CN205907729U - Fixed braced system of horizontal load test pile head of directional formula - Google Patents

Fixed braced system of horizontal load test pile head of directional formula Download PDF

Info

Publication number
CN205907729U
CN205907729U CN201620919296.1U CN201620919296U CN205907729U CN 205907729 U CN205907729 U CN 205907729U CN 201620919296 U CN201620919296 U CN 201620919296U CN 205907729 U CN205907729 U CN 205907729U
Authority
CN
China
Prior art keywords
support
pile crown
pile head
pin
test
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620919296.1U
Other languages
Chinese (zh)
Inventor
陈涛
唐兆来
关文生
王海新
吴强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Nuclear Engineering Co Ltd
Original Assignee
PowerChina Group Environmental Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Group Environmental Engineering Co Ltd filed Critical PowerChina Group Environmental Engineering Co Ltd
Priority to CN201620919296.1U priority Critical patent/CN205907729U/en
Application granted granted Critical
Publication of CN205907729U publication Critical patent/CN205907729U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The utility model discloses a fixed braced system of horizontal load test pile head of directional formula, including pile head bearing structure and the fixed staple bolt of pile head, pile head bearing structure includes two pin support frames, every pin the support frame includes mutually perpendicular welded support post and supporting beam respectively, the welding of supporting beam bottom has the backup pad, the support post with be provided with between the supporting beam and strengthen propping two pin be provided with between the support frame to connect and prop, the fixed staple bolt of pile head is including supporting connecting portion, connecting portion are supported and an after -fixing portion that is connected with can be dismantled, pile head bearing structure's below is provided with supports foundation structure to and a plurality of rolls set up in pile head bearing structure with support the roller bearing between the foundation structure. The utility model discloses form an independent support framework braced system, not only easy dismounting does benefit to and improves test efficiency, and test data is accurate in addition, can actually reflect the parameter needs on industry basis, satisfies test requirement.

Description

Support system fixed by directional type horizontal loading test pile crown
Technical field
The utility model is related to structure steel fabrication and mounting technique field and in particular to the determining of a kind of pile foundation performance test Fix support system to formula horizontal loading test pile crown.
Background technology
Directional type horizontal loading test is the special test method of horizontal bearing capacity in pile foundation performance test, and major embodiment goes out In the big raft foundation of industrial building project concrete, dummy level stress obtains corresponding test parameters to pile foundation, uses Use bearing requirements to check pile foundation global design and whether meet.And directional type horizontal loading test needs to test pile head 2m Carry out rigidity to fix, free segment is arranged on the fixing point of a firm non-displacement, how using the design of 5m anchoring pile, free segment with solid Pinpoint as slide design, test pressurized rear test pile and be oriented horizontal displacement.But, supporting input fixing complicated due to installing High cost, present situation majority carries out pile foundation level test of bearing capacity using free style horizontal loading test method, and the method is to test Stake carries out destructive testing, obtains maximum displacement.Due to pile crown produced by free state displacement parameter, its data can not be real Border reflects that the parameter of industrial foundation needs, and causes design overload.
Utility model content
Technical problem to be solved in the utility model is to provide a kind of easy disassembly, beneficial to raising test efficiency, satisfaction Support system fixed by the directional type horizontal loading test pile crown of test requirements document.
For solving above-mentioned technical problem, the technical solution of the utility model is: directional type horizontal loading test pile crown is fixed Support system, comprising:
Pile crown supporting construction, including two Pin bracing frames, every Pin support frame as described above includes the support being mutually perpendicular to weld respectively Column and support beam, described support beam has gripper shoe away from one end bottom welding of described support post, and described support is stood It is provided with strengthening support between post and described support beam, between two Pin support frames as described above, be provided with connection support;
Anchor ear fixed by pile crown, is provided with two or more and vertically interval setting, supports knot including with described pile crown The support connecting portion that structure is fixedly connected, described support connecting portion is removably connected with a rear fixed part;
Brace foundation structure, is arranged at the lower section of described pile crown supporting construction;
Roller assembly, is arranged at the rolling between described pile crown supporting construction and described brace foundation structure including some rollings Axle.
As preferred technical scheme, described support beam is welded at the Liang meter position of support post top.
As preferred technical scheme, the stake rear fixed part of the fixing anchor ear of described pile crown is provided with lifting handle.
As preferred technical scheme, described brace foundation structure includes the base board of level laying, on described base board Portion centre position is welded with rigidity buttress.
Due to employing technique scheme, support system fixed by directional type horizontal loading test pile crown, props up including pile crown Support structure, pile crown supporting construction includes two Pin bracing frames, and the support that every Pin support frame as described above includes being mutually perpendicular to weld respectively is stood Post and support beam, described support beam has gripper shoe away from one end bottom welding of described support post, described support post It is provided with strengthening support and described support beam between, between two Pin support frames as described above, be provided with connection support;Anchor ear bag fixed by pile crown Include the support connecting portion being fixedly connected with described pile crown supporting construction, described support connecting portion is fixed after being removably connected with stake Portion;The lower section of described pile crown supporting construction is provided with brace foundation structure, and some rollings are arranged at described pile crown and support knot Roller bearing between structure and described brace foundation structure;The utility model has the advantages that said structure forms one solely Vertical supporting framework support system, not only easy accessibility, beneficial to raising test efficiency, and test data is accurately, can be actual The parameter of reflection industrial foundation needs, and meets test requirements document.
Brief description
The following drawings is only intended to, in the utility model is done with schematic illustration and explanation, not limit model of the present utility model Enclose.Wherein:
Fig. 1 is the structural representation of the utility model embodiment;
Fig. 2 is the structural representation of pile crown supporting construction;
Fig. 3 be in Fig. 2 a-a to structural representation;
Fig. 4 be in Fig. 2 b-b to structural representation;
Fig. 5 be in Fig. 2 c-c to structural representation;
Fig. 6 is the structural representation of brace foundation structure;
Fig. 7 is test instrumentation placement schematic diagram.
In figure:
100- pile crown supporting construction;101- support post;102- support beam;103- gripper shoe;104- first strengthening support; 105- second strengthening support;106- the 3rd strengthening support;107- connects support;
Anchor ear fixed by 200- pile crown;201- supports connecting portion;202- stake rear fixed part;203- lifting handle;
300- brace foundation structure;301- base board;302- buttress;
400- roller assembly;
500- test pile;
601st, 602,603,604- test instrumentation.
Specific embodiment
With reference to the accompanying drawings and examples, the utility model is expanded on further.In the following detailed description, only pass through to say Bright mode describes some one exemplary embodiment of the present utility model.Undoubtedly, those of ordinary skill in the art is permissible Recognize, in the case of without departing from spirit and scope of the present utility model, can by with various different in the way of to described Embodiment is modified.Therefore, accompanying drawing and description are inherently illustrative, rather than for limiting the protection of claim Scope.
As shown in Figures 1 to 7, support system fixed by directional type horizontal loading test pile crown, comprising:
Pile crown supporting construction 100, including two Pin bracing frames, every Pin support frame as described above includes being mutually perpendicular to propping up of welding respectively Support column 101 and support beam 102, can be made using 250mm I-steel, support post 101 height 2.8m, support beam 102 length 3.4m, described support beam 102 vertical welding is at support post 101 top Liang meter position;Described support is horizontal Beam 102 has gripper shoe 103 away from one end bottom welding of described support post 101, and gripper shoe 103 adopts 6mm steel plate;Described It is provided with strengthening support, strengthening support includes the first strengthening support 104, the second strengthening support between support column 101 and described support beam 102 105 and the 3rd strengthening support 106, the first strengthening support 104 adopts 150mm I-steel to connect support post 101 and support beam 102, Angle requires (30 °/60 °/90 °), and link position carries out full weld it is ensured that column is required with the perpendicularity of crossbeam;First strengthening support 104 add the second strengthening support 105 that angle of inclination is 45 ° and vertically disposed 3rd strengthening support 106 with square position, and second adds Strong support the 105, the 3rd strengthening support 106 uses 100mm I-steel;Two Pin support frames as described above are located at pile crown both sides respectively, and middle part is by even Connect support 107 (100mm channel-section steel) to connect, depending on two Pin spacing are by Pile Diameter;
Anchor ear 200 fixed by pile crown, is provided with two or more and vertically interval setting, supports including with described pile crown Structure 100 is fixedly connected the support connecting portion 201 of (as welded), and described support connecting portion 201 is fixed after being removably connected with stake Portion 202;In the present embodiment, steel pipe 1/2nd is cut with diameter steel pipe using 16mm is thick, upper, middle and lower arranges three road bags Hoop, shroud ring width 250mm, spacing is 75cm, and shroud ring thickness of slab is not less than 16mm, after the completion of positioning, is reinforced and stress point props up Support, supports connecting portion 201 to be welded to bracing frame, and stake rear fixed part 202 is passed through high-strength bolt and is connected with support connecting portion 201; In stake rear fixed part 202, lifting handle 203 is installed, and indicates installation direction;
Brace foundation structure 300, is arranged at the lower section of described pile crown supporting construction 100, including the base board of level laying 301,3*6m base board can be adopted, described base board 301 upper middle position is welded with 1.2*1.2m rigidity buttress 302, Pier can be welded side by side using 220 I-steel and make, buttress height 250mm, and top uses the levelling welding of steel plate, after test lays Carry out 2 hours static loads using briquetting;
It is provided with roller assembly 400, this enforcement between described pile crown supporting construction 100 and described brace foundation structure 300 Using 8 50mm*4mm seamless steel pipes as the roller bearing sliding in example.
As shown in figure 1, according to test pile 500 position, carrying out excavating operation;Lay the base board of brace foundation structure 300 301, rigidity buttress 302 is positioned over base board 301 center, away from test pile 500 spacing 3m, center line aligns, levelling rear point It is soldered on base board 301;Place roller assembly 400, perpendicular to test pile orientated axis;Pile crown supporting construction 100 is installed, will prop up Support crossbeam 102 leading portion bottom support plate 103 (steel plate) drops down onto on roller assembly 400, and pile crown supporting construction 100 level is advanced to Test pile position, test pile all snaps in the support connecting portion 201 of the fixing anchor ear 200 of pile crown, installs the stake rear fixed part of anchor ear 202, according to dividing to position, using high-strength bolt, shroud ring is fastened;If any out-of-flatness end by Stake head handling.
As shown in fig. 7, test instrumentation 601 detection stake top gradient, test instrumentation 602 detection stake orientation displacement, tester Table 603 detection of pier foundation lateral displacement, test instrumentation 604 detects support lateral displacement, supports in buttress and the detection of roadbed Board position The sedimentation degree at end.
The foregoing is only the schematic specific embodiment of the utility model, be not limited to model of the present utility model Enclose.Any those skilled in the art, done equivalent change on the premise of without departing from design of the present utility model and principle Change and modification, the scope of the utility model protection all should be belonged to.

Claims (4)

1. the fixing support system of directional type horizontal loading test pile crown is it is characterised in that include:
Pile crown supporting construction, including two Pin bracing frames, every Pin support frame as described above includes the support post being mutually perpendicular to weld respectively And support beam, described support beam has gripper shoe away from one end bottom welding of described support post, described support post and It is provided with strengthening support between described support beam, between two Pin support frames as described above, be provided with connection support;
Anchor ear fixed by pile crown, is provided with two or more and vertically interval setting, including solid with described pile crown supporting construction The fixed support connecting portion connecting, described support connecting portion is removably connected with a rear fixed part;
Brace foundation structure, is arranged at the lower section of described pile crown supporting construction;
Roller assembly, is arranged at the roller bearing between described pile crown supporting construction and described brace foundation structure including some rollings.
2. the fixing support system of directional type horizontal loading test pile crown as claimed in claim 1 it is characterised in that: described support Beam welding is at the Liang meter position of support post top.
3. the fixing support system of directional type horizontal loading test pile crown as claimed in claim 1 it is characterised in that: described pile crown It is provided with lifting handle in the stake rear fixed part of fixing anchor ear.
4. the fixing support system of directional type horizontal loading test pile crown as described in claim 1,2 or 3 it is characterised in that: institute State the base board that brace foundation structure includes level laying, described base board upper middle position is welded with rigidity buttress.
CN201620919296.1U 2016-08-23 2016-08-23 Fixed braced system of horizontal load test pile head of directional formula Active CN205907729U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620919296.1U CN205907729U (en) 2016-08-23 2016-08-23 Fixed braced system of horizontal load test pile head of directional formula

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620919296.1U CN205907729U (en) 2016-08-23 2016-08-23 Fixed braced system of horizontal load test pile head of directional formula

Publications (1)

Publication Number Publication Date
CN205907729U true CN205907729U (en) 2017-01-25

Family

ID=57801410

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620919296.1U Active CN205907729U (en) 2016-08-23 2016-08-23 Fixed braced system of horizontal load test pile head of directional formula

Country Status (1)

Country Link
CN (1) CN205907729U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113737871A (en) * 2021-09-17 2021-12-03 中建八局第二建设有限公司 Device and method for preventing rotation generated in pile horizontal thrust test

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113737871A (en) * 2021-09-17 2021-12-03 中建八局第二建设有限公司 Device and method for preventing rotation generated in pile horizontal thrust test

Similar Documents

Publication Publication Date Title
CN102051858B (en) Jack loading triangular truss hanging basket and load test construction method thereof
CN103643800B (en) The erection & lift system of buckling-restrained bracing member and construction method thereof
CN103452053A (en) Anti-overturning reinforcing device of single-column-pier bridge
CN204738324U (en) Clump of piles basis single pile vertical bearing capacity detecting system
CN103982045A (en) Installation construction method of roof lattice shell structure without supports and cantilevers
CN103437279B (en) Overhead cast-in-place box compression struts and construction technology thereof
CN204849607U (en) A continuous beam string basket pre -compaction device for bridge construction
CN109898821B (en) Construction method of high-altitude cantilever formwork support frame body
CN201850669U (en) Spatial accurate positioning support of vibration isolating device
CN115467421A (en) Hoisting construction method for complex large-span steel roof
CN209799167U (en) Pre-buried column base reinforcing system
CN205907729U (en) Fixed braced system of horizontal load test pile head of directional formula
CN206829210U (en) A kind of small tonnage single pile pullout tests system
CN202809494U (en) Bracket for pouring 0# block to rigid continuous girder bridge
CN211006346U (en) Cast-in-place support of side span of dismouting of being convenient for suitable for bridge
CN209194354U (en) High-altitude long-span binder base-supporting shellfish thunder support construction
CN116770980A (en) Ultra-long variable-height V-shaped large-span steel structure corridor and construction method thereof
CN108951864B (en) Replacement support and supporting structure of reticulated shell structure
CN103174300B (en) Viscous damper installation construction method
CN216040719U (en) Template support cantilever bearing structure
CN214832743U (en) Stable supporting foundation pit supporting structure
CN201901847U (en) Jack loading triangular truss hanging basket
CN204715362U (en) A kind of deep foundation ditch embedded column base bracing frame
CN204689525U (en) A kind of equipment jacking apparatus being convenient to measure
CN112411358B (en) Concrete protective layer control positioning device at pier joint and construction process

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 250100 No. 297 industrial North Road, Licheng District, Shandong, Ji'nan

Patentee after: POWERCHINA NUCLEAR ENGINEERING Co.,Ltd.

Address before: 250100 No. 297 industrial North Road, Licheng District, Shandong, Ji'nan

Patentee before: POWERCHINA NUCLEAR ENGINEERING Co.

CP01 Change in the name or title of a patent holder