CN201610974U - Installing structure of large-span cable bridge frame - Google Patents

Installing structure of large-span cable bridge frame Download PDF

Info

Publication number
CN201610974U
CN201610974U CN2009203173628U CN200920317362U CN201610974U CN 201610974 U CN201610974 U CN 201610974U CN 2009203173628 U CN2009203173628 U CN 2009203173628U CN 200920317362 U CN200920317362 U CN 200920317362U CN 201610974 U CN201610974 U CN 201610974U
Authority
CN
China
Prior art keywords
bridge frame
horizontal support
cable bridge
vertical supports
horizontal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009203173628U
Other languages
Chinese (zh)
Inventor
戴传海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Original Assignee
Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guiyang Aluminum Magnesium Design and Research Institute Co Ltd filed Critical Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Priority to CN2009203173628U priority Critical patent/CN201610974U/en
Application granted granted Critical
Publication of CN201610974U publication Critical patent/CN201610974U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses an installing structure of a large-span cable bridge frame. The structure of the installing structure is as follows: a civil engineering column (2) is provided with a bridge frame beam (3); one side of a vertical bracket (5) is connected with the bridge frame beam (3), and the other side thereof is connected with a horizontal bracket (4); and the horizontal bracket (4) is provided with the cable bridge frame (1). The bridge frame beam (3) is provided with a set of vertical bracket (5) and horizontal brackets (4) at every two meters. The set of vertical bracket (5) and horizontal brackets (4) comprises one vertical bracket (5) and 1-2 horizontal brackets (4). The bridge frame beam (3) is made of channel steel. The horizontal brackets (4) and the vertical bracket (5) are made of angle steel. The installing structure reduces the distance among brackets, disperses the load of the large-span cable bridge frame onto the channel steel and the brackets, therefore, the collapse at the middle part of the bridge frame can be prevented, and the laying of the cable along the bridge frame is simpler and more reliable.

Description

The mounting structure of large span cable bridge rack
Technical field
The utility model relates to a kind of mounting structure of large span cable bridge rack.
Background technique
In the aluminium oxide engineering, many workshops do not have exterior wall, only greater than the steel column of 5 meters spans, electric crane span structure can't be installed along wall, generally selects 6 meters big span crane span structures to install along pillar, under the few situation of cable, the employing standard along the pillar installation method, do the crane span structure support on each pillar, promptly every 6 meters supports, crane span structure is arranged on the support.If but cable is too much, load is too heavy, when especially the multilayer crane span structure lays, because crane span structure has certain amount of deflection, 6 meters large span cable bridge rack middle parts can subside, and the overweight crane span structure that more can cause of load ruptures, cause a serious accident, at this time need to provide a kind of new installation method.
Summary of the invention
The technical problems to be solved in the utility model is: provide a kind of mounting structure of simple in structure, safe and reliable large span cable bridge rack, to overcome the deficiencies such as large span cable bridge rack central region sinking that prior art exists.
The utility model is taked following technological scheme: the crane span structure beam is set on the civil engineering pillar, and a side of vertical supports is connected with the crane span structure beam, and opposite side is connected with horizontal support, at horizontal support cable testing bridge is installed.
On the crane span structure beam, a cover vertical supports and a horizontal support is set every 2 meters.
One cover vertical supports and horizontal support comprise 1 vertical supports, 1~2 horizontal support.
The crane span structure beam is made of channel-section steel.
Horizontal support, vertical supports are made of angle steel.
The utility model has reduced the distance between support owing to adopted such scheme, and the load of large span cable bridge rack is distributed on channel-section steel and the support, can prevent that like this gantry middle portion from subsiding, and cable lays safety and reliability along crane span structure.
Description of drawings:
Fig. 1 is a situation plan of the present utility model.
Fig. 2 is the A--A section scheme of installation among Fig. 1.
Embodiment:
Embodiments of the invention: crane span structure beam 3 is set on civil engineering pillar 2, and a side of vertical supports 5 is connected with crane span structure beam 3, and opposite side is connected with horizontal support 4, at horizontal support 4 cable testing bridge 1 is installed.During construction, owing in the civil engineering pillar 2 steel I-column is arranged, therefore welded bridge sets a roof beam in place 3 thereon, and crane span structure beam 3 usefulness 10# channel-section steels are made; Each civil engineering pillar 2 that will need cable testing bridge 1 is installed with crane span structure beam 3 couples together, welding vertical supports 5 on crane span structure beam 3, and at the opposite side welding horizontal support 4 of vertical supports 5, wherein vertical supports 5 and horizontal support 4 adopt the L50x5 angle steel to make.
On crane span structure beam 3, a cover vertical supports 5 and a horizontal support 4 is set every 2000mm (2 meters).One cover vertical supports 5 and horizontal support 4 comprise 1 vertical supports 5 and 1~2 horizontal support 4.
After more than construction is finished, cable testing bridge 1 is lain on the horizontal support 4.
Among the above embodiment, the span of civil engineering pillar 2 is 6000mm, and the length of vertical supports 5, horizontal support 4 is 500mm, and 2 horizontal supports 4 are set on every vertical supports 5, the upper surface absolute altitude of following horizontal support 4 is 3.00m, and the spacing of upper and lower 2 horizontal supports 4 is 300mm.

Claims (5)

1. the mounting structure of a large span cable bridge rack, it is characterized in that: crane span structure beam (3) is set on civil engineering pillar (2), one side of vertical supports (5) is connected with crane span structure beam (3), and opposite side is connected with horizontal support (4), at horizontal support (4) cable testing bridge (1) is installed.
2. the mounting structure of large span cable bridge rack according to claim 1 is characterized in that: go up every 2 meters at crane span structure beam (3) a cover vertical supports (5) and a horizontal support (4) is set.
3. the mounting structure of large span cable bridge rack according to claim 2 is characterized in that: a cover vertical supports (5) and horizontal support (4) comprise 1 vertical supports (5) and 1~2 horizontal support (4).
4. the mounting structure of large span cable bridge rack according to claim 1, it is characterized in that: crane span structure beam (3) is made of channel-section steel.
5. the mounting structure of large span cable bridge rack according to claim 1, it is characterized in that: horizontal support (4), vertical supports (5) are made of angle steel.
CN2009203173628U 2009-12-14 2009-12-14 Installing structure of large-span cable bridge frame Expired - Fee Related CN201610974U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009203173628U CN201610974U (en) 2009-12-14 2009-12-14 Installing structure of large-span cable bridge frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009203173628U CN201610974U (en) 2009-12-14 2009-12-14 Installing structure of large-span cable bridge frame

Publications (1)

Publication Number Publication Date
CN201610974U true CN201610974U (en) 2010-10-20

Family

ID=42961608

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009203173628U Expired - Fee Related CN201610974U (en) 2009-12-14 2009-12-14 Installing structure of large-span cable bridge frame

Country Status (1)

Country Link
CN (1) CN201610974U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104092162A (en) * 2014-06-26 2014-10-08 镇江市江岛电器制造有限公司 Cable bridge wall-following installation mechanism
CN104088866A (en) * 2014-06-26 2014-10-08 镇江市江岛电器制造有限公司 Cable bridge wall-following horizontal installing mechanism

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104092162A (en) * 2014-06-26 2014-10-08 镇江市江岛电器制造有限公司 Cable bridge wall-following installation mechanism
CN104088866A (en) * 2014-06-26 2014-10-08 镇江市江岛电器制造有限公司 Cable bridge wall-following horizontal installing mechanism

Similar Documents

Publication Publication Date Title
CN103452311B (en) A kind of erection method of shaped steel suspended structural support frame
CN103195256B (en) Hanging column type steel structure jig frame construction method
CN103291076A (en) Multilayer steel truss fragmented reverse hoisting construction method in arc-shaped frame
CN105003090B (en) Temporary support frame for mounting assembly type steel structure
CN103437563B (en) A kind of mounting method for large steel-strctrue building steel frame
CN105970819A (en) Installation construction method for steel anchor beams
CN107447973A (en) A kind of unilateral suspension type aerial movement steel platform
CN201610974U (en) Installing structure of large-span cable bridge frame
KR20110014341A (en) Tower ctane wall bracing with a safety fence
CN105570539A (en) Construction method of pipeline protection structure
CN204876631U (en) Assembled steel structure installation uses interim support frame
CN101603379A (en) The mounting method of storehouse-top steel girder
CN102465601B (en) Method for installing main body frame steel structure of benzene hydrogenation project
CN113775165A (en) Balance weight-free ultrahigh hanging basket suspension device and mounting method thereof
CN103899078B (en) Attachment automatic lifting protecting screen mounting method
CN203856256U (en) Lightning protection building
CN209741592U (en) Rail device of smoke prevention and dust control vehicle on top of coke oven
CN109138267B (en) Fixing structure for end part of bearing girder of steel truss on top plate of squat silo and construction method
CN206521180U (en) A kind of hoistway of counterweightless channel-section steel
CN201433589Y (en) Silo roof steel beam slip-form lifting device
CN201261403Y (en) Special H section steel for electrified railroad OCS mast
CN213143833U (en) It attaches wall connection structure to choose structure pin-connected panel
CN204881805U (en) Online adjustable single section components of a whole that can function independently truck scale
CN104695694A (en) Worm and gear lead screw lifting type attached scaffold
CN204851270U (en) Split type reaction frame starts in shield formula TBM hole

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: GUIYANG ALUMINUM AND MAGNESIUM DESIGN INSTITUTE CO

Free format text: FORMER NAME: GUIYANG ALUMINIUM AND MAGNESIUM DESIGN INST.

CP03 Change of name, title or address

Address after: 550081 Guiyang Province, Jinyang New District, Zhu Zhu Road, No. 2

Patentee after: Guiyang Aluminum & Magnesium Design Institute Co., Ltd.

Address before: 550004 No. 208, Beijing Road, Guiyang, Guizhou

Patentee before: Guiyang Aluminium and Magnesium Design Inst.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20101020

Termination date: 20141214

EXPY Termination of patent right or utility model