CN201567164U - Large-span self-propelled tower crane - Google Patents

Large-span self-propelled tower crane Download PDF

Info

Publication number
CN201567164U
CN201567164U CN2009200465910U CN200920046591U CN201567164U CN 201567164 U CN201567164 U CN 201567164U CN 2009200465910 U CN2009200465910 U CN 2009200465910U CN 200920046591 U CN200920046591 U CN 200920046591U CN 201567164 U CN201567164 U CN 201567164U
Authority
CN
China
Prior art keywords
dolly
truss
bearing pin
tie
propelled
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2009200465910U
Other languages
Chinese (zh)
Inventor
王楓
王建军
王厚贞
周生玉
王铁柱
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xuzhou Construction Machinery Group Co Ltd XCMG
Original Assignee
Xuzhou Construction Machinery Group Co Ltd XCMG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xuzhou Construction Machinery Group Co Ltd XCMG filed Critical Xuzhou Construction Machinery Group Co Ltd XCMG
Priority to CN2009200465910U priority Critical patent/CN201567164U/en
Application granted granted Critical
Publication of CN201567164U publication Critical patent/CN201567164U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a large-span self-propelled tower crane which is specially designed and manufactured for Shanghai World Expo, wherein a traveling device of the tower crane consists of two truss girders with 36-m span and a truss girder connecting component; a traveling chassis comprises a rack and a driving trolley and a driven trolley arranged at the lower end of the rack; the rack consists of two groups of parallel truss girders which are inverted equilateral triangular trusses; and each group of truss girders is formed by connecting the end sections of two truss girders and the middle section of one truss girder through flanges and bolts. The upper end of the middle section of the truss girder is hinged with the groined aircraft base, two ends of the end section of the truss girder are hinged with the trolley connecting beam; and the outer end of the trolley connecting beam is provided with a rail clamping device.

Description

Degree of collapsing self-propelled tower crane greatly
Technical field
The utility model relates to a kind of vehicle for construction, is specifically related to degree of collapsing self-propelled tower crane greatly.
Background technology
The self-propelled tower crane is a building engineering operation crane hoisting equipment commonly used, but the self-propelled tower crane that uses at present, the degree of collapsing of its two tracks is less, generally can be above 8~10 meters.Building operation for 10 meters and above width can't be used, more than 30 meter of the width of Shanghai World's Fair project, and the roofing construction, tower machine on the market all can't operation.
Summary of the invention
In order to address the above problem, the utility model provides a kind of self-propelled of degree of collapsing greatly tower crane, it is that our company aims at the large span walking tower crane that the Shanghai World's Fair Project design is made, its running gear assembly satisfies the roofing construction of Shanghai World's Fair project by the truss girder and the truss girder transom of two 36 meters spans.
The utility model is achieved by the following technical solution: a kind of self-propelled of degree of collapsing greatly tower crane comprises: be laid on ground or built on stilts skyborne two tracks, in orbit walking chassis assembly is set, be fixed on walking chassis assembly top the body of the tower standard knot, be fixed on slewing tower on the body of the tower standard knot, be arranged on operator's compartment, crane arm, walking dolly and suspension hook, equilibrium arm and support pull rod device on the slewing tower; Described walking chassis assembly comprises frame and is arranged on the active dolly of frame lower end, driven dolly; It is characterized in that: described frame comprises: two groups of truss girderes that are parallel to each other, connect two groups of truss girderes truss lower edge pipe link, be arranged on the truss girder two ends the dolly tie-beam, connect two dolly tie-beams the moving dolly pipe link of principal and subordinate, connect the rail clamping device of dolly tie-beam and track.
Described truss girder is inverted equilateral triangle truss, and every group of truss girder forms by flange, bolted connection by saving in two truss beam-ends joints and the truss girder; The middle part of joint upper end is hinged by four groups of well cabinet frame Connection Blocks, bearing pin I and four jiaos of well cabinet frame bases in the described truss girder; Described truss beam-ends joint two ends are by chassis Connection Block, bearing pin III and the hinge joint of dolly tie-beam; Two adjacent dolly tie-beams, wherein a lower end is provided with one group of initiatively dolly and one group of driven dolly, and another part dolly tie-beam lower end is provided with two groups of driven dollies, and the outer end of dolly tie-beam is provided with rail clamping device.
Described truss beam-ends joint both sides, top, outer end are respectively by bearing pin II and the hinge joint of hound one end; The described hound other end is by bearing pin II and the hinge joint of dolly tie-beam.
The moving dolly pipe link of principal and subordinate is set between described two adjacent dolly tie-beams; The moving dolly tie-beam two ends of described principal and subordinate are hinged by bearing pin IV and dolly tie-beam respectively.
Described bearing pin I, bearing pin II, bearing pin III, bearing pin IV end are provided with spring cotter.
Aisle platform, guardrail, windrow platform, helper and cable take-up pulley also are set on the described truss girder.
Good effect of the present utility model is:
1, the handling height of working, good speed adjustment features, stable working, efficient height.
2,36 meters of spans, brachium are 35m, and the biggest lifting capacity is 4t, crane arm arm head lift heavy 2t, and it is 40tm that nominal requires hoisting moment.
3, the applicable working condition scope is wide, wind loading rating strong (more being applicable to the coastland).
4, the complete machine connection and reasonable arrangement is aesthetic in appearance.
5, easy to use, easy to maintenance.Have higher reliability and stability
Description of drawings
Below in conjunction with the drawings and specific embodiments the utility model is described in further detail.
Fig. 1 is the utility model structural representation.
Fig. 2 is the birds-eye view of Fig. 1.
Fig. 3 is the left view of Fig. 1.
Fig. 4 is the A place partial enlarged drawing of Fig. 1.
Fig. 5 is the B place partial enlarged drawing of Fig. 1.
Fig. 6 is the C place partial enlarged drawing of Fig. 1.
Fig. 7 is the D place partial enlarged drawing of Fig. 2.
Among the figure: 1, the cross beam base, 2, well cabinet frame Connection Block, 3, bearing pin I, 4, truss beam-ends joint, 5, save 6 in the truss girder, the dolly tie-beam, 7, hound, 8, bearing pin II, 9, bearing pin III, 10, driven dolly, 11, the active dolly, 12, spacer, 13, the principal and subordinate moves dolly pipe link, 14, the aisle platform, 15, guardrail, 16, the windrow platform, 17, the cable take-up pulley, 18, rail clamping device, 19, bearing pin IV, 20, truss lower edge pipe link, 21, spring cotter, 22, track, 23, helper, 24, the body of the tower standard knot, 25, slewing tower, 26, operator's compartment, 27, crane arm, 28, equilibrium arm, 29, the support pull rod device, 30, walking dolly and suspension hook, 31, the chassis Connection Block.
The specific embodiment
As shown in Figure 1, 2, 3: a kind of self-propelled of degree of collapsing greatly tower crane comprises: be laid on ground or built on stilts skyborne two tracks 22, be arranged on walking chassis assembly on the track 22, be fixed on walking chassis assembly top body of the tower standard knot 24, be fixed on slewing tower 25 on the body of the tower standard knot 24, be arranged on operator's compartment 26, crane arm 27, walking dolly and suspension hook 30, equilibrium arm 28 and support pull rod device 29 on the slewing tower 25; Described walking chassis assembly comprises frame and is arranged on active dolly 11, the driven dolly 10 of frame lower end; It is characterized in that: described frame comprises: two groups of truss girderes that are parallel to each other, connect two groups of truss girderes truss lower edge pipe link 20, be arranged on the truss girder two ends dolly tie-beam 6, connect two dolly tie-beams 6 the moving dolly pipe link 13 of principal and subordinate, connect the rail clamping device 18 of dolly tie-beam 6 and track 22.
Described truss girder is inverted equilateral triangle truss, and every group of truss girder formed by flange, bolted connection by joint in 4 and truss girderes of two truss beam-ends joints 5; The middle part of joint 5 upper ends is hinged with 1 four jiaos of well cabinet frame bases by four groups of well cabinet frame Connection Blocks 2, bearing pin I 3 in the described truss girder; Described truss beam-ends saves 4 two ends by chassis Connection Block 31, bearing pin III9 and 6 hinge joints of dolly tie-beam; Two adjacent dolly tie-beams 6, wherein a lower end is provided with one group of initiatively dolly 11 and one group of driven dolly 10, and another part dolly tie-beam 6 lower ends are provided with two groups of driven dollies 10, and the outer end of dolly tie-beam 6 is provided with rail clamping device 18.
Described truss beam-ends saves both sides, top, 4 outer end respectively by bearing pin II 8 and the hinge joint of hound 7 one ends; Described hound 7 other ends are by bearing pin II8 and 6 hinge joints of dolly tie-beam.
The moving dolly pipe link 13 of principal and subordinate is set between described two adjacent dolly tie-beams 6; Moving dolly tie-beam 13 two ends of described principal and subordinate are hinged by bearing pin IV19 and dolly tie-beam 6 respectively.
As shown in Figure 1, 2, 3: the installation method of hoisting crane:
The equipment that the installing/dismounting of this self-propelled tower machine uses is 300 tons of car hosits or wheel-mounted crane and 160 tons of car hosit or wheel-mounted crane, and its installation steps are:
1, on the ground, the 8.8 grade high-strength Bolt Connection of joint 5 usefulness M27 in two joint truss beam-ends joints 4 and the truss girder and M24 are become the truss girder of 36 meters spans and the fastening design predetermincd tension that reaches.
2, the moving dolly pipe link 13 of two cover dolly tie-beams 6 and principals and subordinates is put on the ground according to 36 meters spacings, and in addition supporting; Truss girder with 36 meters spans is lifted on dolly tie-beam 6 assembly parties again, four oblique 7 struts in both sides are installed, and connect with bearing pin II8 and spring cotter 21, spring cotter 21 fully opens, and is with 8.8 grade high-strength bolts that truss beam-ends joint 4 and dolly tie-beam 6 is fastening again.With same procedure other two cover chassis and dolly tie-beams 6 and truss girder are assembled.
3, track 22 is detected, reach and use after the requirement two wheel cranes that the assembly parts of chassis, dolly tie-beam 6 and truss girder is lifted on the roofing track 22, and the both sides rail tongsrail clamp is stepped up.
4, lift on the roofing track 22 with the assembly parts of same procedure, and both sides rail clamping device 18 is stepped up another chassis, dolly linking beam and truss girder.
5, measure and adjust the assembly parts spacing dimension of two cover chassis, dolly tie-beam 6 and truss girderes; Cross beam base 1 lifted in the truss girder on the joint 5 shelves Liang Chu, and with bearing pin III9 and spring cotter 21 with its connection, spring cotter 21 fully opens.
6, on the ground, be one with the two 10.9 grade high-strength bolted connections that save 4 M42 * 3 of body of the tower standard knot 24 usefulness, be lifted on then on the cross beam base 1, use 10.9 grade high-strength bolted connections of 4 M42 * 3 fastening again.
7, on ground upper and lower two well cabinet frame Connection Blocks 2, slewing tower mechanism, pivoting support, slewing tower 25, platform etc. are mounted to one, again assembly is lifted on the body of the tower standard knot 24, with 10.9 grade high-strength bolts of 4 M42 * 3 that the undersetting body of the tower is continuous.Use the 8.8 grade high-strength bolted connections of 24 M22 between pivoting support and upper and lower bearing respectively, slewing tower and upper bracket are with 10.9 grade high-strength bolted connections of 4 M42 * 3.
8, the good equilibrium arm 27 of assembly unit on the ground, and hoisting mechanism, switch box, resistance box, limiter of moment, equilibrium arm pull bar etc. are contained on the equilibrium arm 27, connect the required electric wire of each several part, then, it is next affixed with the bearing pin of 4 φ 40 with slewing tower that equilibrium arm 27 is sling, and spring cotter fully opens;
9, the good crane arm 27 of assembly unit on the ground then, is sling equilibrium arm 27 with slewing tower affixed with the bearing pin of 4 φ 40, and spring cotter fully opens.

Claims (6)

1. degree of collapsing self-propelled tower crane greatly comprises: be laid on ground or built on stilts skyborne two tracks (22), be arranged on walking chassis assembly on the track (22), be fixed on walking chassis assembly top body of the tower standard knot (24), be fixed on slewing tower (25) on the body of the tower standard knot (24), be arranged on operator's compartment (26), crane arm (27), walking dolly and suspension hook (30), equilibrium arm (28) and support pull rod device (29) on the slewing tower (25); Described walking chassis assembly comprises frame and is arranged on the active dolly (11) of frame lower end, driven dolly (10); It is characterized in that: described frame comprises: two groups of truss girderes that are parallel to each other, connect two groups of truss girderes truss lower edge pipe link (20), be arranged on the truss girder two ends dolly tie-beam (6), connect two dolly tie-beams (6) the moving dolly pipe link (13) of principal and subordinate, connect the rail clamping device (18) of dolly tie-beam (6) and track (22).
2. the self-propelled of degree of collapsing greatly tower crane according to claim 1, it is characterized in that: described truss girder is inverted equilateral triangle truss, and every group of truss girder saved by two truss beam-ends that joint (5) forms by flange, bolted connection in (4) and the truss girder; The middle part of joint (5) upper end is hinged with (1) four jiao of well cabinet frame base by four groups of well cabinet frame Connection Blocks (2), bearing pin I (3) in the described truss girder; Described truss beam-ends joint (4) two ends are by chassis Connection Block (31), bearing pin III (9) and dolly tie-beam (6) hinge joint; Adjacent two dolly tie-beams (6), wherein a lower end is provided with one group of initiatively dolly (11) and one group of driven dolly (10), another part dolly tie-beam (6) lower end is provided with two groups of driven dollies (10), and the outer end of dolly tie-beam (6) is provided with rail clamping device (18).
3. the self-propelled of degree of collapsing greatly tower crane according to claim 2 is characterized in that: described truss beam-ends joint both sides, (4) top, outer end are respectively by bearing pin II (8) and the hinge joint of hound (7) one ends; Described hound (7) other end is by bearing pin II (8) and dolly tie-beam (6) hinge joint.
4. the self-propelled of degree of collapsing greatly tower crane according to claim 1 is characterized in that: the moving dolly pipe link (13) of principal and subordinate is set between described adjacent two dolly tie-beams (6); Moving dolly pipe link (13) two ends of described principal and subordinate are hinged with dolly tie-beam (6) by bearing pin IV (19) respectively.
5. according to any one the described self-propelled of degree of collapsing greatly tower crane in claim 2 or 3 or 4, it is characterized in that: described bearing pin I (3), bearing pin II (8), bearing pin III (9), bearing pin IV (19) end are provided with spring cotter (21).
6. the self-propelled of degree of collapsing greatly tower crane according to claim 1 and 2 is characterized in that: aisle platform (14), guardrail (15), windrow platform (16), helper (23) and cable take-up pulley (17) also are set on the described truss girder.
CN2009200465910U 2009-06-13 2009-06-13 Large-span self-propelled tower crane Expired - Lifetime CN201567164U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009200465910U CN201567164U (en) 2009-06-13 2009-06-13 Large-span self-propelled tower crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009200465910U CN201567164U (en) 2009-06-13 2009-06-13 Large-span self-propelled tower crane

Publications (1)

Publication Number Publication Date
CN201567164U true CN201567164U (en) 2010-09-01

Family

ID=42659449

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009200465910U Expired - Lifetime CN201567164U (en) 2009-06-13 2009-06-13 Large-span self-propelled tower crane

Country Status (1)

Country Link
CN (1) CN201567164U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101920913A (en) * 2009-06-13 2010-12-22 徐州建机工程机械有限公司 Self-propelled wide-span tower crane
CN101941653A (en) * 2010-09-02 2011-01-12 山东富友有限公司 Method for improving capacity of flat-head-type tower crane and new-type flat-head-type tower crane
CN107128823A (en) * 2017-05-22 2017-09-05 无锡石油化工起重机有限公司 Double derrick cranes for setting and reinforcing channel board are installed
CN107161877A (en) * 2017-06-16 2017-09-15 无锡石油化工起重机有限公司 The derrick crane of escape way is set
CN109231035A (en) * 2018-11-25 2019-01-18 苏州海斯福智能机械装备有限公司 The portable wind resistance aseismatic mechanism of tower crane

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101920913A (en) * 2009-06-13 2010-12-22 徐州建机工程机械有限公司 Self-propelled wide-span tower crane
CN101920913B (en) * 2009-06-13 2013-08-07 徐州建机工程机械有限公司 Self-propelled wide-span tower crane
CN101941653A (en) * 2010-09-02 2011-01-12 山东富友有限公司 Method for improving capacity of flat-head-type tower crane and new-type flat-head-type tower crane
CN107128823A (en) * 2017-05-22 2017-09-05 无锡石油化工起重机有限公司 Double derrick cranes for setting and reinforcing channel board are installed
CN107161877A (en) * 2017-06-16 2017-09-15 无锡石油化工起重机有限公司 The derrick crane of escape way is set
CN109231035A (en) * 2018-11-25 2019-01-18 苏州海斯福智能机械装备有限公司 The portable wind resistance aseismatic mechanism of tower crane

Similar Documents

Publication Publication Date Title
CN2937068Y (en) Portal crane of round pipe truss structure
CN102267664B (en) Method for installing bridge crane using load-supporting roof beam for hoisting and usage thereof
CN201635012U (en) Bridge box girder erection machine
CN201567164U (en) Large-span self-propelled tower crane
CN102051860B (en) Bridge erecting and track laying machine for railway
CN101559905A (en) Deck unit erection gantry
CN114412158B (en) Aluminum alloy-steel combined attached lifting scaffold and installation method thereof
CN212050244U (en) Gantry crane system for mounting assembled bent cap
CN101920913B (en) Self-propelled wide-span tower crane
CN201214597Y (en) Double beams double bogies gantry crane
CN201933415U (en) Highway and railway twin-girder bridge erection machine
CN100497833C (en) High-altitude framework type simple plate supporting machine
CN201634332U (en) Heavy girder gantry crane
CN205205685U (en) Span wire pier is function portal device at most
CN202090283U (en) Bridge-detecting working platform capable of being spliced and disassembled
RU2307783C1 (en) Tower crane
CN102635066A (en) Hanger articulated bridge inspection vehicle
CN112030777A (en) Descending movable formwork support bracket crossing type transfer construction method
CN201433051Y (en) Large-scale rack lower boom double-track single-beam lifting crane
CN201722621U (en) Integral hoisting frame of pre-fabricated box beam
CN107747280A (en) The Bridge Erector of full span erection steel-pipe concrete truss
CN201334310Y (en) Superhigh large-span light gate-type crane
CN202785365U (en) Bridge-type cross-rail crane
CN202969275U (en) Bridge erection machine
CN202247556U (en) CRTS I-type track slab lifting and laying device for passenger special line

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Wang Jianjun

Inventor after: Li Shiping

Inventor after: Wang Houzhen

Inventor after: Zhou Shengyu

Inventor after: Wang Feng

Inventor before: Wang Fan

Inventor before: Wang Jianjun

Inventor before: Wang Houzhen

Inventor before: Zhou Shengyu

Inventor before: Wang Tiezhu

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: WANG FENG WANG JIANJUN WANG HOUZHEN ZHOU SHENGYU WANG TIEZHU TO: WANG JIANJUN LI SHIPING WANG HOUZHEN ZHOU SHENGYU WANG FENG

AV01 Patent right actively abandoned

Granted publication date: 20100901

Effective date of abandoning: 20090613

RGAV Abandon patent right to avoid regrant