CN111453630B - Bridge deck crane and use method thereof - Google Patents
Bridge deck crane and use method thereof Download PDFInfo
- Publication number
- CN111453630B CN111453630B CN202010391002.3A CN202010391002A CN111453630B CN 111453630 B CN111453630 B CN 111453630B CN 202010391002 A CN202010391002 A CN 202010391002A CN 111453630 B CN111453630 B CN 111453630B
- Authority
- CN
- China
- Prior art keywords
- sling
- lifting
- steel
- bridge
- bracket
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C23/00—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
- B66C23/18—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
- B66C23/20—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes with supporting couples provided by walls of buildings or like structures
- B66C23/202—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes with supporting couples provided by walls of buildings or like structures with supporting couples provided from below, e.g. by floors of buildings
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C1/00—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
- B66C1/10—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C23/00—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
- B66C23/62—Constructional features or details
- B66C23/72—Counterweights or supports for balancing lifting couples
- B66C23/74—Counterweights or supports for balancing lifting couples separate from jib
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C23/00—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
- B66C23/62—Constructional features or details
- B66C23/72—Counterweights or supports for balancing lifting couples
- B66C23/78—Supports, e.g. outriggers, for mobile cranes
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C9/00—Travelling gear incorporated in or fitted to trolleys or cranes
- B66C9/10—Undercarriages or bogies, e.g. end carriages, end bogies
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C9/00—Travelling gear incorporated in or fitted to trolleys or cranes
- B66C9/18—Travelling gear incorporated in or fitted to trolleys or cranes with means for locking trolleys or cranes to runways or tracks to prevent inadvertent movements
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
- E01D21/06—Methods or apparatus specially adapted for erecting or assembling bridges by translational movement of the bridge or bridge sections
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Structural Engineering (AREA)
- Civil Engineering (AREA)
- Architecture (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
Description
技术领域Technical Field
本发明涉及建筑机械领域,具体涉及一种桥面吊机及其使用方法。The invention relates to the field of construction machinery, and in particular to a bridge crane and a use method thereof.
背景技术Background technique
目前,在大跨度钢桥施工中,钢梁节段的组装及预拼装通常是在工厂内完成,然后通过浮吊等运输设备将梁节段运至桥位,通过桥面吊机进行拼装。所以桥面吊机是大型跨江、跨河钢桥架设的关键设备。At present, in the construction of large-span steel bridges, the assembly and pre-assembly of steel beam segments are usually completed in the factory, and then the beam segments are transported to the bridge site by floating cranes and other transportation equipment, and assembled by bridge cranes. Therefore, bridge cranes are key equipment for the erection of large-scale steel bridges across rivers.
随着钢桥的建造跨度、宽度越来越大,钢梁节段的重量、体积也越来越大,经常需要对大吨位(大吨位指1000吨以上)钢梁节段实施起吊。为了增强起吊能力和抗倾覆性,桥面吊机通常都会增大体积和增加配重。但是大体积和大配重也增加了对在建钢桥的压力,使在建钢桥不稳定并且可能变形。As the span and width of steel bridges are getting larger, the weight and volume of steel beam segments are also getting larger. It is often necessary to lift large-tonnage (large-tonnage means more than 1,000 tons) steel beam segments. In order to enhance the lifting capacity and anti-overturning performance, bridge cranes usually increase the size and counterweight. However, the large size and large counterweight also increase the pressure on the steel bridge under construction, making it unstable and possibly deformed.
因此,设计一款自重小并且抗倾覆性好的桥面吊机是十分必要的。Therefore, it is very necessary to design a bridge crane with light deadweight and good anti-overturning ability.
发明内容Summary of the invention
本发明提供了一种桥面吊机及其使用方法,本发明的目的在于减轻桥面吊机的自重和增强桥面吊机的抗倾覆性。The invention provides a bridge crane and a method for using the same. The purpose of the invention is to reduce the deadweight of the bridge crane and enhance the anti-overturning performance of the bridge crane.
上述桥面吊机,其包括吊机本体,吊机本体包括行走部以及向行走部前方探出的吊具支架,吊具支架通过吊绳吊设有吊具,吊具的底部设有行走轮系;行走部上设有锚固装置,锚固装置用于将行走部锚固在在建钢桥上;其中,吊具支架的起吊中心与行走部之间的纵向间距大于或等于二分之一钢梁节段长度与吊具的长度之和。The above-mentioned bridge deck crane includes a crane body, which includes a traveling part and a hoisting bracket extending in front of the traveling part, the hoisting bracket is provided with a hoist through a hoisting rope, and a traveling wheel system is provided at the bottom of the hoist; an anchoring device is provided on the traveling part, and the anchoring device is used to anchor the traveling part to the steel bridge under construction; wherein the longitudinal spacing between the lifting center of the hoisting bracket and the traveling part is greater than or equal to the sum of one-half of the length of the steel beam segment and the length of the hoist.
根据本发明的一个实施例,吊具支架的顶部设有第一横梁和第二横梁,第一横梁和第二横梁之间设有纵向间隔,第一横梁的两端分别吊设有一个吊具,第二横梁吊设有一个吊具。According to one embodiment of the present invention, a first beam and a second beam are provided on the top of the hanger bracket, a longitudinal interval is provided between the first beam and the second beam, a hanger is hung on each end of the first beam, and a hanger is hung on the second beam.
根据本发明的一个实施例,第二横梁位于第一横梁和行走部之间。According to an embodiment of the present invention, the second cross beam is located between the first cross beam and the walking portion.
根据本发明的一个实施例,吊机本体包括多个横向间隔设置的支撑桁架,每相邻两个支撑桁架之间均通过连接结构连接。According to one embodiment of the present invention, the crane body includes a plurality of support trusses arranged at intervals in the transverse direction, and every two adjacent support trusses are connected by a connecting structure.
根据本发明的一个实施例,吊具支架的前端设有前端桁架,前端桁架包括主梁和多个斜撑杆,主梁通过多个斜撑杆与吊具支架连接。According to one embodiment of the present invention, a front end truss is provided at the front end of the hanger bracket, the front end truss includes a main beam and a plurality of diagonal braces, and the main beam is connected to the hanger bracket through the plurality of diagonal braces.
根据本发明的一个实施例,行走部的后端设有后端横梁,后端横梁包括梁主体和两个活动部,两个活动部分别通过收折装置连接在梁主体的两端,活动部设有锚固装置。According to one embodiment of the present invention, a rear end cross beam is provided at the rear end of the walking portion, and the rear end cross beam includes a beam body and two movable portions, the two movable portions are respectively connected to the two ends of the beam body through folding devices, and the movable portion is provided with an anchoring device.
根据本发明的一个实施例,还包括起吊装置,起吊装置用于吊拉吊具,起吊装置包括电机和卷绕吊绳的滑轮。According to one embodiment of the present invention, it also includes a lifting device, which is used to lift the sling, and the lifting device includes a motor and a pulley for winding a lifting rope.
根据本发明的一个实施例,还包括多个支撑座,支撑座设置在行走部的底部。According to one embodiment of the present invention, it further includes a plurality of support seats, which are arranged at the bottom of the walking part.
根据本发明的一个实施例,还包括配重结构,配重结构设置在行走部上。According to one embodiment of the present invention, it also includes a counterweight structure, and the counterweight structure is arranged on the walking part.
本发明还提供了一种桥面吊机的使用方法,其包括:将吊具支架上所有吊具下放到在建钢桥上,吊具设有行走轮系;继续下放预设长度的吊绳;行走部移动,以使吊绳牵引吊具移动;行走部移动预设距离,使吊具支架的起吊中心与行走部之间的纵向间距大于或等于二分之一钢梁节段长度与吊具的长度之和;将桥面吊机锚固于在建钢桥上;吊拉吊具,使吊具离开在建钢桥;将吊具下放到钢梁节段的位置。The present invention also provides a method for using a bridge crane, which includes: lowering all hoists on a hoist bracket onto a steel bridge under construction, the hoist being provided with a traveling wheel system; continuing to lower a hoist rope of a preset length; moving a traveling part so that the hoist rope pulls the hoist to move; moving the traveling part a preset distance so that the longitudinal spacing between the lifting center of the hoist bracket and the traveling part is greater than or equal to the sum of one-half the length of the steel beam segment and the length of the hoist; anchoring the bridge crane to the steel bridge under construction; lifting and pulling the hoist so that the hoist leaves the steel bridge under construction; and lowering the hoist to the position of the steel beam segment.
本申请实施例提供的上述技术方案与现有技术相比具有如下优点:The above technical solution provided by the embodiment of the present application has the following advantages compared with the prior art:
吊具上设置行走轮系,使得吊具可以在在建钢桥上被牵引着移动,所以吊具不需要始终悬挂在吊具支架上,并且通过控制起吊中心与在建钢桥尽头的间距,从而既减小吊具对吊具支架(或吊机本体)的倾覆性拉力,还有助于减轻桥面吊机的自重。A traveling wheel system is provided on the hoist so that the hoist can be towed and moved on the steel bridge under construction, so the hoist does not need to be always suspended on the hoist bracket. By controlling the distance between the lifting center and the end of the steel bridge under construction, the overturning pulling force of the hoist on the hoist bracket (or the crane body) is reduced, which also helps to reduce the deadweight of the bridge deck crane.
附图说明BRIEF DESCRIPTION OF THE DRAWINGS
图1是本发明一实施方式中桥面吊机的侧视图示意图;FIG1 is a schematic side view of a bridge crane in one embodiment of the present invention;
图2是本发明一实施方式中桥面吊机的主视图示意图;FIG2 is a schematic diagram of a front view of a bridge crane in one embodiment of the present invention;
图3是本发明一实施方式中后端横梁的局部示意图;FIG3 is a partial schematic diagram of a rear end cross beam in one embodiment of the present invention;
图4是本发明一实施方式中前端桁架的示意图;FIG4 is a schematic diagram of a front end truss in one embodiment of the present invention;
图5是本发明一实施方式中吊具的示意图。FIG. 5 is a schematic diagram of a lifting device according to an embodiment of the present invention.
附图标记:Reference numerals:
1、行走部;2、吊具支架;3、吊具;4、行走轮系;5、第一支撑桁架;6、第二支撑桁架;7、第三支撑桁架;8、第四支撑桁架;9、连接结构;10、第一横梁;11、第二横梁;12、前端桁架;13、梁主体;14、活动部。1. Traveling part; 2. Hoist bracket; 3. Hoist; 4. Traveling wheel system; 5. First supporting truss; 6. Second supporting truss; 7. Third supporting truss; 8. Fourth supporting truss; 9. Connecting structure; 10. First crossbeam; 11. Second crossbeam; 12. Front end truss; 13. Beam body; 14. Movable part.
具体实施方式Detailed ways
为了能够更清楚地理解本发明的上述目的、特征和优点,下面结合附图和实施例对本发明作进一步的详细说明。可以理解的是,所描述的实施例是本发明的一部分实施例,而不是全部的实施例。此处所描述的具体实施例仅仅用于解释本发明,而非对本发明的限定。基于所描述的本发明的实施例,本领域普通技术人员所获得的所有其他实施例,都属于本发明保护的范围。In order to more clearly understand the above-mentioned purpose, features and advantages of the present invention, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It is to be understood that the described embodiments are part of the embodiments of the present invention, rather than all of the embodiments. The specific embodiments described herein are only used to explain the present invention, rather than to limit the present invention. Based on the described embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art belong to the scope of protection of the present invention.
在本发明中,纵向指的是钢桥铺设的方向,横向指的是水平的垂直于纵向的方向;或者说,纵向指的是钢桥长度的所在方向,横向指的是钢桥宽度的所在方向。In the present invention, the longitudinal direction refers to the direction in which the steel bridge is laid, and the transverse direction refers to the horizontal direction perpendicular to the longitudinal direction; in other words, the longitudinal direction refers to the direction in which the length of the steel bridge is located, and the transverse direction refers to the direction in which the width of the steel bridge is located.
如图1所示,本发明提供了一种桥面吊机,该桥面吊机包括吊机本体。吊机本体包括行走部1和向行走部1前方探出的吊具支架2。行走部1位于吊机本体的下部,行走部1用于桥面吊机在在建钢桥上移动,行走部1通常采用步履式推进装置移动。行走部1上还设有锚固装置,锚固装置可以用于将行走部1锚固在在建钢桥上。行走部1是本领域的常规结构,锚固装置是本领域的常规装置,本领域技术人员有能力进行了解和实现,本发明对其结构和位置不再赘述。吊具支架2通过吊绳吊设有吊具3,并且吊具3的底部设有行走轮系4,行走轮系4可以用于吊具3在在建钢桥上移动。吊具3和行走轮系4(例如多个万向轮或者多个普通的行走轮)可以是本领域的常规设置,本领域技术人员有能力进行了解和实现,本发明在此不再赘述。As shown in FIG1 , the present invention provides a bridge crane, which includes a crane body. The crane body includes a traveling part 1 and a hanger bracket 2 extending forward of the traveling part 1. The traveling part 1 is located at the lower part of the crane body, and the traveling part 1 is used for the bridge crane to move on the steel bridge under construction. The traveling part 1 is usually moved by a walking propulsion device. An anchoring device is also provided on the traveling part 1, and the anchoring device can be used to anchor the traveling part 1 on the steel bridge under construction. The traveling part 1 is a conventional structure in the field, and the anchoring device is a conventional device in the field. Those skilled in the art are capable of understanding and implementing it, and the present invention will not repeat its structure and position. The hanger bracket 2 is provided with a hanger 3 through a hanging rope, and a traveling wheel system 4 is provided at the bottom of the hanger 3, and the traveling wheel system 4 can be used for the hanger 3 to move on the steel bridge under construction. The hanger 3 and the traveling wheel system 4 (for example, a plurality of universal wheels or a plurality of ordinary traveling wheels) can be conventional settings in the field, and those skilled in the art are capable of understanding and implementing it, and the present invention will not repeat it here.
在本实施例中,当行走部1移动时,可以将吊具3下放到在建钢桥上,倾斜的吊绳就可以牵引吊具3移动,所以吊具3不需要悬挂在吊具支架2上(在建钢桥可以对吊具3进行支撑),也就减轻了吊具3对吊具支架2的倾覆性拉力,从而增加了桥面吊机的抗倾覆性,因此桥面吊机的配重也可以减小(减轻自重)。进一步的,当桥面吊机的配重减小时,对在建钢桥的施加的压力也会减小,有利于保持在建钢桥的结构稳定。In this embodiment, when the walking part 1 moves, the sling 3 can be lowered onto the steel bridge under construction, and the inclined sling rope can pull the sling 3 to move, so the sling 3 does not need to be suspended on the sling bracket 2 (the steel bridge under construction can support the sling 3), which reduces the overturning pulling force of the sling 3 on the sling bracket 2, thereby increasing the anti-overturning ability of the bridge crane, so the counterweight of the bridge crane can also be reduced (reducing its own weight). Furthermore, when the counterweight of the bridge crane is reduced, the pressure applied to the steel bridge under construction will also be reduced, which is conducive to maintaining the structural stability of the steel bridge under construction.
在本实施例中,正如本领域技术人员所熟知的,吊具3需要对钢梁节段的中部(钢梁节段的重心位于钢梁节段的中部)进行吊拉;并且当钢梁节段被吊拉到与在建钢桥水平的位置时,钢梁节段与在建钢桥尽头之间必须保留纵向间隔,从而避免钢梁节段在向上吊拉时被在建钢桥干涉。所以在吊具3吊拉钢梁节段时,吊具支架2的起吊中心与在建钢桥尽头的间距应当大于或者等于二分之一钢梁节段长度;同时由于吊具3吊拉钢梁节段之前,吊具3依然需要位于在建钢桥上,所以在建钢桥上预留给吊具3的空间(即行走部1与在建钢桥尽头之间的空间)的长度,应当大于或等于吊具3的长度,从而使得吊具3不会从在建钢桥上坠下。总结来说,当吊机本体被锚固于在建钢桥并对钢梁节段进行吊装时,吊具支架2的起吊中心与行走部1的纵向间距应当大于或者等于二分之一钢梁节段长度和吊具3的长度之和。因此,虽然仅仅是在吊具3上设置了行走轮系4,但是通过控制起吊中心与在建钢桥尽头的间距,实际上还可以在提升抗倾覆性的条件下减轻桥面吊机的自重。另外,正如本领域技术人员所熟知的,吊具支架2的起吊中心包含如下含义:吊具3处于可以对钢梁节段进行吊拉的位置时(此时吊机本体被锚固于在建钢桥,吊具3悬挂在吊具支架2上),吊具3的中心所在位置就是一个起吊中心(为保证吊拉的稳定性,本领域的吊具3设置为对称结构,其重心和中心重合)。当然,当吊具支架2设有多个吊具3时,这些吊具3可以等效为一个等效吊具,该等效吊具的中心所在位置也是一个起吊中心。In this embodiment, as is well known to those skilled in the art, the hoist 3 needs to lift the middle of the steel beam segment (the center of gravity of the steel beam segment is located in the middle of the steel beam segment); and when the steel beam segment is lifted to a position horizontal to the steel bridge under construction, a longitudinal interval must be kept between the steel beam segment and the end of the steel bridge under construction, so as to avoid interference of the steel beam segment by the steel bridge under construction when the steel beam segment is lifted upward. Therefore, when the hoist 3 lifts the steel beam segment, the distance between the lifting center of the hoist bracket 2 and the end of the steel bridge under construction should be greater than or equal to half the length of the steel beam segment; at the same time, since the hoist 3 still needs to be located on the steel bridge under construction before lifting the steel beam segment, the length of the space reserved for the hoist 3 on the steel bridge under construction (i.e., the space between the walking part 1 and the end of the steel bridge under construction) should be greater than or equal to the length of the hoist 3, so that the hoist 3 will not fall from the steel bridge under construction. In summary, when the crane body is anchored to the steel bridge under construction and the steel beam segment is hoisted, the longitudinal distance between the lifting center of the hoist bracket 2 and the walking part 1 should be greater than or equal to the sum of half the length of the steel beam segment and the length of the hoist 3. Therefore, although the walking wheel system 4 is only provided on the hoist 3, by controlling the distance between the lifting center and the end of the steel bridge under construction, the deadweight of the bridge crane can actually be reduced while improving the anti-overturning performance. In addition, as is well known to those skilled in the art, the lifting center of the hoist bracket 2 includes the following meanings: when the hoist 3 is in a position where the steel beam segment can be hoisted (at this time, the crane body is anchored to the steel bridge under construction, and the hoist 3 is suspended on the hoist bracket 2), the position where the center of the hoist 3 is located is a lifting center (in order to ensure the stability of the hoisting, the hoist 3 in this field is set as a symmetrical structure, and its center of gravity coincides with the center). Of course, when the sling bracket 2 is provided with a plurality of slings 3, these slings 3 may be equivalent to an equivalent sling, and the center position of the equivalent sling is also a lifting center.
需要说明的是,和本领域现有的桥面吊机相同,本发明的桥面吊机还包括用于吊拉吊具3的起吊装置,起吊装置设置在行走部1上,起吊装置包括电机和卷绕吊绳的滑轮等;桥面吊机还包括用于使吊机本体保持的平衡的配重结构,配重结构设置在行走部1上;桥面吊机还包括用于支撑吊机本体的多个支撑座,支撑座设置在行走部1的下方。当然,本发明的桥面吊机还可以包括其他的装置。但是本发明不涉及对这些装置的改进(例如位置和结构),本领域技术人员有能力对其进行了解和实现,所以本发明没有对这些装置进行详细说明。It should be noted that, like the existing bridge cranes in the art, the bridge crane of the present invention also includes a lifting device for lifting the sling 3, the lifting device is arranged on the walking part 1, and the lifting device includes a motor and a pulley for winding the lifting rope, etc.; the bridge crane also includes a counterweight structure for keeping the crane body balanced, and the counterweight structure is arranged on the walking part 1; the bridge crane also includes a plurality of support seats for supporting the crane body, and the support seats are arranged below the walking part 1. Of course, the bridge crane of the present invention may also include other devices. However, the present invention does not involve improvements to these devices (such as position and structure), and those skilled in the art are capable of understanding and implementing them, so the present invention does not provide a detailed description of these devices.
如图2所示,在本发明的一个实施例中,吊机本体包括多个横向间隔设置的支撑桁架。每相邻两个支撑桁架之间均通过连接结构9连接。所以所有的支撑桁架可以连接为一个整体,增强了吊机本体的支撑强度,使得吊机本体可以承受大吨位钢梁节段的拉力。As shown in Fig. 2, in one embodiment of the present invention, the crane body includes a plurality of support trusses arranged at intervals in a transverse direction. Each two adjacent support trusses are connected by a connection structure 9. Therefore, all the support trusses can be connected as a whole, thereby enhancing the support strength of the crane body, so that the crane body can withstand the tensile force of the large-tonnage steel beam segment.
如图2所示,在一个优选的实施例中。吊机本体包括四个支撑桁架,分别为第一支撑桁架5、第二支撑桁架6、第三支撑桁架7和第四支撑桁架8。其中,第二支撑桁架6和第三支撑桁架7之间的间距,小于第一支撑桁架5和第二支撑桁架6的间距,也小于第三支撑桁架7和第四支撑桁架8的间距。并且连接结构9优选为横向联结系。当然,支撑桁架和横向联结系均为本领域常见的装置(例如,支撑桁架包括上纵梁,横向联结系包括多个交错连接的连接杆),本领域技术人员有能力了解和实现其结构,本发明在此不再赘述。As shown in FIG2 , in a preferred embodiment. The crane body includes four support trusses, namely a first support truss 5, a second support truss 6, a third support truss 7 and a fourth support truss 8. Among them, the spacing between the second support truss 6 and the third support truss 7 is smaller than the spacing between the first support truss 5 and the second support truss 6, and is also smaller than the spacing between the third support truss 7 and the fourth support truss 8. And the connecting structure 9 is preferably a transverse connection system. Of course, the support truss and the transverse connection system are both common devices in the field (for example, the support truss includes an upper longitudinal beam, and the transverse connection system includes a plurality of staggered connecting rods), and those skilled in the art are capable of understanding and implementing its structure, and the present invention will not be repeated here.
如图1和图2所示,在本发明的一个实施例中,吊具支架2的顶部设有第一横梁10和第二横梁11,并且第一横梁10和第二横梁11之间设有纵向的间隔。吊具支架2通过第一横梁10和第二横梁11来吊设多个吊具3。As shown in Fig. 1 and Fig. 2, in one embodiment of the present invention, a first cross beam 10 and a second cross beam 11 are provided on the top of the hanger bracket 2, and a longitudinal interval is provided between the first cross beam 10 and the second cross beam 11. The hanger bracket 2 hangs a plurality of hangers 3 through the first cross beam 10 and the second cross beam 11.
如图2所示,在一个优选的实施例中,第一横梁10的两端分别吊设有一个吊具3,第二横梁11上可以吊设一个吊具3,这三个吊具3均可以被吊放到在建钢桥上进行移动。在本实施例中,由于两个横梁是间隔开的,所以三个吊具3在自然悬吊的状态时,三个吊具3是彼此间隔开的。当这三个吊具3分别与钢梁节段连接时,三个吊具3与钢梁节段的连接位置呈三角形分布,一方面这种连接方式使得钢梁节段在移动时更加稳定、不易摆动;另一方面这种连接方式还有助于调节钢梁节段在各个方向上的水平度,进一步使得钢梁节段与在建钢桥对接时不易产生缝隙。As shown in FIG2 , in a preferred embodiment, a hanger 3 is respectively suspended at both ends of the first crossbeam 10, and a hanger 3 can be suspended on the second crossbeam 11, and the three hangers 3 can be suspended on the steel bridge under construction for movement. In this embodiment, since the two crossbeams are spaced apart, the three hangers 3 are spaced apart from each other when they are in a naturally suspended state. When the three hangers 3 are respectively connected to the steel beam segment, the connection positions of the three hangers 3 and the steel beam segment are distributed in a triangular shape. On the one hand, this connection method makes the steel beam segment more stable and less likely to swing when moving; on the other hand, this connection method also helps to adjust the horizontality of the steel beam segment in all directions, further making it less likely to produce gaps when the steel beam segment is connected to the steel bridge under construction.
如图1所示,在一个优选的实施例中,第二横梁11位于第一横梁10和行走部1之间。换个角度说,第一横梁10位于第二横梁11和吊具支架2的前端之间。所以第二横梁11上的吊具3更加靠近行走部1。因此钢梁节段在吊装时,靠近在建钢桥的部分更加稳定,有利于对接。As shown in FIG1 , in a preferred embodiment, the second cross beam 11 is located between the first cross beam 10 and the running part 1. In other words, the first cross beam 10 is located between the second cross beam 11 and the front end of the hanger bracket 2. Therefore, the hanger 3 on the second cross beam 11 is closer to the running part 1. Therefore, when the steel beam segment is hoisted, the part close to the steel bridge under construction is more stable, which is conducive to docking.
如图1和图2所示,在一个优选的实施例中,第一支撑桁架5和第四支撑桁架8的顶部与第一横梁10连接,第二支撑桁架6和第三支撑桁架7的顶部与第二横梁11连接。4个支撑桁架均直接承受被吊钢梁节段的荷载,使得4个支撑桁架受力更加均匀。As shown in Fig. 1 and Fig. 2, in a preferred embodiment, the tops of the first supporting truss 5 and the fourth supporting truss 8 are connected to the first cross beam 10, and the tops of the second supporting truss 6 and the third supporting truss 7 are connected to the second cross beam 11. The four supporting trusses directly bear the load of the suspended steel beam segment, so that the four supporting trusses are more evenly stressed.
如图3所示,在本发明的一个实施例中,桥面吊机还包括后端横梁,后端横梁与行走部1的后端连接。后端横梁进一步包括梁主体13和两个活动部14,这两个活动部14分别通过收折装置连接在梁主体13的两端,活动部14设有锚固装置。收折装置包括液压杆、第一连接部和第二连接部,液压杆与第一连接部铰接,第一连接部和第二连接部铰接;第一连接部与活动部14连接,第二连接部与梁主体13连接,而液压杆与吊机本体(例如第一支撑桁架5)连接。在本实施例中,当桥面吊机需要移动时,通过收折装置将活动部14向吊机本体(例如第一支撑桁架5)移动。所以在行走部1的移动过程中,锚固装置不会被在建钢桥上的吊索连接头阻碍。收折装置是本领域常规的装置,本领域技术人员有能力了解和实现,本发明不再进行详细说明。As shown in FIG3 , in one embodiment of the present invention, the bridge crane further includes a rear cross beam, which is connected to the rear end of the walking part 1. The rear cross beam further includes a beam body 13 and two movable parts 14, which are respectively connected to the two ends of the beam body 13 through a folding device, and the movable part 14 is provided with an anchoring device. The folding device includes a hydraulic rod, a first connecting part and a second connecting part, the hydraulic rod is hinged to the first connecting part, and the first connecting part and the second connecting part are hinged; the first connecting part is connected to the movable part 14, the second connecting part is connected to the beam body 13, and the hydraulic rod is connected to the crane body (for example, the first supporting truss 5). In this embodiment, when the bridge crane needs to move, the movable part 14 is moved toward the crane body (for example, the first supporting truss 5) through the folding device. Therefore, during the movement of the walking part 1, the anchoring device will not be blocked by the sling connector on the steel bridge under construction. The folding device is a conventional device in the art, and those skilled in the art are capable of understanding and implementing it, and the present invention will not be described in detail.
如图4所示,在本发明的一个实施例中,吊具支架2的前端设有前端桁架12。前端桁架12包括主梁和多个斜撑杆,主梁通过这些斜撑杆与吊具支架2连接。这些斜撑杆可以彼此交错的布置。当吊具3吊拉钢梁节段时,前端桁架12会使所有的支撑桁架受力均匀、变形协调,增强了吊具支架2的稳定性和结构强度。在一个优选的实施例中,前端桁架12可以与第一支撑桁架5、第二支撑桁架6、第三支撑桁架7和第四支撑桁架8连接,并使这四个支撑桁架受力均匀,变形协调。As shown in FIG4 , in one embodiment of the present invention, a front end truss 12 is provided at the front end of the hanger bracket 2. The front end truss 12 includes a main beam and a plurality of diagonal braces, and the main beam is connected to the hanger bracket 2 through these diagonal braces. These diagonal braces can be arranged in a staggered manner. When the hanger 3 lifts the steel beam segment, the front end truss 12 will make all the supporting trusses evenly stressed and deformed in a coordinated manner, thereby enhancing the stability and structural strength of the hanger bracket 2. In a preferred embodiment, the front end truss 12 can be connected to the first supporting truss 5, the second supporting truss 6, the third supporting truss 7 and the fourth supporting truss 8, and make these four supporting trusses evenly stressed and deformed in a coordinated manner.
下面结合附图对本发明的桥面吊机的使用方法进行说明。The method for using the bridge deck crane of the present invention will be described below in conjunction with the accompanying drawings.
第一步:将吊具支架2上的所有吊具3下放到在建钢桥上;并且当所有吊具3落到桥面上时,继续下放预设长度的吊绳。The first step: lower all the hangers 3 on the hanger bracket 2 onto the steel bridge under construction; and when all the hangers 3 fall onto the bridge deck, continue to lower the hanging rope of the preset length.
第二步:行走部1移动,此时与吊具3连接的吊绳会逐渐张紧。当吊绳完全张紧时,吊绳是倾斜的状态,并且倾斜的吊绳会随着行走部1的移动而牵引吊具3移动。Step 2: The walking part 1 moves, and the rope connected to the sling 3 is gradually tightened. When the rope is fully tightened, the rope is in an inclined state, and the inclined rope will pull the sling 3 to move as the walking part 1 moves.
第三步:行走部1移动预设距离,使吊具支架2的起吊中心与行走部1之间的纵向间距大于或等于二分之一钢梁节段长度与吊具3的长度之和。也就是说,行走部1在移动一段预设距离之后,起吊中心与在建钢桥尽头的间距会大于或等于二分之一钢梁节段长度,从而方便钢梁节段和在建钢桥的对接;而行走部1与在建钢桥尽头的间距会大于或等于吊具3的长度,从而避免吊具3从在建钢桥上坠下。Step 3: The walking part 1 moves a preset distance so that the longitudinal distance between the lifting center of the hanger bracket 2 and the walking part 1 is greater than or equal to the sum of half the length of the steel beam segment and the length of the hanger 3. In other words, after the walking part 1 moves a preset distance, the distance between the lifting center and the end of the steel bridge under construction will be greater than or equal to half the length of the steel beam segment, thereby facilitating the docking of the steel beam segment and the steel bridge under construction; and the distance between the walking part 1 and the end of the steel bridge under construction will be greater than or equal to the length of the hanger 3, thereby preventing the hanger 3 from falling from the steel bridge under construction.
第四步:通过锚固装置将桥面吊机锚固于在建钢桥上。Step 4: Anchor the bridge crane to the steel bridge under construction through the anchoring device.
第五步:通过起吊装置吊拉所有吊具3,使得所有吊具3向上提升并离开在建钢桥的桥面。此时所有吊具3竖直的悬吊(或悬挂)在吊具支架2上。Step 5: All the slings 3 are lifted by the lifting device so that all the slings 3 are lifted upward and leave the bridge deck of the steel bridge under construction. At this time, all the slings 3 are vertically suspended (or hung) on the sling bracket 2.
第六步:将所有吊具3下放到钢梁节段的位置。Step 6: Lower all the hangers 3 to the position of the steel beam segment.
在上述方法中,虽然仅仅在吊具3上设置了行走轮系4,但是通过控制起吊中心与在建钢桥尽头的间距,既可以减轻吊具3对吊具支架2的倾覆性拉力,还可以减轻桥面吊机的自重。In the above method, although only the traveling wheel system 4 is provided on the hoist 3, by controlling the distance between the lifting center and the end of the steel bridge under construction, the overturning pulling force of the hoist 3 on the hoist bracket 2 can be reduced, and the deadweight of the bridge crane can also be reduced.
最后应说明的是:以上实施例仅用以说明本发明的技术方案,而非对其限制;尽管参照前述实施例对本发明进行了详细的说明,本领域的普通技术人员应当理解:其依然可以对前述各实施例所记载的技术方案进行修改,或者对其中部分技术特征进行等同替换;而这些修改或者替换,并不使相应技术方案的本质脱离本发明各实施例技术方案的精神和范围。Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.
Claims (9)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202010391002.3A CN111453630B (en) | 2020-05-09 | 2020-05-09 | Bridge deck crane and use method thereof |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202010391002.3A CN111453630B (en) | 2020-05-09 | 2020-05-09 | Bridge deck crane and use method thereof |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN111453630A CN111453630A (en) | 2020-07-28 |
| CN111453630B true CN111453630B (en) | 2024-07-05 |
Family
ID=71673868
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202010391002.3A Active CN111453630B (en) | 2020-05-09 | 2020-05-09 | Bridge deck crane and use method thereof |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN111453630B (en) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN112209269B (en) * | 2020-10-13 | 2023-05-12 | 湖南省中南桥梁安装工程有限公司 | Multipoint lifting arch climbing crane |
Citations (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN212559207U (en) * | 2020-05-09 | 2021-02-19 | 中铁第五勘察设计院集团有限公司 | bridge crane |
Family Cites Families (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS60202084A (en) * | 1984-03-22 | 1985-10-12 | 三菱重工業株式会社 | Turning hanging beam device |
| JPH06305683A (en) * | 1993-04-20 | 1994-11-01 | Ohbayashi Corp | Load hoisting device for crane |
| CN101279640B (en) * | 2008-05-16 | 2013-07-10 | 游勇 | Ship-shore double supporting type cargo handling machine |
| CN103882811A (en) * | 2014-04-03 | 2014-06-25 | 重庆建工桥梁工程有限责任公司 | Bridge floor crane for cable-stayed bridge |
| CN206941419U (en) * | 2017-04-01 | 2018-01-30 | 中交第二航务工程局有限公司 | A kind of walking mechanism of erection crane |
| CN107165046B (en) * | 2017-06-30 | 2019-01-01 | 中交第二航务工程局有限公司 | A kind of installation method of bridge inspection car |
| CN209397501U (en) * | 2018-10-26 | 2019-09-17 | 中交路桥华南工程有限公司 | Deck crane |
-
2020
- 2020-05-09 CN CN202010391002.3A patent/CN111453630B/en active Active
Patent Citations (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN212559207U (en) * | 2020-05-09 | 2021-02-19 | 中铁第五勘察设计院集团有限公司 | bridge crane |
Also Published As
| Publication number | Publication date |
|---|---|
| CN111453630A (en) | 2020-07-28 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN101462672B (en) | Big elevating capacity and big elevating height hoisting crane | |
| CN101559905A (en) | Deck unit erection gantry | |
| CN104803303B (en) | A kind of single movable-arm floor mast with rock type counter-jib | |
| CN207891749U (en) | A steel box girder hanger | |
| CN110562850A (en) | Main tower integral hoisting system and method | |
| CN113106866B (en) | Counterweight type mounting method of main beam | |
| CN100567129C (en) | A crane lifting device | |
| CN112982183A (en) | Counterweight type mounting system of main beam | |
| CN111453630B (en) | Bridge deck crane and use method thereof | |
| CN105398944B (en) | Steel structure component bikini lifts by crane erecting device | |
| CN115522460A (en) | A method for hoisting stiffening beams of suspension bridges | |
| CN110436335A (en) | A kind of deck unit erection gantry installing mechanism and its application method | |
| CN212559207U (en) | bridge crane | |
| CN204569237U (en) | A kind of oscillating type pole equilibrium arm | |
| CN211971577U (en) | Tower crane system | |
| CN217627283U (en) | Asynchronous hanging basket with triangular truss type hoisting equipment | |
| CN217104777U (en) | Interim landing stage demolishs device | |
| CN214783346U (en) | Counterweight type mounting system of main beam | |
| CN214935275U (en) | Lower lifting appliance assembly for lifting large-span arc-shaped multilayer steel truss | |
| CN115354575A (en) | Multifunctional bridge floor crane for middle cable plane cable-stayed bridge | |
| CN114855631A (en) | Method for installing multi-beam steel cable tower | |
| CN116084302A (en) | A Construction Method for Construction of Concrete Box Girder Sections of Cable-Stayed Bridges Using Pull Cables and Hanging Baskets | |
| CN211496634U (en) | Main tower integral hoisting system | |
| JP7756220B1 (en) | Method and device for erecting a suspended structure for a suspension bridge | |
| CN221720275U (en) | A cap beam lifting auxiliary device |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant |