CN101559905A - Deck unit erection gantry - Google Patents

Deck unit erection gantry Download PDF

Info

Publication number
CN101559905A
CN101559905A CNA2009100393847A CN200910039384A CN101559905A CN 101559905 A CN101559905 A CN 101559905A CN A2009100393847 A CNA2009100393847 A CN A2009100393847A CN 200910039384 A CN200910039384 A CN 200910039384A CN 101559905 A CN101559905 A CN 101559905A
Authority
CN
China
Prior art keywords
pulley
deck unit
lifting
unit erection
erection gantry
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA2009100393847A
Other languages
Chinese (zh)
Inventor
刘宏波
谭立心
李斌
冯炳生
吴聪
钱亮
钟建锋
何畅
焉生全
黄德明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Changda Highway Engineering Co Ltd
Original Assignee
Guangdong Changda Highway Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Changda Highway Engineering Co Ltd filed Critical Guangdong Changda Highway Engineering Co Ltd
Priority to CNA2009100393847A priority Critical patent/CN101559905A/en
Publication of CN101559905A publication Critical patent/CN101559905A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a deck unit erection gantry. The gantry comprises two towers, a winding engine, a lifting pulley and track ropes, wherein the winding engine is arranged on tops of the towers; the track ropes are connected with the tops of the two towers; the winding engine slides along two parallel track ropes through driving the lifting pulley by a hauling cable; the lifting pulley consists of two end girders, a load bearing cross beam, a fixed pulley and a movable pulley; the fixed pulley is arranged on the load bearing cross beam; lifting ropes are wound on the fixed pulley and the movable pulley. The deck unit erection gantry is characterized in that each upper surface of the two end girders is provided with a hinge base; two ends of the load bearing cross beam are connected with hinges of the end girders through the hinge bases; the movable pulley and a carrying-pole beam are connected and have a connection point positioned on the gravity center of the carrying-pole beam. The deck unit erection gantry has reasonable stress of bearing structure, simple structure, convenient operation, low cost and safe construction, and is particularly convenient for lifting and mounting a large steel box girder prefabricated structural element of a suspension bridge.

Description

A kind of deck unit erection gantry
Technical field
The present invention relates to the used loop wheel machine equipment of lifting installation process such as the precast construction part of the medium-and-large-sized building of a kind of large scale civil engineering or building materials, refer in particular to the deck unit erection gantry that the precast beam sections to the large-scale suspension bridge bridge lifts.
Background technology
Deck unit erection gantry is used for the suspension bridge box girder segment more to be risen and re-mounts, as steel box girder segment or concrete box girder segment.The two root architecture main push-towing ropes that deck unit erection gantry normally relies on suspension bridge to install in advance are supporting point, adopt vertical-lift box girder segment under the main push-towing rope, and articulate with hoist cable on the main push-towing rope.Deck unit erection gantry should possess following radical function: (1) can realize the fixed vertical lifting at main push-towing rope horizontal segment and tilting section; (2) can unloaded telephone-moving on main push-towing rope, particularly can cross over the cord clip framing member on the main push-towing rope.
The deck unit erection gantry load larrying member mainly are made up of two end carriages and a carrying crossbeam.Usually end carriage is provided with two load-bearing bearings and traveling roller: deck unit erection gantry acts on the main push-towing rope by bearing during lifting; Deck unit erection gantry is supported on main push-towing rope by walking wheel during telephone-moving.Four telescopic walking wheels of every end carriage operated by rotary motion, and by the flexible walking wheel of oil cylinder effect, the realization deck unit erection gantry is marked time and is crossed over the main push-towing rope cord clip.The deck unit erection gantry traveling is a traction power with the winch wire rope block group on the cat head door frame usually.
The elevator system of deck unit erection gantry has two kinds of winch elevator system and hydraulic lift systems.The winch elevator system has fast, the simple to operate but winch of hoisting speed and characteristics such as the rope hoisting system is huge, lifting weight is less; Characteristics such as hydraulic lift system has that lifting weight is big, scantling of structure is little but hoisting speed is slow, complicated operation.
Common winch elevator system is implemented at 4 to hoisting structure and is lifted mode.This makes elevator system need four winchs and quadruplet polyspast, and need lay two cover load-bearing carrying crossbeams on main push-towing rope.Cause load larrying member, winch and rope hoisting system huge.Bring installation, various, the operating difficulties of telephone-moving operation thus, require at 4 when lifting especially and lift speed synchronization.
The beam prefabricated sections of case generally by barge be transported to cast anchor under the main push-towing rope in place; For the nearly tower place in shoal and nonirrigated farmland, generally by setting up trestle and being transported to lifting position under the main push-towing rope by chassis.
Summary of the invention
In order to overcome above-mentioned deficiency, the object of the present invention is to provide a kind of simple in structure, easy to operate, cost is low, construction safety, is convenient to very much effectively rise the deck unit erection gantry that re-mounts the beam prefabricated framing member of large-scale steel case.
To achieve these goals, the technical solution used in the present invention is: a kind of deck unit erection gantry, include two pylons, winch, play hanging pulley, bearer cable, winch is located at the top of pylon, the top of bearer cable and two pylons is to connecting, winch drives the lifting coaster by hauling rope and slides along two parallel bearer cables, described hanging pulley is by two end carriages, article one, carry crossbeam, fixed pulley, movable pulley is formed, fixed pulley is located on the carrying crossbeam, at fixed pulley, be wound with lifting rope on the movable pulley, it is characterized in that: the upper surface at two end carriages is respectively equipped with hinge base, and the both ends of carrying crossbeam are connected with the end carriage hinge by hinge base; Described movable pulley is connected with the center of gravity place that shoulder pole girder and point of connection are positioned at shoulder pole girder.
The bottom of described end carriage is provided with walking roller and anchor ear, and anchor ear is socketed on the bearer cable, and the both sides of end carriage are provided with side retaining roller.
Also be provided with wheel flutter on the described carrying crossbeam.The effect of wheel flutter is to help the control that turns to suspended object.
Beneficial effect of the present invention: these deck unit erection gantry load larrying member stressed reasonable, simple in structure, easy to operate, cost is low, construction safety, especially be convenient to effectively rise re-mount the beam prefabricated framing member of large-scale steel case.
Description of drawings
The present invention is described in further detail below in conjunction with accompanying drawing.
Fig. 1 is a structural representation of the present invention;
Fig. 2 is a birds-eye view shown in Figure 1;
Fig. 3 be shown in Figure 1 rise hanging pulley structural representation;
Fig. 4 is a birds-eye view shown in Figure 3;
Fig. 5 is the cutaway view along the A-A line shown in Figure 3;
Fig. 6 be end carriage shown in Figure 3 along B-B to configuration diagram;
Fig. 7 is an enlarged drawing shown in Figure 6.
Among the figure: 1, winch; 2, play hanging pulley; 3, bearer cable; 4, end carriage; 5, carrying crossbeam; 6, fixed pulley; 7, movable pulley; 8, lifting rope; 9, hinge base; 10, shoulder pole girder; 11, walking roller; 12, anchor ear; 13, side retaining roller; 14, steel case beam section; 15, hauling rope; 16, the steel case beam after the lifting; 17, hoist cable; 18, pylon; 19, wheel flutter.
The specific embodiment
As Fig. 1, Fig. 2, Fig. 3, Fig. 4, shown in Figure 5, a kind of deck unit erection gantry, include two pylons 18, winch 1, play hanging pulley 2, bearer cable 3, winch 1 is located at the top of pylon 18, the top of bearer cable 3 and two pylons 18 is to connecting, winch 1 has driven hanging pulley 2 by hauling rope 15 and has slided along two parallel bearer cables 3, described hanging pulley 2 is by two end carriages 4, article one, carry crossbeam 5, fixed pulley 6, movable pulley 7 is formed, fixed pulley 6 is located on the carrying crossbeam 5, at fixed pulley 6, be wound with lifting rope 8 on the movable pulley 7, it is characterized in that: the upper surface at two end carriages 4 is respectively equipped with hinge base 9, and the both ends of carrying crossbeam 5 form steel pin pivotally attached type of attachment by hinge base 9 and end carriage 4; Described movable pulley 7 is connected with the center of gravity place that shoulder pole girder 10 and point of connection are positioned at shoulder pole girder 10.Point of connection is positioned at the center of gravity place of shoulder pole girder 10, and purpose is that suspended object is the liftings of steel case beam section 14 levels.Play the both ends of the carrying crossbeam 5 of hanging pulley 2 and adopt steel pin pivotally attached forms,, promptly keep main truss unilateral interior stressed with two main truss sheets guaranteeing to carry crossbeam 5 vertical all the time under the lift heavy effect with end carriage 4.
As Fig. 6, shown in Figure 7, the bottom of described end carriage 4 is provided with walking roller 11 and anchor ear 12, and anchor ear 12 is socketed on the bearer cable 3, and the both sides of end carriage 4 are provided with side retaining roller 13.The effect of walking roller 11 is to have made hanging pulley 2 to slide along bearer cable; The effect of anchor ear 12 is when playing hanging pulley 2 in lifting steel case beam section 14, utilize anchor ear 12 that bearer cable 3 is held tightly earlier, thereby it is fixing to play hanging pulley 2, to prevent lifting by crane coaster 2 under the state of work, slides along bearer cable 3; The effect of side retaining roller 13 has prevented that hanging pulley 2 breaks away from bearer cable 3.
Also be provided with wheel flutter 19 on the described carrying crossbeam 5.
Application when when the present invention builds a bridge over a river bridge being lifted
The present invention adopts two to overlap hanging pulley effluent mid point the construction method to two sides, river symmetry lifting bridge section is as follows respectively:
1, deck unit erection gantry assembly unit
Shown in Fig. 1, diagram 2, set up two pylons 18,18 of pylons are connected with two parallel bearer cables 3, play hanging pulley 2 assembly unit on the bearer cable 3 at nearly tower place.The end carriage 4 and the carrying crossbeam 5 that play hanging pulley 2 utilize the tower crane lifting to finish.
2, playing hanging pulley transfers in place
Play hanging pulley 2 under the tractive of winch 1, in place by the cat head telephone-moving to span centre; The later hanging pulley that rises in place utilizes anchor ear 12 to be locked on the bearer cable 3, utilizes adjacent cord clip that the anti-cable wire that draws is set simultaneously, to prevent that lifting by crane coaster glides.
3, suspender and articulated by the steel box girder segment that lifted by crane
Winch has been transferred the shoulder pole girder suspender on the movable pulley in the hanging pulley, and shoulder pole girder suspender and steel case beam section 14 articulate;
4, steel case beam section lifting
Two winchs 1 promote the steel case beam section 14 of being lifted by crane synchronously to the installation position, and articulate with hoist cable 17 on the bearer cable 3, simultaneously with lift after steel case beam 16 be connected temporarily;
5, the lifting of closure segment
Two have overlapped hanging pulley is located in two bearer cable positions directly over the nearly tower place closure segment, and with the pre-50cm partially of the box girder segment onshore side of king-post side hoisted in position, playing hanging pulley, to promote closure segment in place, and articulates with hoist cable on the bearer cable.The lifting of whole steel case beam is finished, with each joint steel case beam fastening after, folding removes and steel case beam bonded assembly hoist cable 17.

Claims (4)

1, a kind of deck unit erection gantry, include two pylons (18), winch (1), play hanging pulley (2), bearer cable (3), winch (1) is located at the top of pylon (18), bearer cable (3) links to each other with the top of two pylons (18), winch (1) has driven hanging pulley (2) by hauling rope (15) and has slided along two parallel bearer cables (3), described hanging pulley (2) is by two end carriages (4), article one, carry crossbeam (5), fixed pulley (6), movable pulley (7) is formed, fixed pulley (6) is located on the carrying crossbeam (5), in fixed pulley (6), be wound with lifting rope (8) on the movable pulley (7), it is characterized in that: the upper surface at two end carriages (4) is respectively equipped with hinge base (9), and the both ends of carrying crossbeam (5) are connected with end carriage (4) hinge by hinge base (9); Described movable pulley (7) is connected with the center of gravity place that shoulder pole girder (10) and point of connection are positioned at shoulder pole girder (10).
2, a kind of deck unit erection gantry according to claim 1 is characterized in that: the bottom of described end carriage (4) is provided with walking roller (11), and the both sides of end carriage (4) are provided with side retaining roller (13).
3, a kind of deck unit erection gantry according to claim 1 is characterized in that: also be provided with wheel flutter (19) on the described carrying crossbeam (5).
4, a kind of deck unit erection gantry according to claim 1 is characterized in that: the bottom of described end carriage (4) is provided with anchor ear (12), and anchor ear (12) is socketed on the bearer cable (3).
CNA2009100393847A 2009-05-12 2009-05-12 Deck unit erection gantry Pending CN101559905A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA2009100393847A CN101559905A (en) 2009-05-12 2009-05-12 Deck unit erection gantry

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA2009100393847A CN101559905A (en) 2009-05-12 2009-05-12 Deck unit erection gantry

Publications (1)

Publication Number Publication Date
CN101559905A true CN101559905A (en) 2009-10-21

Family

ID=41218914

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA2009100393847A Pending CN101559905A (en) 2009-05-12 2009-05-12 Deck unit erection gantry

Country Status (1)

Country Link
CN (1) CN101559905A (en)

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101787795A (en) * 2010-03-03 2010-07-28 潮峰钢构集团有限公司 Large-size net rack suspension cable mounting platform and suspension cable construction method
CN101863423A (en) * 2010-06-23 2010-10-20 广东省长大公路工程有限公司 Steel box beam cable carrying lifter for construction of suspension bridge
CN102926388A (en) * 2012-10-15 2013-02-13 中国建筑第六工程局有限公司 Earth moving device and method for deep foundation pit excavation
CN103061262A (en) * 2011-10-19 2013-04-24 中交第一公路工程局有限公司 Cable-crossing crane and application method thereof
CN103790114A (en) * 2014-01-28 2014-05-14 柳州欧维姆机械股份有限公司 Hydraulic dragging and idler wheel walking combination cable carrying crane and walking method thereof
CN106917354A (en) * 2017-01-21 2017-07-04 广西大学 Cable carrying crane combining hoisting and walking
CN107245957A (en) * 2017-08-16 2017-10-13 湖南路桥建设集团有限责任公司 A kind of method and apparatus of aerial trackless erecting suspension bridge stiff girder
CN109680616A (en) * 2019-01-09 2019-04-26 中交第二航务工程局有限公司 A liter construction method for equipment hoisting girder is held using deck unit erection gantry collaboration
CN109680611A (en) * 2018-12-07 2019-04-26 中铁九桥工程有限公司 A kind of deck unit erection gantry with automatic aligning pressure-bearing shearing resistance
CN110436335A (en) * 2019-07-30 2019-11-12 中铁大桥局集团有限公司 A kind of deck unit erection gantry installing mechanism and its application method
CN110626957A (en) * 2019-09-29 2019-12-31 中铁大桥局集团第六工程有限公司 Method for installing cable crane
CN110937506A (en) * 2019-11-29 2020-03-31 中铁九桥工程有限公司 Fast-walking cable-mounted crane and traction method
CN110939068A (en) * 2019-12-10 2020-03-31 广西路桥工程集团有限公司 Pre-tensioning system for longitudinal horizontal displacement of tower and using method thereof
CN111188273A (en) * 2019-12-31 2020-05-22 湖北省路桥集团有限公司 Large-section steel truss girder erection system of large-span steel-concrete composite bridge and construction method

Cited By (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101787795B (en) * 2010-03-03 2011-09-21 潮峰钢构集团有限公司 Large-size net rack suspension cable mounting platform and suspension cable construction method
CN101787795A (en) * 2010-03-03 2010-07-28 潮峰钢构集团有限公司 Large-size net rack suspension cable mounting platform and suspension cable construction method
CN101863423A (en) * 2010-06-23 2010-10-20 广东省长大公路工程有限公司 Steel box beam cable carrying lifter for construction of suspension bridge
CN101863423B (en) * 2010-06-23 2012-07-18 广东省长大公路工程有限公司 Steel box beam cable carrying lifter for construction of suspension bridge
CN103061262A (en) * 2011-10-19 2013-04-24 中交第一公路工程局有限公司 Cable-crossing crane and application method thereof
CN103061262B (en) * 2011-10-19 2016-02-24 中交第一公路工程局有限公司 A kind of deck erection gantry and application process thereof
CN102926388A (en) * 2012-10-15 2013-02-13 中国建筑第六工程局有限公司 Earth moving device and method for deep foundation pit excavation
CN102926388B (en) * 2012-10-15 2015-05-13 中国建筑第六工程局有限公司 Earth moving method for deep foundation pit excavation
CN103790114A (en) * 2014-01-28 2014-05-14 柳州欧维姆机械股份有限公司 Hydraulic dragging and idler wheel walking combination cable carrying crane and walking method thereof
CN106917354B (en) * 2017-01-21 2019-03-01 广西大学 Cable carrying crane combining hoisting and walking
CN106917354A (en) * 2017-01-21 2017-07-04 广西大学 Cable carrying crane combining hoisting and walking
CN107245957A (en) * 2017-08-16 2017-10-13 湖南路桥建设集团有限责任公司 A kind of method and apparatus of aerial trackless erecting suspension bridge stiff girder
CN107245957B (en) * 2017-08-16 2022-11-15 湖南路桥建设集团有限责任公司 Method and equipment for erecting stiffening beam of suspension bridge in air without track
CN109680611A (en) * 2018-12-07 2019-04-26 中铁九桥工程有限公司 A kind of deck unit erection gantry with automatic aligning pressure-bearing shearing resistance
CN109680611B (en) * 2018-12-07 2023-10-20 中铁九桥工程有限公司 Cable-carrying crane with automatic alignment pressure-bearing shearing resistance
CN109680616A (en) * 2019-01-09 2019-04-26 中交第二航务工程局有限公司 A liter construction method for equipment hoisting girder is held using deck unit erection gantry collaboration
CN110436335A (en) * 2019-07-30 2019-11-12 中铁大桥局集团有限公司 A kind of deck unit erection gantry installing mechanism and its application method
CN110626957A (en) * 2019-09-29 2019-12-31 中铁大桥局集团第六工程有限公司 Method for installing cable crane
CN110937506A (en) * 2019-11-29 2020-03-31 中铁九桥工程有限公司 Fast-walking cable-mounted crane and traction method
CN110939068A (en) * 2019-12-10 2020-03-31 广西路桥工程集团有限公司 Pre-tensioning system for longitudinal horizontal displacement of tower and using method thereof
CN110939068B (en) * 2019-12-10 2022-03-01 广西路桥工程集团有限公司 Pre-tensioning system for longitudinal horizontal displacement of tower and using method thereof
CN111188273A (en) * 2019-12-31 2020-05-22 湖北省路桥集团有限公司 Large-section steel truss girder erection system of large-span steel-concrete composite bridge and construction method

Similar Documents

Publication Publication Date Title
CN101559905A (en) Deck unit erection gantry
CN101476294B (en) Method for mounting lower beam section of large-span steel box girder cable-stayed bridge tower
CN109653105B (en) Main truss system of box girder bridge cantilever construction hanging basket and use method thereof
CN205387439U (en) Mast hoisting accessory
CN103882812A (en) Construction method for midspan main beams of cable-stayed bridge
CN110396931A (en) A kind of excessively cable-styled erection crane of center double plane cable stayed bridge and its construction method
CN106276627B (en) A kind of multi-tower continuous across hoist cable crane
CN201485194U (en) 60T walking type full-swing erecting crane
CN110820602A (en) Single-segment box girder bridge girder erection machine and operation method thereof
CN107476195B (en) Girder transporting pulley system for transporting stiffening girder by suspension bridge
CN201473221U (en) Light cable crane for suspension bridge
RU2307783C1 (en) Tower crane
CN207091932U (en) A kind of equipment of aerial trackless erecting suspension bridge stiff girder
CN106522097B (en) The adaptive deck unit erection gantry of super-span Spatial Cable face suspension cable bridge stand beam
CN206069230U (en) A kind of multi-tower continuous across hoist cable crane
CN110040638B (en) Cable-mounted crane device for mounting stiff beam of suspension bridge and mounting method
CN113235460B (en) Prefabricated segment swinging method for bridge cantilever assembly
CN116216481A (en) Multi-point lifting balance assembly for steel beam lifting
CN201362571Y (en) Equipment of cross beam for hoisting arch-first and girder-late tied bars arch bridge
CN212559207U (en) Bridge floor crane
CN111453630B (en) Bridge deck crane and use method thereof
CN211687988U (en) Segment assembling bridge girder erection machine hoisting trolley
CN209618693U (en) A kind of encircling type single-beam operation trolley
CN112982183A (en) Counterweight type mounting system of main beam
CN107245957B (en) Method and equipment for erecting stiffening beam of suspension bridge in air without track

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
AD01 Patent right deemed abandoned

Effective date of abandoning: 20091021

C20 Patent right or utility model deemed to be abandoned or is abandoned