CN105114089B - Shield formula TBM originates split type reaction frame in hole - Google Patents

Shield formula TBM originates split type reaction frame in hole Download PDF

Info

Publication number
CN105114089B
CN105114089B CN201510443058.8A CN201510443058A CN105114089B CN 105114089 B CN105114089 B CN 105114089B CN 201510443058 A CN201510443058 A CN 201510443058A CN 105114089 B CN105114089 B CN 105114089B
Authority
CN
China
Prior art keywords
reaction frame
liang
hole
jurisdiction
section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510443058.8A
Other languages
Chinese (zh)
Other versions
CN105114089A (en
Inventor
齐梦学
高振宅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 18th Bureau Group Co Ltd
Tunnel Engineering Co Ltd of China Railway 18th Bureau Group Co Ltd
Original Assignee
China Railway 18th Bureau Group Co Ltd
Tunnel Engineering Co Ltd of China Railway 18th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 18th Bureau Group Co Ltd, Tunnel Engineering Co Ltd of China Railway 18th Bureau Group Co Ltd filed Critical China Railway 18th Bureau Group Co Ltd
Priority to CN201510443058.8A priority Critical patent/CN105114089B/en
Publication of CN105114089A publication Critical patent/CN105114089A/en
Application granted granted Critical
Publication of CN105114089B publication Critical patent/CN105114089B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

Originate reaction frame in a kind of shield formula TBM holes, monomer reaction frame on the wall of preparation hole hole, and makes monomer reaction frame press prepared hole Dong Bi by anchor rod anchored by nut, pad;Ji Liang is welded on pedestal, and Ji Liang one end is cantilever design;One end of cantilever beam is welded in Ji Liang cantilever design, and the other end of cantilever beam is cantilever design;The end face of cantilever beam is welded with reaction plate;Increase diagonal brace between reaction plate and cantilever beam or between reaction plate and base beam;When each monomer reaction frame anchors installation on the wall of preparation hole hole, each reaction plate is on same perpendicular.Split type reaction frame has that simple in construction, lightweight, structural strength and rigidity are reliable, occupied little space, making and the characteristics of install convenient, can save system peace cost more than 70%.

Description

Shield formula TBM originates split type reaction frame in hole
Technical field
The present invention relates to shield formula TBM construction installations, particularly reaction rack equipment is originated in hole.
Background technology
Complete-section tunnel boring machine (TBM) application is more and more wider, expansion, construction ring recently as construction scale of projects The change in border, shield formula TBM is equally developed.Shield formula TBM completes assembly and adjustment, and process is originated before starting driving, A set of reaction frame is needed, is provided for pipe sheet assembling and is supported and undertake driving (single shield TBM) or pushed away when changing step (double-shielded TBM) Enter the counter-force of oil cylinder (single shield TBM) or auxiliary propulsion oil cylinder (double-shielded TBM) pushing tow section of jurisdiction.No matter originated outside conventional hole or Originated in hole, reaction frame is monoblock type, and configure large-sized diagonal brace or horizontal support, counter-force is delivered to ground or perpendicular Wall, structure bulky, consuming steel are more, space-consuming is big and install inconvenience.
The content of the invention
The invention provides originating reaction frame in a kind of shield formula TBM holes, with simple in construction, lightweight, install convenient, The characteristics of cost is low.
The technical scheme is that originating reaction frame in a kind of shield formula TBM holes, preparation hole contour line (3) is preparation hole The contour line of hole wall (4), section of jurisdiction internal diameter contour line (1), section of jurisdiction external diameter contour line (2) are the contour line of section of jurisdiction, monomer reaction frame (5) it is arranged between section of jurisdiction internal diameter contour line (1), section of jurisdiction external diameter contour line (2).Each monomer reaction frame (5) along preparation hole Dong Bi (4) circumferentially;
Monomer reaction frame (5) is anchored on prepared hole Dong Bi (4) by anchor pole (6), and passes through nut (7), pad (8) Monomer reaction frame (5) is set to press prepared hole Dong Bi (4).
Monomer reaction frame (5) is made up of reaction plate (9), cantilever beam (10), Ji Liang (11), pedestal (12) and diagonal brace (13), Ji Liang (11) is welded on pedestal (12), and Ji Liang (11) one end is cantilever design;One end of cantilever beam (10) is welded on Ji Liang (11) in cantilever design, the other end of cantilever beam (10) is cantilever design;The end face of cantilever beam (10) is welded with reaction plate (9);Diagonal brace (13) is provided between reaction plate (9) and cantilever beam (10) or between reaction plate (9) and Ji Liang (11).
When each monomer reaction frame (5) anchors installation on preparation hole Dong Bi (4), each reaction plate (9) is in same vertical flat On face.
Beneficial effects of the present invention:Split type reaction frame have simple in construction, lightweight, structural strength and rigidity it is reliable, Occupy little space, make and the characteristics of install convenient, system peace cost more than 70% can be saved.
Brief description of the drawings
Fig. 1 is split type reaction frame distribution map.
Fig. 2 is monomer reaction frame installation diagram.
Fig. 3 is the front view of monomer reaction frame structure.
The left view of Fig. 4 monomer reaction frame structures.
The diagonal brace schematic diagram of Fig. 5 monomer reaction frame structures.
In figure, 1, section of jurisdiction internal diameter contour line;2nd, section of jurisdiction external diameter contour line;3rd, preparation hole contour line;4th, preparation hole Dong Bi;5、 Monomer reaction frame;6th, anchor pole;7th, nut;8th, pad;9th, reaction plate;10th, cantilever beam;11st, Ji Liang;12nd, pedestal;13rd, diagonal brace.
Embodiment
As shown in Figure 1-2, the contour line that prepared hole contour line (3) is preparation hole Dong Bi (4), section of jurisdiction internal diameter contour line (1), Section of jurisdiction external diameter contour line (2), the contour line for section of jurisdiction, monomer reaction frame (5) is outside section of jurisdiction internal diameter contour line (1), section of jurisdiction Between footpath contour line (2).Each monomer reaction frame (5) along preparation hole Dong Bi (4) circumferentially;Monomer reaction frame (5) is in preparation hole Hole wall is uniformly distributed on (4), 1 group of surface arrangement, 2 groups of arranged just beneath, and the left and right sides is symmetrically and evenly arranged, while ensureing every There is monomer reaction frame (5) support the corresponding position in one piece of section of jurisdiction, different according to TBM digging diameters difference, section of jurisdiction piecemeal, monomer The quantity of reaction frame (5) need to be adjusted accordingly.
Monomer reaction frame (5) is anchored on prepared hole Dong Bi (4) by anchor pole (6), and passes through nut (7), pad (8) Monomer reaction frame (5) is set to press prepared hole Dong Bi (4) with certain pretightning force.Preparation hole Dong Bi (4) and monomer reaction frame (5) it Between it is closely knit, must not exist cavity and loose media, with ensure shield formula TBM originate counter-force by therebetween frictional force offset, it is no Then anchor pole will fail due to being cut, bent, and cause reaction frame overall deformation.
Anchor pole (6) length is not less than 2m, and diameter is not less than 25mm, and The concrete specification is according to TBM digging diameters, preparation hole country rock Condition, originate counter-force determination.
As in Figure 3-5, monomer reaction frame (5) by reaction plate (9), cantilever beam (10), Ji Liang (11), pedestal (12) and tiltedly (13) composition is supportted, Ji Liang (11) is welded on pedestal (12), Ji Liang (11) one end is cantilever design;One end weldering of cantilever beam (10) In the cantilever design for being connected on Ji Liang (11), the other end of cantilever beam (10) is cantilever design;The end face of cantilever beam (10) is welded with Reaction plate (9);Increase diagonal brace (13) between reaction plate (9) and cantilever beam (10) or between reaction plate (9) and Ji Liang (11).
Above-mentioned 5 parts are firmly welded as a whole, level weld seam requirement full weld, full, zero defect, and weld bead height is according to mother Body selection and force analysis are determined.
When each monomer reaction frame (5) for constituting reaction frame system anchors installation on preparation hole Dong Bi (4), each reaction plate (9) on same perpendicular.
Pedestal (12) steel plate thickness is not less than 20mm, the uniform through hole in the left and right sides and rear portion, to install anchor pole (6).It is empty Position should ensure that there is appropriate spacing at steel plate edge, to ensure intensity, ensure to keep appropriate spacing between Ji Liang (11) again, In order to clamp nut (7).
Such as Fig. 3, Ji Liang (11) and cantilever beam (10) are advisable with H profile steel, its specification can according to TBM digging diameters, section of jurisdiction and The distance between hole wall (4), TBM originate counter-force determination, in addition to the requirement in terms of structural strength, rigidity, also to make cantilever beam (10) it is consistent with the center line of reaction plate (9) with section of jurisdiction thickness center line.If because bulk reason can not choose conjunction The shaped steel of suitable specification, can be welded into H types or box-structure using steel plate.
Reaction plate (9) thickness is not less than 20mm, and width is not less than section of jurisdiction thickness, and length is not less than 40cm;Reaction plate (9) and Increase diagonal brace (13) between cantilever beam (10) or between reaction plate (9) and Ji Liang (11) with enhancing structure stability.

Claims (1)

1. shield formula TBM originates reaction frame in hole, it is characterised in that:Preparation hole contour line (3) is preparation hole Dong Bi (4) profile Line, section of jurisdiction internal diameter contour line (1), section of jurisdiction external diameter contour line (2) are the contour line of section of jurisdiction, and monomer reaction frame (5) is arranged on section of jurisdiction Between internal diameter profile line (1), section of jurisdiction external diameter contour line (2);Each monomer reaction frame (5) along preparation hole Dong Bi (4) circumferentially;
Monomer reaction frame (5) is anchored on prepared hole Dong Bi (4) by anchor pole (6), and makes list by nut (7), pad (8) Body reaction frame (5) presses prepared hole Dong Bi (4);
Monomer reaction frame (5) is made up of reaction plate (9), cantilever beam (10), Ji Liang (11), pedestal (12) and diagonal brace (13), Ji Liang (11) it is welded on pedestal (12), Ji Liang (11) one end is cantilever design;One end of cantilever beam (10) is welded on Ji Liang's (11) In cantilever design, the other end of cantilever beam (10) is cantilever design;The end face of cantilever beam (10) is welded with reaction plate (9);Counter-force Diagonal brace (13) is provided between plate (9) and cantilever beam (10) or between reaction plate (9) and Ji Liang (11);
When each monomer reaction frame (5) anchors installation on preparation hole Dong Bi (4), each reaction plate (9) is on same perpendicular;
Monomer reaction frame (5) is uniformly distributed on preparation hole Dong Bi (4), and 1 group, 2 groups of arranged just beneath, left and right two are arranged in surface Side is symmetrically and evenly arranged, while ensureing that there is monomer reaction frame (5) support the corresponding position in each piece of section of jurisdiction, is excavated according to TBM Diameter is different, section of jurisdiction piecemeal is different, and the quantity of monomer reaction frame (5) need to be adjusted accordingly.
CN201510443058.8A 2015-07-26 2015-07-26 Shield formula TBM originates split type reaction frame in hole Active CN105114089B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510443058.8A CN105114089B (en) 2015-07-26 2015-07-26 Shield formula TBM originates split type reaction frame in hole

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510443058.8A CN105114089B (en) 2015-07-26 2015-07-26 Shield formula TBM originates split type reaction frame in hole

Publications (2)

Publication Number Publication Date
CN105114089A CN105114089A (en) 2015-12-02
CN105114089B true CN105114089B (en) 2017-07-28

Family

ID=54662175

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510443058.8A Active CN105114089B (en) 2015-07-26 2015-07-26 Shield formula TBM originates split type reaction frame in hole

Country Status (1)

Country Link
CN (1) CN105114089B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108035718B (en) * 2017-11-24 2019-03-05 上海市基础工程集团有限公司 Locking device is leaned on after tunnel inner ring type

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6724000B2 (en) * 2002-05-16 2004-04-20 Nikon Corporation Reaction frame apparatus and method
CN103375171A (en) * 2013-07-18 2013-10-30 中铁隧道集团有限公司 Counterforce frame in shield hole
CN103953353A (en) * 2014-04-23 2014-07-30 中铁十五局集团有限公司 Shield launching counter-force frame and installation and use method thereof
CN204327103U (en) * 2014-12-12 2015-05-13 中铁十一局集团城市轨道工程有限公司 A kind of reaction frame started for tunneling shield
CN204851270U (en) * 2015-07-26 2015-12-09 中铁十八局集团隧道工程有限公司 Split type reaction frame starts in shield formula TBM hole

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6724000B2 (en) * 2002-05-16 2004-04-20 Nikon Corporation Reaction frame apparatus and method
CN103375171A (en) * 2013-07-18 2013-10-30 中铁隧道集团有限公司 Counterforce frame in shield hole
CN103953353A (en) * 2014-04-23 2014-07-30 中铁十五局集团有限公司 Shield launching counter-force frame and installation and use method thereof
CN204327103U (en) * 2014-12-12 2015-05-13 中铁十一局集团城市轨道工程有限公司 A kind of reaction frame started for tunneling shield
CN204851270U (en) * 2015-07-26 2015-12-09 中铁十八局集团隧道工程有限公司 Split type reaction frame starts in shield formula TBM hole

Also Published As

Publication number Publication date
CN105114089A (en) 2015-12-02

Similar Documents

Publication Publication Date Title
CN201794079U (en) Foundation pit supporting system
CN204327103U (en) A kind of reaction frame started for tunneling shield
CN104294828B (en) A kind of foundation pit supporting construction
CN204959771U (en) Prestressing force H shaped steel bearing structure
CN204731107U (en) A kind of high-altitude straight wall anchor pole pulling resistance testing device
CN104929148B (en) The upside-down mounting hardened system of generation power foundation of wind power ring group plinth and reinforcement means thereof
CN205242885U (en) Lightweight concrete prefabricated staircase connection structure
CN103470018A (en) Detachable converter tooling platform
CN105114089B (en) Shield formula TBM originates split type reaction frame in hole
CN204780622U (en) Girder 0# piece construction bracket
CN103628408B (en) The construction method of bridge cast in place concrete form Eight characters bracing frame
CN203822315U (en) Shield launching reaction frame
CN101614304B (en) Fixing force transfer bracket for thermodynamic pipe in thermodynamic shield tunnel
CN202671068U (en) Detachable crane seat for tower crane
CN204851270U (en) Split type reaction frame starts in shield formula TBM hole
CN203546618U (en) Splayed supporting frame for bridge cast-in-place concrete formwork
CN204084762U (en) A kind of cross arm type fixed support for heavy caliber air-conditioning standpipe
KR101491048B1 (en) Supporting structure for underground external wall using double layer wale and truss combined strut
CN205224272U (en) Steel construction factory building is with structure of encorbelmenting
CN213775409U (en) Double-arch ring loess cave dwelling supporting device
CN205077493U (en) Steel sheet pile is strutted inside steel pipe and is supported telescopic joint
CN201474702U (en) Heating pipeline-fixing force transfer support of heating shield tunnel
CN104278681B (en) A kind of supporting component of foundation ditch backplate
CN204575311U (en) Railway T-beam static test truss
CN210857492U (en) Fabricated building structure system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant