring embedded part not, comprise the body for being located on floor, described body periphery wall is provided with seal ring, the upper and lower port of described body is respectively arranged with upper outside flanged ring and lower outside flanged ring, be provided with in described tube cavity for the pipe box with standpipe adhesion, elastic diaphragm is provided with, in order to pipe box relative movement in body between described body and pipe box.
In a preferred embodiment, the upper port of described body is also provided with for splicing and being bonded in the circular flat deck of two halves on pipe box outer wall, the circular flat deck of described two halves and upper outside flanged ring adhesion.
In a preferred embodiment, the lower port of described body is also provided with for splicing and being bonded in the circular flat deck of two halves on standing tube outer wall.
In a preferred embodiment, the external diameter of the circular flat deck of described two halves is greater than the external diameter of body, and the semicircle orifice edge of the circular flat deck of described two halves is provided with semicircular flanges, and the semicircle flat deck outward flange of one of them stretches out, to form epitaxy part.
In a preferred embodiment, described elastic diaphragm is telescopic ripple type elastic diaphragm.
In a preferred embodiment, described lower outside flanged ring is evenly equipped with the through hole passed for iron nail, is fixed on the wooden form of floor in order to by body.
In a preferred embodiment, the space that described inboard wall of tube body, the two halves be arranged in upper port circular flat deck, pipe box and elastic diaphragm surround is filled with light-weight water-proof filler.
Another technical scheme of the present invention is: a kind of construction method of not shutoff standpipe through-flooring embedded part, comprises above-mentioned not shutoff standpipe through-flooring embedded part, carries out according to the following steps:
(1) according to intending the external diameter installing standpipe, the not shutoff standpipe through-flooring embedded part matched is selected, Embedded installation on wooden form;
(2) conservation treatment is carried out to not shutoff standpipe through-flooring embedded part Elastic barrier film, and concreting;
(3) in the pipe box of not shutoff standpipe through-flooring embedded part, standpipe is worn, by standpipe and not shutoff standpipe through-flooring embedded part adhesion after putting in place;
(4) on elastic diaphragm, light-weight water-proof filler is loaded;
(5) circular for the two halves be positioned in body upper port flat deck is bonded in pipe box outer wall and upper outside flanged ring adhesion, circular for the two halves be positioned in body lower port flat deck is bonded on standpipe and lower outside flanged ring.
Also carry out between above-mentioned steps (2) and step (3): adopt same vertical line to measure the centre deviation of the body on upper and lower floor, finally comprehensively determined the vertical centre installing standpipe, and be labeled on the not shutoff standpipe through-flooring embedded part of each layer.
The construction of flooring and ceiling has also been carried out after above-mentioned steps (5).
The invention has the advantages that: one is that the internal diameter of tube body of this floorslab embedded part is greater than standpipe external diameter, and make standpipe have certain move place, be conducive to overcoming construction error, and can combine closely with floor, waterproof is reliable, easy construction, and efficiency of construction is high, and use value is high; Two is that this floorslab embedded part can make in the factory, and reliable in quality, cost is low.
Accompanying drawing explanation
Fig. 1 is the sectional structure schematic diagram of the not shutoff standpipe through-flooring embedded part in embodiments of the invention.
Fig. 2 is the mounting structure schematic top plan view of the elastic diaphragm in embodiments of the invention.
Fig. 3 is the two halves circular flat deck plan structure schematic diagram in embodiments of the invention.
In figure: 1-body, 2-seal ring, 3-upper outside flanged ring 4-lower outside flanged ring 5-standpipe, 6-pipe box, 7-elastic diaphragm, 8-semicircle flat deck 9-semicircular flanges, 10-light-weight water-proof filler, 11-tier, 12-ceiling layer.
Detailed description of the invention
For above-mentioned feature and advantage of the present invention can be become apparent, special embodiment below, and coordinate accompanying drawing, be described in detail below, but the present invention is not limited to this.
Referring to accompanying drawing 1 ~ 3, not shutoff standpipe through-flooring embedded part of the present invention, comprise the body 1 for being located on floor, described body 1 periphery wall is provided with seal ring 2, the upper and lower port of described body 1 is respectively arranged with upper outside flanged ring 3 and lower outside flanged ring 4, be provided with in described body 1 inner chamber for the pipe box 6 with standpipe 5 adhesion, between described body 1 and pipe box 6, be provided with elastic diaphragm 7, in order to pipe box 6 relative movement in body 1.The material that it should be noted that elastic diaphragm 7 is flexible plastic, rubber or composite aluminium film etc., is folded into many rings and telescopic structure through press mold.The outer rim of this elastic diaphragm 7 and inboard wall of tube body welding, the outside wall surface welding of its inner rim and pipe box.
In the present embodiment, the upper port of described body 1 is also provided with for splicing and being bonded in the circular flat deck 8 of two halves on pipe box outer wall.The lower port of described body 1 is also provided with for splicing and being bonded in the circular flat deck 8 of two halves on standing tube outer wall.
The external diameter of the circular flat deck 8 of above-mentioned two halves is greater than the external diameter of body 1, and the semicircle orifice edge of the circular flat deck 8 of described two halves is provided with vertical semicircular flanges 9, and the semicircle flat deck outward flange of one of them stretches out, to form epitaxy part.Like this when standpipe 5 and body 1 are eccentric, body also can cover in by two halves circular flat deck completely.
Above-mentioned elastic diaphragm 7 is telescopic ripple type elastic diaphragm, and its moulding is identical with the dust cover on automobile gears case.
Above-mentioned lower outside flanged ring 4 is evenly equipped with the through hole passed for iron nail, is fixed on the wooden form of floor in order to by body 1.
The space that above-mentioned tubular body 1 inwall, the two halves be arranged in upper port circular flat deck 8, pipe box 6 and elastic diaphragm 7 surround is filled with light-weight water-proof filler 10.
The construction method of not shutoff standpipe through-flooring embedded part of the present invention, comprises as the not shutoff standpipe through-flooring embedded part in claim 1 ~ 7 as described in any one, carries out according to the following steps:
(1) according to intending the external diameter installing standpipe 5, the not shutoff standpipe through-flooring embedded part matched is selected, Embedded installation on wooden form;
(2) carry out conservation treatment to not shutoff standpipe through-flooring embedded part Elastic barrier film 7, the conservation treatment of indication refers to and to cover by the upper port of plastic foil by body here, and prevent when concreting, concrete is low-priced on elastic diaphragm 7, and concreting;
(3) in the pipe box 6 of not shutoff standpipe through-flooring embedded part, standpipe 5 is worn, by standpipe 5 and not shutoff standpipe through-flooring embedded part adhesion after putting in place;
(4) on elastic diaphragm 7, light-weight water-proof filler 10 is loaded;
(5) circular for the two halves be positioned in body 1 upper port flat deck is bonded on pipe box outer wall, circular for the two halves be positioned in body 1 lower port flat deck 8 is bonded on standpipe 5.
Also carry out between above-mentioned steps (2) and step (3): adopt same vertical line to measure the centre deviation of the body 1 on upper and lower floor, finally comprehensively determined the vertical centre installing standpipe 5, and be labeled on the not shutoff standpipe through-flooring embedded part of each layer.
The construction of flooring and ceiling has also been carried out after above-mentioned steps (5).
The foregoing is only preferred embodiment of the present invention, all equalizations done according to the present patent application the scope of the claims change and modify, and all should belong to covering scope of the present invention.
Claims (4)
1. a not shutoff standpipe through-flooring embedded part, comprise the body for being located on floor, described body periphery wall is provided with seal ring, it is characterized in that, the upper and lower port of described body is respectively arranged with upper outside flanged ring and lower outside flanged ring, described lower outside flanged ring is evenly equipped with the through hole passed for iron nail, is fixed on the wooden form of floor in order to by body; The upper port of described body is also provided with for splicing and being bonded in the circular flat deck of two halves on pipe box outer wall, the circular flat deck of described two halves and upper outside flanged ring adhesion, the lower port of described body is also provided with for splicing and being bonded in the circular flat deck of two halves on standing tube outer wall, the external diameter of the circular flat deck of described two halves is greater than the external diameter of body, the semicircle orifice edge of the circular flat deck of described two halves is provided with semicircular flanges, the semicircle flat deck outward flange of one of them stretches out, to form epitaxy part; Be provided with in described tube cavity for the pipe box with standpipe adhesion, between described body and pipe box, be provided with elastic diaphragm, in order to pipe box relative movement in body; The space that described inboard wall of tube body, the two halves be arranged in upper port circular flat deck, pipe box and elastic diaphragm surround is filled with light-weight water-proof filler.
2. not shutoff standpipe through-flooring embedded part according to claim 1, it is characterized in that, described elastic diaphragm is telescopic ripple type elastic diaphragm.
3. a construction method for not shutoff standpipe through-flooring embedded part, comprises as the not shutoff standpipe through-flooring embedded part in claim 1 ~ 2 as described in any one, it is characterized in that, carry out according to the following steps:
(1) according to intending the external diameter installing standpipe, the not shutoff standpipe through-flooring embedded part matched is selected, Embedded installation on wooden form;
(2) conservation treatment is carried out to not shutoff standpipe through-flooring embedded part Elastic barrier film, and concreting;
(3) adopt same vertical line to measure the centre deviation of the body on upper and lower floor, finally comprehensively determine the vertical centre installing standpipe, and be labeled on the not shutoff standpipe through-flooring embedded part of each layer;
(4) in the pipe box of not shutoff standpipe through-flooring embedded part, standpipe is worn, by standpipe and not shutoff standpipe through-flooring embedded part adhesion after putting in place;
(5) on elastic diaphragm, light-weight water-proof filler is loaded;
(6) circular for the two halves be positioned in body upper port flat deck is bonded on pipe box outer wall, circular for the two halves be positioned in body lower port flat deck is bonded on standpipe.
4. the construction method of not shutoff standpipe through-flooring embedded part according to claim 3, is characterized in that, after above-mentioned steps (6), also carried out the construction of flooring and ceiling.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210221526.3A CN102733601B (en) | 2012-06-30 | 2012-06-30 | Non-plugging vertical pipe slab penetrating embedment piece and construction method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210221526.3A CN102733601B (en) | 2012-06-30 | 2012-06-30 | Non-plugging vertical pipe slab penetrating embedment piece and construction method thereof |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102733601A CN102733601A (en) | 2012-10-17 |
CN102733601B true CN102733601B (en) | 2015-05-13 |
Family
ID=46989846
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210221526.3A Expired - Fee Related CN102733601B (en) | 2012-06-30 | 2012-06-30 | Non-plugging vertical pipe slab penetrating embedment piece and construction method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102733601B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110397271A (en) * | 2019-08-02 | 2019-11-01 | 中建四局安装工程有限公司 | A kind of ferrule mold and application method for the installation of skyscraper vertical pipeline |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3425429A1 (en) * | 1984-07-11 | 1986-01-23 | Werner 7925 Dischingen Hauff | PERFORMANCE FOR AT LEAST ONE LINE, LIKE PIPE, CABLE OR THE LIKE. THROUGH A WALL OPENING |
CN2436751Y (en) * | 2000-07-14 | 2001-06-27 | 樊运平 | Sealing device for underground chamber of direct buried hot supply pipeline |
CN1473226A (en) * | 2001-07-19 | 2004-02-04 | �紨����ʽ���� | Manhole structure constructing method, manhole structure water-stop flexible joint and manhole structure |
JP3663579B2 (en) * | 2000-08-01 | 2005-06-22 | 清水建設株式会社 | Mounting structure with drain trap and drain pipe in double floor |
CN2900653Y (en) * | 2006-02-24 | 2007-05-16 | 陈斌 | Double water discharging drain for shit toilet |
CN101392560A (en) * | 2008-09-25 | 2009-03-25 | 陕西省第三建筑工程公司 | Construction method once and for all for installing pipe sleeve pipe for construction |
CN101575913A (en) * | 2009-06-09 | 2009-11-11 | 中天建设集团有限公司天津分公司 | Construction method for preventing reserved holes of pipes from water leakage |
CN101858464A (en) * | 2009-04-11 | 2010-10-13 | 牟义慧 | Sealed elastic compensation sleeve |
CN202032180U (en) * | 2011-04-25 | 2011-11-09 | 四川省电力公司自贡电业局 | Hoop special for plugging power cable hole of transformer substation |
CN202812489U (en) * | 2012-06-30 | 2013-03-20 | 福州市第三建筑工程公司 | Floorslab embedded part for non-plugging penetration of stand pipe |
-
2012
- 2012-06-30 CN CN201210221526.3A patent/CN102733601B/en not_active Expired - Fee Related
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3425429A1 (en) * | 1984-07-11 | 1986-01-23 | Werner 7925 Dischingen Hauff | PERFORMANCE FOR AT LEAST ONE LINE, LIKE PIPE, CABLE OR THE LIKE. THROUGH A WALL OPENING |
CN2436751Y (en) * | 2000-07-14 | 2001-06-27 | 樊运平 | Sealing device for underground chamber of direct buried hot supply pipeline |
JP3663579B2 (en) * | 2000-08-01 | 2005-06-22 | 清水建設株式会社 | Mounting structure with drain trap and drain pipe in double floor |
CN1473226A (en) * | 2001-07-19 | 2004-02-04 | �紨����ʽ���� | Manhole structure constructing method, manhole structure water-stop flexible joint and manhole structure |
CN2900653Y (en) * | 2006-02-24 | 2007-05-16 | 陈斌 | Double water discharging drain for shit toilet |
CN101392560A (en) * | 2008-09-25 | 2009-03-25 | 陕西省第三建筑工程公司 | Construction method once and for all for installing pipe sleeve pipe for construction |
CN101858464A (en) * | 2009-04-11 | 2010-10-13 | 牟义慧 | Sealed elastic compensation sleeve |
CN101575913A (en) * | 2009-06-09 | 2009-11-11 | 中天建设集团有限公司天津分公司 | Construction method for preventing reserved holes of pipes from water leakage |
CN202032180U (en) * | 2011-04-25 | 2011-11-09 | 四川省电力公司自贡电业局 | Hoop special for plugging power cable hole of transformer substation |
CN202812489U (en) * | 2012-06-30 | 2013-03-20 | 福州市第三建筑工程公司 | Floorslab embedded part for non-plugging penetration of stand pipe |
Also Published As
Publication number | Publication date |
---|---|
CN102733601A (en) | 2012-10-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202812489U (en) | Floorslab embedded part for non-plugging penetration of stand pipe | |
CN102725456B (en) | Water closet flange seal | |
US20120124736A1 (en) | Waterproof base and methods of fabrication and installation thereof | |
CN203808283U (en) | Assembly type housing compound external wall | |
CN204530780U (en) | The water proof structure of underground-structure deformation joint | |
CN202730881U (en) | Integral embedded part with functions of lateral drainage, water stop and seepage prevention | |
WO2012078547A3 (en) | Hydrophilic end seal | |
CN102733601B (en) | Non-plugging vertical pipe slab penetrating embedment piece and construction method thereof | |
CN204875972U (en) | Pre -buried seat of drain pipe between kitchen guarding | |
WO2012078557A3 (en) | Hydrophilic end seal | |
CN202125056U (en) | Internal-sleeved connecting device of exhaust pipeline | |
CN202755650U (en) | Novel embedded pipe fitting for drainage and pollution discharge of building floors | |
CN207333977U (en) | A kind of bushing type self waterproofing waterstop joint | |
CN203796281U (en) | Grouting pipe structure embedded in composite pipe piece | |
CN202390856U (en) | Combination type inspection well | |
CN202181723U (en) | Concrete embedded mould for vertical pipe of water supplying-draining pipeline | |
KR101208606B1 (en) | Structure for combine pipe with manhole and methode combine there of | |
CN204420336U (en) | Through-flooring waste pipe preformed hole sealing configuration | |
CN112628477A (en) | Drain pipe pre-embedding device with stretching and water drainage preventing functions and installation method | |
CN201554123U (en) | Vaulted reinforced concrete structure | |
CN203654430U (en) | Assembled type fiber reinforced plastic inspection well | |
CN202530644U (en) | Roof waterproof structure | |
CN200982478Y (en) | Building floor pipe sealing part | |
CN205153083U (en) | Whole inspection shaft of pin -connected panel | |
CN201209264Y (en) | Building floor water supply and drainage pipe sealing member |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150513 Termination date: 20210630 |