CN109016126A - A method of based on assembled architecture wallboard preheating embedding line - Google Patents
A method of based on assembled architecture wallboard preheating embedding line Download PDFInfo
- Publication number
- CN109016126A CN109016126A CN201810751202.8A CN201810751202A CN109016126A CN 109016126 A CN109016126 A CN 109016126A CN 201810751202 A CN201810751202 A CN 201810751202A CN 109016126 A CN109016126 A CN 109016126A
- Authority
- CN
- China
- Prior art keywords
- wallboard
- pipeline
- embedded part
- assembled architecture
- pipeline embedded
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 19
- 239000002184 metal Substances 0.000 claims abstract description 15
- 239000012943 hotmelt Substances 0.000 claims abstract description 9
- 238000012423 maintenance Methods 0.000 claims abstract description 3
- 238000004519 manufacturing process Methods 0.000 claims description 6
- 238000009434 installation Methods 0.000 claims description 3
- 238000000605 extraction Methods 0.000 claims description 2
- 238000011065 in-situ storage Methods 0.000 abstract description 4
- 230000000717 retained effect Effects 0.000 abstract 1
- 238000010276 construction Methods 0.000 description 6
- 238000005192 partition Methods 0.000 description 6
- 229910000831 Steel Inorganic materials 0.000 description 5
- 239000010959 steel Substances 0.000 description 5
- 238000005520 cutting process Methods 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 3
- 230000010354 integration Effects 0.000 description 3
- 230000000873 masking effect Effects 0.000 description 3
- QVGXLLKOCUKJST-UHFFFAOYSA-N atomic oxygen Chemical compound [O] QVGXLLKOCUKJST-UHFFFAOYSA-N 0.000 description 2
- 238000011156 evaluation Methods 0.000 description 2
- 229910052760 oxygen Inorganic materials 0.000 description 2
- 239000001301 oxygen Substances 0.000 description 2
- 229910001294 Reinforcing steel Inorganic materials 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 230000000903 blocking effect Effects 0.000 description 1
- 239000002131 composite material Substances 0.000 description 1
- 239000000428 dust Substances 0.000 description 1
- 238000003475 lamination Methods 0.000 description 1
- 239000000289 melt material Substances 0.000 description 1
- 238000009527 percussion Methods 0.000 description 1
- 238000011112 process operation Methods 0.000 description 1
- 238000004088 simulation Methods 0.000 description 1
- 239000002002 slurry Substances 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B23/00—Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
- B28B23/0025—Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects with installation or service material, e.g. tubes for electricity or water
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/74—Removable non-load-bearing partitions; Partitions with a free upper edge
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G15/00—Forms or shutterings for making openings, cavities, slits, or channels
- E04G15/06—Forms or shutterings for making openings, cavities, slits, or channels for cavities or channels in walls of floors, e.g. for making chimneys
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Manufacturing & Machinery (AREA)
- Chemical & Material Sciences (AREA)
- Ceramic Engineering (AREA)
- Rod-Shaped Construction Members (AREA)
Abstract
The invention discloses a kind of methods based on assembled architecture wallboard preheating embedding line, establish model by integrated design, carry out the virtual positioning of plate preparatory typesetting and pipeline embedded part;The pipeline embedded part of corresponding length is intercepted according to design size;Pipeline embedded part is arranged according to the virtual positioning of pipeline embedded part;Finished product wallboard is made, and forms plate pipeline duct at the pipeline embedded part of arrangement;Steam press maintenance is carried out after pouring into the mold for ALC wallboard, pipeline embedded part is retained inside ALC wallboard using high temperature resistant tubing, or forms plate pipeline duct by steam pressure high temperature melt using hot melt bar;The smooth metal bar that pipeline embedded part PVC pipe or use for EPS wallboard can extract out is extracted to form plate pipeline duct in wallboard forming.The standardization for advancing assembled architecture component component at this stage is applied and product is integrated, is improved assembled architecture assembled in situ efficiency, is improved site operation environment, improves to obtain room area.
Description
Technical field
The present invention relates to a kind of assembled architecture wallboard steel pipe buried in advance technologies, more particularly to one kind to be based on assembled architecture wall
The method of plate preheating embedding line.
Background technique
The necessity of assembled architecture wallboard steel pipe buried in advance is embodied in: assembled architecture evaluation criterion highlights internal partition wall and adopts
With wall, pipeline, fit up integrated " integration ".Internal partition wall just needed to carry out integrated design from the design phase, in pipe
On the basis of line generalization design, realize that wall and the integrated and civil engineering of pipeline are integrated with finishing, to form " internal partition wall
System ".Wall and pipeline, decorative lamination integration are conducive to improve assembled architecture assembly rate, are conducive to promote assembled at this stage
The standardization of building subassembly component is applied and product is integrated.
In the prior art, it is arranged for pipeline construction, if pipeline is pre-buried in factory's progress.Design pipeline stays in wall
Outside industrializes built-in facing and needs levelling masking pipeline, need to increase aerial measure;Design pipeline is embedded in inside wall, then
It needs manually to cut fluting in building site.Mainly take following technical scheme:
If pipeline is not pre-buried, building-site manually compares drawing scribing line, thread cutting groove;
Pipeline industrializes built-in facing and needs levelling masking pipeline outside wall, increases aerial measure.
The shortcomings that prior art, is:
When scene is slotted, more, the live rubbish of heavy workload, dust is more, and worker's resentment is obvious, causes cost unrestrained
Take and construction delay.
Levelling masking pipeline increases aerial measure, will necessarily also reduce to obtain room area (about 30~50mm thickness space waste),
And according to people's dwelling habits, the sound of hollow percussion is not received.
Currently, existing wallboard manufacturer (ALC plate, EPS composite plate producer etc.) have a go at it is pre-buried, in the wallboard production phase
Just pipeline, wire box are embedded in inside plate.But the orientation problem of wire box is not easy to solve, technical bottleneck can not be broken through.
Summary of the invention
The object of the present invention is to provide a kind of methods based on assembled architecture wallboard preheating embedding line.
The purpose of the present invention is what is be achieved through the following technical solutions:
Method based on assembled architecture wallboard preheating embedding line of the invention, comprising steps of
A, model is established by integrated design, carries out the virtual positioning of plate preparatory typesetting and pipeline embedded part;
B, the pipeline embedded part of corresponding length is intercepted according to design size;
C, pipeline embedded part is arranged according to the virtual positioning of pipeline embedded part;
D, finished product wallboard is made, and forms plate pipeline duct at the pipeline embedded part of arrangement;
The pipeline embedded part is high temperature resistant tubing, hot melt bar or the smooth metal bar that can be extracted out.
As seen from the above technical solution provided by the invention, provided in an embodiment of the present invention to be based on assembled architecture wall
The method of plate preheating embedding line solves the problems, such as that internal partition wall wall, pipeline, finishing are integrated " integrated ", advances and fill at this stage
Standardization with formula building subassembly component is applied and product is integrated, is improved assembled architecture assembled in situ efficiency, is improved
Site operation environment improves to obtain room area.
Specific embodiment
The embodiment of the present invention will be described in further detail below.What is be not described in detail in the embodiment of the present invention is interior
Appearance belongs to the prior art well known to professional and technical personnel in the field.
Method based on assembled architecture wallboard preheating embedding line of the invention, preferable specific embodiment is:
Comprising steps of
A, model is established by integrated design, carries out the virtual positioning of plate preparatory typesetting and pipeline embedded part;
B, the pipeline embedded part of corresponding length is intercepted according to design size;
C, pipeline embedded part is arranged according to the virtual positioning of pipeline embedded part;
D, finished product wallboard is made, and forms plate pipeline duct at the pipeline embedded part of arrangement;
The pipeline embedded part is high temperature resistant tubing, hot melt bar or the smooth metal bar that can be extracted out.
In the step B, the surplus of 10cm or more is reserved for the smooth metal bar interception size that can be extracted out, for resistance to
Both ends are blocked after the interception of high temperature tubing.
The plate is ALC or EPS wallboard, in the step D:
The ALC wallboard carries out steam press maintenance after pouring into the mold, pipeline embedded part retains ALC using the high temperature resistant tubing
Inside wallboard, or using hot melt bar by steam pressure high temperature melt formation plate pipeline duct;
The pipeline embedded part PVC pipe of the EPS wallboard uses the smooth metal bar that can be extracted out, the energy
The smooth metal bar of extraction is extracted to form plate pipeline duct when wallboard shapes.
Reinforced mesh built in the ALC wallboard, the pipeline embedded part are fixed on the reinforced mesh;
Mounting and positioning device on the case die wall of the EPS wallboard, the pipeline embedded part are fixed in the positioning device.
Finished product wallboard after production ships in-site installation, opens up wire box on plate pipeline duct according to design requirement
Slot installs wire box.
Method based on assembled architecture wallboard preheating embedding line of the invention solves internal partition wall wall, pipeline, finishing one
" integrated " problem of body, the standardization for advancing assembled architecture component component at this stage is applied and product is integrated, is improved
Assembled architecture assembled in situ efficiency, improves site operation environment, improves to obtain room area.
Specific embodiment:
When pipeline embedded part is used for the production procedure of ALC wallboard, high temperature resistant tubing can be used to retain inside wallboard for embedded part, heat-resisting
Temperature, which should be higher than that, steams oxygen temperature, and cutting when facilitating construction;Hot melt bar can also be used to form plate by steam pressure high temperature melt
Material pipeline duct;Because ALC plate is loose, it is not recommended that use the prefabricated pipeline hole road of bar.EPS wallboard does not have high-temperature process link,
Its embedded part can be used PVC pipe or using the prefabricated pipeline hole road of smooth metal bar that can be extracted out, and wherein metal bar is in wallboard
It is extracted when forming.
The following steps are included:
Step 1: the design phase by BIM information system management technology, believes so that the items of assembled architecture engineering project are related
It based on ceasing data, realizes that model is established in integrated design, carries out the virtual positioning such as the preparatory typesetting of plate and pipeline embedded part.This
The step informationization technology powerful by BIM establishes buildings model in the design phase, and simulation pipeline arrangement is pre-buried, is component
Life cycle production provides foundation.
Step 2: the embedded part (consideration of embedded part design size reserves 10cm surplus) of corresponding length is intercepted according to design size,
Such as socket wire box 400mm from the ground, when preheating embedding line, can arrange 500mm height, construct etc. and to stay for the wire box of subsequent field
Sufficient surplus;Tubulose embedded part is blocked, and prevents wallboard slurry from flowing into blocking.
Step 3: according to pipeline embedded part position fixed embedded part (bar length in reserve has more about 100mm, principle be equally for
Surplus is stopped in wire box construction of subsequent field etc.), ALC reinforcing steel bars of wallboards mesh sheet pipeline embedded part fixing piece.Steel mesh built in ALC wallboard
Piece, the position relative to every wallboard be it is fixed, therefore, pipeline embedded part, which is fixed on corresponding reinforced mesh, can be achieved to bury
The accurate positionin of part;Pipeline embedded part or bar is arranged in case die wall mounting and positioning device in EPS wallboard.
Step 4: pouring into the mold, and carry out follow-up producing process operation.
Step 5: finished product wallboard ships in-site installation, wire box slot is opened up according to drawing requirement, wire box is accurately installed.
Preheating embedding line wallboard of the invention meets assembled architecture evaluation criterion for internal partition wall wall, pipeline, finishing one
" integration " requirement of body is conducive to promote the standardization of assembled architecture component component at this stage using integrated with product.
Cooperate the built-in aerial floor slab construction of assembled, since floor is aerial, pipeline adjustable range is larger, to wallboard steel pipe buried in advance scene
Horizontal location size is of less demanding, does not influence site operation convenience, is conducive to play assembled architecture assembled in situ efficiency.
Meanwhile for site operation environment, room area etc. is with the obvious advantage.
Factory's steel pipe buried in advance method of the invention, wherein the pipeline embedded part can be high temperature resistant tubing, hot melt bar
Or the smooth metal bar that can be extracted out, it is virtually positioned in advance by digital information means.
When pipeline embedded part is used for the production procedure of ALC wallboard in the present invention, high temperature resistant tubing can be used to retain in wallboard for embedded part
Portion, heat resisting temperature, which should be higher than that, steams oxygen temperature, and cutting when facilitating construction;It can also be used hot melt bar by steam pressure high-temperature molten
Change forms plate pipeline duct;Because ALC plate is loose, it is not recommended that use the prefabricated pipeline hole road of bar.EPS wallboard does not have at high temperature
Link is managed, embedded part can be used PVC pipe or use the prefabricated pipeline hole road of smooth metal bar that can be extracted out, wherein metal bar
It is extracted in wallboard forming.
The foregoing is only a preferred embodiment of the present invention, but scope of protection of the present invention is not limited thereto,
Within the technical scope of the present disclosure, any changes or substitutions that can be easily thought of by anyone skilled in the art,
It should be covered by the protection scope of the present invention.Therefore, protection scope of the present invention should be with the protection model of claims
Subject to enclosing.
Claims (5)
1. a kind of method based on assembled architecture wallboard preheating embedding line, which is characterized in that comprising steps of
A, model is established by integrated design, carries out the virtual positioning of plate preparatory typesetting and pipeline embedded part;
B, the pipeline embedded part of corresponding length is intercepted according to design size;
C, pipeline embedded part is arranged according to the virtual positioning of pipeline embedded part;
D, finished product wallboard is made, and forms plate pipeline duct at the pipeline embedded part of arrangement;
The pipeline embedded part is high temperature resistant tubing, hot melt bar or the smooth metal bar that can be extracted out.
2. the method according to claim 1 based on assembled architecture wallboard preheating embedding line, which is characterized in that the step
In B, the surplus of 10cm or more is reserved for the smooth metal bar interception size that can be extracted out, for right after the interception of high temperature resistant tubing
Both ends are blocked.
3. the method according to claim 2 based on assembled architecture wallboard preheating embedding line, which is characterized in that the plate
For ALC or EPS wallboard, in the step D:
The ALC wallboard carries out steam press maintenance after pouring into the mold, pipeline embedded part retains ALC wallboard using the high temperature resistant tubing
Inside, or plate pipeline duct is formed by steam pressure high temperature melt using hot melt bar;
The pipeline embedded part PVC pipe of the EPS wallboard uses the smooth metal bar that can be extracted out, the energy extraction
Smooth metal bar wallboard shape when extract to form plate pipeline duct.
4. the method according to claim 3 based on assembled architecture wallboard preheating embedding line, it is characterised in that:
Reinforced mesh built in the ALC wallboard, the pipeline embedded part are fixed on the reinforced mesh;
Mounting and positioning device on the case die wall of the EPS wallboard, the pipeline embedded part are fixed in the positioning device.
5. the method according to any one of claims 1 to 4 based on assembled architecture wallboard preheating embedding line, feature exist
In, the finished product wallboard after production ships in-site installation, wire box slot is opened up on plate pipeline duct according to design requirement,
Wire box is installed.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810751202.8A CN109016126A (en) | 2018-07-10 | 2018-07-10 | A method of based on assembled architecture wallboard preheating embedding line |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810751202.8A CN109016126A (en) | 2018-07-10 | 2018-07-10 | A method of based on assembled architecture wallboard preheating embedding line |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109016126A true CN109016126A (en) | 2018-12-18 |
Family
ID=64640922
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810751202.8A Pending CN109016126A (en) | 2018-07-10 | 2018-07-10 | A method of based on assembled architecture wallboard preheating embedding line |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109016126A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112227598A (en) * | 2020-08-24 | 2021-01-15 | 江苏东尚住宅工业有限公司 | Prefabricated slab with built-in cavity and manufacturing method |
CN112589996A (en) * | 2020-12-04 | 2021-04-02 | 范潇淏 | Absorption type ALC plate pipeline integrated production method |
CN113650154A (en) * | 2021-08-17 | 2021-11-16 | 山东恒瑞新型建材有限公司 | Production method of assembled aerated concrete composite heat-insulation external wall panel |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN203947667U (en) * | 2013-10-18 | 2014-11-19 | 山东天玉墙体材料有限公司 | Autoclaved aerated concrete slabs |
CN106499046A (en) * | 2016-11-17 | 2017-03-15 | 西咸新区矩阵实业有限公司 | Architectural Equipment pipeline integral structure and design and construction process based on inverted ladder type slot type combined wall board |
EP3249128A2 (en) * | 2016-05-27 | 2017-11-29 | Kp1 | Pre-slab with means for marking sleeve paths and associated manufacturing method |
CN107663947A (en) * | 2017-10-31 | 2018-02-06 | 中国冶集团有限公司 | Autoclaved aerated concrete slab construction method in assembled architecture based on BIM |
CN107859232A (en) * | 2017-12-14 | 2018-03-30 | 陕西凝远新材料科技股份有限公司 | A kind of sand aerated concrete sheet material of built-in line box line pipe and preparation method thereof |
-
2018
- 2018-07-10 CN CN201810751202.8A patent/CN109016126A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN203947667U (en) * | 2013-10-18 | 2014-11-19 | 山东天玉墙体材料有限公司 | Autoclaved aerated concrete slabs |
EP3249128A2 (en) * | 2016-05-27 | 2017-11-29 | Kp1 | Pre-slab with means for marking sleeve paths and associated manufacturing method |
CN106499046A (en) * | 2016-11-17 | 2017-03-15 | 西咸新区矩阵实业有限公司 | Architectural Equipment pipeline integral structure and design and construction process based on inverted ladder type slot type combined wall board |
CN107663947A (en) * | 2017-10-31 | 2018-02-06 | 中国冶集团有限公司 | Autoclaved aerated concrete slab construction method in assembled architecture based on BIM |
CN107859232A (en) * | 2017-12-14 | 2018-03-30 | 陕西凝远新材料科技股份有限公司 | A kind of sand aerated concrete sheet material of built-in line box line pipe and preparation method thereof |
Non-Patent Citations (1)
Title |
---|
赖一飞等: "《工程项目管理学》", 30 September 2015, 武汉大学出版社 * |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112227598A (en) * | 2020-08-24 | 2021-01-15 | 江苏东尚住宅工业有限公司 | Prefabricated slab with built-in cavity and manufacturing method |
CN112589996A (en) * | 2020-12-04 | 2021-04-02 | 范潇淏 | Absorption type ALC plate pipeline integrated production method |
CN113650154A (en) * | 2021-08-17 | 2021-11-16 | 山东恒瑞新型建材有限公司 | Production method of assembled aerated concrete composite heat-insulation external wall panel |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109016126A (en) | A method of based on assembled architecture wallboard preheating embedding line | |
CN103321436B (en) | Pre-installation construction method for wire box on building bricked body and pre-installation supporting frame thereof | |
CN103758272B (en) | Autoclaved aerated concrete blocks built-in wall steel pipe buried in advance construction method | |
CN106088148B (en) | Pipe gallery template and its application | |
CN102003010A (en) | Energy-saving cast-in-place hollow floor | |
CN203977690U (en) | A kind of superimposed wallboard of waterproof of Novel belt prefabricated windows | |
CN207177063U (en) | A kind of blockwork of pre-buried air conditioner condensate water drain bushing | |
CN106522359A (en) | Total-prefabricated rural residential class composite wall structure system and construction method thereof | |
CN113882670A (en) | BIM-based construction method for cast-in-place concrete of special-shaped roof | |
CN107023032A (en) | A kind of cast-in-place method of pipe gallery | |
CN107724678A (en) | Heat insucation prefabricated plate connecting node constructs and heat insucation prefabricated plate connecting node construction method | |
CN109914644A (en) | A kind of assembled heat insulation masonry wall and preparation method thereof | |
CN207017445U (en) | A kind of connecting structure of girder steel and retaining wall | |
CN104153451A (en) | Construction method for installing concrete pipeline through prefabricated supporting block | |
CN102767378B (en) | Method for constructing distyle tunnel portal by framed bent | |
CN204174729U (en) | The prefabricated window that wafts of a kind of staggered floor suspension type | |
CN104453236A (en) | Circulating water natural cooling system and method for controlling mass concrete cracks | |
CN201933625U (en) | Novel insulation board | |
CN101994358A (en) | Combined hollow box body used for cast-in-place energy-saving hollow floor system | |
CN206110398U (en) | Outer wall body of antidetonation flexonics assembly self preservation temperature | |
CN207469533U (en) | A kind of exterior finish modeling structure of two-sided prefabricated overlapping wall | |
CN107355031A (en) | A kind of exterior finish modeling structure of two-sided prefabricated overlapping wall and preparation method thereof | |
CN205804386U (en) | A kind of finished product template system for basis grade beam | |
CN107859228A (en) | Prefabricated distribution box standard module building block and preparation method thereof | |
CN101122174A (en) | Architecture pipeline preformed hole production method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20181218 |