CN201580857U - 新型丈量盘 - Google Patents
新型丈量盘 Download PDFInfo
- Publication number
- CN201580857U CN201580857U CN2010203021539U CN201020302153U CN201580857U CN 201580857 U CN201580857 U CN 201580857U CN 2010203021539 U CN2010203021539 U CN 2010203021539U CN 201020302153 U CN201020302153 U CN 201020302153U CN 201580857 U CN201580857 U CN 201580857U
- Authority
- CN
- China
- Prior art keywords
- handle
- axis
- centre shaft
- sleeve
- movable
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Sampling And Sample Adjustment (AREA)
Abstract
本实用新型公开了一种新型丈量盘,包括中轴、连接在中轴底端的挡板,固定在挡板底部的接头,中轴、挡板与接头连为一体,在中轴的顶端设有一个手柄,在手柄的底部连接有两个偏心块,偏心块对称于中轴的轴心分布在中轴的两侧,在手柄上设有锁紧销;在挡板上设有两片活动盘心,在活动盘心内侧设有两个轴承座,在活动盘心的顶部外侧设有斜槽,在活动盘心的顶部设有内圈能卡在斜槽内的活动挡板。本实用新型采用了在丈量盘的中轴上设置偏心块的结构,使盘心的直径可变,通过盘心直径的改变来实现盘线与取线,并极大的简化取下与安装活动挡板所需要的操作,减少了工人的劳动强度,从而有效的提高了生产效率。本实用新型结构简单,容易制作,使用效果好。
Description
技术领域
本实用新型涉及一种丈量盘,尤其是一种新型丈量盘。
背景技术
丈量机作为生产电线、电缆产品企业的专用设备,是一种半自动的放线、收线、成盘的装置,而丈量盘则是丈量机的主要部件之一,其构造原理采取电动的螺旋式的轴盘,绕线盘心的叶片分为三片,在绕组成圈完成后,要取下盘好的电线、电缆等需要将挡板旋下,比较费时、费力,操作工的劳动强度比较大,工作效率不高。因此现有的丈量盘的特性和操作的实际情况,已影响了企业生产效益,以及设备运行效果。
实用新型内容
本实用新型的目的是:提供一种新型丈量盘,它可以快速取下盘好的电线、电缆,有效的提高了工作效率,减少了劳动强度,以克服现有技术的不足。
本实用新型是这样实现的:新型丈量盘,包括中轴、连接在中轴底端的挡板,固定在挡板底部的接头,中轴、挡板与接头连为一体,在中轴的顶端设有一个手柄,在手柄的底部连接有两个偏心块,偏心块对称于中轴的轴心分布在中轴的两侧,在手柄上设有锁紧销;在挡板上固定有两片活动盘心,在活动盘心内侧设有两个轴承座,在活动盘心的顶部外侧设有斜槽,在活动盘心的顶部设有内圈能卡在斜槽内的活动挡板。
偏心块的内侧固定在一个套筒上,套筒套在中轴上,偏心块通过套筒与手柄连接。
在手柄的内侧底部设有一个固定在中轴上的固定片,在固定片上设有两个位置与轴承座对应的卡槽,锁紧销与偏心块的位置对应,在手柄的底部设有卡块,在套筒的顶部设有滑槽,卡块安装在滑槽中;在锁紧销的底部连接有弹簧,弹簧的底部固定在套筒上。
在套筒底部设有两个限位槽,在轴承座底部设有销钉,销钉落在限位槽中。
由于采用了上述技术方案,与现有技术相比,本实用新型采用了在丈量盘的中轴上设置偏心块的结构,使盘心的直径可变,通过盘心直径的改变来实现盘线与取线,并极大的简化取下与安装活动挡板所需要的操作,减少了工人的劳动强度,从而有效的提高了生产效率。
本实用新型结构简单,容易制作,使用效果好。
附图说明
附图1为本实用新型的结构示意图;
附图2为附图1的A-A剖视图;
附图3为附图1的B-B剖视图;
附图4为附图1的C-C剖视图;
附图5为活动盘心收拢时的结构示意图。
具体实施方式
本实用新型的实施例:新型丈量盘的结构如图1所示,制作一根中轴1,在中轴1底端焊接挡板2,在挡板2底部安装上接头3,使中轴1、挡板2与接头3连为一体,在中轴1的顶端安装一个手柄4,在手柄4的侧面装上两根锁紧销6,在中轴1的对应位置上固定一个固定片12,在固定片12上开设有两个卡槽13,锁紧销6可以在卡槽13中上下移动;在手柄4的下部制作出两个卡块14,并制作一个能套住中轴1的套筒11,在套筒11外侧焊接两个中心对称的偏心块5,偏心块5的位置与锁紧销6对应,在套筒11上部设有两个卡槽13,将手柄4的下部的卡块14装入卡槽13中,在套筒11底部焊接两个限位槽17;在挡板2上安装上两片活动盘心8,每片活动盘心8的一端都通过转销固定在挡板2上,并在活动盘心8内侧焊接上两个轴承座10,轴承座10与卡槽13的位置对应,在轴承座10底部设有销钉18,销钉18落在限位槽17中;在活动盘心8的顶部外侧制作出斜槽7,制作一个内圈能卡在斜槽7内的活动挡板9;最后在锁紧销6的底部与套筒11之间安装上弹簧16。
在使用时,将接头3与电机的输出轴连接,并将活动挡板9放置在活动盘心8上,通过旋转手柄4使偏心块5转动,旋转到偏心块5将轴承座10完全顶起的位置上(如图2所示),此时手柄4的锁紧销6与固定片12上的卡槽13对应,在弹簧16的作用力下,锁紧销6被顶入卡槽13中(如图4所示),使手柄无法转动;此时,活动盘心8的直径被顶至最大,活动挡板9被卡紧在斜槽7中无法移动,这样启动电机就可以实现盘线工作。当盘线完成后,将手柄4推向套筒11,使锁紧销6脱出卡槽13中,再反向转动手柄4,使偏心块5完全离开轴承座10的内侧(如图5所示),由于在轴承座10底部的销钉18落在套筒11底部的限位槽17中,限位槽17具有限位并导向的作用,因此轴承座10会向内圈移动,从而使活动盘心8的直径减至最小,这时活动挡板9的内圈直径大于斜槽7,因此就可以取下活动挡板9以及活动盘心8上所盘的电线、电缆。
本实用新型的结构整体连动性好,上下连动只需要1秒左右,产品成圈的时间也很快,不到30秒就成圈每圈100M,极大地提高生产效率,由于简化了取下活动挡板9的方式,与现有的螺纹连接形式的挡板相比,活动挡板9的安装与取下所需要的时间少,工作量小,能有效的提高工作效率,并且由于活动盘心8只有两片,与传统的盘心相比,方便了生产与组装。
Claims (4)
1.一种新型丈量盘,包括中轴(1)、连接在中轴(1)底端的挡板(2),固定在挡板(2)底部的接头(3),中轴(1)、挡板(2)与接头(3)连为一体,其特征在于:在中轴(1)的顶端设有一个手柄(4),在手柄(4)的底部连接有两个偏心块(5),偏心块(5)对称于中轴(1)的轴心分布在中轴(1)的两侧,在手柄(4)上设有锁紧销(6);在挡板(2)上设有两片活动盘心(8),在活动盘心(8)内侧设有两个轴承座(10),在活动盘心(8)的顶部外侧设有斜槽(7),在活动盘心(8)的顶部设有内圈能卡在斜槽(7)内的活动挡板(9)。
2.根据权利要求1所述的新型丈量盘,其特征在于:偏心块(5)的内侧固定在一个套筒(11)上,套筒(11)套在中轴(1)上,偏心块(5)通过套筒(11)与手柄(4)连接。
3.根据权利要求2所述的新型丈量盘,其特征在于:在手柄(4)的内侧底部设有一个固定在中轴(1)上的固定片(12),在固定片(12)上设有两个位置与轴承座(10)对应的卡槽(13),锁紧销(6)与偏心块(5)的位置对应,在手柄(4)的底部设有卡块(14),在套筒(11)的顶部设有滑槽(15),卡块(14)安装在滑槽(15)中;在锁紧销(6)的底部连接有弹簧(16),弹簧(16)的底部固定在套筒(11)上。
4.根据权利要求2所述的新型丈量盘,其特征在于:在套筒(11)底部设有两个限位槽(17),在轴承座(10)底部设有销钉(18),销钉(18)落在限位槽(17)中。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010203021539U CN201580857U (zh) | 2010-02-02 | 2010-02-02 | 新型丈量盘 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010203021539U CN201580857U (zh) | 2010-02-02 | 2010-02-02 | 新型丈量盘 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201580857U true CN201580857U (zh) | 2010-09-15 |
Family
ID=42722853
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010203021539U Expired - Lifetime CN201580857U (zh) | 2010-02-02 | 2010-02-02 | 新型丈量盘 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201580857U (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103058025A (zh) * | 2013-01-15 | 2013-04-24 | 上海广树机电有限公司 | 弹簧涨缩式圆柱形打扎头 |
CN111204615A (zh) * | 2020-01-07 | 2020-05-29 | 姜兴安 | 一种油水井管线穿孔器 |
CN112158680A (zh) * | 2020-10-21 | 2021-01-01 | 中国南方电网有限责任公司超高压输电公司曲靖局 | 一种换流站接地线盘线器 |
-
2010
- 2010-02-02 CN CN2010203021539U patent/CN201580857U/zh not_active Expired - Lifetime
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103058025A (zh) * | 2013-01-15 | 2013-04-24 | 上海广树机电有限公司 | 弹簧涨缩式圆柱形打扎头 |
CN103058025B (zh) * | 2013-01-15 | 2015-04-22 | 上海广树机电有限公司 | 弹簧涨缩式圆柱形打扎头 |
CN111204615A (zh) * | 2020-01-07 | 2020-05-29 | 姜兴安 | 一种油水井管线穿孔器 |
CN111204615B (zh) * | 2020-01-07 | 2021-01-05 | 姜兴安 | 一种油水井管线穿孔器 |
CN112158680A (zh) * | 2020-10-21 | 2021-01-01 | 中国南方电网有限责任公司超高压输电公司曲靖局 | 一种换流站接地线盘线器 |
CN112158680B (zh) * | 2020-10-21 | 2023-03-14 | 中国南方电网有限责任公司超高压输电公司曲靖局 | 一种换流站接地线盘线器 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108516419A (zh) | 一种机械涨紧式通信电缆收卷装置 | |
CN208201460U (zh) | 一种钢丝绳的捻股装置 | |
CN201825596U (zh) | 一种自动排线收线机 | |
CN201580857U (zh) | 新型丈量盘 | |
CN204189519U (zh) | 多层同心绞合用管式绞线机 | |
CN103401382B (zh) | 电机定子拉线机 | |
CN203434821U (zh) | 电机定子拉线机 | |
CN104494774A (zh) | 遥控齿轮离合双驱动高速无刷大轮毂电机 | |
CN211248538U (zh) | 一种新能源锂电池薄壁铝壳生产自动用切管机 | |
CN111762628A (zh) | 一种新能源汽车充电桩电缆线盘线装置 | |
CN203368170U (zh) | 分体式转子 | |
CN211496388U (zh) | 一种电缆生产用的自动收卷设备 | |
CN217920857U (zh) | 电源线自动绕扎机 | |
CN201447260U (zh) | 一种快速膨胀式涨紧线盘装置 | |
CN210223676U (zh) | 一种线缆生产加工用成缆机 | |
CN205194424U (zh) | 一种具有连续生产能力的成缆机 | |
CN221165374U (zh) | 一种电子线束绕卷装置 | |
CN201430512Y (zh) | 转盘式整形块缩放机构 | |
CN211413204U (zh) | 一种适用于电线电缆的拉丝机的收线装置 | |
CN201498924U (zh) | 一种电缆主绝缘层倒角器 | |
CN215364306U (zh) | 一种电力工程线路安装放线装置 | |
CN216957582U (zh) | 一种电力电缆线芯绞线分线装置 | |
CN220702921U (zh) | 一种电缆立式卷盘 | |
CN214125103U (zh) | 电机定子绕组绕线机构 | |
CN205132507U (zh) | 一种电源线收集装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20190418 Address after: 550025 West Side of Guihui Road, Fengbaoyun Village, Guiyang Economic and Technological Development Zone, Guizhou Province Patentee after: Guizhou Yudi Electrical Co., Ltd. Address before: 550048 No. 1 Jinzhu Town, Guiyang City, Guizhou Province Patentee before: Guiyang Electric Wire Works Co., Ltd. |
|
CX01 | Expiry of patent term | ||
CX01 | Expiry of patent term |
Granted publication date: 20100915 |