CN106499046A - Architectural Equipment pipeline integral structure and design and construction process based on inverted ladder type slot type combined wall board - Google Patents
Architectural Equipment pipeline integral structure and design and construction process based on inverted ladder type slot type combined wall board Download PDFInfo
- Publication number
- CN106499046A CN106499046A CN201611012910.7A CN201611012910A CN106499046A CN 106499046 A CN106499046 A CN 106499046A CN 201611012910 A CN201611012910 A CN 201611012910A CN 106499046 A CN106499046 A CN 106499046A
- Authority
- CN
- China
- Prior art keywords
- wallboard
- design
- pipeline
- line box
- concrete
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/0023—Building characterised by incorporated canalisations
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/02—Structures consisting primarily of load-supporting, block-shaped, or slab-shaped elements
- E04B1/04—Structures consisting primarily of load-supporting, block-shaped, or slab-shaped elements the elements consisting of concrete, e.g. reinforced concrete, or other stone-like material
- E04B1/043—Connections specially adapted therefor
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C2/00—Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels
- E04C2/30—Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by the shape or structure
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C2/00—Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels
- E04C2/44—Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by the purpose
- E04C2/52—Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by the purpose with special adaptations for auxiliary purposes, e.g. serving for locating conduits
- E04C2/521—Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by the purpose with special adaptations for auxiliary purposes, e.g. serving for locating conduits serving for locating conduits; for ventilating, heating or cooling
Abstract
A kind of Architectural Equipment line construction based on inverted ladder type slot type combined wall board, including sandwich thermal insulated compound external wall panel, composite interior wallboard and truss bars laminated floor slab, wherein, the side rib post of the compound external wall panel and composite interior wallboard is in inverted trapezoidal fluted shape going out at reinforcing bar, the inverted trapezoidal groove is to go to the bottom for opening, the waist of upside is oblique waist, in the default electrical pipeline of the sandwich thermal insulated compound external wall panel, composite interior wallboard and truss bars laminated floor slab and device installation position.Present invention also offers the design and construction process of the structure, when inverted ladder type groove combined wall board is produced by Architectural Equipment steel pipe buried in advance realizing the design and construction based on the integration of inverted ladder type groove composite wall Architectural Equipment pipeline;The present invention not only eliminates the trouble of later-stage secondary cutting perforate construction, and effectively prevent the pipeline collision of site operation appearance, substantially reduce in construction stage loss that therefore class mistake is caused and rework problems, be truly realized.
Description
Technical field
The invention belongs to technical field of buildings, more particularly to a kind of Architectural Equipment pipe based on inverted ladder type slot type combined wall board
Line integral structure and design and construction process.
Background technology
With flourishing for China's economy, building industry is also into the fast-developing phase.Get in construction project design complexity
Come bigger, and the design cycle is short, the duration nervous in the case of, traditional Architectural Equipment pipeline designs and form of construction work face multiple
Difficult.At this stage Architectural Equipment pipeline mostly using later-stage secondary cutting perforate construction by the way of.Due to various Architectural Equipments
Purposes and professional performance are different, and the engineering time has different, does not such as carry out comprehensive arrangement in early stage of constructing to all kinds of pipelines in advance, will
Delay project progress, waste money brings inconvenience so as to just affecting whole building thing to later period maintenance and management work
Often use.But pipeline layout design exists and is related to that specialty is more again, cooperation difficulty is big, once lack overall management or design
Flow process is unreasonable, will cause the problems such as doing over again in a large number.
Content of the invention
In order to overcome the shortcoming of above-mentioned prior art, it is an object of the invention to provide a kind of compound based on inverted ladder type slot type
The Architectural Equipment pipeline integral structure of wallboard and design and construction process, when inverted ladder type groove combined wall board is produced by Architectural Equipment
Steel pipe buried in advance with realize based on inverted ladder type groove composite wall Architectural Equipment pipeline integration design and construction;With conventional wallboard phase
Than the wallboard not only eliminates the trouble of later-stage secondary cutting perforate construction, and effectively prevent the pipe of site operation appearance
Line is collided, and is substantially reduced in construction stage loss that therefore class mistake is caused and rework problems, has been truly realized
It is easy to use again and keeps in repair.
To achieve these goals, the technical solution used in the present invention is:
A kind of Architectural Equipment line construction based on inverted ladder type slot type combined wall board, including sandwich thermal insulated compound external wall panel 1,
Composite interior wallboard 6 and truss bars laminated floor slab 10, wherein, the side rib post of the compound external wall panel 1 and composite interior wallboard 6 is going out
It is in inverted trapezoidal fluted shape at reinforcing bar, the inverted trapezoidal groove is gone to the bottom as opening, the waist of upside is oblique waist, protects in the sandwich
Warm compound external wall panel 1, composite interior wallboard 6 and truss bars laminated floor slab 10 preset electrical pipeline and device installation position.
The sandwich thermal insulated compound external wall panel 1, is provided with high-order socket line box 3, low level socket line box 2 and bottom on wallboard
Portion's equipment spool installs preformed groove 4, is embedded with electric pipeline 5 in wallboard;
The composite interior wallboard 6, is provided with bottom equipment spool on wallboard and installs preformed groove 4 and top apparatus spool peace
Dress preformed groove 9, is embedded with electric pipeline 5, distribution box hole 8 and electric switch socket 7 in wallboard;
Truss bars laminated floor slab 10, is provided with live pipeline installation 11, pre-buried illumination line box 12 on floor, reserved sets
Standby pipeline hole 13.
The integrated design construction work of the Architectural Equipment line construction based on inverted ladder type slot type combined wall board of the present invention
Skill, including:
Step 1, design:
According to the position of the position of spool and switch, line box in wallboard, water pipe through-flooring and roof boarding, bonding apparatus
Specially, building, construction featuress carry out Integration Design;
Step 2, Workshop Production:
Sandwich thermal insulated compound external wall panel 1 and composite interior wallboard 6 is produced in workshop, is designed according to step 1 during production, pre-buried
Good equipment installation and all kinds of line box and socket, equipment installation, electric switch and the one-shot forming aborning of line box socket;
Certainly, truss bars laminated floor slab 10 can also Synchronization Design in this step.
Step 3, site operation:
In constructing at the scene, after the completion of main building lifting, design according to step 1, penetrate in reserved pipeline each
Cable needed for kind, penetrate all kinds of water pipes of required caliber at the hole of reserved sleeve pipe, it is to avoid later-stage secondary cutting is opened
The trouble of hole construction.
In step 1, prefabricated components split design, and in position of the design spool and switch, line box in wallboard, building worn by water pipe
During the position of plate and roof boarding, strictly observe《Building electric engineering construction quality accident specification》With《Building plumbing system and adopt
Warm engineering construction quality acceptance specification》And premised on the actually used convenience of user.Will be same with building, structure discipline for mechanical discipline
Shi Jinhang Integration Design.Wallboard embedded switch is generally fixed to from the position of door opening edge 200mm, the pre-buried low level socket one of wallboard
As be fixed at liftoff 400mm, the pre-buried high-order socket of wallboard is generally fixed at liftoff 1800mm, and water power spool position is according to reality
Border demand arrangement, is slotted in ecological bulk if necessary.
In the step 2, sandwich thermal insulated compound external wall panel 1 and composite interior wallboard 6 are with section and the less coagulation of arrangement of reinforcement
Native sash, embeds the plate-type component constituted with ecological bulk;The sandwich thermal insulated compound external wall panel 1 and composite interior wallboard 6 are produced
In, at the reserved line box of metope and switch, wallboard is two-sided troweling.
The ecological bulk can be autoclave aerated concrete building block or ceramsite concrete blocks.
The production process of the sandwich thermal insulated compound external wall panel 1 is as follows:
Step one:Using manufacture method is inverted, assembles the special steel form of heat-insulation layer first, make reinforced mesh;
Step 2:Reinforced mesh enters mould, places protective layer cushion block, casting concrete;
Step 3:Warming plate is laid, warming plate is laid in cover concrete and pours and completes in rear 20min, lays insulation
The good heat insulation cementing mortar of mixing is paved during plate and is applied in insulation plate face to strengthen the tight bond of warming plate and concrete,
Smear as comprehensive layer plastering method;Warming plate after lay taps vibration compacting with rubber hammer, and inserts bar for line;
Step 4:After heat-insulation layer wallboard meets desirable strength requirement, special structure sheaf steel form is assembled thereon, make
Make framework of steel reinforcement, wall steel bar skeleton enters mould, and warming plate is abound with smears heat insulation cementing mortar, will be raw within 10min after smearing
State bulk is inserted in wallboard rib lattice, is designed according to step 1, is put reserved line box, pipeline and other built-in fittings;
Step 5:Confirm to be sealed with packing material after all steel pipe buried in advance positions are accurate, prevent from pouring coagulation
Block pre-buried pipeline and hole when native, pour C30 pea gravel concretens again, subsequently catch up with flat, wipe one's face, prefabricated after the completion of standard support
Shield, when concrete strength reaches the 75% of design load, can lift by crane.
The heat insulation protecting layer concrete is poured using C30 pea gravel concretens, and the concrete slump for pouring should be controlled
Between 180 to 200mm, the warming plate self-extinguishment EPS warming plate pours the EPS granular polystyrene coagulations for calculating desired thickness
Soil.
The production process of the composite interior wallboard 6 is as follows:
Step one:Special steel form is assembled first, and bottom pours 20mm thickness C30 pea gravel concretens, if there is line box at the back side
Pre-buried line box is then needed, the framework of steel reinforcement of the girt strip that makes and rib post is hung in steel form, put ecological bulk immediately;
Step 2:Design according to step 1, put reserved line box, pipeline and miscellaneous equipment built-in fitting;
Step 3:After all steel pipe buried in advance positions to be confirmed are accurate, sealed with packing material, prevent from pouring mixed
Pre-buried pipeline and hole are blocked during solidifying soil, 20mm thickness C30 pea gravel concretens are poured again, subsequently catch up with flat, wipe one's face, prefabricated after the completion of
Standard curing, when concrete strength reaches the 75% of design load, can lift by crane.
Compared with prior art, the invention has the beneficial effects as follows:
1st, Architectural Equipment pipeline integration assembled combined wall board takes into full account the coordination between each specialty in the design phase
Property, by plumbing, electrically and the mechanical discipline such as HVAC with split design and combine, worn component production and construction stage are pre-buried well
The pipeline of body of wall and reserve the pipeline hole of through-flooring, it is to avoid the trouble of hydroelectric line is installed in later-stage secondary cutting, is met
The high efficiency of construction, high-quality, build the demand of the low consumption of resources and low environmental impact for using, meet China " 13
Five " innovation and development of proposition, coordinated development, the theory of Green Development in planning.
2nd, can achieve to optimize Architectural Equipment pipeline designs by reserving hole and steel pipe buried in advance, thoroughly eliminate hard, soft touching
Hit, improve engineering design.The wallboard not only eliminates the trouble of later-stage secondary cutting perforate construction compared with conventional wallboard, and
The pipeline collision of site operation appearance is effectively prevent, is substantially reduced in construction stage loss that therefore class mistake is caused and is done over again
Problem.
Description of the drawings
Fig. 1 is sandwich thermal insulated inverted trapezoidal slot type compound external wall panel pipeline integral structure schematic diagram of the invention.
Fig. 2 is inverted trapezoidal slot type composite interior wallboard pipeline integral structure schematic diagram of the present invention.
Fig. 3 is main building equipment pipe network integral structure schematic diagram of the present invention.
Specific embodiment
Embodiments of the present invention are described in detail with reference to the accompanying drawings and examples.
Architectural Equipment pipeline integral structure of the present invention based on inverted ladder type slot type combined wall board as shown in Figure 1, Figure 2 with Fig. 3 institutes
Show, including sandwich thermal insulated compound external wall panel 1, composite interior wallboard 6 and truss bars laminated floor slab 10, wherein, 1 He of compound external wall panel
The side rib post of composite interior wallboard 6 is going out in inverted trapezoidal fluted shape at reinforcing bar, and inverted trapezoidal groove is gone to the bottom as opening, the waist of upside
For oblique waist, electrical pipeline and device is preset in sandwich thermal insulated compound external wall panel 1, composite interior wallboard 6 and truss bars laminated floor slab 10
Part installation position.
Sandwich thermal insulated compound external wall panel 1, is provided with high-order socket line box 3, low level socket line box 2 and bottom on wallboard and sets
Standby spool installs preformed groove 4, is embedded with electric pipeline 5 in wallboard;
Composite interior wallboard 6, is provided with bottom equipment spool installation preformed groove 4 on wallboard and top apparatus spool is installed in advance
Groove 9 is stayed, electric pipeline 5, distribution box hole 8 and electric switch socket 7 in wallboard, is embedded with;
Truss bars laminated floor slab 10, is provided with live pipeline installation 11, pre-buried illumination line box 12 on floor, reserved sets
Standby pipeline hole 13.
The present invention design and construction mainly include inverted ladder type slot type combined wall board Architectural Equipment pipeline integrated design, fall ladder
Three partial content of the Workshop Production of type groove formula combined wall board and site operation.
1st, inverted ladder type slot type combined wall board Architectural Equipment pipeline integrated design:Design rank is split in the component of prefabricated components
Section, takes into full account the position of the position of spool and switch, line box in wallboard, water pipe through-flooring and roof boarding, by mechanical discipline
Integration Design is carried out simultaneously with building, structure discipline.
In the fractionation design phase of prefabricated components, in position of the design spool and switch, line box in wallboard, building worn by water pipe
During the position of plate and roof boarding, strictly observe《Building electric engineering construction quality accident specification》With《Building plumbing system and adopt
Warm engineering construction quality acceptance specification》And premised on the actually used convenience of user.Will be same with building, structure discipline for mechanical discipline
Shi Jinhang Integration Design.Its deadlight embedded switch is generally fixed to from the position of door opening edge 200mm, and the pre-buried low level of wallboard is inserted
Seat is generally fixed at liftoff 400mm, and the pre-buried high-order socket of wallboard is generally fixed at liftoff 1800mm, water power spool position root
Arrange according to actual demand, can slot in ecological bulk if necessary.
2nd, the Workshop Production of inverted ladder type slot type combined wall board:Inverted ladder type slot type combined wall board is less with section and arrangement of reinforcement
Concrete sash, embeds with the board-like structure of the ecology bulk composition such as such as autoclave aerated concrete building block or ceramsite concrete blocks
Part.The equipment installation position provided according to design drawing when wallboard is produced and model, pre-buried good equipment in wallboard production
Pipeline and all kinds of line box and socket.Equipment installation, electric switch and the one-shot forming aborning of line box socket;Wherein line box is adopted
86 types, spool adopt DN20PVC spools.At the reserved line box of metope and switch, wallboard is two-sided troweling, and such way is excellent
Point only needs Puttying, brushes for later stage building, without the need for secondary levelling troweling.Special punching block is adopted in the rib post of wallboard side simultaneously
Plate makes so that side rib post is going out in inverted trapezoidal fluted shape at reinforcing bar, and the combined wall board of this innovation form is not only easier to
The degree of compaction of joint connection in site post concreting, and the frictional force between connecting pole and wallboard is increased, and increase can be played
Wallboard laterally goes out the effect of the anchorage length of reinforcing bar so that connects between combined wall board and more stablizes, is more beneficial for antidetonation.
The specific embodiment of inverted ladder type slot type combined wall board includes two classes:
The production of 2.1 sandwich thermal insulated inverted trapezoidal slot type compound external wall panels.
Step one:This wallboard is using inversion manufacture method.The special steel form of assembling heat-insulation layer, makes reinforced mesh first.
Step 2:Reinforced mesh enters mould, places protective layer cushion block, to be confirmed errorless after, casting concrete (protect by insulation immediately
Sheath concrete is poured using C30 pea gravel concretens, and the concrete slump for pouring should be controlled between 180 to 200mm).
Step 3:Lay warming plate (using self-extinguishment EPS warming plate or pours the EPS granular polystyrenes for calculating desired thickness
Concrete), warming plate lays and should complete in 20min after cover concrete is poured, in order to strengthen warming plate with concrete
Mixing good heat insulation cementing mortar should be paved when laying warming plate and is applied in insulation plate face, be smeared as comprehensive by tight bond
Layer plastering method;Warming plate after lay taps vibration compacting with rubber hammer, and inserts bar for line.
Step 4:After heat-insulation layer wallboard meets desirable strength requirement, special structure sheaf steel form is assembled thereon, make
Make framework of steel reinforcement, wall steel bar skeleton enters mould, and warming plate is abound with smears insulation bonding mortar, should incite somebody to action within 10min after smearing
Ecological bulk is inserted in wallboard rib lattice, puts reserved line box, pipeline and other built-in fittings according to design drawing.
Step 5:Confirming to be sealed with packing material after all steel pipe buried in advance positions are accurate (prevents from pouring coagulation
Pre-buried pipeline and hole is blocked when native).Pour C30 pea gravel concretens again, subsequently catch up with flat, wipe one's face, prefabricated after the completion of standard support
Shield, when concrete strength reaches the 75% of design load, can lift by crane;
The production of 2.2 inverted trapezoidal slot type composite interior wallboards.
Step one:Special steel form assembled first, and bottom pours 20mm thickness C30 pea gravel concretens (if there is line box at the back side
Pre-buried line box is then needed), the framework of steel reinforcement of the girt strip that makes and rib post is hung in steel form, ecological bulk is put immediately.
Step 2:Reserved line box, pipeline and miscellaneous equipment built-in fitting are put according to design drawing.
Step 3:After all steel pipe buried in advance positions to be confirmed are accurate, being sealed with packing material (prevents from pouring mixed
Pre-buried pipeline and hole are blocked during solidifying soil).Pour 20mm thickness C30 pea gravel concretens again, subsequently catch up with flat, wipe one's face, prefabricated complete
Standard curing afterwards, when concrete strength reaches the 75% of design load, can lift by crane.
3rd, site operation:In constructing at the scene, after the completion of main building lifting, it is only necessary to require according to design drawing and wall
Corresponding reserved line box position in plate, penetrates various required cables, in reserved pipeline according to design in floor
The requirement of drawing, penetrate all kinds of water pipes of required caliber at the hole of reserved sleeve pipe, it is to avoid later-stage secondary cutting is opened
The trouble of hole construction.
Claims (10)
1. a kind of Architectural Equipment line construction based on inverted ladder type slot type combined wall board, it is characterised in that including sandwich thermal insulated multiple
Side fascia (1), composite interior wallboard (6) and truss bars laminated floor slab (10) is closed, wherein, compound external wall panel (1) and compound
Going out in inverted trapezoidal fluted shape at reinforcing bar, the inverted trapezoidal groove is gone to the bottom as opening to the side rib post of lining (6), upside
Waist is oblique waist, default in sandwich thermal insulated compound external wall panel (1), composite interior wallboard (6) and truss bars laminated floor slab (10)
Electrical pipeline and device installation position.
2. Architectural Equipment line construction according to claim 1 based on inverted ladder type slot type combined wall board, it is characterised in that
Sandwich thermal insulated compound external wall panel (1), be provided with wallboard high-order socket line box (3), low level socket line box (2) and
Bottom equipment spool installs preformed groove (4), is embedded with electric pipeline (5) in wallboard;
Composite interior wallboard (6), are provided with bottom equipment spool on wallboard and install preformed groove (4) and top apparatus spool peace
Dress preformed groove (9), is embedded with electric pipeline (5), distribution box hole (8) and electric switch socket (7) in wallboard;
Truss bars laminated floor slab (10), is provided with live pipeline installation (11), pre-buried illumination line box (12) on floor, reserves
Equipment pipe hole (13).
3. described in claim 1 based on inverted ladder type slot type combined wall board Architectural Equipment line construction integrated design construction work
Skill, it is characterised in that include:
Step 1, design:
According to the position of the position of spool and switch, line box in wallboard, water pipe through-flooring and roof boarding, bonding apparatus specially, build
Build, construction featuress carry out Integration Design;
Step 2, Workshop Production:
Sandwich thermal insulated compound external wall panel (1) is produced in workshop and composite interior wallboard (6) is designed according to step 1 when producing, pre-buried
Good equipment installation and all kinds of line box and socket, equipment installation, electric switch and the one-shot forming aborning of line box socket;
Step 3, site operation:
In constructing at the scene, after the completion of main building lifting, design according to step 1, in reserved pipeline, penetrate various institutes
Cable is needed, all kinds of water pipes of required caliber are penetrated at the hole of reserved sleeve pipe, it is to avoid later-stage secondary cutting perforate is applied
The trouble of work.
4. integrated design construction technology according to claim 3, it is characterised in that in the step 1, prefabricated components split
Design, at the position of position of the design spool and switch, line box in wallboard, water pipe through-flooring and roof boarding, strictly observes
《Building electric engineering construction quality accident specification》With《Building plumbing system and heating engineering construction quality accident specification》And with
Premised on the actually used convenience of user.Mechanical discipline is carried out Integration Design simultaneously with building, structure discipline.
5. integrated design construction technology according to claim 4, it is characterised in that in the step 1, wallboard embedded switch
It is generally fixed to from the position of door opening edge 200mm, the pre-buried low level socket of wallboard is generally fixed at liftoff 400mm, and wallboard is pre-
Bury high-order socket to be generally fixed at liftoff 1800mm, water power spool position is arranged according to the actual requirements, if necessary in ecological block
Slot in material.
6. integrated design construction technology according to claim 3, it is characterised in that in the step 2, sandwich thermal insulated compound
Side fascia (1) and composite interior wallboard (6) are with section and the less concrete sash of arrangement of reinforcement, embed the plate constituted with ecological bulk
Formula component;In the production of sandwich thermal insulated compound external wall panel (1) and composite interior wallboard (6), except the reserved line box of metope and switch
Place, wallboard are two-sided troweling.
7. integrated design construction technology according to claim 6, it is characterised in that the ecological bulk is steam pressurized mixed
Solidifying earth building blocks or ceramsite concrete blocks.
8. integrated design construction technology according to claim 3, it is characterised in that the sandwich thermal insulated compound external wall panel
(1) production process is as follows:
Step one:Using manufacture method is inverted, assembles the special steel form of heat-insulation layer first, make reinforced mesh;
Step 2:Reinforced mesh enters mould, places protective layer cushion block, casting concrete;
Step 3:Warming plate is laid, warming plate is laid in cover concrete and pours and completes in rear 20min, when laying warming plate
Insulation bonding mortar good for mixing is paved and is applied in insulation plate face to strengthen the tight bond of warming plate and concrete, smeared
For comprehensive layer plastering method;Warming plate after lay taps vibration compacting with rubber hammer, and inserts bar for line;
Step 4:After heat-insulation layer wallboard meets desirable strength requirement, special structure sheaf steel form is assembled thereon, make steel
Muscles and bones frame, wall steel bar skeleton enter mould, and warming plate is abound with smears heat insulation cementing mortar, by ecological block within the 10min after smearing
Material is inserted in wallboard rib lattice, is designed according to step 1, is put reserved line box, pipeline and other built-in fittings;
Step 5:Confirm to be sealed with packing material after all steel pipe buried in advance positions are accurate, when preventing casting concrete
Block pre-buried pipeline and hole, pour C30 pea gravel concretens again, subsequently catch up with flat, wipe one's face, prefabricated after the completion of standard curing, treat
When concrete strength reaches the 75% of design load, can lift by crane.
9. integrated design construction technology according to claim 8, it is characterised in that the heat insulation protecting layer concrete is adopted
C30 pea gravel concretens are poured, and the concrete slump for pouring should be controlled between 180 to 200mm, the warming plate self-extinguishment
EPS warming plates pour the EPS granular polystyrene concrete for calculating desired thickness.
10. integrated design construction technology according to claim 3, it is characterised in that the production of composite interior wallboard (6)
Process is as follows:
Step one:Assemble special steel form first, bottom pours 20mm thickness C30 pea gravel concretens, when there is line box at the back side if need
Pre-buried line box, the framework of steel reinforcement of the girt strip that makes and rib post is hung in steel form, puts ecological bulk immediately;
Step 2:Design according to step 1, put reserved line box, pipeline and miscellaneous equipment built-in fitting;
Step 3:After all steel pipe buried in advance positions to be confirmed are accurate, sealed with packing material, prevented casting concrete
When block pre-buried pipeline and hole, pour 20mm thickness C30 pea gravel concretens again, subsequently catch up with flat, wipe one's face, prefabricated after the completion of standard
Maintenance, when concrete strength reaches the 75% of design load, can lift by crane.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611012910.7A CN106499046A (en) | 2016-11-17 | 2016-11-17 | Architectural Equipment pipeline integral structure and design and construction process based on inverted ladder type slot type combined wall board |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611012910.7A CN106499046A (en) | 2016-11-17 | 2016-11-17 | Architectural Equipment pipeline integral structure and design and construction process based on inverted ladder type slot type combined wall board |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106499046A true CN106499046A (en) | 2017-03-15 |
Family
ID=58324958
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611012910.7A Pending CN106499046A (en) | 2016-11-17 | 2016-11-17 | Architectural Equipment pipeline integral structure and design and construction process based on inverted ladder type slot type combined wall board |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106499046A (en) |
Cited By (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107471406A (en) * | 2017-09-09 | 2017-12-15 | 中国二十二冶集团有限公司 | Wallboard preparation method with distribution box |
CN107558633A (en) * | 2017-09-09 | 2018-01-09 | 中国二十二冶集团有限公司 | It is provided with the installation method of the prefabricated panel with distribution box |
CN107859232A (en) * | 2017-12-14 | 2018-03-30 | 陕西凝远新材料科技股份有限公司 | A kind of sand aerated concrete sheet material of built-in line box line pipe and preparation method thereof |
CN108005286A (en) * | 2017-11-23 | 2018-05-08 | 安徽同济建设集团有限责任公司 | A kind of construction method of the unidirectional overlapping floorboard of assembled architecture |
CN109016126A (en) * | 2018-07-10 | 2018-12-18 | 中建钢构有限公司 | A method of based on assembled architecture wallboard preheating embedding line |
CN109322487A (en) * | 2018-11-05 | 2019-02-12 | 长沙远大住工智能科技有限公司 | On wall equipment connect with walking in butt hole generation method |
CN109680951A (en) * | 2019-01-30 | 2019-04-26 | 台州职业技术学院 | A kind of assembled architecture Beam-Slab Construction method |
CN110359552A (en) * | 2019-08-16 | 2019-10-22 | 甘亚金 | A kind of novel plate building system |
CN110421684A (en) * | 2019-07-03 | 2019-11-08 | 辽宁煜梽新型建材有限公司 | A kind of production method of lining |
CN110835965A (en) * | 2019-11-29 | 2020-02-25 | 上海宝冶集团有限公司 | EPS module sandwich heat-preservation cast-in-place shear wall integrated hole part construction method |
CN110835971A (en) * | 2018-08-19 | 2020-02-25 | 程松林 | Half-rib composite floor slab with floor heating pipe groove |
CN111705952A (en) * | 2020-05-27 | 2020-09-25 | 中博建设工程集团有限公司 | Building wallboard mounting structure and construction process thereof |
CN112324046A (en) * | 2020-11-30 | 2021-02-05 | 珠海旺龙建材有限公司 | ALC plate pipeline integration |
CN112339064A (en) * | 2020-10-21 | 2021-02-09 | 唐高山 | Method for manufacturing pipeline integrated autoclaved aerated concrete slab |
CN113090076A (en) * | 2021-04-15 | 2021-07-09 | 北京林婉嫕空间艺术设计有限公司 | Modular prefabricated integrated building construction system and construction method thereof |
CN114658142A (en) * | 2022-03-03 | 2022-06-24 | 中建一局集团建设发展有限公司 | Ceramsite concrete wallboard mounting structure and construction method thereof |
CN115749054A (en) * | 2022-11-21 | 2023-03-07 | 韶关市粤仁建设工程有限公司 | Masonry wall modular slotting-free wire pipe reservation and embedding construction method |
CN116480034A (en) * | 2023-04-23 | 2023-07-25 | 华川建设集团有限公司 | Fireproof heat-insulating building wall and construction method thereof |
Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2007304679A (en) * | 2006-05-09 | 2007-11-22 | Original Engineering Consultants Co Ltd | Building of new construction, design for structure and verification method for construction |
CN101967851A (en) * | 2009-07-28 | 2011-02-09 | 董杨 | Board-mixing structure assembly type house and building method thereof |
CN104120798A (en) * | 2013-04-25 | 2014-10-29 | 上海启鹏工程材料科技有限公司 | Prefabricated concrete sandwich thermal-insulating wall and manufacturing method thereof |
CN104988995A (en) * | 2015-05-26 | 2015-10-21 | 中建五局蚌埠建筑工程有限公司 | Method for cracking prevention at wire box and distribution box hole in wall |
CN204728519U (en) * | 2015-02-11 | 2015-10-28 | 中建三局机电工程有限公司 | The installation system of embedded and wall-hanging equipment on a kind of body of wall |
CN105649196A (en) * | 2016-01-15 | 2016-06-08 | 山东乾元泽孚科技股份有限公司 | Modularized building system |
CN105908829A (en) * | 2016-04-07 | 2016-08-31 | 中国十七冶集团有限公司 | Residential house water supply pipeline air-entrapping concrete block partition wall and pipe trench reservation method |
CN105951981A (en) * | 2016-06-24 | 2016-09-21 | 东南大学 | Independent type combination outer containment system and assembly method thereof |
CN205653934U (en) * | 2016-04-29 | 2016-10-19 | 广东省建筑科学研究院集团股份有限公司 | Cast -in -place lightweight concrete wall body of green energy -conserving integration |
CN106088312A (en) * | 2016-06-21 | 2016-11-09 | 北新集成房屋(成都)有限公司 | A kind of construction method of the low layer assembled integrated house of steel wood mixing |
CN206245459U (en) * | 2016-11-17 | 2017-06-13 | 西咸新区矩阵实业有限公司 | Architectural Equipment pipeline integral structure based on inverted ladder type slot type combined wall board |
-
2016
- 2016-11-17 CN CN201611012910.7A patent/CN106499046A/en active Pending
Patent Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2007304679A (en) * | 2006-05-09 | 2007-11-22 | Original Engineering Consultants Co Ltd | Building of new construction, design for structure and verification method for construction |
CN101967851A (en) * | 2009-07-28 | 2011-02-09 | 董杨 | Board-mixing structure assembly type house and building method thereof |
CN104120798A (en) * | 2013-04-25 | 2014-10-29 | 上海启鹏工程材料科技有限公司 | Prefabricated concrete sandwich thermal-insulating wall and manufacturing method thereof |
CN204728519U (en) * | 2015-02-11 | 2015-10-28 | 中建三局机电工程有限公司 | The installation system of embedded and wall-hanging equipment on a kind of body of wall |
CN104988995A (en) * | 2015-05-26 | 2015-10-21 | 中建五局蚌埠建筑工程有限公司 | Method for cracking prevention at wire box and distribution box hole in wall |
CN105649196A (en) * | 2016-01-15 | 2016-06-08 | 山东乾元泽孚科技股份有限公司 | Modularized building system |
CN105908829A (en) * | 2016-04-07 | 2016-08-31 | 中国十七冶集团有限公司 | Residential house water supply pipeline air-entrapping concrete block partition wall and pipe trench reservation method |
CN205653934U (en) * | 2016-04-29 | 2016-10-19 | 广东省建筑科学研究院集团股份有限公司 | Cast -in -place lightweight concrete wall body of green energy -conserving integration |
CN106088312A (en) * | 2016-06-21 | 2016-11-09 | 北新集成房屋(成都)有限公司 | A kind of construction method of the low layer assembled integrated house of steel wood mixing |
CN105951981A (en) * | 2016-06-24 | 2016-09-21 | 东南大学 | Independent type combination outer containment system and assembly method thereof |
CN206245459U (en) * | 2016-11-17 | 2017-06-13 | 西咸新区矩阵实业有限公司 | Architectural Equipment pipeline integral structure based on inverted ladder type slot type combined wall board |
Non-Patent Citations (1)
Title |
---|
冷超群、李长城、曲梦露: "《建筑节能设计》", 31 January 2016, 航空工业出版社 * |
Cited By (20)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107558633A (en) * | 2017-09-09 | 2018-01-09 | 中国二十二冶集团有限公司 | It is provided with the installation method of the prefabricated panel with distribution box |
CN107471406A (en) * | 2017-09-09 | 2017-12-15 | 中国二十二冶集团有限公司 | Wallboard preparation method with distribution box |
CN108005286A (en) * | 2017-11-23 | 2018-05-08 | 安徽同济建设集团有限责任公司 | A kind of construction method of the unidirectional overlapping floorboard of assembled architecture |
CN107859232A (en) * | 2017-12-14 | 2018-03-30 | 陕西凝远新材料科技股份有限公司 | A kind of sand aerated concrete sheet material of built-in line box line pipe and preparation method thereof |
CN109016126A (en) * | 2018-07-10 | 2018-12-18 | 中建钢构有限公司 | A method of based on assembled architecture wallboard preheating embedding line |
CN110835971A (en) * | 2018-08-19 | 2020-02-25 | 程松林 | Half-rib composite floor slab with floor heating pipe groove |
CN109322487A (en) * | 2018-11-05 | 2019-02-12 | 长沙远大住工智能科技有限公司 | On wall equipment connect with walking in butt hole generation method |
CN109680951A (en) * | 2019-01-30 | 2019-04-26 | 台州职业技术学院 | A kind of assembled architecture Beam-Slab Construction method |
CN110421684A (en) * | 2019-07-03 | 2019-11-08 | 辽宁煜梽新型建材有限公司 | A kind of production method of lining |
CN110359552A (en) * | 2019-08-16 | 2019-10-22 | 甘亚金 | A kind of novel plate building system |
CN110835965A (en) * | 2019-11-29 | 2020-02-25 | 上海宝冶集团有限公司 | EPS module sandwich heat-preservation cast-in-place shear wall integrated hole part construction method |
CN111705952A (en) * | 2020-05-27 | 2020-09-25 | 中博建设工程集团有限公司 | Building wallboard mounting structure and construction process thereof |
CN112339064A (en) * | 2020-10-21 | 2021-02-09 | 唐高山 | Method for manufacturing pipeline integrated autoclaved aerated concrete slab |
CN112324046A (en) * | 2020-11-30 | 2021-02-05 | 珠海旺龙建材有限公司 | ALC plate pipeline integration |
CN113090076A (en) * | 2021-04-15 | 2021-07-09 | 北京林婉嫕空间艺术设计有限公司 | Modular prefabricated integrated building construction system and construction method thereof |
CN114658142A (en) * | 2022-03-03 | 2022-06-24 | 中建一局集团建设发展有限公司 | Ceramsite concrete wallboard mounting structure and construction method thereof |
CN114658142B (en) * | 2022-03-03 | 2024-01-30 | 中建一局集团建设发展有限公司 | Ceramsite concrete wallboard mounting structure and construction method thereof |
CN115749054A (en) * | 2022-11-21 | 2023-03-07 | 韶关市粤仁建设工程有限公司 | Masonry wall modular slotting-free wire pipe reservation and embedding construction method |
CN115749054B (en) * | 2022-11-21 | 2023-05-30 | 韶关市粤仁建设工程有限公司 | Masonry wall modularization grooving-free line pipe reservation pre-buried construction method |
CN116480034A (en) * | 2023-04-23 | 2023-07-25 | 华川建设集团有限公司 | Fireproof heat-insulating building wall and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106499046A (en) | Architectural Equipment pipeline integral structure and design and construction process based on inverted ladder type slot type combined wall board | |
CN104358341B (en) | Building brickwork and masonry construction method of building brickwork | |
CN104746772B (en) | Ash concrete hollow partition board anti-cracking construction method | |
CN104612282B (en) | Construction method of prefabricated steel fiber sludge-made ceramisite concrete wall based on T-shaped groove connection | |
CN105696744B (en) | Steam-pressing aero-concrete integral wall and its production technology | |
CN106522359A (en) | Total-prefabricated rural residential class composite wall structure system and construction method thereof | |
CN206245459U (en) | Architectural Equipment pipeline integral structure based on inverted ladder type slot type combined wall board | |
CN105804292A (en) | Environment-friendly and energy-saving integrated cast-in-situ lightweight concrete wall and construction method thereof | |
CN112459291A (en) | Prefabricated heat insulation structure integrated wall structure and construction process thereof | |
CN106013509A (en) | Dry-method construction method for high-performance autolaved aerated concrete block wall | |
CN107227870A (en) | A kind of transformer station spliced by prefabricated components builds | |
CN110359631A (en) | Secondary structure Constructional Col-umn Construction method | |
CN103866885A (en) | Energy-saving insulation structure of lighting window and construction method thereof | |
CN110359601A (en) | A kind of one-time formed energy saving form walls of one-piece casting and construction method | |
CN104712079B (en) | The assembled polypropylene fibre sludge ceramsite concrete wall and its construction method connected based on mat surface | |
CN104594525A (en) | Composite thermal insulation wallboard and building structure integrated thermal insulation wall system and construction process | |
CN206220238U (en) | Fully-prefabricated assembled structure | |
CN110485650A (en) | A kind of water-proof system and its construction method of the modularization precast concrete circular arc chamfering for rolled roofing material waterproof paving | |
CN105672562A (en) | Autoclaved aerated concrete integral insulating wall board and production process thereof | |
CN206956959U (en) | Light composite heat insulation outer wall plate | |
CN105780992A (en) | Construction method of orthogonal and ortho-laid steel concrete vierendeel sandwich plate floor | |
CN104675012A (en) | Prefabricated polypropylene fiber sludge ceramsite concrete wall based on serrated racking connection and construction method thereof | |
CN102535841A (en) | Construction technology of prefabricated wall panel | |
CN205502366U (en) | Evaporate and press whole wallboard of aerated concrete | |
CN103883022B (en) | The construction method of space enclosing structure inner-outer wall antidetonation and sound insulation cracking resistance integrated structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170315 |
|
RJ01 | Rejection of invention patent application after publication |