CN106499046A - Architectural Equipment pipeline integral structure and design and construction process based on inverted ladder type slot type combined wall board - Google Patents

Architectural Equipment pipeline integral structure and design and construction process based on inverted ladder type slot type combined wall board Download PDF

Info

Publication number
CN106499046A
CN106499046A CN201611012910.7A CN201611012910A CN106499046A CN 106499046 A CN106499046 A CN 106499046A CN 201611012910 A CN201611012910 A CN 201611012910A CN 106499046 A CN106499046 A CN 106499046A
Authority
CN
China
Prior art keywords
wallboard
design
pipeline
line box
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611012910.7A
Other languages
Chinese (zh)
Inventor
黄炜
杨树森
石安仁
陈建仓
吴鹏
罗斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xi ` An Industrial Co Ltd
Original Assignee
Xi ` An Industrial Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xi ` An Industrial Co Ltd filed Critical Xi ` An Industrial Co Ltd
Priority to CN201611012910.7A priority Critical patent/CN106499046A/en
Publication of CN106499046A publication Critical patent/CN106499046A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/0023Building characterised by incorporated canalisations
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/02Structures consisting primarily of load-supporting, block-shaped, or slab-shaped elements
    • E04B1/04Structures consisting primarily of load-supporting, block-shaped, or slab-shaped elements the elements consisting of concrete, e.g. reinforced concrete, or other stone-like material
    • E04B1/043Connections specially adapted therefor
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C2/00Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels
    • E04C2/30Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by the shape or structure
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C2/00Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels
    • E04C2/44Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by the purpose
    • E04C2/52Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by the purpose with special adaptations for auxiliary purposes, e.g. serving for locating conduits
    • E04C2/521Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by the purpose with special adaptations for auxiliary purposes, e.g. serving for locating conduits serving for locating conduits; for ventilating, heating or cooling

Abstract

A kind of Architectural Equipment line construction based on inverted ladder type slot type combined wall board, including sandwich thermal insulated compound external wall panel, composite interior wallboard and truss bars laminated floor slab, wherein, the side rib post of the compound external wall panel and composite interior wallboard is in inverted trapezoidal fluted shape going out at reinforcing bar, the inverted trapezoidal groove is to go to the bottom for opening, the waist of upside is oblique waist, in the default electrical pipeline of the sandwich thermal insulated compound external wall panel, composite interior wallboard and truss bars laminated floor slab and device installation position.Present invention also offers the design and construction process of the structure, when inverted ladder type groove combined wall board is produced by Architectural Equipment steel pipe buried in advance realizing the design and construction based on the integration of inverted ladder type groove composite wall Architectural Equipment pipeline;The present invention not only eliminates the trouble of later-stage secondary cutting perforate construction, and effectively prevent the pipeline collision of site operation appearance, substantially reduce in construction stage loss that therefore class mistake is caused and rework problems, be truly realized.

Description

Architectural Equipment pipeline integral structure and design based on inverted ladder type slot type combined wall board Construction technology
Technical field
The invention belongs to technical field of buildings, more particularly to a kind of Architectural Equipment pipe based on inverted ladder type slot type combined wall board Line integral structure and design and construction process.
Background technology
With flourishing for China's economy, building industry is also into the fast-developing phase.Get in construction project design complexity Come bigger, and the design cycle is short, the duration nervous in the case of, traditional Architectural Equipment pipeline designs and form of construction work face multiple Difficult.At this stage Architectural Equipment pipeline mostly using later-stage secondary cutting perforate construction by the way of.Due to various Architectural Equipments Purposes and professional performance are different, and the engineering time has different, does not such as carry out comprehensive arrangement in early stage of constructing to all kinds of pipelines in advance, will Delay project progress, waste money brings inconvenience so as to just affecting whole building thing to later period maintenance and management work Often use.But pipeline layout design exists and is related to that specialty is more again, cooperation difficulty is big, once lack overall management or design Flow process is unreasonable, will cause the problems such as doing over again in a large number.
Content of the invention
In order to overcome the shortcoming of above-mentioned prior art, it is an object of the invention to provide a kind of compound based on inverted ladder type slot type The Architectural Equipment pipeline integral structure of wallboard and design and construction process, when inverted ladder type groove combined wall board is produced by Architectural Equipment Steel pipe buried in advance with realize based on inverted ladder type groove composite wall Architectural Equipment pipeline integration design and construction;With conventional wallboard phase Than the wallboard not only eliminates the trouble of later-stage secondary cutting perforate construction, and effectively prevent the pipe of site operation appearance Line is collided, and is substantially reduced in construction stage loss that therefore class mistake is caused and rework problems, has been truly realized It is easy to use again and keeps in repair.
To achieve these goals, the technical solution used in the present invention is:
A kind of Architectural Equipment line construction based on inverted ladder type slot type combined wall board, including sandwich thermal insulated compound external wall panel 1, Composite interior wallboard 6 and truss bars laminated floor slab 10, wherein, the side rib post of the compound external wall panel 1 and composite interior wallboard 6 is going out It is in inverted trapezoidal fluted shape at reinforcing bar, the inverted trapezoidal groove is gone to the bottom as opening, the waist of upside is oblique waist, protects in the sandwich Warm compound external wall panel 1, composite interior wallboard 6 and truss bars laminated floor slab 10 preset electrical pipeline and device installation position.
The sandwich thermal insulated compound external wall panel 1, is provided with high-order socket line box 3, low level socket line box 2 and bottom on wallboard Portion's equipment spool installs preformed groove 4, is embedded with electric pipeline 5 in wallboard;
The composite interior wallboard 6, is provided with bottom equipment spool on wallboard and installs preformed groove 4 and top apparatus spool peace Dress preformed groove 9, is embedded with electric pipeline 5, distribution box hole 8 and electric switch socket 7 in wallboard;
Truss bars laminated floor slab 10, is provided with live pipeline installation 11, pre-buried illumination line box 12 on floor, reserved sets Standby pipeline hole 13.
The integrated design construction work of the Architectural Equipment line construction based on inverted ladder type slot type combined wall board of the present invention Skill, including:
Step 1, design:
According to the position of the position of spool and switch, line box in wallboard, water pipe through-flooring and roof boarding, bonding apparatus Specially, building, construction featuress carry out Integration Design;
Step 2, Workshop Production:
Sandwich thermal insulated compound external wall panel 1 and composite interior wallboard 6 is produced in workshop, is designed according to step 1 during production, pre-buried Good equipment installation and all kinds of line box and socket, equipment installation, electric switch and the one-shot forming aborning of line box socket;
Certainly, truss bars laminated floor slab 10 can also Synchronization Design in this step.
Step 3, site operation:
In constructing at the scene, after the completion of main building lifting, design according to step 1, penetrate in reserved pipeline each Cable needed for kind, penetrate all kinds of water pipes of required caliber at the hole of reserved sleeve pipe, it is to avoid later-stage secondary cutting is opened The trouble of hole construction.
In step 1, prefabricated components split design, and in position of the design spool and switch, line box in wallboard, building worn by water pipe During the position of plate and roof boarding, strictly observe《Building electric engineering construction quality accident specification》With《Building plumbing system and adopt Warm engineering construction quality acceptance specification》And premised on the actually used convenience of user.Will be same with building, structure discipline for mechanical discipline Shi Jinhang Integration Design.Wallboard embedded switch is generally fixed to from the position of door opening edge 200mm, the pre-buried low level socket one of wallboard As be fixed at liftoff 400mm, the pre-buried high-order socket of wallboard is generally fixed at liftoff 1800mm, and water power spool position is according to reality Border demand arrangement, is slotted in ecological bulk if necessary.
In the step 2, sandwich thermal insulated compound external wall panel 1 and composite interior wallboard 6 are with section and the less coagulation of arrangement of reinforcement Native sash, embeds the plate-type component constituted with ecological bulk;The sandwich thermal insulated compound external wall panel 1 and composite interior wallboard 6 are produced In, at the reserved line box of metope and switch, wallboard is two-sided troweling.
The ecological bulk can be autoclave aerated concrete building block or ceramsite concrete blocks.
The production process of the sandwich thermal insulated compound external wall panel 1 is as follows:
Step one:Using manufacture method is inverted, assembles the special steel form of heat-insulation layer first, make reinforced mesh;
Step 2:Reinforced mesh enters mould, places protective layer cushion block, casting concrete;
Step 3:Warming plate is laid, warming plate is laid in cover concrete and pours and completes in rear 20min, lays insulation The good heat insulation cementing mortar of mixing is paved during plate and is applied in insulation plate face to strengthen the tight bond of warming plate and concrete, Smear as comprehensive layer plastering method;Warming plate after lay taps vibration compacting with rubber hammer, and inserts bar for line;
Step 4:After heat-insulation layer wallboard meets desirable strength requirement, special structure sheaf steel form is assembled thereon, make Make framework of steel reinforcement, wall steel bar skeleton enters mould, and warming plate is abound with smears heat insulation cementing mortar, will be raw within 10min after smearing State bulk is inserted in wallboard rib lattice, is designed according to step 1, is put reserved line box, pipeline and other built-in fittings;
Step 5:Confirm to be sealed with packing material after all steel pipe buried in advance positions are accurate, prevent from pouring coagulation Block pre-buried pipeline and hole when native, pour C30 pea gravel concretens again, subsequently catch up with flat, wipe one's face, prefabricated after the completion of standard support Shield, when concrete strength reaches the 75% of design load, can lift by crane.
The heat insulation protecting layer concrete is poured using C30 pea gravel concretens, and the concrete slump for pouring should be controlled Between 180 to 200mm, the warming plate self-extinguishment EPS warming plate pours the EPS granular polystyrene coagulations for calculating desired thickness Soil.
The production process of the composite interior wallboard 6 is as follows:
Step one:Special steel form is assembled first, and bottom pours 20mm thickness C30 pea gravel concretens, if there is line box at the back side Pre-buried line box is then needed, the framework of steel reinforcement of the girt strip that makes and rib post is hung in steel form, put ecological bulk immediately;
Step 2:Design according to step 1, put reserved line box, pipeline and miscellaneous equipment built-in fitting;
Step 3:After all steel pipe buried in advance positions to be confirmed are accurate, sealed with packing material, prevent from pouring mixed Pre-buried pipeline and hole are blocked during solidifying soil, 20mm thickness C30 pea gravel concretens are poured again, subsequently catch up with flat, wipe one's face, prefabricated after the completion of Standard curing, when concrete strength reaches the 75% of design load, can lift by crane.
Compared with prior art, the invention has the beneficial effects as follows:
1st, Architectural Equipment pipeline integration assembled combined wall board takes into full account the coordination between each specialty in the design phase Property, by plumbing, electrically and the mechanical discipline such as HVAC with split design and combine, worn component production and construction stage are pre-buried well The pipeline of body of wall and reserve the pipeline hole of through-flooring, it is to avoid the trouble of hydroelectric line is installed in later-stage secondary cutting, is met The high efficiency of construction, high-quality, build the demand of the low consumption of resources and low environmental impact for using, meet China " 13 Five " innovation and development of proposition, coordinated development, the theory of Green Development in planning.
2nd, can achieve to optimize Architectural Equipment pipeline designs by reserving hole and steel pipe buried in advance, thoroughly eliminate hard, soft touching Hit, improve engineering design.The wallboard not only eliminates the trouble of later-stage secondary cutting perforate construction compared with conventional wallboard, and The pipeline collision of site operation appearance is effectively prevent, is substantially reduced in construction stage loss that therefore class mistake is caused and is done over again Problem.
Description of the drawings
Fig. 1 is sandwich thermal insulated inverted trapezoidal slot type compound external wall panel pipeline integral structure schematic diagram of the invention.
Fig. 2 is inverted trapezoidal slot type composite interior wallboard pipeline integral structure schematic diagram of the present invention.
Fig. 3 is main building equipment pipe network integral structure schematic diagram of the present invention.
Specific embodiment
Embodiments of the present invention are described in detail with reference to the accompanying drawings and examples.
Architectural Equipment pipeline integral structure of the present invention based on inverted ladder type slot type combined wall board as shown in Figure 1, Figure 2 with Fig. 3 institutes Show, including sandwich thermal insulated compound external wall panel 1, composite interior wallboard 6 and truss bars laminated floor slab 10, wherein, 1 He of compound external wall panel The side rib post of composite interior wallboard 6 is going out in inverted trapezoidal fluted shape at reinforcing bar, and inverted trapezoidal groove is gone to the bottom as opening, the waist of upside For oblique waist, electrical pipeline and device is preset in sandwich thermal insulated compound external wall panel 1, composite interior wallboard 6 and truss bars laminated floor slab 10 Part installation position.
Sandwich thermal insulated compound external wall panel 1, is provided with high-order socket line box 3, low level socket line box 2 and bottom on wallboard and sets Standby spool installs preformed groove 4, is embedded with electric pipeline 5 in wallboard;
Composite interior wallboard 6, is provided with bottom equipment spool installation preformed groove 4 on wallboard and top apparatus spool is installed in advance Groove 9 is stayed, electric pipeline 5, distribution box hole 8 and electric switch socket 7 in wallboard, is embedded with;
Truss bars laminated floor slab 10, is provided with live pipeline installation 11, pre-buried illumination line box 12 on floor, reserved sets Standby pipeline hole 13.
The present invention design and construction mainly include inverted ladder type slot type combined wall board Architectural Equipment pipeline integrated design, fall ladder Three partial content of the Workshop Production of type groove formula combined wall board and site operation.
1st, inverted ladder type slot type combined wall board Architectural Equipment pipeline integrated design:Design rank is split in the component of prefabricated components Section, takes into full account the position of the position of spool and switch, line box in wallboard, water pipe through-flooring and roof boarding, by mechanical discipline Integration Design is carried out simultaneously with building, structure discipline.
In the fractionation design phase of prefabricated components, in position of the design spool and switch, line box in wallboard, building worn by water pipe During the position of plate and roof boarding, strictly observe《Building electric engineering construction quality accident specification》With《Building plumbing system and adopt Warm engineering construction quality acceptance specification》And premised on the actually used convenience of user.Will be same with building, structure discipline for mechanical discipline Shi Jinhang Integration Design.Its deadlight embedded switch is generally fixed to from the position of door opening edge 200mm, and the pre-buried low level of wallboard is inserted Seat is generally fixed at liftoff 400mm, and the pre-buried high-order socket of wallboard is generally fixed at liftoff 1800mm, water power spool position root Arrange according to actual demand, can slot in ecological bulk if necessary.
2nd, the Workshop Production of inverted ladder type slot type combined wall board:Inverted ladder type slot type combined wall board is less with section and arrangement of reinforcement Concrete sash, embeds with the board-like structure of the ecology bulk composition such as such as autoclave aerated concrete building block or ceramsite concrete blocks Part.The equipment installation position provided according to design drawing when wallboard is produced and model, pre-buried good equipment in wallboard production Pipeline and all kinds of line box and socket.Equipment installation, electric switch and the one-shot forming aborning of line box socket;Wherein line box is adopted 86 types, spool adopt DN20PVC spools.At the reserved line box of metope and switch, wallboard is two-sided troweling, and such way is excellent Point only needs Puttying, brushes for later stage building, without the need for secondary levelling troweling.Special punching block is adopted in the rib post of wallboard side simultaneously Plate makes so that side rib post is going out in inverted trapezoidal fluted shape at reinforcing bar, and the combined wall board of this innovation form is not only easier to The degree of compaction of joint connection in site post concreting, and the frictional force between connecting pole and wallboard is increased, and increase can be played Wallboard laterally goes out the effect of the anchorage length of reinforcing bar so that connects between combined wall board and more stablizes, is more beneficial for antidetonation.
The specific embodiment of inverted ladder type slot type combined wall board includes two classes:
The production of 2.1 sandwich thermal insulated inverted trapezoidal slot type compound external wall panels.
Step one:This wallboard is using inversion manufacture method.The special steel form of assembling heat-insulation layer, makes reinforced mesh first.
Step 2:Reinforced mesh enters mould, places protective layer cushion block, to be confirmed errorless after, casting concrete (protect by insulation immediately Sheath concrete is poured using C30 pea gravel concretens, and the concrete slump for pouring should be controlled between 180 to 200mm).
Step 3:Lay warming plate (using self-extinguishment EPS warming plate or pours the EPS granular polystyrenes for calculating desired thickness Concrete), warming plate lays and should complete in 20min after cover concrete is poured, in order to strengthen warming plate with concrete Mixing good heat insulation cementing mortar should be paved when laying warming plate and is applied in insulation plate face, be smeared as comprehensive by tight bond Layer plastering method;Warming plate after lay taps vibration compacting with rubber hammer, and inserts bar for line.
Step 4:After heat-insulation layer wallboard meets desirable strength requirement, special structure sheaf steel form is assembled thereon, make Make framework of steel reinforcement, wall steel bar skeleton enters mould, and warming plate is abound with smears insulation bonding mortar, should incite somebody to action within 10min after smearing Ecological bulk is inserted in wallboard rib lattice, puts reserved line box, pipeline and other built-in fittings according to design drawing.
Step 5:Confirming to be sealed with packing material after all steel pipe buried in advance positions are accurate (prevents from pouring coagulation Pre-buried pipeline and hole is blocked when native).Pour C30 pea gravel concretens again, subsequently catch up with flat, wipe one's face, prefabricated after the completion of standard support Shield, when concrete strength reaches the 75% of design load, can lift by crane;
The production of 2.2 inverted trapezoidal slot type composite interior wallboards.
Step one:Special steel form assembled first, and bottom pours 20mm thickness C30 pea gravel concretens (if there is line box at the back side Pre-buried line box is then needed), the framework of steel reinforcement of the girt strip that makes and rib post is hung in steel form, ecological bulk is put immediately.
Step 2:Reserved line box, pipeline and miscellaneous equipment built-in fitting are put according to design drawing.
Step 3:After all steel pipe buried in advance positions to be confirmed are accurate, being sealed with packing material (prevents from pouring mixed Pre-buried pipeline and hole are blocked during solidifying soil).Pour 20mm thickness C30 pea gravel concretens again, subsequently catch up with flat, wipe one's face, prefabricated complete Standard curing afterwards, when concrete strength reaches the 75% of design load, can lift by crane.
3rd, site operation:In constructing at the scene, after the completion of main building lifting, it is only necessary to require according to design drawing and wall Corresponding reserved line box position in plate, penetrates various required cables, in reserved pipeline according to design in floor The requirement of drawing, penetrate all kinds of water pipes of required caliber at the hole of reserved sleeve pipe, it is to avoid later-stage secondary cutting is opened The trouble of hole construction.

Claims (10)

1. a kind of Architectural Equipment line construction based on inverted ladder type slot type combined wall board, it is characterised in that including sandwich thermal insulated multiple Side fascia (1), composite interior wallboard (6) and truss bars laminated floor slab (10) is closed, wherein, compound external wall panel (1) and compound Going out in inverted trapezoidal fluted shape at reinforcing bar, the inverted trapezoidal groove is gone to the bottom as opening to the side rib post of lining (6), upside Waist is oblique waist, default in sandwich thermal insulated compound external wall panel (1), composite interior wallboard (6) and truss bars laminated floor slab (10) Electrical pipeline and device installation position.
2. Architectural Equipment line construction according to claim 1 based on inverted ladder type slot type combined wall board, it is characterised in that
Sandwich thermal insulated compound external wall panel (1), be provided with wallboard high-order socket line box (3), low level socket line box (2) and Bottom equipment spool installs preformed groove (4), is embedded with electric pipeline (5) in wallboard;
Composite interior wallboard (6), are provided with bottom equipment spool on wallboard and install preformed groove (4) and top apparatus spool peace Dress preformed groove (9), is embedded with electric pipeline (5), distribution box hole (8) and electric switch socket (7) in wallboard;
Truss bars laminated floor slab (10), is provided with live pipeline installation (11), pre-buried illumination line box (12) on floor, reserves Equipment pipe hole (13).
3. described in claim 1 based on inverted ladder type slot type combined wall board Architectural Equipment line construction integrated design construction work Skill, it is characterised in that include:
Step 1, design:
According to the position of the position of spool and switch, line box in wallboard, water pipe through-flooring and roof boarding, bonding apparatus specially, build Build, construction featuress carry out Integration Design;
Step 2, Workshop Production:
Sandwich thermal insulated compound external wall panel (1) is produced in workshop and composite interior wallboard (6) is designed according to step 1 when producing, pre-buried Good equipment installation and all kinds of line box and socket, equipment installation, electric switch and the one-shot forming aborning of line box socket;
Step 3, site operation:
In constructing at the scene, after the completion of main building lifting, design according to step 1, in reserved pipeline, penetrate various institutes Cable is needed, all kinds of water pipes of required caliber are penetrated at the hole of reserved sleeve pipe, it is to avoid later-stage secondary cutting perforate is applied The trouble of work.
4. integrated design construction technology according to claim 3, it is characterised in that in the step 1, prefabricated components split Design, at the position of position of the design spool and switch, line box in wallboard, water pipe through-flooring and roof boarding, strictly observes 《Building electric engineering construction quality accident specification》With《Building plumbing system and heating engineering construction quality accident specification》And with Premised on the actually used convenience of user.Mechanical discipline is carried out Integration Design simultaneously with building, structure discipline.
5. integrated design construction technology according to claim 4, it is characterised in that in the step 1, wallboard embedded switch It is generally fixed to from the position of door opening edge 200mm, the pre-buried low level socket of wallboard is generally fixed at liftoff 400mm, and wallboard is pre- Bury high-order socket to be generally fixed at liftoff 1800mm, water power spool position is arranged according to the actual requirements, if necessary in ecological block Slot in material.
6. integrated design construction technology according to claim 3, it is characterised in that in the step 2, sandwich thermal insulated compound Side fascia (1) and composite interior wallboard (6) are with section and the less concrete sash of arrangement of reinforcement, embed the plate constituted with ecological bulk Formula component;In the production of sandwich thermal insulated compound external wall panel (1) and composite interior wallboard (6), except the reserved line box of metope and switch Place, wallboard are two-sided troweling.
7. integrated design construction technology according to claim 6, it is characterised in that the ecological bulk is steam pressurized mixed Solidifying earth building blocks or ceramsite concrete blocks.
8. integrated design construction technology according to claim 3, it is characterised in that the sandwich thermal insulated compound external wall panel (1) production process is as follows:
Step one:Using manufacture method is inverted, assembles the special steel form of heat-insulation layer first, make reinforced mesh;
Step 2:Reinforced mesh enters mould, places protective layer cushion block, casting concrete;
Step 3:Warming plate is laid, warming plate is laid in cover concrete and pours and completes in rear 20min, when laying warming plate Insulation bonding mortar good for mixing is paved and is applied in insulation plate face to strengthen the tight bond of warming plate and concrete, smeared For comprehensive layer plastering method;Warming plate after lay taps vibration compacting with rubber hammer, and inserts bar for line;
Step 4:After heat-insulation layer wallboard meets desirable strength requirement, special structure sheaf steel form is assembled thereon, make steel Muscles and bones frame, wall steel bar skeleton enter mould, and warming plate is abound with smears heat insulation cementing mortar, by ecological block within the 10min after smearing Material is inserted in wallboard rib lattice, is designed according to step 1, is put reserved line box, pipeline and other built-in fittings;
Step 5:Confirm to be sealed with packing material after all steel pipe buried in advance positions are accurate, when preventing casting concrete Block pre-buried pipeline and hole, pour C30 pea gravel concretens again, subsequently catch up with flat, wipe one's face, prefabricated after the completion of standard curing, treat When concrete strength reaches the 75% of design load, can lift by crane.
9. integrated design construction technology according to claim 8, it is characterised in that the heat insulation protecting layer concrete is adopted C30 pea gravel concretens are poured, and the concrete slump for pouring should be controlled between 180 to 200mm, the warming plate self-extinguishment EPS warming plates pour the EPS granular polystyrene concrete for calculating desired thickness.
10. integrated design construction technology according to claim 3, it is characterised in that the production of composite interior wallboard (6) Process is as follows:
Step one:Assemble special steel form first, bottom pours 20mm thickness C30 pea gravel concretens, when there is line box at the back side if need Pre-buried line box, the framework of steel reinforcement of the girt strip that makes and rib post is hung in steel form, puts ecological bulk immediately;
Step 2:Design according to step 1, put reserved line box, pipeline and miscellaneous equipment built-in fitting;
Step 3:After all steel pipe buried in advance positions to be confirmed are accurate, sealed with packing material, prevented casting concrete When block pre-buried pipeline and hole, pour 20mm thickness C30 pea gravel concretens again, subsequently catch up with flat, wipe one's face, prefabricated after the completion of standard Maintenance, when concrete strength reaches the 75% of design load, can lift by crane.
CN201611012910.7A 2016-11-17 2016-11-17 Architectural Equipment pipeline integral structure and design and construction process based on inverted ladder type slot type combined wall board Pending CN106499046A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611012910.7A CN106499046A (en) 2016-11-17 2016-11-17 Architectural Equipment pipeline integral structure and design and construction process based on inverted ladder type slot type combined wall board

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611012910.7A CN106499046A (en) 2016-11-17 2016-11-17 Architectural Equipment pipeline integral structure and design and construction process based on inverted ladder type slot type combined wall board

Publications (1)

Publication Number Publication Date
CN106499046A true CN106499046A (en) 2017-03-15

Family

ID=58324958

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611012910.7A Pending CN106499046A (en) 2016-11-17 2016-11-17 Architectural Equipment pipeline integral structure and design and construction process based on inverted ladder type slot type combined wall board

Country Status (1)

Country Link
CN (1) CN106499046A (en)

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107471406A (en) * 2017-09-09 2017-12-15 中国二十二冶集团有限公司 Wallboard preparation method with distribution box
CN107558633A (en) * 2017-09-09 2018-01-09 中国二十二冶集团有限公司 It is provided with the installation method of the prefabricated panel with distribution box
CN107859232A (en) * 2017-12-14 2018-03-30 陕西凝远新材料科技股份有限公司 A kind of sand aerated concrete sheet material of built-in line box line pipe and preparation method thereof
CN108005286A (en) * 2017-11-23 2018-05-08 安徽同济建设集团有限责任公司 A kind of construction method of the unidirectional overlapping floorboard of assembled architecture
CN109016126A (en) * 2018-07-10 2018-12-18 中建钢构有限公司 A method of based on assembled architecture wallboard preheating embedding line
CN109322487A (en) * 2018-11-05 2019-02-12 长沙远大住工智能科技有限公司 On wall equipment connect with walking in butt hole generation method
CN109680951A (en) * 2019-01-30 2019-04-26 台州职业技术学院 A kind of assembled architecture Beam-Slab Construction method
CN110359552A (en) * 2019-08-16 2019-10-22 甘亚金 A kind of novel plate building system
CN110421684A (en) * 2019-07-03 2019-11-08 辽宁煜梽新型建材有限公司 A kind of production method of lining
CN110835965A (en) * 2019-11-29 2020-02-25 上海宝冶集团有限公司 EPS module sandwich heat-preservation cast-in-place shear wall integrated hole part construction method
CN110835971A (en) * 2018-08-19 2020-02-25 程松林 Half-rib composite floor slab with floor heating pipe groove
CN111705952A (en) * 2020-05-27 2020-09-25 中博建设工程集团有限公司 Building wallboard mounting structure and construction process thereof
CN112324046A (en) * 2020-11-30 2021-02-05 珠海旺龙建材有限公司 ALC plate pipeline integration
CN112339064A (en) * 2020-10-21 2021-02-09 唐高山 Method for manufacturing pipeline integrated autoclaved aerated concrete slab
CN113090076A (en) * 2021-04-15 2021-07-09 北京林婉嫕空间艺术设计有限公司 Modular prefabricated integrated building construction system and construction method thereof
CN114658142A (en) * 2022-03-03 2022-06-24 中建一局集团建设发展有限公司 Ceramsite concrete wallboard mounting structure and construction method thereof
CN115749054A (en) * 2022-11-21 2023-03-07 韶关市粤仁建设工程有限公司 Masonry wall modular slotting-free wire pipe reservation and embedding construction method
CN116480034A (en) * 2023-04-23 2023-07-25 华川建设集团有限公司 Fireproof heat-insulating building wall and construction method thereof

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007304679A (en) * 2006-05-09 2007-11-22 Original Engineering Consultants Co Ltd Building of new construction, design for structure and verification method for construction
CN101967851A (en) * 2009-07-28 2011-02-09 董杨 Board-mixing structure assembly type house and building method thereof
CN104120798A (en) * 2013-04-25 2014-10-29 上海启鹏工程材料科技有限公司 Prefabricated concrete sandwich thermal-insulating wall and manufacturing method thereof
CN104988995A (en) * 2015-05-26 2015-10-21 中建五局蚌埠建筑工程有限公司 Method for cracking prevention at wire box and distribution box hole in wall
CN204728519U (en) * 2015-02-11 2015-10-28 中建三局机电工程有限公司 The installation system of embedded and wall-hanging equipment on a kind of body of wall
CN105649196A (en) * 2016-01-15 2016-06-08 山东乾元泽孚科技股份有限公司 Modularized building system
CN105908829A (en) * 2016-04-07 2016-08-31 中国十七冶集团有限公司 Residential house water supply pipeline air-entrapping concrete block partition wall and pipe trench reservation method
CN105951981A (en) * 2016-06-24 2016-09-21 东南大学 Independent type combination outer containment system and assembly method thereof
CN205653934U (en) * 2016-04-29 2016-10-19 广东省建筑科学研究院集团股份有限公司 Cast -in -place lightweight concrete wall body of green energy -conserving integration
CN106088312A (en) * 2016-06-21 2016-11-09 北新集成房屋(成都)有限公司 A kind of construction method of the low layer assembled integrated house of steel wood mixing
CN206245459U (en) * 2016-11-17 2017-06-13 西咸新区矩阵实业有限公司 Architectural Equipment pipeline integral structure based on inverted ladder type slot type combined wall board

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007304679A (en) * 2006-05-09 2007-11-22 Original Engineering Consultants Co Ltd Building of new construction, design for structure and verification method for construction
CN101967851A (en) * 2009-07-28 2011-02-09 董杨 Board-mixing structure assembly type house and building method thereof
CN104120798A (en) * 2013-04-25 2014-10-29 上海启鹏工程材料科技有限公司 Prefabricated concrete sandwich thermal-insulating wall and manufacturing method thereof
CN204728519U (en) * 2015-02-11 2015-10-28 中建三局机电工程有限公司 The installation system of embedded and wall-hanging equipment on a kind of body of wall
CN104988995A (en) * 2015-05-26 2015-10-21 中建五局蚌埠建筑工程有限公司 Method for cracking prevention at wire box and distribution box hole in wall
CN105649196A (en) * 2016-01-15 2016-06-08 山东乾元泽孚科技股份有限公司 Modularized building system
CN105908829A (en) * 2016-04-07 2016-08-31 中国十七冶集团有限公司 Residential house water supply pipeline air-entrapping concrete block partition wall and pipe trench reservation method
CN205653934U (en) * 2016-04-29 2016-10-19 广东省建筑科学研究院集团股份有限公司 Cast -in -place lightweight concrete wall body of green energy -conserving integration
CN106088312A (en) * 2016-06-21 2016-11-09 北新集成房屋(成都)有限公司 A kind of construction method of the low layer assembled integrated house of steel wood mixing
CN105951981A (en) * 2016-06-24 2016-09-21 东南大学 Independent type combination outer containment system and assembly method thereof
CN206245459U (en) * 2016-11-17 2017-06-13 西咸新区矩阵实业有限公司 Architectural Equipment pipeline integral structure based on inverted ladder type slot type combined wall board

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
冷超群、李长城、曲梦露: "《建筑节能设计》", 31 January 2016, 航空工业出版社 *

Cited By (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107558633A (en) * 2017-09-09 2018-01-09 中国二十二冶集团有限公司 It is provided with the installation method of the prefabricated panel with distribution box
CN107471406A (en) * 2017-09-09 2017-12-15 中国二十二冶集团有限公司 Wallboard preparation method with distribution box
CN108005286A (en) * 2017-11-23 2018-05-08 安徽同济建设集团有限责任公司 A kind of construction method of the unidirectional overlapping floorboard of assembled architecture
CN107859232A (en) * 2017-12-14 2018-03-30 陕西凝远新材料科技股份有限公司 A kind of sand aerated concrete sheet material of built-in line box line pipe and preparation method thereof
CN109016126A (en) * 2018-07-10 2018-12-18 中建钢构有限公司 A method of based on assembled architecture wallboard preheating embedding line
CN110835971A (en) * 2018-08-19 2020-02-25 程松林 Half-rib composite floor slab with floor heating pipe groove
CN109322487A (en) * 2018-11-05 2019-02-12 长沙远大住工智能科技有限公司 On wall equipment connect with walking in butt hole generation method
CN109680951A (en) * 2019-01-30 2019-04-26 台州职业技术学院 A kind of assembled architecture Beam-Slab Construction method
CN110421684A (en) * 2019-07-03 2019-11-08 辽宁煜梽新型建材有限公司 A kind of production method of lining
CN110359552A (en) * 2019-08-16 2019-10-22 甘亚金 A kind of novel plate building system
CN110835965A (en) * 2019-11-29 2020-02-25 上海宝冶集团有限公司 EPS module sandwich heat-preservation cast-in-place shear wall integrated hole part construction method
CN111705952A (en) * 2020-05-27 2020-09-25 中博建设工程集团有限公司 Building wallboard mounting structure and construction process thereof
CN112339064A (en) * 2020-10-21 2021-02-09 唐高山 Method for manufacturing pipeline integrated autoclaved aerated concrete slab
CN112324046A (en) * 2020-11-30 2021-02-05 珠海旺龙建材有限公司 ALC plate pipeline integration
CN113090076A (en) * 2021-04-15 2021-07-09 北京林婉嫕空间艺术设计有限公司 Modular prefabricated integrated building construction system and construction method thereof
CN114658142A (en) * 2022-03-03 2022-06-24 中建一局集团建设发展有限公司 Ceramsite concrete wallboard mounting structure and construction method thereof
CN114658142B (en) * 2022-03-03 2024-01-30 中建一局集团建设发展有限公司 Ceramsite concrete wallboard mounting structure and construction method thereof
CN115749054A (en) * 2022-11-21 2023-03-07 韶关市粤仁建设工程有限公司 Masonry wall modular slotting-free wire pipe reservation and embedding construction method
CN115749054B (en) * 2022-11-21 2023-05-30 韶关市粤仁建设工程有限公司 Masonry wall modularization grooving-free line pipe reservation pre-buried construction method
CN116480034A (en) * 2023-04-23 2023-07-25 华川建设集团有限公司 Fireproof heat-insulating building wall and construction method thereof

Similar Documents

Publication Publication Date Title
CN106499046A (en) Architectural Equipment pipeline integral structure and design and construction process based on inverted ladder type slot type combined wall board
CN104358341B (en) Building brickwork and masonry construction method of building brickwork
CN104746772B (en) Ash concrete hollow partition board anti-cracking construction method
CN104612282B (en) Construction method of prefabricated steel fiber sludge-made ceramisite concrete wall based on T-shaped groove connection
CN105696744B (en) Steam-pressing aero-concrete integral wall and its production technology
CN106522359A (en) Total-prefabricated rural residential class composite wall structure system and construction method thereof
CN206245459U (en) Architectural Equipment pipeline integral structure based on inverted ladder type slot type combined wall board
CN105804292A (en) Environment-friendly and energy-saving integrated cast-in-situ lightweight concrete wall and construction method thereof
CN112459291A (en) Prefabricated heat insulation structure integrated wall structure and construction process thereof
CN106013509A (en) Dry-method construction method for high-performance autolaved aerated concrete block wall
CN107227870A (en) A kind of transformer station spliced by prefabricated components builds
CN110359631A (en) Secondary structure Constructional Col-umn Construction method
CN103866885A (en) Energy-saving insulation structure of lighting window and construction method thereof
CN110359601A (en) A kind of one-time formed energy saving form walls of one-piece casting and construction method
CN104712079B (en) The assembled polypropylene fibre sludge ceramsite concrete wall and its construction method connected based on mat surface
CN104594525A (en) Composite thermal insulation wallboard and building structure integrated thermal insulation wall system and construction process
CN206220238U (en) Fully-prefabricated assembled structure
CN110485650A (en) A kind of water-proof system and its construction method of the modularization precast concrete circular arc chamfering for rolled roofing material waterproof paving
CN105672562A (en) Autoclaved aerated concrete integral insulating wall board and production process thereof
CN206956959U (en) Light composite heat insulation outer wall plate
CN105780992A (en) Construction method of orthogonal and ortho-laid steel concrete vierendeel sandwich plate floor
CN104675012A (en) Prefabricated polypropylene fiber sludge ceramsite concrete wall based on serrated racking connection and construction method thereof
CN102535841A (en) Construction technology of prefabricated wall panel
CN205502366U (en) Evaporate and press whole wallboard of aerated concrete
CN103883022B (en) The construction method of space enclosing structure inner-outer wall antidetonation and sound insulation cracking resistance integrated structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170315

RJ01 Rejection of invention patent application after publication