CN113775165A - Balance weight-free ultrahigh hanging basket suspension device and mounting method thereof - Google Patents

Balance weight-free ultrahigh hanging basket suspension device and mounting method thereof Download PDF

Info

Publication number
CN113775165A
CN113775165A CN202111208123.0A CN202111208123A CN113775165A CN 113775165 A CN113775165 A CN 113775165A CN 202111208123 A CN202111208123 A CN 202111208123A CN 113775165 A CN113775165 A CN 113775165A
Authority
CN
China
Prior art keywords
steel wire
wire rope
fixed
hanging basket
buckle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202111208123.0A
Other languages
Chinese (zh)
Inventor
潘志颢
侍毅华
陈磊
周磊
施永雷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Tongji Construction Co ltd
Original Assignee
Shanghai Tongji Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Tongji Construction Co ltd filed Critical Shanghai Tongji Construction Co ltd
Priority to CN202111208123.0A priority Critical patent/CN113775165A/en
Publication of CN113775165A publication Critical patent/CN113775165A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G3/30Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G3/30Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables
    • E04G3/32Hoisting devices; Safety devices
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G3/34Mobile scaffolds; Scaffolds with mobile platforms characterised by supporting structures provided on the roofs

Abstract

The invention discloses a counterweight-free ultrahigh hanging basket suspension device and an installation method thereof, relating to the technical field of hanging basket suspension devices and comprising the following steps: the hanging basket beam comprises a plurality of hanging basket beams, the hanging basket beams are fixed on the framework beam and are parallel to each other, and the front ends of the hanging basket beams are connected with hanging baskets through hanging basket steel wire ropes; the fixed steel wire ropes are a plurality of, the upper ends of the fixed steel wire ropes are fixed at the rear end of the hanging basket beam, and the lower ends of the fixed steel wire ropes are fixed on the parapet. The invention does not need to add a balance weight, is suitable for various house buildings when in use and installation, and has wide application range.

Description

Balance weight-free ultrahigh hanging basket suspension device and mounting method thereof
Technical Field
The invention relates to the technical field of hanging basket hanging devices, in particular to a balance weight-free ultrahigh hanging basket hanging device and an installation method thereof.
Background
Modern building roof structures are more and more complex, and the current hanging mechanism of hanging basket often needs to be stabilized through a rear support balancing weight, as shown in patent No. CN 211313320U. The standard hanging basket suspension mechanism is often limited by the house structure, and the construction requirements on the site can not be met slowly. At present, some non-standard erection methods or even soil methods are usually adopted according to local conditions on construction sites, but the safety and the stability of the operation cannot be well guaranteed.
Therefore, there is a high demand for a new type of suspension device in the market to solve the above problems.
Disclosure of Invention
The invention aims to provide a balance weight-free ultrahigh hanging basket suspension device and an installation method thereof, which are used for solving the technical problems in the prior art, do not need to install balance weights and have wide application range.
In order to achieve the purpose, the invention provides the following scheme:
the invention discloses a counterweight-free ultrahigh hanging basket suspension device, which comprises:
the hanging basket beam comprises a plurality of hanging basket beams, the hanging basket beams are fixed on the framework beam and are parallel to each other, and the front ends of the hanging basket beams are connected with hanging baskets through hanging basket steel wire ropes;
the hanging basket comprises a plurality of fixed steel wire ropes, the upper ends of the fixed steel wire ropes are fixed at the rear end of the hanging basket beam, and the lower ends of the fixed steel wire ropes are fixed on a parapet wall.
Preferably, a plurality of L-shaped clamping plates are fixed on the framework beam, one basket beam is fixed between two adjacent L-shaped clamping plates, and the two adjacent L-shaped clamping plates are symmetrically arranged relative to the basket beam in the middle.
Preferably, the hanging flower basket roof beam is including the front-axle beam, well roof beam and the back beam that set gradually, the front-axle beam with the back beam set up respectively in both ends around the well roof beam, well roof beam passes through L type splint are fixed in on the framework roof beam, the front-axle beam is kept away from the one end of well roof beam can be connected hanging flower basket wire rope, the back beam is kept away from the one end of well roof beam can be connected fixed wire rope.
Preferably, the both ends of well roof beam are equipped with the first connecting hole of a plurality of, the front-axle beam with the back beam is close to the one end of well roof beam is equipped with a plurality of second connecting hole, the front-axle beam with the back beam is close to the internal diameter of well roof beam one end is greater than the external diameter of well roof beam, the front-axle beam with the back beam overlaps respectively to be established the both ends outside of well roof beam, first connecting hole with the second connecting hole can be fixed through connecting bolt.
Preferably, the upper end of the hanging basket beam is fixed with the lower end of an upper support, the upper end of the upper support is fixed with a rope pulley, a reinforcing steel wire rope is arranged on the rope pulley, and two ends of the reinforcing steel wire rope are respectively fixed on the front beam and the rear beam.
Preferably, one end of the front beam, which is far away from the middle beam, is provided with a front steel wire rope buckle, one side of the rear beam, which is far away from the middle beam, is provided with a rear steel wire rope buckle, the rear steel wire rope buckle is connected with the lower end of the reinforced turn buckle, and two ends of the reinforced steel wire rope are respectively fixed at the upper ends of the front steel wire rope buckle and the reinforced turn buckle.
Preferably, the parapet is close to one side of fixed wire rope is fixed with the lug plate, be equipped with the lug on the lug plate, the lug is used for connecting the lower extreme of lug turn-buckle, the upper end of lug turn-buckle is connected fixed wire rope.
Preferably, the fixed steel wire rope comprises a safe steel wire rope and a diagonal steel wire rope, one is connected to the hanging basket beam the upper ends of the safe steel wire rope and the two diagonal steel wire ropes, the lower ends of the safe steel wire rope and the diagonal steel wire ropes are respectively fixed to the parapet, and the two diagonal steel wire ropes are respectively located at two ends of the safe steel wire rope.
The invention also discloses an installation method of the counterweight-free ultrahigh hanging basket suspension device, which comprises the following steps:
s1: installing the embedded part;
s101: mounting the lifting lug plate on the parapet wall below the framework beam;
s102: mounting the clamping plates on the framework beams;
s2: mounting the hanging basket beam;
s201: fixing an upper support column on the upper part of the middle beam;
s202: fixing the middle beam between two adjacent clamping plates;
s203: the front beam and the rear beam are respectively connected with the middle beam and the length of the middle beam is adjusted;
s3: installing a steel wire rope;
s301: the reinforcing steel wire rope is connected with the reinforcing turn buckle on the rear steel wire rope through the rope pulley at the top of the upper support column from the front steel wire rope buckle, and the reinforcing turn buckle is tightened;
s302: the upper end of the diagonal steel wire rope is fixed at the steel wire rope buckle, and the lower end of the diagonal steel wire rope is fixed on a lug plate of the parapet wall and tightened by a lug turn buckle;
s303: the upper end of the safety steel wire rope is fixed at the steel wire rope buckle, and the lower end of the safety steel wire rope is fixed on a lifting lug plate of the parapet wall and tightened by a lifting lug turn buckle.
Compared with the prior art, the invention has the following technical effects:
the invention can solve the problem of erecting a hanging mechanism of a roof hanging basket under a complex roof structure to a certain extent, does not need to arrange a rear support and ultrahigh erection of a counterweight, and only needs the embedded plate of the parapet wall to bear the tension of a cable-stayed steel wire rope and the tension of a safe steel wire rope.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings needed in the embodiments will be briefly described below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and it is obvious for those skilled in the art to obtain other drawings without creative efforts.
FIG. 1 is a schematic structural diagram of an ultra-high hanging basket suspension device without a counterweight according to an embodiment of the invention;
FIG. 2 is a diagram illustrating a connection relationship between the ear plates according to an embodiment of the present invention;
FIG. 3 is a view showing a bolt connection relationship of a flower basket according to an embodiment of the present invention;
FIG. 4 is a schematic structural view of a splint according to an embodiment of the present invention;
in the figure: 1-parapet wall; 2-a truss beam; 3-hanging basket beam; 4-upper prop; 5-L-shaped splints; 6-reinforcing the steel wire rope; 7-safety steel wire ropes; 8-stayed steel wire ropes; 9-a lug plate; 10-lug turnbuckle.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
The invention aims to provide a balance weight-free ultrahigh hanging basket suspension device and an installation method thereof, which are used for solving the technical problems in the prior art, do not need to install balance weights and have wide application range.
In order to make the aforementioned objects, features and advantages of the present invention comprehensible, embodiments accompanied with figures are described in further detail below.
As shown in fig. 1 to 4, the present embodiment provides a non-counterweight ultra-high hanging basket suspension device, comprising:
the hanging basket comprises a plurality of hanging basket beams 3, the hanging basket beams 3 are fixed on a framework beam 2, the hanging basket beams 3 are perpendicular to the framework beam 2, the number of the hanging basket beams 3 is two in the embodiment, the distance between the two hanging basket beams 3 is matched with the length of a hanging basket, the hanging basket beams 3 are parallel to each other, and the front ends of the hanging basket beams 3 are connected with the hanging basket through hanging basket steel wire ropes;
the fixed wire ropes are a plurality of, the upper ends of the fixed wire ropes are fixed at the rear end of the hanging basket beam 3, and the lower ends of the fixed wire ropes are fixed on the parapet wall 1.
When the hanging basket beam 3 is used, the balance weight is not needed, and the hanging basket beam 3 can be kept balanced only by fixing the steel wire rope.
In the embodiment, a plurality of L-shaped clamp plates 5, specifically four L-shaped clamp plates 5, are fixed on the upper surface of the framework beam 2 through a plurality of M12 chemical bolts, as shown in fig. 4, each L-shaped clamp plate 5 is of an L-shaped structure, and two adjacent clamp plates 5 are symmetrically arranged opposite to each other. And a hanging basket beam 3 is fixed between two adjacent clamping plates 5 through high-strength bolts.
In this embodiment, the hanging basket beam 3 includes the front beam, the middle beam and the back beam that set gradually, and front beam and back beam set up respectively in the front and back both ends of middle beam, and the middle beam is fixed in framework roof beam 2 through L type splint 5 on, and front beam and back beam are in the state of encorbelmenting. The end of the front beam far away from the middle beam can be connected with a hanging basket steel wire rope, and the end of the rear beam far away from the middle beam can be connected with a fixed steel wire rope.
In this embodiment, the both ends of well roof beam are equipped with the first connecting hole of a plurality of, and the one end that front beam and back beam are close to well roof beam is equipped with a plurality of second connecting hole, and the internal diameter that front beam and back beam are close to well roof beam one end is greater than the external diameter of well roof beam, and front beam and back beam overlap respectively and establish the both ends outside at well roof beam, and first connecting hole and second connecting hole can be fixed through connecting bolt. When the telescopic connecting bolt is used, the telescopic lengths of the front beam and the rear beam can be adjusted as required, and when the length reaches the preset length, the first connecting hole and the second connecting hole are fixedly connected through the connecting bolt.
In this embodiment, the upper end of the hanging basket beam 3 is fixed with the lower end of the upper support column 4, the upper end of the upper support column 4 is fixed with the rope pulley, the rope pulley is provided with the reinforced steel wire rope 6, the rope pulley is connected with the reinforced steel wire rope 6 in a rolling manner, and two ends of the reinforced steel wire rope 6 are respectively fixed at the front end of the front beam and the rear end of the rear beam. The strength of the basket beam 3 can be further improved by the upper stays 4 and the reinforcing wire ropes 6.
In this embodiment, the one end that the well roof beam was kept away from to the front beam is equipped with preceding wire rope buckle, and the back roof beam is kept away from one side of well roof beam is equipped with back wire rope buckle, and preceding wire rope buckle and back wire rope buckle all are the common part that is used for fixed wire rope in the building field. The rear steel wire rope buckle is connected with the lower end of the reinforcing turn buckle, the two ends of the reinforcing steel wire rope 6 are fixed to the upper ends of the front steel wire rope buckle and the reinforcing turn buckle respectively, and the tightening effect of the reinforcing steel wire rope is achieved through the reinforcing turn buckle.
In this embodiment, as shown in fig. 2-3, a lifting lug plate 9 is fixed on one side of the parapet 1 close to the fixed steel wire rope by a chemical bolt, a lifting lug is arranged on the lifting lug plate 9, the lifting lug is used for connecting the lower end of a lifting lug turn-buckle 10, and the upper end of the lifting lug turn-buckle 10 is connected with the fixed steel wire rope. The turn buckle 10 is used for connecting and fixing the wire rope, and can control the tightness of the fixing wire rope.
In this embodiment, the fixed steel wire rope includes safe steel wire rope 7 and draws steel wire rope 8 to one side, and the steel wire rope buckle on the hanging flower basket roof beam 3 is connected with the upper end of a safe steel wire rope 7 and two draw steel wire ropes 8 to one side, and safe steel wire rope 7 and the lower extreme that draws steel wire rope 8 to one side are fixed in on the lug plate 9 of parapet 1, and a safe steel wire rope 7 or one draw steel wire rope 8 to one side are connected with a lug plate 9 respectively, need set up three lug plate 9 below one hanging flower basket roof beam 3 promptly. The two diagonal steel wire ropes 8 are respectively positioned at two ends of the safety steel wire rope 7 and distributed in a splayed shape.
The embodiment also provides an installation method of the counterweight-free ultrahigh hanging basket suspension device, which comprises the following steps:
s1, installing an embedded part, wherein the embedded part comprises a lug plate 9 and a clamping plate 5;
s101: placing six lifting lug plates 9 on the parapet wall 1 below the framework beam 2, wherein each plate is fixed by 4 chemical bolts;
s102: vertically placing four L-shaped clamping plates 5 on a framework beam 2, wherein each clamping plate 5 is fixed by 2 chemical bolts;
s2, mounting the hanging basket beam 3;
s201: fixing the upper support 4 on the upper part of the middle beam by using a high-strength bolt;
s202: fixing the middle beam between two adjacent L-shaped clamping plates 5 by using a high-strength bolt;
s203: the front beam and the rear beam are respectively connected with the middle beam and adjusted to be proper in length;
s3: installing the steel wire rope;
s301: the reinforced steel wire rope 6 is connected with the reinforced turn buckle on the rear steel wire rope through the rope pulley at the top of the upper support 4 from the front steel wire rope buckle, and the reinforced turn buckle is tightened;
s302: two diagonal steel wire ropes 8 are arranged downwards in a splayed shape from the steel wire rope buckle at the end part of the back beam and are fixed on a lifting lug plate 9 of the parapet wall 1, and lifting lug turn buckle bolts 10 are tightened;
s303: and a safety steel wire rope 7 is vertically downwards arranged on a steel wire rope buckle at the end part of the back beam, is fixed on a lifting lug plate 9 of the parapet wall 1, and is tightened by a lifting lug turn buckle 10.
The principle and the implementation mode of the present invention are explained by applying specific examples in the present specification, and the above descriptions of the examples are only used to help understanding the method and the core idea of the present invention; meanwhile, for a person skilled in the art, according to the idea of the present invention, the specific embodiments and the application range may be changed. In view of the above, the present disclosure should not be construed as limiting the invention.

Claims (9)

1. A no counter weight superelevation hanging flower basket linkage, its characterized in that includes:
the hanging basket beam comprises a plurality of hanging basket beams, the hanging basket beams are fixed on the framework beam and are parallel to each other, and the front ends of the hanging basket beams are connected with hanging baskets through hanging basket steel wire ropes;
the hanging basket comprises a plurality of fixed steel wire ropes, the upper ends of the fixed steel wire ropes are fixed at the rear end of the hanging basket beam, and the lower ends of the fixed steel wire ropes are fixed on a parapet wall.
2. The ultra-high hanging basket suspension device without counterweight as claimed in claim 1, wherein: a plurality of L-shaped clamping plates are fixed on the framework beam, one hanging basket beam is fixed between every two adjacent L-shaped clamping plates, and the two adjacent L-shaped clamping plates are symmetrically arranged relative to the hanging basket beam in the middle.
3. The ultra-high hanging basket suspension device without counterweight as claimed in claim 2, wherein: the hanging flower basket roof beam is including the front-axle beam, well roof beam and the back beam that set gradually, the front-axle beam with the back beam set up respectively in both ends around the well roof beam, well roof beam passes through L type splint are fixed in on the framework roof beam, the front-axle beam is kept away from the one end of well roof beam can be connected hanging flower basket wire rope, the back beam is kept away from the one end of well roof beam can be connected fixed wire rope.
4. The ultra-high hanging basket suspension device without counterweight as claimed in claim 3, wherein: the both ends of well roof beam are equipped with the first connecting hole of a plurality of, the front-axle beam with the back beam is close to the one end of well roof beam is equipped with a plurality of second connecting hole, the front-axle beam with the back beam is close to the internal diameter of well roof beam one end is greater than the external diameter of well roof beam, the front-axle beam with the back beam overlaps respectively and is established the both ends outside of well roof beam, first connecting hole with the second connecting hole can be fixed through connecting bolt.
5. The ultra-high hanging basket suspension device without counterweight as claimed in claim 3, wherein: the hanging basket is characterized in that the lower end of an upper support is fixed at the upper end of the hanging basket beam, a rope wheel is fixed at the upper end of the upper support, a reinforcing steel wire rope is arranged on the rope wheel, and two ends of the reinforcing steel wire rope are fixed on the front beam and the rear beam respectively.
6. The ultra-high hanging basket suspension device without counterweight as claimed in claim 5, wherein: one end, far away from the center sill, of the front beam is provided with a front steel wire rope buckle, one side, far away from the center sill, of the rear beam is provided with a rear steel wire rope buckle, the rear steel wire rope buckle is connected with the lower end of the reinforcing turn buckle, and the two ends of the reinforcing steel wire rope are fixed to the upper ends of the front steel wire rope buckle and the reinforcing turn buckle respectively.
7. The ultra-high hanging basket suspension device without counterweight as claimed in claim 1, wherein: the parapet is close to one side of fixed wire rope is fixed with the lug plate, be equipped with the lug on the lug plate, the lug is used for connecting lug turn-buckle's lower extreme, lug turn-buckle's upper end is connected fixed wire rope.
8. The ultra-high hanging basket suspension device without counterweight as claimed in claim 1, wherein: the fixed steel wire rope comprises a safe steel wire rope and a diagonal steel wire rope, one is connected to the hanging basket beam, the safe steel wire rope and the two upper ends of the diagonal steel wire rope are connected to the hanging basket beam, the lower ends of the safe steel wire rope and the diagonal steel wire rope are fixed to the parapet respectively, and the two diagonal steel wire ropes are located at two ends of the safe steel wire rope respectively.
9. The installation method of the non-counterweight ultra-high hanging basket suspension device according to any one of the claims 1 to 8, characterized by comprising the following steps:
s1: installing the embedded part;
s101: mounting the lifting lug plate on the parapet wall below the framework beam;
s102: mounting the clamping plates on the framework beams;
s2: mounting the hanging basket beam;
s201: fixing an upper support column on the upper part of the middle beam;
s202: fixing the middle beam between two adjacent clamping plates;
s203: the front beam and the rear beam are respectively connected with the middle beam and the length of the middle beam is adjusted;
s3: installing a steel wire rope;
s301: the reinforcing steel wire rope is connected with the reinforcing turn buckle on the rear steel wire rope through the rope pulley at the top of the upper support column from the front steel wire rope buckle, and the reinforcing turn buckle is tightened;
s302: the upper end of the diagonal steel wire rope is fixed at the steel wire rope buckle, and the lower end of the diagonal steel wire rope is fixed on a lug plate of the parapet wall and tightened by a lug turn buckle;
s303: the upper end of the safety steel wire rope is fixed at the steel wire rope buckle, and the lower end of the safety steel wire rope is fixed on a lifting lug plate of the parapet wall and tightened by a lifting lug turn buckle.
CN202111208123.0A 2021-10-18 2021-10-18 Balance weight-free ultrahigh hanging basket suspension device and mounting method thereof Pending CN113775165A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111208123.0A CN113775165A (en) 2021-10-18 2021-10-18 Balance weight-free ultrahigh hanging basket suspension device and mounting method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111208123.0A CN113775165A (en) 2021-10-18 2021-10-18 Balance weight-free ultrahigh hanging basket suspension device and mounting method thereof

Publications (1)

Publication Number Publication Date
CN113775165A true CN113775165A (en) 2021-12-10

Family

ID=78871462

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111208123.0A Pending CN113775165A (en) 2021-10-18 2021-10-18 Balance weight-free ultrahigh hanging basket suspension device and mounting method thereof

Country Status (1)

Country Link
CN (1) CN113775165A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114960437A (en) * 2022-05-24 2022-08-30 中国水利水电科学研究院 Walking type mobile operation trolley for external construction of large aqueduct

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114960437A (en) * 2022-05-24 2022-08-30 中国水利水电科学研究院 Walking type mobile operation trolley for external construction of large aqueduct

Similar Documents

Publication Publication Date Title
CN105569242A (en) Assembling method for composite floor slabs
CN201116267Y (en) Externally hung supporting device for internally climbing tower crane
CN106219419A (en) High-rise building large-scale swing arm tower crane is converted to plug-in construction method by interior climbing in situ
CN107100187A (en) Tower crane steel girder erection structure and installation method
CN113775165A (en) Balance weight-free ultrahigh hanging basket suspension device and mounting method thereof
CN108894329B (en) Overhanging type pipe truss and mounting method of supporting rod thereof
KR20110014341A (en) Tower ctane wall bracing with a safety fence
CN108729640B (en) Mounting method of cantilever plate of assembled building
CN107419907B (en) A kind of steel-making tower steel structure platform is staggered installation of welding method
CN216007760U (en) Non-counterweight ultrahigh hanging basket suspension device
CN110761555A (en) Construction method for large-span folded beam in orderly hall
CN215055324U (en) High-rise structure construction device
CN115341701A (en) High-altitude overhanging steel bar truss floor support plate hanging formwork construction method
CN210340110U (en) Two T board hoisting structure of large-span assembled
CN209958229U (en) External prestressing device for improving span of temporary support of Bailey beam
CN112942777A (en) Ultrahigh-layer periphery protection cyclic telescopic detachable cantilever structure and mounting method
CN111219005A (en) Keel assembly, hoisting structure and hoisting method of double-fish belly guy cable curtain wall
CN219261701U (en) Adjusting and fixing device and girder riding hanging basket system using same
CN216974227U (en) Gantry stirrup platform of unloading
CN217379735U (en) Wall connecting device suitable for large-span high frame
CN218323967U (en) Steel construction roof truss goes up and down and stop device
CN217326383U (en) Parapet hanging basket structure
CN218091400U (en) Structure swaying column for fixing unit curtain wall
CN220014396U (en) Cantilever structure template scaffold support frame
CN220058778U (en) Wall-riding hanging basket

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination