CN101122174A - Architecture pipeline preformed hole production method - Google Patents
Architecture pipeline preformed hole production method Download PDFInfo
- Publication number
- CN101122174A CN101122174A CNA200710152304XA CN200710152304A CN101122174A CN 101122174 A CN101122174 A CN 101122174A CN A200710152304X A CNA200710152304X A CN A200710152304XA CN 200710152304 A CN200710152304 A CN 200710152304A CN 101122174 A CN101122174 A CN 101122174A
- Authority
- CN
- China
- Prior art keywords
- preformed hole
- reinforcement
- colligation
- pipes
- template
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The invention discloses a making method for pre-reserved holes of pipes in buildings, which is characterized in that the holes of the pipes are pre-reserved step by step: firstly, a fine sleeve is fixed on a template by a fixing rod avoiding positions for the pre-reserved holes; a main reinforced rib and a structural rib at the position of each pre-served hole are bonded; after bonding, a coarse sleeve is covered on the fine sleeve and then arranged on the bonded main reinforced rid and the structural rib, and then the structural rib and a latch is bonded and bent at positions of outer sleeves during bonding; 3. after the main reinforced rib, the structural rib, the coarse and the fine sleeves are made sure not to be displaced, the concrete is cast; 4. the coarse and the fine sleeves as well as templates are stripped from the cast concrete, and the pre-reserved holes are finished. Pre-reserved holes made with the invention have small hole diameter, high intensity of the pre-served hole positions of the pipes; during installation of pipes, the cast concrete is not necessary to be dug so as not to damage the stressed reinforced ribs, which improves the engineering quality; mould stripping is easy, so that the moulds are reusable, which reduces the construction cost and obviously improves the working efficiency.
Description
One, technical field:
The present invention relates to a kind of preparation method of architecture pipeline preformed hole.
Two, background technology:
Building all needs to be provided with many pipelines, as above sewer pipe, natural gas line, air-conditioning duct etc.In the building storey pipeline preformed hole, there are two big technologies complicated at present, have much room for improvement.One, preformed hole mould: when concreting, need on floor, to reserve an eyelet bigger than caliber, pass for pipeline, present way mainly adopts thick batten, follow closely into the square tub by caliber, on template, throw off with template the cast back as the mould nail, just form cubic hole, the existing mold way, more original, take a lot of work, take material, an eyelet needs a model, wastes a large amount of timber.And generally be to lay main reinforcement and distributing bar earlier, installation mold if laying main reinforcement and distributing bar influence the installation of mould, must be done bending process with reinforcing bar again, influences the intensity of main reinforcement like this, makes preformed hole position intensity low.They are two years old, lay template in the floor bottom: pipeline passes from reserving eyelet during installation, because pipeline and preformed hole have the gap of very big adjusting deviation, need play cutter cast-in-situ concrete during piping erection, destroy steel bar stress, need during sealing of hole lay template once more in the preformed hole bottom, template is fixing adopt pin top, bottom or with iron wire around above floor, hanging, fluid concrete again, this kind method, not only time-consumingly take material, and template often occurs and cave in, often do over again.
Three, summary of the invention:
The present invention solves now with the problems referred to above that exist in the technology, a kind of preparation method of architecture pipeline preformed hole is provided, the mould that this method is used can use repeatedly, secondary hole sealing need not re-lay template, do not destroy the structure of main reinforcement, main reinforcement significantly improves operating efficiency at the position of preformed hole intensity height.
For addressing the above problem, technical solution of the present invention is: a kind of preparation method of architecture pipeline preformed hole, the steps include: 1, unwrapping wire, and accurately mark the position of preformed hole; 2, the substep of pipeline preformed hole is reserved: the mould of use is made up of thick, thin two sleeve pipes and threaded fixed bar, the first step is fixed on thin sleeve pipe on the template by fixed bar, avoid the preformed hole position, colligation preformed hole position main reinforcement and constructional reinforcement, after colligation is finished, second step with thick casing pipe sleeve on thin sleeve pipe, place on the main reinforcement and constructional reinforcement of colligation colligation constructional reinforcement and button iron again, run into the position of outer tube during colligation, constructional reinforcement is done bending process; 3, guaranteeing fluid concrete under the situation that main reinforcement, constructional reinforcement and thick, thin sleeve pipe are not subjected to displacement; 4, thick, thin sleeve pipe and mould are pulled the concrete of cast, preformed hole is promptly finished.
Foregoing invention is wooden form or bamboo plywood form as the template of using, and can directly fixed bar be screwed on the template, as be steel form, can punch and tighten with the nut shimming.
The present invention installed by two steps of strict unwrapping wire and thick, thin two sleeve pipes, made the reservation aperture little at the paving location of main reinforcement, and main reinforcement need not to do bending process when laying, and has guaranteed main reinforcement intensity, has guaranteed the intensity at pipeline preformed hole place.Dwindled the diameter of a part below the preformed hole, not only do not influenced the installation of pipeline, and secondary hole sealing need not re-lay template, reduce the operation of piping erection, reduce working strength of workers.Need not play cutter cast-in-situ concrete during piping erection, destroy steel bar stress, improve workmanship, after the piping erection, with miniature expansive concrete plug-hole, the pipe root be carried out waterproofing work, the probability that infiltration takes place is minimum.In a word, the preformed hole that adopts the present invention to make, its aperture is little, the intensity height at pipeline preformed hole place, need not play cutter cast-in-situ concrete during piping erection, destroy steel bar stress, improved workmanship, the probability that infiltration takes place behind the sealing of hole is minimum, the demoulding is easy, its mould can use repeatedly, has reduced construction cost, significantly improves operating efficiency.
Four, description of drawings
Below in conjunction with accompanying drawing the present invention is further described:
The front view that the mould that Fig. 1 uses for the present invention is installed together;
The vertical view that the mould that Fig. 2 uses for the present invention is installed together;
Fig. 3 for colligation behind the first step preformed hole of the present invention vertical view behind main reinforcement and the constructional reinforcement;
Fig. 4 for the present invention second step preformed hole after colligation the vertical view of constructional reinforcement.
Five, the specific embodiment:
As Fig. 1, Fig. 2, Fig. 3, shown in Figure 4, the preparation method of a kind of architecture pipeline preformed hole of the present invention the steps include: 1, unwrapping wire, accurately marks the position of preformed hole.2, the substep of pipeline preformed hole is reserved: the mould of use is by slightly, thin two sleeve pipes 3,2 and threaded fixed bar 1 form, template is a wooden form, the first step is screwed in thin sleeve pipe 2 on the wooden form by fixed bar 1, avoid preformed hole position 2-3mm, colligation preformed hole position main reinforcement 5 and constructional reinforcement 6, spacing between the main reinforcement 5 is no more than 10mm, after colligation is finished, second step was enclosed within thick sleeve pipe 3 on the thin sleeve pipe 2, place on the main reinforcement 5 and constructional reinforcement 6 of colligation, colligation constructional reinforcement 6 and button iron again, run into the position of outer tube 3 during colligation, constructional reinforcement 6 is done bending process.3, guaranteeing fluid concrete under the situation that main reinforcement 5, constructional reinforcement 6 and thick, thin sleeve pipe 3,2 are not subjected to displacement.4, thick, thin sleeve pipe 3,2 and wooden model are pulled the concrete of cast, preformed hole is promptly finished.5, after the piping erection,, the pipe root is carried out waterproofing work with miniature expansive concrete plug-hole.4 is body of wall.
Claims (3)
1. the preparation method of an architecture pipeline preformed hole, it comprises step 1, unwrapping wire, accurately marks the position of preformed hole; The distribution that it is characterized in that: further comprising step 2, pipeline preformed hole is reserved: the mould of use is made up of thick, thin two sleeve pipes and threaded fixed bar, the first step is fixed on thin sleeve pipe on the template by fixed bar, avoid the preformed hole position, colligation preformed hole position main reinforcement and constructional reinforcement, after colligation is finished, second step with thick casing pipe sleeve on thin sleeve pipe, place on the main reinforcement and constructional reinforcement of colligation, again the colligation constructional reinforcement and the button iron, run into the position of outer tube during colligation, constructional reinforcement is done bending process; Step 3, guaranteeing fluid concrete under the situation that main reinforcement, constructional reinforcement and thick, thin sleeve pipe are not subjected to displacement; Step 4, thick, the thin sleeve pipe of general and mould pull the concrete of cast, and preformed hole is finished.
2. the preparation method of architecture pipeline preformed hole according to claim 1 is characterized in that: when described template is wooden form or bamboo plywood form, directly fixed bar (1) is screwed on the template.
3. the preparation method of architecture pipeline preformed hole according to claim 1 is characterized in that: when described template is steel form, after fixed bar (1) punching, tighten with the nut shimming.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNA200710152304XA CN101122174A (en) | 2007-09-25 | 2007-09-25 | Architecture pipeline preformed hole production method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNA200710152304XA CN101122174A (en) | 2007-09-25 | 2007-09-25 | Architecture pipeline preformed hole production method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN101122174A true CN101122174A (en) | 2008-02-13 |
Family
ID=39084656
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNA200710152304XA Pending CN101122174A (en) | 2007-09-25 | 2007-09-25 | Architecture pipeline preformed hole production method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101122174A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104727552A (en) * | 2015-04-01 | 2015-06-24 | 香港华艺设计顾问(深圳)有限公司 | Construction method for reserving water feed pipe grooves in prefabricated shear wall |
CN108755735A (en) * | 2018-06-13 | 2018-11-06 | 中国二十二冶集团有限公司 | Wind power foundation prestress wire preformed hole construction method and its special withdrawing stick |
CN109137750A (en) * | 2018-10-23 | 2019-01-04 | 南京工业大学 | Method for manufacturing concrete preformed hole |
-
2007
- 2007-09-25 CN CNA200710152304XA patent/CN101122174A/en active Pending
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104727552A (en) * | 2015-04-01 | 2015-06-24 | 香港华艺设计顾问(深圳)有限公司 | Construction method for reserving water feed pipe grooves in prefabricated shear wall |
CN108755735A (en) * | 2018-06-13 | 2018-11-06 | 中国二十二冶集团有限公司 | Wind power foundation prestress wire preformed hole construction method and its special withdrawing stick |
CN109137750A (en) * | 2018-10-23 | 2019-01-04 | 南京工业大学 | Method for manufacturing concrete preformed hole |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103061515B (en) | Concrete hollow block infilled wall pre-buried PVC conduit poling mounting method | |
CN103061504B (en) | Concrete slab Pipe installing hole to be provided construction mould and construction method | |
CN101392560A (en) | Construction method once and for all for installing pipe sleeve pipe for construction | |
CN103556819B (en) | A kind of construction method of reserved constructional column hole on beam slab | |
CN206090861U (en) | Portable built -in fitting is used in curtain installation | |
CN102235034A (en) | Prefabricated part and construction method for connecting prefabricated part with main structure | |
CN104806274A (en) | Large-span long-distance underground space main body supporting integrated structure and construction method | |
CN104727552A (en) | Construction method for reserving water feed pipe grooves in prefabricated shear wall | |
CN106049862A (en) | Inflatable adjustable type construction mold for reserved hole in concrete structure plate, and construction method | |
CN108755972B (en) | Foot pad for prefabricated part and using method thereof | |
CN101122174A (en) | Architecture pipeline preformed hole production method | |
CN105256931B (en) | Reinforced Concrete Slab Cracks control method | |
CN201116396Y (en) | Die for manufacturing building pipeline preformed pore | |
CN210950229U (en) | Embedded device for gas inlet pipe sleeve in indoor shear wall | |
CN211817000U (en) | Constructional column steel bar positioning mechanism | |
CN109016126A (en) | A method of based on assembled architecture wallboard preheating embedding line | |
CN203160693U (en) | Detachable water stopping screw | |
CN209066871U (en) | A kind of Pipe installing standard element of Preembedded of tier building | |
CN217734777U (en) | Construction structure of building outer wall | |
CN104878756B (en) | Sand-filling hollow structure based cast-in-place special-shaped pile construction method | |
CN207079809U (en) | A kind of assembled steel reinforced Concrete U Vierendeel girder and making mould and connection steelframe | |
KR200455455Y1 (en) | Index plate | |
CN205421555U (en) | Super high-rise floor bearing plate steel bar reservation pre-buried structure | |
CN212428082U (en) | Electromechanical pre-buried device of high-rise apartment building | |
ITVE20090027A1 (en) | PANEL IN LOW DENSITY POLYMER MATERIAL SELF-SUPPORTING FOR THE CONSTRUCTION OF WALLS AND ITS PROCEDURE. |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |