CN104088866A - Cable bridge wall-following horizontal installing mechanism - Google Patents

Cable bridge wall-following horizontal installing mechanism Download PDF

Info

Publication number
CN104088866A
CN104088866A CN201410292050.1A CN201410292050A CN104088866A CN 104088866 A CN104088866 A CN 104088866A CN 201410292050 A CN201410292050 A CN 201410292050A CN 104088866 A CN104088866 A CN 104088866A
Authority
CN
China
Prior art keywords
bracket
wall
cable testing
testing bridge
cable bridge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410292050.1A
Other languages
Chinese (zh)
Inventor
戴跃明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHENJIANG JIANGDAO ELECTRICAL Manufacturing Co Ltd
Original Assignee
ZHENJIANG JIANGDAO ELECTRICAL Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHENJIANG JIANGDAO ELECTRICAL Manufacturing Co Ltd filed Critical ZHENJIANG JIANGDAO ELECTRICAL Manufacturing Co Ltd
Priority to CN201410292050.1A priority Critical patent/CN104088866A/en
Publication of CN104088866A publication Critical patent/CN104088866A/en
Pending legal-status Critical Current

Links

Abstract

The invention provides a cable bridge wall-following horizontal installing mechanism which comprises a wall (1), a cable bridge (2), a cover plate (3), a clamp plate (4), channel steel (5), a bracket (6) and a connecting piece (7). The cable bridge wall-following horizontal installing mechanism is characterized in that the channel steel (5) is fixedly installed on the wall (1), the bracket (6) is installed on the channel steel (5), the connecting piece (7) is arranged on the bracket (6), the cable bridge (2) is installed at the upper end of the bracket (6), the cover plate (3) is installed at the upper end of the cable bridge (2), and the clamp plate (4) is further arranged on the bracket (6) and used for fixing and clamping the cable bridge (2). The cover plate and the bracket on the cable bridge wall-following horizontal installing mechanism are respectively made of stainless steel and aluminum alloy, and the corrosion resistance is good. In addition, the cable bridge is fixed and clamped by adopting the clamp plate, and the cable bridge wall-following horizontal installing mechanism has the advantages of being firm and reliable in installation and good in stability.

Description

Cable testing bridge is along the horizontal mounting mechanism of wall
Technical field
The present invention relates to a kind of mounting mechanism, particularly a kind of cable testing bridge is along the horizontal mounting mechanism of wall.
Background technique
In prior art, the application of cable testing bridge is very extensive.Cable testing bridge is along the horizontal mounting mechanism of wall, also be a kind of common application, but original cable testing bridge is along cover plate and bracket in the horizontal mounting mechanism of wall, respectively generally to adopt iron sheet and castiron, the cover plate that this employing iron sheet is made and the castiron bracket of employing, the shortcoming that has easy corrosion and easily get rusty, will make the life-span of cover plate and bracket shorten like this, thereby cause again changing cover plate and bracket, increased thus operating time and cost.
Also have original cable testing bridge along not adopting clamping plate means of fixation on the horizontal mounting mechanism of wall, therefore there is the stable not firmly shortcoming of fixed installation.
Summary of the invention
In order to solve the problem of tradition existence, to the invention provides following technological scheme be:
A kind of cable testing bridge is along the horizontal mounting mechanism of wall, comprise wall, cable testing bridge, cover plate, clamping plate, channel-section steel, bracket, connecting sheet, it is characterized in that, on described wall, be installed with channel-section steel, on described channel-section steel, bracket be installed, on described bracket, be provided with connecting sheet, described bracket upper end is provided with cable testing bridge, described cable testing bridge upper end is provided with cover plate, is also provided with clamping plate on described bracket, and described clamping plate are for fixedly clamping cable testing bridge.
Further, described cover plate adopts stainless steel material to make.
Further, described channel-section steel takes the shape of the letter U.
Further, described bracket is connected with channel-section steel is vertical.
Further, described bracket adopts aluminum alloy material to make.
The beneficial effect that the present invention brings is:
Cable testing bridge of the present invention adopts respectively stainless steel and aluminum alloy to make along the cover plate on the horizontal mounting mechanism of wall and bracket, has corrosion resistance strong, but also adopts clamping plate fixedly to clamp cable testing bridge, and it is solid and reliable and stable good to have advantages of.
Brief description of the drawings
Fig. 1 is structural representation of the present invention.
Number in the figure is:
1-wall, 2-cable testing bridge, 3-cover plate, 4-clamping plate
5-channel-section steel, 6-bracket, 7-connecting sheet.
Embodiment
Below to by reference to the accompanying drawings preferred embodiment of the present invention being elaborated, thereby so that advantages and features of the invention can be easier to be it will be appreciated by those skilled in the art that, protection scope of the present invention is made to more explicit defining.
As shown in Figure 1, a kind of cable testing bridge is along the horizontal mounting mechanism of wall, comprise wall 1, cable testing bridge 2, cover plate 3, clamping plate 4, channel-section steel 5, bracket 6, connecting sheet 7, on described wall 1, be installed with channel-section steel 5, on described channel-section steel 5, bracket 6 is installed, on described bracket 6, be provided with connecting sheet 7, described bracket 6 upper ends are provided with cable testing bridge 2, described cable testing bridge 2 upper ends are provided with cover plate 3, on described bracket 6, be also provided with clamping plate 4, described clamping plate 4 are for fixedly clamping cable testing bridge 2, described cover plate 3 adopts stainless steel material to make, described channel-section steel 5 takes the shape of the letter U, described bracket 6 is connected with channel-section steel 5 is vertical, described bracket 6 adopts aluminum alloy material to make.
In sum, cable testing bridge of the present invention adopts respectively stainless steel and aluminum alloy to make along the cover plate on the horizontal mounting mechanism of wall and bracket, have corrosion resistance strong, but also adopt clamping plate fixedly to clamp cable testing bridge, it is solid and reliable and stable good to have advantages of.
The above; it is only one of the specific embodiment of the present invention; but protection scope of the present invention is not limited to this; any those of ordinary skill in the art are in the disclosed technical scope of the present invention; the variation that can expect without creative work or replacement, within all should being encompassed in protection scope of the present invention.Therefore, protection scope of the present invention should be as the criterion with the protection domain that claims were limited.

Claims (5)

1. a cable testing bridge is along the horizontal mounting mechanism of wall, comprise wall (1), cable testing bridge (2), cover plate (3), clamping plate (4), channel-section steel (5), bracket (6), connecting sheet (7), it is characterized in that, on described wall (1), be installed with channel-section steel (5), bracket (6) is installed on described channel-section steel (5), on described bracket (6), be provided with connecting sheet (7), described bracket (6) upper end is provided with cable testing bridge (2), described cable testing bridge (2) upper end is provided with cover plate (3), on described bracket (6), be also provided with clamping plate (4), described clamping plate (4) are for fixedly clamping cable testing bridge (2).
2. a kind of cable testing bridge according to claim 1, along the horizontal mounting mechanism of wall, is characterized in that, described cover plate (3) adopts stainless steel material to make.
3. a kind of cable testing bridge according to claim 1, along the horizontal mounting mechanism of wall, is characterized in that, described channel-section steel (5) takes the shape of the letter U.
4. a kind of cable testing bridge according to claim 1, along the horizontal mounting mechanism of wall, is characterized in that, described bracket (6) and vertical connection of channel-section steel (5).
5. a kind of cable testing bridge according to claim 1, along the horizontal mounting mechanism of wall, is characterized in that, described bracket (6) adopts aluminum alloy material to make.
CN201410292050.1A 2014-06-26 2014-06-26 Cable bridge wall-following horizontal installing mechanism Pending CN104088866A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410292050.1A CN104088866A (en) 2014-06-26 2014-06-26 Cable bridge wall-following horizontal installing mechanism

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410292050.1A CN104088866A (en) 2014-06-26 2014-06-26 Cable bridge wall-following horizontal installing mechanism

Publications (1)

Publication Number Publication Date
CN104088866A true CN104088866A (en) 2014-10-08

Family

ID=51636609

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410292050.1A Pending CN104088866A (en) 2014-06-26 2014-06-26 Cable bridge wall-following horizontal installing mechanism

Country Status (1)

Country Link
CN (1) CN104088866A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104332906A (en) * 2014-10-18 2015-02-04 福州万山电力咨询有限公司 Power distribution project-used cable bridge mounting structure and mounting method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0056898A1 (en) * 1980-12-19 1982-08-04 Minnesota Mining And Manufacturing Company Stackable flat cable clamp
CN2472379Y (en) * 2000-12-14 2002-01-16 郭道华 Stainless steel electric cable sheath
CN201496662U (en) * 2009-08-05 2010-06-02 上海宝冶建设有限公司 Cable bridge vertical arranging structure
CN201610974U (en) * 2009-12-14 2010-10-20 贵阳铝镁设计研究院 Installing structure of large-span cable bridge frame
CN202901540U (en) * 2012-11-07 2013-04-24 上海市政工程设计研究总院(集团)有限公司 Cable bridge embedded part for mounting cable bridge on side wall of underground cavern

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0056898A1 (en) * 1980-12-19 1982-08-04 Minnesota Mining And Manufacturing Company Stackable flat cable clamp
CN2472379Y (en) * 2000-12-14 2002-01-16 郭道华 Stainless steel electric cable sheath
CN201496662U (en) * 2009-08-05 2010-06-02 上海宝冶建设有限公司 Cable bridge vertical arranging structure
CN201610974U (en) * 2009-12-14 2010-10-20 贵阳铝镁设计研究院 Installing structure of large-span cable bridge frame
CN202901540U (en) * 2012-11-07 2013-04-24 上海市政工程设计研究总院(集团)有限公司 Cable bridge embedded part for mounting cable bridge on side wall of underground cavern

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104332906A (en) * 2014-10-18 2015-02-04 福州万山电力咨询有限公司 Power distribution project-used cable bridge mounting structure and mounting method

Similar Documents

Publication Publication Date Title
CN203747356U (en) Omni-bearing rotation support for cable tunnel
CN203857135U (en) Fixing clamp for high-voltage cable
CN203674672U (en) Cable support
CN104088866A (en) Cable bridge wall-following horizontal installing mechanism
CN205592493U (en) An assembled gallows
CN104092162A (en) Cable bridge wall-following installation mechanism
CN103939673A (en) Blocking plate type fixed heat-insulated pipe support
CN109424790A (en) Novel assembled pipe clamp cross arm
CN104410017A (en) Rapid cable fixing device
CN104100770A (en) Cable bridge ceiling hoisting mechanism
CN203893018U (en) Ceiling lamp simple to mount
CN105318153A (en) Universal mounting mechanism for supporting, fixing, mounting and debugging equipment
CN204942760U (en) Double flute hanger
CN104104037A (en) Combined cable bridge
CN104948837A (en) Pipeline mounting support
CN203247711U (en) Canopy connecting piece
CN104806292A (en) Tunnel pipeline fixing device
CN109257004A (en) Roof panel fixture is used in a kind of installation of solar panels
CN202420628U (en) Meter clamp
CN112700953B (en) Transformer clamp
CN203847838U (en) Pipeline fixing bracket
CN209181213U (en) A kind of air-conditioning duct fixed convenient for assembly
CN203160616U (en) Subway wall plate back bolt system
CN105351707A (en) Angle-adjustable television set hanging frame
CN209096653U (en) A kind of chassis pipeline and harness pipeline exchange fixed bracket

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20141008