CN202901540U - Cable bridge embedded part for mounting cable bridge on side wall of underground cavern - Google Patents
Cable bridge embedded part for mounting cable bridge on side wall of underground cavern Download PDFInfo
- Publication number
- CN202901540U CN202901540U CN 201220582779 CN201220582779U CN202901540U CN 202901540 U CN202901540 U CN 202901540U CN 201220582779 CN201220582779 CN 201220582779 CN 201220582779 U CN201220582779 U CN 201220582779U CN 202901540 U CN202901540 U CN 202901540U
- Authority
- CN
- China
- Prior art keywords
- testing bridge
- cable testing
- cable bridge
- side wall
- embedded part
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model discloses a cable bridge embedded part for mounting a cable bridge on the side wall of an underground cavern. The cable bridge embedded part is characterized by comprising a cavity box embedded in the structural concrete side wall of the underground cavern, an embedded steel plate is arranged on the outer side of the cavity box and provided with an insertion hole, and the cable bridge is provided with an insertion part matched with the insertion hole. The cable bridge embedded part has the advantages that construction can be simple, convenient and rapid, a construction period is shortened, and construction quality is guaranteed more effectively, and has the greatest advantage of capability of reducing labor cost.
Description
Technical field
The utility model is applicable to the cable testing bridge embedded part that cut and cover tunneling cast-in-situ steel reinforced concrete underground chamber structure is arranged at (comprising roads and tunnels, subway sectional tunnel etc.) side wall.
Technical background
After underground chamber builds up, according to tunnel operation usage requirement, need vertically to lay all kinds of cables along tunnel sidewalls, cable is arranged on the cable testing bridge.
When former method is met this type of situation, generally tunnel main body reinforced concrete build finish and reach certain intensity after, the punching of tunnel sidewalls secondary install crab-bolt with bolt Connecting format installing cables crane span structure or on the side wall embedded part welding cable crane span structure.The method has certain damage such as punching, high-temperature soldering to concrete, and working procedure is many, long in time limit.
The model utility content
The purpose of this utility model is to provide a kind of cable testing bridge embedded part at underground chamber side wall installing cables crane span structure, need not in constructions such as concrete side wall punch, the cable testing bridge that forms product can be inserted the installation that to finish cable testing bridge in the tunnel sidewalls embedded part aperture in the later stage.Adopt this method not only can simple and convenient rapid construction, reduce the duration, and construction quality is more guaranteed, larger advantage is to reduce cost of labor, especially at present cost of labor is higher, and cost of labor will be tending towards showing that further it reduces the advantage of human cost aspect under the higher condition later on.
To achieve these goals, technical solutions of the utility model are: a kind of cable testing bridge embedded part at underground chamber side wall installing cables crane span structure, described cable testing bridge is provided with an inserting member, it is characterized in that the cable testing bridge embedded part comprises the cavity box that is embedded in the underground chamber structural concrete side wall, the outside of described cavity box is provided with a pre-embedded steel slab, and described pre-embedded steel slab is provided with the patchhole that matches with the cable testing bridge inserting member.According to specific embodiment of the utility model, described patchhole is T font hole.The inboard of described pre-embedded steel slab is connected with the reinforcing bar that anchors into side wall concrete.Pre-embedded steel slab also is provided with the weep hole that is communicated with described cavity box.Described inserting member comprise insert steel plate and with the floor of described insertion Plate Welding, described cable testing bridge welds with floor.
The utility model has the advantage of: not only can simple and convenient rapid construction, reduce the duration, and construction quality is more guaranteed, larger advantage is to reduce cost of labor, especially for the Underground Transportation Engineering tunnel, its design length of service is 100 years, and cable testing bridge (the local infiltration in tunnel is common disease under the wet environment condition, and cable is vertically to arrange along the tunnel total length, the cable testing bridge of unavoidable regional area is in wet environment, and this environment is larger on the impact of steel cable bridge durability.) to reach the design period of service with time limits such as tunnels, need to carry out regularly (scaling brush coating etc.) maintaining to cable testing bridge, so not only the duration longer, and to traffic operation affect (such as cable setting and traffic circulation vehicle at the same space).And by this method installing cables crane span structure, its maintaining only needs the cable testing bridge assembly is withdrawed from from fastener inserts, inserts separately new cable testing bridge assembly and can finish.Higher for present cost of labor, and later on cost of labor will be tending towards will showing further that this method reduces the advantage of human cost aspect under the higher condition.
Description of drawings
Fig. 1 is the insert configuration schematic representation.
Fig. 2 is the structural representation of cable testing bridge.
Fig. 3 a is cable testing bridge embedded part schematic representation, and Fig. 3 b is the side view of Fig. 3 a.
Fig. 4 is one of scheme of installation of cable testing bridge.
Fig. 5 be cable testing bridge scheme of installation two.
Embodiment
Below in conjunction with accompanying drawing the utility model is further described:
The utility model is a kind of cable testing bridge embedded part method, and its methods ﹠﹠ steps of implementation is as follows:
1. when colligation underground chamber side wall reinforcing bar, position in accordance with regulations arranges cable testing bridge fastener inserts 10.Fastener inserts is made in advance, is processed to form product, and it is composed as follows:
1) T font hole 7(is set and is used for inserting the cable testing bridge assembly in the middle of pre-embedded steel slab 5) and draining
Hole 9(is used for getting rid of the water that flows in the reservation cavity box 8);
2) reserve cavity box 8, adopt steel plate to make, with steel plate 5 welding;
3) will anchor into side wall concrete reinforcing bar 6 and steel plate 5 welding;
2. the floor 2 in the assembly 4 is inserted the bottom in " T " font holes 7 in " T " font hole 7 of pre-embedded steel slab 5 that will form the insertion steel plate 1 centering cable testing bridge fastener inserts 10 of plug-in package 4 in the cable testing bridge assembly 11 then.The cable testing bridge assembly is made in advance, is processed to form product, and it is composed as follows:
1) the cable testing bridge 3 general shaped steel processing and fabricatings that adopt, shaped steel can be angle steel, channel-section steel, " worker " word steel, rectangular steel pipe etc., is common product;
2) inserting member is welded to form by inserting steel plate 1 and floor 2;
3) inserting member 4 and cable testing bridge 3 welding are formed cable testing bridge assembly 11.
Claims (4)
1. cable testing bridge embedded part at underground chamber side wall installing cables crane span structure, described cable testing bridge is provided with an inserting member, it is characterized in that the cable testing bridge embedded part comprises the cavity box that is embedded in the underground chamber structural concrete side wall, the outside of described cavity box is provided with a pre-embedded steel slab, and described pre-embedded steel slab is provided with the patchhole that matches with the cable testing bridge inserting member.
2. cable testing bridge embedded part according to claim 1 is characterized in that described patchhole is T font hole.
3. cable testing bridge embedded part according to claim 1 is characterized in that the inboard of described pre-embedded steel slab is connected with the reinforcing bar that anchors into side wall concrete.
4. cable testing bridge embedded part according to claim 1 is characterized in that pre-embedded steel slab also is provided with the weep hole that is communicated with described cavity box.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220582779 CN202901540U (en) | 2012-11-07 | 2012-11-07 | Cable bridge embedded part for mounting cable bridge on side wall of underground cavern |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220582779 CN202901540U (en) | 2012-11-07 | 2012-11-07 | Cable bridge embedded part for mounting cable bridge on side wall of underground cavern |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202901540U true CN202901540U (en) | 2013-04-24 |
Family
ID=48122211
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201220582779 Expired - Fee Related CN202901540U (en) | 2012-11-07 | 2012-11-07 | Cable bridge embedded part for mounting cable bridge on side wall of underground cavern |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202901540U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104088866A (en) * | 2014-06-26 | 2014-10-08 | 镇江市江岛电器制造有限公司 | Cable bridge wall-following horizontal installing mechanism |
CN107239061A (en) * | 2017-05-23 | 2017-10-10 | 上海市政工程设计研究总院(集团)有限公司 | A kind of bridge drainage pipeline dangerous material leak emergency method |
-
2012
- 2012-11-07 CN CN 201220582779 patent/CN202901540U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104088866A (en) * | 2014-06-26 | 2014-10-08 | 镇江市江岛电器制造有限公司 | Cable bridge wall-following horizontal installing mechanism |
CN107239061A (en) * | 2017-05-23 | 2017-10-10 | 上海市政工程设计研究总院(集团)有限公司 | A kind of bridge drainage pipeline dangerous material leak emergency method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104179364B (en) | Punch after a kind of shear wall ruggedized construction and construction method thereof | |
CN108824652A (en) | A kind of Urban Underground pipe gallery pre-embedded device and its construction method | |
CN205840048U (en) | A kind of inserting bolt type precast shear wall perps attachment structure | |
CN202901540U (en) | Cable bridge embedded part for mounting cable bridge on side wall of underground cavern | |
CN103741583B (en) | The prefabricated case beam transverse prestress twisted wire mounting structure of plate girder bridge | |
CN105040743B (en) | Underground structure post-cast strip detachable support replacement method and structure | |
CN203701436U (en) | Lap joint structure of vertical reinforcements and steel sleeve of assembled wall | |
CN204936869U (en) | A kind of detachable pre-buried channel flow | |
CN204139643U (en) | Punch after a kind of shear wall ruggedized construction | |
CN203904462U (en) | Replaceable anode assembling device applied to town gas-electricity protection system | |
CN203546944U (en) | Assembly type shear wall | |
CN203487776U (en) | Connecting structure for cast-in-place heat preservation protection layer of prefabricated concrete structure and module | |
CN208430636U (en) | A kind of Urban Underground pipe gallery pre-embedded device | |
CN210003314U (en) | Hydraulic support coal leakage hole | |
CN205369874U (en) | Elevartor shaft outer wall cantilever frame | |
CN103223952B (en) | A kind of locomotive rheostatic brake erecting device | |
CN205187559U (en) | No computer lab elevator car rope hitch plate | |
CN207274464U (en) | A kind of compact-type automobile charging charging station structure | |
KR20120023989A (en) | Wave steel plate concrete block | |
CN215330954U (en) | Pre-buried steel bar isolation device | |
CN204252171U (en) | The rubber fastening band at basement shrinkage joint installs fixing special tool | |
CN211690800U (en) | Vertical electric power support connection structure | |
CN216558379U (en) | Natural draft cooling tower with pipeline | |
CN204435372U (en) | A kind of prestress anchorage cable | |
CN204609465U (en) | A kind of anti-climb assembling fence |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130424 Termination date: 20211107 |
|
CF01 | Termination of patent right due to non-payment of annual fee |