CN204851270U - Split type reaction frame starts in shield formula TBM hole - Google Patents

Split type reaction frame starts in shield formula TBM hole Download PDF

Info

Publication number
CN204851270U
CN204851270U CN201520550690.8U CN201520550690U CN204851270U CN 204851270 U CN204851270 U CN 204851270U CN 201520550690 U CN201520550690 U CN 201520550690U CN 204851270 U CN204851270 U CN 204851270U
Authority
CN
China
Prior art keywords
reaction frame
liang
hole
section
monomer reaction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520550690.8U
Other languages
Chinese (zh)
Inventor
齐梦学
高振宅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 18th Bureau Group Co Ltd
Tunnel Engineering Co Ltd of China Railway 18th Bureau Group Co Ltd
Original Assignee
China Railway 18th Bureau Group Co Ltd
Tunnel Engineering Co Ltd of China Railway 18th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 18th Bureau Group Co Ltd, Tunnel Engineering Co Ltd of China Railway 18th Bureau Group Co Ltd filed Critical China Railway 18th Bureau Group Co Ltd
Priority to CN201520550690.8U priority Critical patent/CN204851270U/en
Application granted granted Critical
Publication of CN204851270U publication Critical patent/CN204851270U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Connection Of Plates (AREA)

Abstract

The utility model provides the reaction frame that starts in the shield formula TBM hole, monomer reaction frame pass through the stock anchor on preparing hole wall to it prepares hole dong bi to sticis through nut, gasket messenger monomer reaction frame, the ji liang welding is on the base, and basic roof beam one end is cantilever structure, the one end welding of cantilever beam is on ji liang's cantilever structure, and the other end of cantilever beam is cantilever structure, the terminal surface welding of cantilever beam has the counter -force board, increase the bracing between counter -force board and the cantilever beam or between counter -force board and the basic roof beam, during the anchorage fixing, each counter -force board is in on the same vertical plane each monomer reaction frame on preparing hole wall. Split type reaction frame has that simple structure, light in weight, structural strength and rigidity are reliable, occupation space is little, make and install convenient characteristics, can practice thrift system ann cost more than 70%.

Description

Start in shield formula TBM hole split type reaction frame
Technical field
The utility model relates in shield formula TBM construction installation, particularly hole the reaction rack equipment that starts.
Background technology
Complete-section tunnel boring machine (TBM) application is more and more wider, and in recent years along with the expansion of construction scale of projects, the change of built environment, shield formula TBM is developed equally.Shield formula TBM completes assembly and adjustment, the operation that starts before starting to tunnel, need a set of reaction frame, for pipe sheet assembling provide support and bear driving (single shield TBM) or change step (double-shielded TBM) time propelling cylinder (single shield TBM) or the counter-force of auxiliary propulsion oil cylinder (double-shielded TBM) pushing tow section of jurisdiction.No matter started outside hole or started in hole in the past, reaction frame was monolithic, and configured large-sized diagonal brace or horizontal support, counter-force was delivered to ground or straight wall, structure bulky, expend steel many, take up room large and inconvenience be installed.
Summary of the invention
The utility model provides in a kind of shield formula TBM hole the reaction frame that starts, have structure simple, lightweight, convenient, that cost is low feature is installed.
The technical solution of the utility model is the reaction frame that starts in a kind of shield formula TBM hole, preparation hole outline line (3) is the outline line of preparation hole Dong Bi (4), the outline line that section of jurisdiction internal diameter profile line (1), section of jurisdiction external diameter outline line (2) are section of jurisdiction, monomer reaction frame (5) is arranged between section of jurisdiction internal diameter profile line (1), section of jurisdiction external diameter outline line (2).Each monomer reaction frame (5) along preparation hole Dong Bi (4) circumferentially;
Monomer reaction frame (5) is anchored in preparation hole Dong Bi (4) by anchor pole (6), and makes monomer reaction frame (5) press preparation hole Dong Bi (4) by nut (7), pad (8).
Monomer reaction frame (5) is made up of reaction plate (9), semi girder (10), Ji Liang (11), pedestal (12) and diagonal brace (13), Ji Liang (11) is welded on pedestal (12), and Ji Liang (11) one end is cantilever construction; One end of semi girder (10) is welded in the cantilever construction of Ji Liang (11), and the other end of semi girder (10) is cantilever construction; The end face weld of semi girder (10) is connected to reaction plate (9); Diagonal brace (13) is provided with between reaction plate (9) and semi girder (10) or between reaction plate (9) and Ji Liang (11).
Each monomer reaction frame (5) is when preparing the upper anchoring of hole Dong Bi (4) and installing, and each reaction plate (9) is on same perpendicular.
The beneficial effects of the utility model: split type reaction frame has that structure is simple, lightweight, structural strength and rigidity reliable, take up room little, make and install feature easily, system peace cost more than 70% can be saved.
Accompanying drawing explanation
Fig. 1 is split type reaction frame distribution map.
Fig. 2 is monomer reaction frame installation drawing.
Fig. 3 is the front view of monomer reaction frame structure.
The left view of Fig. 4 monomer reaction frame structure.
The diagonal brace schematic diagram of Fig. 5 monomer reaction frame structure.
In figure, 1, section of jurisdiction internal diameter profile line; 2, section of jurisdiction external diameter outline line; 3, hole outline line is prepared; 4, hole Dong Bi is prepared; 5, monomer reaction frame; 6, anchor pole; 7, nut; 8, pad; 9, reaction plate; 10, semi girder; 11, Ji Liang; 12, pedestal; 13, diagonal brace.
Detailed description of the invention
As shown in Figure 1-2, preparation hole outline line (3) is the outline line of preparation hole Dong Bi (4), section of jurisdiction internal diameter profile line (1), section of jurisdiction external diameter outline line (2), outline line for section of jurisdiction, monomer reaction frame (5) is arranged between section of jurisdiction internal diameter profile line (1), section of jurisdiction external diameter outline line (2).Each monomer reaction frame (5) along preparation hole Dong Bi (4) circumferentially; Monomer reaction frame (5) is uniformly distributed in preparation hole Dong Bi (4), directly over arrange 1 group, arranged just beneath 2 groups, the left and right sides is arranged symmetrically and evenly, ensure that position corresponding to each block section of jurisdiction all has monomer reaction frame (5) to support simultaneously,, section of jurisdiction piecemeal difference different according to TBM digging diameter, the corresponding adjustment of number needs of monomer reaction frame (5).
Monomer reaction frame (5) is anchored in preparation hole Dong Bi (4) by anchor pole (6), and makes monomer reaction frame (5) press preparation hole Dong Bi (4) with certain pretightning force by nut (7), pad (8).Closely knit between preparation hole Dong Bi (4) and monomer reaction frame (5), cavity and loose media must not be there is, to ensure that the shield formula TBM counter-force that starts is offset by frictional force therebetween, otherwise anchor pole will owing to being cut, bending and lost efficacy, cause reaction frame bulk deformation.
Anchor pole (6) length is not less than 2m, and diameter is not less than 25mm, and concrete specification is determined according to TBM digging diameter, preparation hole wall rock condition, the counter-force that starts.
As in Figure 3-5, monomer reaction frame (5) is made up of reaction plate (9), semi girder (10), Ji Liang (11), pedestal (12) and diagonal brace (13), Ji Liang (11) is welded on pedestal (12), and Ji Liang (11) one end is cantilever construction; One end of semi girder (10) is welded in the cantilever construction of Ji Liang (11), and the other end of semi girder (10) is cantilever construction; The end face weld of semi girder (10) is connected to reaction plate (9); Diagonal brace (13) is increased between reaction plate (9) and semi girder (10) or between reaction plate (9) and Ji Liang (11).
Above-mentioned 5 parts are firmly welded as a whole, and weld seam requires full weld, full, zero defect, and weld bead height is determined according to parent selection and force analysis.
Form each monomer reaction frame (5) of reaction frame system when preparing the upper anchoring of hole Dong Bi (4) and installing, each reaction plate (9) is on same perpendicular.
Pedestal (12) steel plate thickness is not less than 20mm, and the uniform through hole in the left and right sides and rear portion, in order to skyhook (6).Room should ensure that there is suitable spacing at steel plate edge, to guarantee intensity, ensures again to keep suitable spacing, so that clamp nut (7) between Ji Liang (11).
As Fig. 3, Ji Liang (11) and semi girder (10) are advisable with H profile steel, its specification can be determined according to TBM digging diameter, the distance between section of jurisdiction and Dong Bi (4), the TBM counter-force that starts, except the requirement of structural strength, rigidity aspect, the center line of semi girder (10) and reaction plate (9) and section of jurisdiction thickness center line also to be made to be consistent.If because bulk reason cannot choose the shaped steel of appropriate size, Plate Welding can be adopted to become H type or box-structure.
Reaction plate (9) thickness is not less than 20mm, and width is not less than section of jurisdiction thickness, and length is not less than 40cm; Diagonal brace (13) is increased to strengthen structural stability between reaction plate (9) and semi girder (10) or between reaction plate (9) and Ji Liang (11).

Claims (1)

1. start in a shield formula TBM hole reaction frame, it is characterized in that: preparation hole outline line (3) is the outline line of preparation hole Dong Bi (4), the outline line that section of jurisdiction internal diameter profile line (1), section of jurisdiction external diameter outline line (2) they are section of jurisdiction, and monomer reaction frame (5) is arranged between section of jurisdiction internal diameter profile line (1), section of jurisdiction external diameter outline line (2); Each monomer reaction frame (5) along preparation hole Dong Bi (4) circumferentially;
Monomer reaction frame (5) is anchored in preparation hole Dong Bi (4) by anchor pole (6), and makes monomer reaction frame (5) press preparation hole Dong Bi (4) by nut (7), pad (8);
Monomer reaction frame (5) is made up of reaction plate (9), semi girder (10), Ji Liang (11), pedestal (12) and diagonal brace (13), Ji Liang (11) is welded on pedestal (12), and Ji Liang (11) one end is cantilever construction; One end of semi girder (10) is welded in the cantilever construction of Ji Liang (11), and the other end of semi girder (10) is cantilever construction; The end face weld of semi girder (10) is connected to reaction plate (9); Diagonal brace (13) is provided with between reaction plate (9) and semi girder (10) or between reaction plate (9) and Ji Liang (11);
Each monomer reaction frame (5) is when preparing the upper anchoring of hole Dong Bi (4) and installing, and each reaction plate (9) is on same perpendicular.
CN201520550690.8U 2015-07-26 2015-07-26 Split type reaction frame starts in shield formula TBM hole Expired - Fee Related CN204851270U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520550690.8U CN204851270U (en) 2015-07-26 2015-07-26 Split type reaction frame starts in shield formula TBM hole

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520550690.8U CN204851270U (en) 2015-07-26 2015-07-26 Split type reaction frame starts in shield formula TBM hole

Publications (1)

Publication Number Publication Date
CN204851270U true CN204851270U (en) 2015-12-09

Family

ID=54741828

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520550690.8U Expired - Fee Related CN204851270U (en) 2015-07-26 2015-07-26 Split type reaction frame starts in shield formula TBM hole

Country Status (1)

Country Link
CN (1) CN204851270U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105114089A (en) * 2015-07-26 2015-12-02 中铁十八局集团隧道工程有限公司 Split type reaction frame realizing shield launching from working shaft and applied to shield type TBM (tunnel boring machine)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105114089A (en) * 2015-07-26 2015-12-02 中铁十八局集团隧道工程有限公司 Split type reaction frame realizing shield launching from working shaft and applied to shield type TBM (tunnel boring machine)
CN105114089B (en) * 2015-07-26 2017-07-28 中铁十八局集团隧道工程有限公司 Shield formula TBM originates split type reaction frame in hole

Similar Documents

Publication Publication Date Title
CN203430059U (en) Temporary fixing device used for installing large-span steel structure roof primary truss
CN201794079U (en) Foundation pit supporting system
CN105649325B (en) The adjustable tripod support system of assembly concrete shear wall structure and method
CN210603852U (en) Full-assembly type steel structure reaction frame
CN102979108B (en) For locating the location stock of crab-bolt group
CN103276676B (en) Traffic guidance display screen frame
CN205852606U (en) Three dimensions tubular truss assembly moulding bed
CN202718127U (en) Scaffold tube support for underground foundation pit
CN204851270U (en) Split type reaction frame starts in shield formula TBM hole
CN102817617B (en) Novel inhaul cable type shield originating backrest substrate system
CN211006346U (en) Cast-in-place support of side span of dismouting of being convenient for suitable for bridge
CN202671068U (en) Detachable crane seat for tower crane
CN105114089A (en) Split type reaction frame realizing shield launching from working shaft and applied to shield type TBM (tunnel boring machine)
CN214783194U (en) Mountain area superelevation is protected and is led to curve cast-in-place box girder sectional shelf-unit
CN205224272U (en) Steel construction factory building is with structure of encorbelmenting
CN211777451U (en) Shield constructs advance drilling slip casting platform
CN211735418U (en) Fabricated foundation pit upright post underpinning structure
CN104499435A (en) Bracket used for mounting self-anchored suspension bridge splay saddle base
CN103938877B (en) The installation method of crab-bolt stock
CN203822340U (en) Gate-type support frame equipment
CN203308109U (en) External carrying net device
CN203096742U (en) Difunctional supporting hanging plate
CN205907729U (en) Fixed braced system of horizontal load test pile head of directional formula
CN214533013U (en) Interim support reinforcement in tunnel hole
CN217353522U (en) Supporting structure of template for constructing arch structure along with shape

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151209

CF01 Termination of patent right due to non-payment of annual fee