CN205653934U - Cast -in -place lightweight concrete wall body of green energy -conserving integration - Google Patents
Cast -in -place lightweight concrete wall body of green energy -conserving integration Download PDFInfo
- Publication number
- CN205653934U CN205653934U CN201620388242.7U CN201620388242U CN205653934U CN 205653934 U CN205653934 U CN 205653934U CN 201620388242 U CN201620388242 U CN 201620388242U CN 205653934 U CN205653934 U CN 205653934U
- Authority
- CN
- China
- Prior art keywords
- wall
- wall body
- cast
- column
- hole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Building Environments (AREA)
Abstract
The utility model discloses a cast -in -place lightweight concrete wall body of green energy -conserving integration, including wall body and the drawknot muscle that adopts the cast -in -place lightweight concrete of template to make, the drawknot muscle is established on the structure post that lies in wall body both ends and is lain in the structure roof beam at wall body top to the anchor is in the wall body, and at wall this internal pre -buried wired box and pipeline, and the reservation has the hole and the door and window entrance to a cave on the wall body. The utility model discloses a cast -in -place technology, it is convenient to construct, after the form removal wall body roughness high, need not to criticize and swing, exempt from to plaster, reduce building rubbish, the utility model discloses intensity is high, can hang, can directly imbed the bolt, has solved foam concrete and has built the too big and mould that results in collapsing of lateral pressure perpendicularly, and because of subsiding the inhomogeneous problem of layering, vertical height 3's~4 meters wall body can be realized once only building, and whole work progress is laid bricks the time limit for a project and is shortened near half thely, improves the efficiency of construction, reduces the engineering management cost, improves rate of return on investment, and messenger enterprise obtains good economic benefits and social.
Description
Technical field
This utility model relates to a kind of light energy conservation body of wall, particularly to a kind of green energy conservation integration cast-in-place light
Concrete wall.
Background technology
Entered since new century, governments at all levels of China materials for wall innovation is classified as building energy conservation important content it
One.For the body of wall of building, in addition to requiring it to have certain mechanical property, also require that it has
There are the performances such as excellent insulation, heat insulation, sound insulation, waterproof, fire prevention.During construction body of wall, according to masonry way,
Human cost is high, and efficiency of construction is low, along with the soaring year by year propelling with mechanized construction of labor cost, existing
Field builds the demand being not suitable with current architectural development by laying bricks or stones;According to the mode of prefabricated panel, its mechanized construction
Advantage cannot be embodied in the assembling of indoor, and cutting easily produces building waste, and at pipe well, turning, beam
Inferior position easily produces dead angle.
After the slowly development that experienced by last 100 years, lightweight concrete has welcome the New Times of high speed development.Lightweight
Concrete has that mobility is high, gather materials consumption less, light weight, insulation, prevent fires, insulate against sound, antidetonation, resistance to
For a long time, safety and Health, the excellent properties such as energy-conserving and environment-protective, be that the energy saving and environment friendly self-heat conserving given priority to now is gone along with sb. to guard him
Material.The states such as the U.S., Britain, Holland, Canada, Japan, Korea S are all fully recognized that lightweight concrete
Superperformance, its application in architectural engineering is constantly expanded.Lightweight concrete is used for cast-in-situ wall
It is great technological break-through, is fundamentally solving building heat preservation, sound insulation, lightweight, environmental protection, safety and work
The problem that industry metaplasia is produced, is the important directions of building energy conservation.
In recent years, domestic many lightweight concrete enterprises have started to develop cast-in-place self-heat conserving external wall, load-bearing or non-hold
Heavily sound insulation interior wall etc., and defined exploitation upsurge, large quantities of application technologies are just in various places anxiety is researched and developed.
The most domestic occurring in that a kind of cast-in-place light concrete self-insulating combined wall, it uses high-quality lightgage steel joist conduct
Framework, uses fiber cement board pressure as clad can, and the body of wall formed at Os Draconis and fiber cement board pressure is empty
Chamber is poured into a mould lightweight concrete, after hardening, forms sandwiched light composite wall.But, due to lightweight concrete
Self light weight is low by force so that this combined wall load-bearing stress is extremely limited, it is impossible to as bearing wall.Additionally.
Lightweight concrete, fiber cement board pressure is poured into a mould in the wall cavity that Os Draconis and fiber cement board pressure are formed
Using as template, the adhesion between lightweight concrete and template is not strong, causes shelling between concrete and template
From forming space, have a strong impact on intensity and the hanging force etc. of body of wall.These defects all govern cast-in-place light coagulation
The further development of cob wall body.
Utility model content
The purpose of this utility model is to provide that a kind of construction is convenient, can ensure that construction quality, improves efficiency of construction,
Reduce construction cost green energy conservation integration cast-in-place light concrete wall, it have heat-insulation and heat-preservation, fire prevention,
Sound insulation, flatness is good, the advantage of the multifunctional all such as strong, steel pipe buried in advance, door and window are reserved of exempting to plaster, hang,
Commerical ready-mixed concrete company, template enterprise, hydropower installation, civil engineering and finishing enterprise etc. can be organically combined, it is achieved
The mechanization production construction of cast-in-place light body of wall and water power civil engineering integration produce, and effectively promote green and execute
Work is promoted and implements building energy conservation.
Above-mentioned purpose of the present utility model is realized by following technical measures: a kind of green energy conservation integration is cast-in-place
Lightweight concrete body of wall, it is characterised in that: include the wall body using template cast-in-place light concrete to make and draw
Knot muscle, described tension rib is provided on the structural column at wall body two ends and is positioned in the structural beams of wall bodies top,
And be anchored in wall body, at this internal line box and pipeline of being embedded with of described wall and reserved porose on wall body
Hole and door-window opening.
This utility model has heat-insulation and heat-preservation, fire prevention, sound insulation, flatness is good, exempt to plaster, hang strong, pipeline
The advantage of the multifunctional alls such as pre-buried, door and window is reserved;This utility model uses cast in place process, constructs convenient,
Form removal back wall flatness is high, without plaster, exempt to plaster, reduce building waste;This utility model intensity height,
Suspended, can directly imbed bolt, efficiently solving foam concrete, vertically to pour lateral pressure excessive and cause
Collapse mould, and because of the sedimentation uneven problem of layering, the body of wall of vertical height 3~4 meters can realize primary concreting, whole
Individual work progress relatively lay bricks the duration shorten nearly half, improve efficiency of construction, reduce engineering management cost, carry
High investment yield, makes enterprise achieve good economic benefit and social benefit.
A kind of improve as of the present utility model, described wall this most internal set up the constructional column contour with wall body and
Reinforced mesh, described constructional column is spaced apart along the length direction of wall body, is provided with tension rib on constructional column,
Described reinforced mesh is vertically provided between constructional column with structural column and between adjacent constructional column, is positioned at structure
Reinforced mesh between post with structural column is connected with the tension rib being arranged on structural column and constructional column, is positioned at adjacent
Constructional column between reinforced mesh be connected with the tension rib being arranged on constructional column.
This utility model this internal pre-buried line box of wall be switch enclosure, socket box, network cable box, telephone wire box and/
Or cable television box.This internal pre-buried pipeline of wall be electric wire, netting twine, telephone wire, water pipe, extinguishing pipe,
Cable television netting twine, air conditioning piping and/or smart machine pipeline.
The hole reserved on wall body of this utility model is that air-conditioning equipment hole, fire protection pipeline hole, intelligence set
Standby hole, water pipe hole and/or wire mesh string holes hole;The top of described door-window opening is provided with lintel.
Constructional column described in the utility model is mortar post, concrete column or steel column, being smaller than of adjacent formation post
Or equal to 4m.
Lightweight concrete described in the utility model is foam concrete or lightweight aggregate concrete, and intensity is more than or equal to
4.5MPa, do not collapse in vertical height 4 meters mould.
Compared with prior art, this utility model has a following significantly effect:
(1) this utility model uses cast in place process, constructs convenient, form removal back wall flatness is high, without plaster,
Exempt to plaster, reduce building waste, there is heat-insulation and heat-preservation, fire prevention, sound insulation, flatness is good, exempt to plaster, hang
By force, the advantage of the multifunctional all such as steel pipe buried in advance, door and window be reserved, this utility model is by pipeline and line box in advance
Pre-buried, and reserving hole and door-window opening, reduce fluting and punch;This utility model intensity height, suspended, can
Directly imbed bolt, efficiently solve foam concrete and vertically pour that lateral pressure is excessive and the mould that causes collapsing, because of heavy
The problem that fall layering is uneven.
(2) this utility model can realize primary concreting for the body of wall of vertical height 3~4 meters, and whole constructed
Journey relatively lay bricks the duration shorten nearly half, improve efficiency of construction, reduce engineering management cost, improve investment
Earning rate, makes enterprise achieve good economic benefit and social benefit.
(3) this utility model is by built-in line box, pipeline and reserving hole, door and window, and uses mortar premixing, shows
Prepare the mechanized construction such as lightweight concrete and pumping, it is ensured that construction quality, construct convenient, it is achieved that cast-in-place
The mechanization production construction of Light Wall and water power civil engineering integration produce.
(4) this utility model can be by commerical ready-mixed concrete company, template enterprise, hydropower installation, civil engineering and finishing enterprise
Deng organically combining, effectively facilitating green construction promotes and implements building energy conservation, brings good economic effect for enterprise
Benefit and social benefit, all have very in many aspects such as energy-saving and environmental protection, green and raising construction engineering qualities
Important economy and social meaning.
Accompanying drawing explanation
The utility model is described in further detail with specific embodiment below in conjunction with the accompanying drawings.
Fig. 1 is one of structural representation of this utility model green energy conservation integration cast-in-place light concrete wall;
Fig. 2 is the two of the structural representation of this utility model green energy conservation integration cast-in-place light concrete wall;
Fig. 3 is line A-A profile along Fig. 2.
Detailed description of the invention
As shown in Figures 1 to 3, it is this utility model one green energy conservation integration cast-in-place light concrete wall, bag
Include wall body 10, reinforced mesh 3, constructional column 2 and the tension rib (figure using template cast-in-place light concrete to make
In be not drawn into), tension rib is provided on the structural column 1 at wall body 10 two ends and is positioned at wall body 10 top
In structural beams, constructional column 2 and reinforced mesh 3 are positioned at wall body 10, constructional column 2 and reinforced mesh 3 and wall
Body is contour, and constructional column 2 is spaced apart along the length direction of wall body, is provided with a structure in the present embodiment
Making post 2, be provided with tension rib (being not drawn in figure) on constructional column 2, reinforced mesh 3 is vertically provided at constructional column
Between 2 and structural column 1, when constructional column 2 is two or more, reinforced mesh 3 is additionally arranged at adjacent constructional column
Between 2, wherein, the reinforced mesh 3 between constructional column 2 and structural column 1 be arranged on structural column 1 and structure
Make tension rib on post 2 to connect, the reinforced mesh 3 between adjacent constructional column 2 be arranged on constructional column 2
On tension rib connect.
Pre-buried wired box 8 and pipeline 9 in wall body 10, line box 8 be switch enclosure, socket box, network cable box,
Telephone wire box and/or cable television box.Pipeline 9 is electric wire, netting twine, telephone wire, water pipe, extinguishing pipe, wired
TV netting twine, air conditioning piping and/or smart machine pipeline.
Being reserved with hole and door-window opening, the most square preformed hole 6 and circular preformed hole 7 on wall body, hole is
Air-conditioning equipment hole, fire protection pipeline hole, smart machine hole, water pipe hole and/or wire mesh string holes hole.Door
Window hole is door opening 4 and window opening 5, and the top of door-window opening is provided with lintel.
Constructional column 2 is mortar post, concrete column or steel column, being smaller than or equal to 4m of adjacent formation post 2.
Lightweight concrete 10 is foam concrete or lightweight aggregate concrete, and intensity is more than or equal to 4.5MPa, vertical height
Do not collapse in 4 meters mould.
The construction method of a kind of above-mentioned green energy conservation integration cast-in-place light concrete wall, comprises the following steps:
(1) require to determine position the unwrapping wire of body of wall according to design, on the structural column 1 of building body and structural beams
On tension rib is set, i.e. using the structural beams of major structure of construction, structural column as the strong point, tension rib diameter is not
Less than 6mm, spacing is not more than 500mm, anchors into length not less than 200mm;
When wall clear height is more than 3m, reinforced concrete should be set in lightweight concrete longitudinal cross wall junction and partition wall corner
Soil constructional column, or when lightweight concrete body of wall length is more than 5m, reinforced concrete structural column, constructional column should be set
Setting space is not more than 5m, and the strength grade of concrete of reinforced concrete structural column is not less than C15.When wall clear height
During less than 3m, lightweight concrete longitudinal cross wall junction and partition wall corner can arrange sleeper, the same lightweight of sleeper intensity
Concrete strength.
Length direction along wall body 10 is spaced and arranges constructional column 2, arranges tension rib on constructional column 2, and
Vertically arranged reinforced mesh 3 between constructional column 2 with structural column 1 and between adjacent constructional column 2, will be located in structure
Make the reinforced mesh 3 between post 2 and structural column 1 with the tension rib being arranged on structural column 1 and constructional column 2 even
Connecing, the reinforced mesh 3 that will be located between adjacent constructional column 2 is connected with the tension rib being arranged on constructional column 2.
On reinforced mesh 3, the diameter of reinforcing bar is not less than 10mm, and the grid of reinforced mesh 3 presses rectangular arrangement, reinforcing bar
The bar spacing of mesh sheet 3 is not more than 300mm, and reinforced mesh 3 is positioned in the middle of template 11, by reinforced mesh 3
Together with passing through tension rib colligation with constructional column 2.
Reserving hole and door-window opening on reinforced mesh 3, after reinforced mesh 3 of having constructed, built-in line box 8 He
Pipeline 9.Line box 8 is switch enclosure, socket box, network cable box, telephone wire box and/or cable television box, by line box 8
Invest on the inner surface of template 11.Pipeline 9 is electric wire, netting twine, telephone wire, water pipe, extinguishing pipe, You Xian electricity
View line, air conditioning piping and/or smart machine pipeline, be fixed on pipeline 9 on reinforced mesh 3.
Hole is air-conditioning equipment hole, fire protection pipeline hole, smart machine hole, water pipe hole and/or wire mesh
String holes hole, hole size requires to arrange according to design, and hole is by plastic tube, iron pipe or cement pipe pre-embedding.Hole
Hole such as slot 6 and circular port 7.
Door-window opening is door opening 4 and window opening 5, and the lightweight concrete in door-window opening surrounding sets stiffener within the walls,
In erection of doors and windows position embedded iron parts, ironware dowel and stiffener colligation;When door-window opening top is less than structural beams
Time, reinforcing bar lintel should be set, lintel shelving length on lightweight concrete wall cannot be less than 300mm.
(2) the two ends of template 11 are overlapped on structural column 1 by support template 11, and the top of template 11 is then taken
It is connected in structural beams, and makes tension rib extend in template 11.The supporting flatness of template 11 and the error of perpendicularity
For ± 2~± 5mm;Template 11 is aluminum alloy pattern plate, plastic formwork or plank sheathing;
(3) repair between seam and the bottom of template 11 and the ground between two ends and the structural column 1 of template 11
Seam, seam between bottom and the ground of template 11 uses fast hard mortar to repair, and the two ends of template 11
And the seam between structural column 1 uses foamed glue to repair, make seam not spillage, and template is interior without hydrops;
(4) use premixing mortar foaming at the construction field (site) to prepare lightweight concrete, specifically use concrete mixing plant
Or the premixing mortar that mortar premixing station provides, within 28 days, intensity is not less than 30MPa.Scene utilizes automatization's foaming dress
Put and prepare the adjustable controlled lightweight concrete of unit weight;
(5) lightweight concrete scene is stirred and is made and be poured in template 11;By pumping equipment will have fluidity good,
Easily pumping, the lightweight concrete of high-strength cracking resistance are cast in the middle of template 11;Pumping equipment is mortar pump, concrete
Pump or piston pump.Lightweight concrete intensity is not less than 4.5MPa, and do not collapse in vertical height 4 meters mould.
(6) lightweight concrete being carried out natural curing, natural curing is no less than 3 days, form removal 11.
Embodiment of the present utility model is not limited to this, according to foregoing of the present utility model, according to this area
Ordinary technical knowledge and customary means, without departing under this utility model above-mentioned basic fundamental thought premise, this reality
With novel the amendment of other various ways can also be made, replace or change, all fall within this utility model right and protect
Within the scope of protecting.
Claims (8)
1. a green energy conservation integration cast-in-place light concrete wall, it is characterised in that: include using template existing
Watering wall body and tension rib that lightweight concrete is made, described tension rib is provided at the structural column at wall body two ends
Upper and be positioned in the structural beams of wall bodies top, and be anchored in wall body, at described wall, this most internal is embedded with line
Hole and door-window opening it is reserved with on box and pipeline, and wall body.
Green energy conservation integration cast-in-place light concrete wall the most according to claim 1, it is characterised in that:
At described wall, this most internal sets up the constructional column contour with wall body and reinforced mesh, and described constructional column is along wall body
Length direction spaced apart, constructional column is provided with tension rib, described reinforced mesh is vertically provided at constructional column
With between structural column and between adjacent constructional column, the reinforced mesh between constructional column and structural column with set
Put the tension rib on structural column and constructional column to connect, the reinforced mesh between adjacent constructional column and setting
Tension rib on constructional column connects.
Green energy conservation integration cast-in-place light concrete wall the most according to claim 2, it is characterised in that:
It is switch enclosure, socket box, network cable box, telephone wire box and/or cable television box at this internal pre-buried line box of wall.
Green energy conservation integration cast-in-place light concrete wall the most according to claim 3, it is characterised in that:
This internal pre-buried pipeline of wall be electric wire, netting twine, telephone wire, water pipe, extinguishing pipe, cable television netting twine,
Air conditioning piping and/or smart machine pipeline.
Green energy conservation integration cast-in-place light concrete wall the most according to claim 4, it is characterised in that:
Hole reserved on wall body is air-conditioning equipment hole, fire protection pipeline hole, smart machine hole, water pipe hole
Hole and/or wire mesh string holes hole.
Green energy conservation integration cast-in-place light concrete wall the most according to claim 5, it is characterised in that:
The top of described door-window opening is provided with lintel.
Green energy conservation integration cast-in-place light concrete wall the most according to claim 6, it is characterised in that:
Described constructional column is mortar post, concrete column or steel column, being smaller than or equal to 4m of adjacent formation post.
Green energy conservation integration cast-in-place light concrete wall the most according to claim 7, it is characterised in that:
Described lightweight concrete is foam concrete or lightweight aggregate concrete, and intensity is more than or equal to 4.5MPa.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620388242.7U CN205653934U (en) | 2016-04-29 | 2016-04-29 | Cast -in -place lightweight concrete wall body of green energy -conserving integration |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620388242.7U CN205653934U (en) | 2016-04-29 | 2016-04-29 | Cast -in -place lightweight concrete wall body of green energy -conserving integration |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205653934U true CN205653934U (en) | 2016-10-19 |
Family
ID=57401826
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620388242.7U Active CN205653934U (en) | 2016-04-29 | 2016-04-29 | Cast -in -place lightweight concrete wall body of green energy -conserving integration |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205653934U (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105804292A (en) * | 2016-04-29 | 2016-07-27 | 广东省建筑科学研究院集团股份有限公司 | Environment-friendly and energy-saving integrated cast-in-situ lightweight concrete wall and construction method thereof |
CN106499046A (en) * | 2016-11-17 | 2017-03-15 | 西咸新区矩阵实业有限公司 | Architectural Equipment pipeline integral structure and design and construction process based on inverted ladder type slot type combined wall board |
CN106522359A (en) * | 2016-11-17 | 2017-03-22 | 西咸新区矩阵实业有限公司 | Total-prefabricated rural residential class composite wall structure system and construction method thereof |
CN107387162A (en) * | 2017-06-29 | 2017-11-24 | 山东科技大学 | A kind of tunnel hermatic door, tunnel brattice and preparation method thereof |
CN112832425A (en) * | 2021-01-11 | 2021-05-25 | 周云国 | Cast-in-place method for building non-bearing wall by using building solid waste concrete |
CN114215230A (en) * | 2021-11-09 | 2022-03-22 | 河南新城建设有限公司 | Green integrated assembly type building wallboard and installation method thereof |
-
2016
- 2016-04-29 CN CN201620388242.7U patent/CN205653934U/en active Active
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105804292A (en) * | 2016-04-29 | 2016-07-27 | 广东省建筑科学研究院集团股份有限公司 | Environment-friendly and energy-saving integrated cast-in-situ lightweight concrete wall and construction method thereof |
CN106499046A (en) * | 2016-11-17 | 2017-03-15 | 西咸新区矩阵实业有限公司 | Architectural Equipment pipeline integral structure and design and construction process based on inverted ladder type slot type combined wall board |
CN106522359A (en) * | 2016-11-17 | 2017-03-22 | 西咸新区矩阵实业有限公司 | Total-prefabricated rural residential class composite wall structure system and construction method thereof |
CN106522359B (en) * | 2016-11-17 | 2022-03-11 | 西咸新区矩阵实业有限公司 | Fully-assembled village and town dwelling type composite wall structure system and construction method thereof |
CN107387162A (en) * | 2017-06-29 | 2017-11-24 | 山东科技大学 | A kind of tunnel hermatic door, tunnel brattice and preparation method thereof |
CN107387162B (en) * | 2017-06-29 | 2020-02-18 | 山东科技大学 | Roadway sealing door, roadway air wall and manufacturing method thereof |
CN112832425A (en) * | 2021-01-11 | 2021-05-25 | 周云国 | Cast-in-place method for building non-bearing wall by using building solid waste concrete |
CN114215230A (en) * | 2021-11-09 | 2022-03-22 | 河南新城建设有限公司 | Green integrated assembly type building wallboard and installation method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205653934U (en) | Cast -in -place lightweight concrete wall body of green energy -conserving integration | |
CN105804292A (en) | Environment-friendly and energy-saving integrated cast-in-situ lightweight concrete wall and construction method thereof | |
CN108678258B (en) | Large-span hemispherical reinforced concrete dome structure and construction method thereof | |
CN206503230U (en) | A kind of fabricated steel building | |
CN105649360A (en) | Integral assembling type building system and installing method | |
CN101985882A (en) | Construction method of rigid primary support of mould-building concrete of plateau permafrost tunnel | |
CN206016309U (en) | A kind of overall assembled building system | |
CN106522359A (en) | Total-prefabricated rural residential class composite wall structure system and construction method thereof | |
CN105275089A (en) | Fully-prefabricated cold-formed steel house modular unit and assembly connection method | |
CN105239718A (en) | Integral heat insulation wallboard building system | |
CN108301531A (en) | Assembled built-in heat insulation layer concrete composite wall-light steel frame-floor connecting node | |
CN107989238A (en) | A kind of cast-in-place sandwiched heat-preservation shear wall structure, assembled architecture and engineering method | |
CN105003020A (en) | Ceramsite concrete metal net rack light wallboard and splicing structure thereof | |
CN105317109A (en) | Three-dimensional net fixed house adopting overall pouring of foamed wall and construction method | |
CN208168032U (en) | Assembled built-in heat insulation layer concrete composite wall-light steel frame-floor connecting node | |
CN106894538A (en) | Filling wall and agent structure concrete integral shaping method | |
CN101469559B (en) | Composite heat insulating walling and mounting method thereof | |
CN204899003U (en) | Take hollow light partition wall board of rack | |
CN104389360A (en) | Externally suspended insulation board type reinforcement brickwork shear wall system and construction method thereof | |
CN204876313U (en) | Take mesh frame clip heart light partition wall board | |
CN107747378A (en) | The body composite board processing method of Fast Installation heat insulation decorative load-bearing one | |
CN204919968U (en) | Ceramsite concrete metal rack light weight wallboard | |
CN204139316U (en) | A kind of steel structure shear wall structure system | |
CN106368445A (en) | Existing building reinforcing and self-supporting thermal insulation integrated system and construction method | |
CN206205140U (en) | A kind of full assembled villages and small towns local-style dwelling houses class composite wall structure system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20200115 Address after: 510500 martyrs East Road, Guangdong, Guangzhou No. 121 Patentee after: Guangdong Construction Academy Group Plc Address before: 510500 martyrs East Road, Guangdong, Guangzhou No. 121 Co-patentee before: Guangdong Jian Ke energy-conserving and environment-protective Science and Technology Ltd. Patentee before: Guangdong Construction Academy Group Plc |
|