CN100497833C - High-altitude framework type simple plate supporting machine - Google Patents

High-altitude framework type simple plate supporting machine Download PDF

Info

Publication number
CN100497833C
CN100497833C CNB200710130865XA CN200710130865A CN100497833C CN 100497833 C CN100497833 C CN 100497833C CN B200710130865X A CNB200710130865X A CN B200710130865XA CN 200710130865 A CN200710130865 A CN 200710130865A CN 100497833 C CN100497833 C CN 100497833C
Authority
CN
China
Prior art keywords
truss
lifting
gantry
aisle
wheel box
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CNB200710130865XA
Other languages
Chinese (zh)
Other versions
CN101117794A (en
Inventor
刘俊
曹春元
孙黄花
欧阳平
黄江刚
余本俊
朱琪
贾珍
程晨
张武
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
FORTH ENGINEERING OF ZHONGTIE BRIDGE BUREAU CO LTD
Original Assignee
FORTH ENGINEERING OF ZHONGTIE BRIDGE BUREAU CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by FORTH ENGINEERING OF ZHONGTIE BRIDGE BUREAU CO LTD filed Critical FORTH ENGINEERING OF ZHONGTIE BRIDGE BUREAU CO LTD
Priority to CNB200710130865XA priority Critical patent/CN100497833C/en
Publication of CN101117794A publication Critical patent/CN101117794A/en
Application granted granted Critical
Publication of CN100497833C publication Critical patent/CN100497833C/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

本发明是高空框架式简易架板机,其结构是门架联结梁与门架上立柱相接,门架上立柱与起重桁架走道梁相接,起重桁架走道梁与门架下立柱相接,起重小车设在起重桁架上,起重桁架前、后端点座落在起重桁架走道梁上,前走行轮箱组、后走行轮箱组设置在门架下立柱的下方;前走行轮箱组、后走行轮箱组在运输车运板走道上,前走行轮轨道、后走行轮轨道设在运输车运板走道的下方;钢桁梁上弦杆上设多个钢桁梁上弦节点,钢桁梁上弦杆斜拉接钢桁梁纵梁,电动葫芦挂设在门架联接梁的底面。优点:纵、横向自行,每节间四块砼桥面板一次架设就位;采用常规的万能杆件结构拼装成框架结构,整体稳定性好,抗风载能力强、制作时间短成本低,使用简单、方便。

Figure 200710130865

The invention is a high-altitude frame-type simple erecting machine. Its structure is that the gantry connecting beam is connected with the upper column of the gantry, the upper column of the gantry is connected with the hoisting truss aisle beam, and the hoisting truss aisle beam is connected with the gantry lower column. Then, the lifting trolley is set on the lifting truss, the front and rear end points of the lifting truss are seated on the aisle beam of the lifting truss, the front wheel box group and the rear wheel box group are set under the lower column of the gantry; The traveling wheel box group and the rear traveling wheel box group are located on the aisle of the transport vehicle, and the front and rear wheel tracks are set under the aisle of the transport vehicle; multiple steel truss upper chords are arranged on the upper chord of the steel truss girder Node, the steel truss girder upper chord is cable-stayed to the steel truss girder longitudinal beam, and the electric hoist is hung on the bottom surface of the gantry connecting beam. Advantages: vertical and horizontal self-propelled, four concrete bridge decks in each section are erected in place at one time; the conventional universal rod structure is used to assemble a frame structure, the overall stability is good, the wind load resistance is strong, the production time is short and the cost is low, and the use easy and convenient.

Figure 200710130865

Description

高空框架式简易架板机 High-altitude frame type simple racking machine

技术领域 technical field

本发明涉及的是高空框架式简易架板机,属于高空框架式架板机技术领域。The invention relates to a high-altitude frame-type simple lifting machine, which belongs to the technical field of high-altitude frame-type lifting machines.

背景技术 Background technique

通常板桁组合结构梁的砼桥面板在块件尺寸适当、自重不大、墩身高度较低时采取前几节间在地面上用吊机架设完成后,将轮胎式汽车吊机吊至桥面上进行前方砼桥面板架设。然而在砼桥面板结构尺寸较大(11.52x5.62m),重量大(400KN)的大型桥梁建设中,若采用汽车吊机上桥面上去架梁有以下缺陷:因为桥面板结构尺寸较大,使用单台移动式吊机作业时(受桥面上条件限制,边板只能用单台吊机架设),工作半径至少在9m以上,因此需使用一台额定起重量在100t以上的汽车吊机进行架板作业;由于此时桥面上吊机站位处的砼桥面板尚未进行现浇湿接缝浇筑,无法与钢桁梁形成板桁结构来共同受力,只能以三边(或四边)支承的简支板来进行砼桥面板施工状态受力检算,应该说此种施工方案砼桥面板的设计是由施工荷载控制,需要加大设计断面;受移动式吊机工作半径的限制,每架设一块砼桥面板,吊机要调整位置一次,每节间的4块砼板面板不能一次架设到位,施工较为繁琐。Usually, when the concrete bridge deck of the slab-truss composite structure beam is of appropriate size, small self-weight, and low pier height, the first few sections are erected on the ground with a crane, and the tire-type truck crane is hoisted to the bridge. The front concrete bridge deck is erected on the surface. However, in the construction of a large-scale bridge with a large concrete bridge deck structure (11.52x5.62m) and a large weight (400KN), if the truck crane is used to erect the beam on the bridge surface, there are the following defects: because the bridge deck structure is large in size, the use of When working with a single mobile crane (limited by the conditions on the bridge surface, the side slab can only be erected with a single crane), the working radius is at least 9m, so a car crane with a rated lifting capacity of more than 100t is required Carry out slab erection work; since the concrete bridge deck at the crane station on the bridge deck has not yet been poured in-situ with wet joints, it cannot form a slab truss structure with the steel truss girder to bear the force together, so it can only be used on three sides (or four sides) ) supported simply supported slabs to check the force of the concrete bridge deck construction state. It should be said that the design of the concrete bridge deck in this construction scheme is controlled by the construction load, and the design section needs to be enlarged; it is limited by the working radius of the mobile crane , every time a concrete bridge deck is erected, the crane needs to adjust its position once, and the 4 concrete deck panels in each section cannot be erected in place at one time, and the construction is more cumbersome.

发明内容 Contents of the invention

本发明旨在针对上述的缺陷,提出一种高空框架式简易架板机,实现用一台额定起重量为100t以上的汽车吊机完成架板作业。The present invention aims at above-mentioned defect, proposes a kind of high-altitude frame type simple erecting machine, realizes to complete the erecting operation with a car crane whose rated lifting capacity is more than 100t.

本发明的技术解决方案:其结构是包括门架联结梁、门架上立柱、门架下立柱、起重桁架走道梁、起重桁架、起重小车、和走行系统;其中门架联结梁与门架上立柱相接,门架上立柱与起重桁架走道梁相接,起重桁架走道梁与门架下立柱相接,起重小车设在起重桁架上,起重桁架前、后端点座落在起重桁架走道梁上,走行系统中的前走行轮箱组、后走行轮箱组设置在门架下立柱的下方;各节间钢桁梁上弦杆通过上弦节点联成整体,走行系统中的前走行轮箱组在钢桁梁上弦杆上的前走行轮轨道上行走、后走行轮箱组在已架设的砼桥面板上的后走行轮轨道上行走;运输车运板走道布置在砼桥面板中板上(起重桁架走道梁跨内);电动葫芦挂设在门架联接梁的底面。Technical solution of the present invention: its structure is to comprise gantry connecting beam, gantry upper column, gantry lower column, lifting truss aisle beam, lifting truss, lifting trolley, and running system; wherein gantry connecting beam and The upper column of the gantry is connected, the upper column of the gantry is connected with the aisle beam of the lifting truss, the aisle beam of the lifting truss is connected with the lower column of the gantry, the lifting trolley is set on the lifting truss, and the front and rear ends of the lifting truss It is located on the aisle beam of the lifting truss, and the front wheel box group and the rear wheel box group in the running system are set under the lower column of the gantry; The front wheel box group in the system walks on the front wheel track on the upper chord of the steel truss girder, and the rear wheel box set walks on the rear wheel track on the erected concrete bridge deck; On the middle plate of the concrete bridge deck (inside the beam span of the hoisting truss walkway); the electric hoist is hung on the bottom surface of the gantry connecting beam.

本发明的优点:简易架板机是为架设大型公路桥板桁结合连续梁的砼桥面板而自行研制的一种大型起重设备,它具有纵、横向自行,每节间四块砼桥面板一次架设到位的特点,根据龙门起重机械的工作原理,设在40多米高的桥面上作业,作业面积达75平方米,是大结构尺寸(11.52 X 5.62m)、大重量(400KN)公路板桁结合连续梁砼桥面板专用架设设备;本架板机采取上侧(横向)分离式双门架联结梁;下侧四个大车走行轮箱拉开距离,上设即做为一侧两支腿的联结梁,又兼做起重桁梁的轨道梁,使形成框架的架板机结构即满足该大型起重设备的纵、横向自行功能,又增加高空作业的抗风载能力,具有整体稳定性优良的功能;引入固定工厂车间桁车结构原理,将起重桁架布置在门架立柱上承担砼桥面板吊装时的起重桁梁轨道梁;两个门架横梁下均挂设3t电动葫芦,用于高空作业的架板机前、后走行轮轨道设备的安装,真正实现全机械化作业;框架式简易架板机构架主要采用建筑工程常规的万能杆件拼装,具有制作、组拼时间短,成本较低,投资小的特点,即有可观的经济和社会效益,又拓展了常规式万能杆件拼装大型起重设备的新空间;通过结构受力分析和现场使用,框架式简易架板机完全可作为一种大型起重机械架设大面积板件,为起重机械结构的发展开拓了一个新途径;四个独立设置的走行轮箱按横向12m、纵向26m的间距布置,稳定性好。桁架走道梁架高设置,使运板车可从走道梁下穿过,砼板可一次运输到位,使用简单、方便。Advantages of the present invention: the simple erecting machine is a large-scale lifting device developed by itself for erecting concrete bridge decks of large-scale highway bridge trusses combined with continuous beams. The feature of erecting in place at one time, according to the working principle of the gantry crane, is set up to operate on the bridge deck with a height of more than 40 meters, with an operating area of 75 square meters. It is a large structural size (11.52 X 5.62m), heavy weight (400KN) highway Special erection equipment for slab truss combined with continuous girder concrete bridge deck; the erection machine adopts the upper side (horizontal) separated double-gantry connecting beam; the four cart wheel boxes on the lower side are separated from each other, and the upper side is used as one side The connecting beam of the two legs is also used as the track beam of the lifting truss beam, so that the erecting machine structure forming the frame not only meets the vertical and horizontal self-propelled functions of the large-scale lifting equipment, but also increases the wind load resistance of high-altitude operations. It has the function of excellent overall stability; the principle of fixed factory workshop truss car structure is introduced, and the lifting truss is arranged on the gantry column to bear the lifting truss track beam when the concrete bridge deck is hoisted; both gantry beams are hung under The 3t electric hoist is used for the installation of the front and rear wheel track equipment of the racking machine for high-altitude operations, and truly realizes fully mechanized operations; It has the characteristics of short assembly time, low cost and small investment, which not only has considerable economic and social benefits, but also expands the new space for assembling large-scale lifting equipment with conventional universal rods; through structural force analysis and on-site use, frame type The simple racking machine can be used as a large-scale hoisting machine to erect large-area panels, which opens up a new way for the development of hoisting machine structures; four independently set traveling wheel boxes are arranged at a distance of 12m in the horizontal direction and 26m in the vertical direction. Good stability. The height of the truss aisle beam is set so that the trolley can pass under the aisle beam, and the concrete slab can be transported in place at one time, which is simple and convenient to use.

附图说明 Description of drawings

附图1是架板机门架平面(纵向)立面图。Accompanying drawing 1 is a planar (longitudinal) elevation view of a door frame of a trigger plate machine.

附图2是架板机前走行断面图。Accompanying drawing 2 is the cross-sectional view of running before the trigger.

附图3是架板机后走行断面图。Accompanying drawing 3 is the traveling sectional view behind the trigger.

附图4是钢桁架上砼桥面板布置图。Accompanying drawing 4 is the layout diagram of the concrete bridge deck on the steel truss.

图中的1是门架联结梁、2是门架上立柱、3是门架下立柱、4是起重桁架走道梁、5是起重桁架、6是起重小车、7是前走行轮箱组、8是后走行轮箱组、9是电动葫芦、10是前走行轮轨道、11是后走行轮轨道、12是运输车运板走道、13是砼桥面板运输车、14是砼桥面板、15是钢桁梁上弦杆、16是钢桁梁纵梁、17是砼桥面板中板、18是砼桥面板边板、19是钢桁梁上弦节点。In the figure, 1 is the connecting beam of the gantry, 2 is the upper column of the gantry, 3 is the lower column of the gantry, 4 is the aisle beam of the lifting truss, 5 is the lifting truss, 6 is the lifting trolley, and 7 is the front wheel box Group, 8 is the rear traveling wheel box group, 9 is the electric hoist, 10 is the front traveling wheel track, 11 is the rear traveling wheel track, 12 is the aisle of the transport vehicle, 13 is the concrete bridge deck transport vehicle, 14 is the concrete bridge deck 15 is the upper chord of the steel truss girder, 16 is the longitudinal girder of the steel truss girder, 17 is the middle plate of the concrete bridge deck, 18 is the side plate of the concrete bridge deck, and 19 is the upper chord node of the steel truss girder.

具体实施方式 Detailed ways

对照附图,其结构是包括门架联结梁1、门架上立柱2、门架下立柱3、起重桁架走道梁4、起重桁架5、起重小车6、和走行系统;其中门架联结梁1与门架上立柱2相接,门架上立柱2与起重桁架走道梁4相接,起重桁架走道梁4与门架下立柱3相接,起重小车6设在起重桁架5上,起重桁架前、后端点座落在起重桁架走道梁4上,走行系统中的前走行轮箱组7、后走行轮箱组8设置在门架下立柱3的下方;各节间钢桁梁上弦杆通过上弦节点联成整体,走行系统中的前走行轮箱组7在钢桁梁上弦杆上的前走行轮轨道10上行走、后走行轮箱组8在已架设的砼桥面板上的后走行轮轨道11上行走;运输车运板走道12布置在砼桥面板中板17上(起重桁架走道梁跨内);电动葫芦9挂设在门架联接梁1的底面。Referring to the accompanying drawings, its structure includes gantry connecting beam 1, gantry upper column 2, gantry lower column 3, lifting truss aisle beam 4, lifting truss 5, lifting trolley 6, and running system; wherein the gantry The connecting beam 1 is connected with the upper column 2 of the gantry, the upper column 2 of the gantry is connected with the aisle beam 4 of the hoisting truss, the aisle beam 4 of the hoisting truss is connected with the lower column 3 of the gantry, and the lifting trolley 6 is set on the lifting platform. On the truss 5, the front and rear end points of the lifting truss are located on the aisle beam 4 of the lifting truss, and the front traveling wheel box group 7 and the rear traveling wheel box group 8 in the traveling system are arranged under the lower column 3 of the gantry; The upper chords of the steel truss girders are connected as a whole through the upper chord nodes. The front wheel box group 7 in the running system travels on the front wheel track 10 on the steel truss upper chord, and the rear wheel box group 8 runs on the erected The rear walking wheel track 11 on the concrete bridge deck walks; the transport vehicle board walkway 12 is arranged on the middle plate 17 of the concrete bridge deck (inside the beam span of the lifting truss walkway); the electric hoist 9 is hung on the door frame connecting beam 1 bottom surface.

四个大车走行轮支点按横向12m、纵向26m的大间距布置。The fulcrums of the four cart running wheels are arranged at a large interval of 12m in the horizontal direction and 26m in the vertical direction.

起重桁架架高设置,砼板运输车可从起重桁架走道梁下方直接运至起重桁架跨内;门架横梁下挂设电动葫芦安装走行轮轨道设备。The height of the hoisting truss is set, and the concrete slab transport vehicle can be directly transported from the bottom of the aisle beam of the hoisting truss to the inner span of the hoisting truss; the electric hoist is hung under the beam of the gantry to install the traveling wheel track equipment.

采用建筑工程常规的万能杆件结构拼装。It is assembled with the conventional universal rod structure of construction engineering.

构成简易框架式架板机构架的主要部件门架联结梁1、门架上立柱2、门架下立柱3、起重桁架走道梁4,乃是抵抗风载、承受起重桁架移动荷载、保持整机工作稳定性的主要受力结构。The main components of the simple frame-type truss-plate mechanism frame are the gantry connecting beam 1, the upper column of the gantry 2, the lower column of the gantry 3, and the lifting truss walkway beam 4, which are used to resist wind loads, withstand the moving load of the lifting truss, and maintain The main force-bearing structure of the machine's working stability.

起重桁梁5是起吊桥面板的主桁梁,跨度24米,起重桁梁结构也用万能杆件组拼,起重能力500KN,通过在起重桁架走道梁上左右移动、起重小车的前后移动,来实现的砼桥面板的起吊、对位、架设作业。Lifting truss girder 5 is the main truss girder for lifting the deck of the bridge, with a span of 24 meters. The lifting truss girder structure is also assembled with universal rods, with a lifting capacity of 500KN. To realize the lifting, alignment and erection of the concrete bridge deck by moving back and forth.

起重小车6由一台75KN卷扬机,倍率为10的滑车组组成,起重能力为500KN,可以沿起重桁梁前、后移动。Lifting trolley 6 is made up of a 75KN winch, the block block group that magnification is 10, and lifting capacity is 500KN, can move forward and backward along the lifting truss beam.

门架纵向走行四组轮箱组均为主动轮箱,前两组走行轮箱组7在钢桁梁上弦杆17上设钢枕+钢轨轨道上行走,后两组走行轮箱组8在已架设的砼桥面板上铺设枕木+钢轨轨道上行走。The four groups of wheel boxes running longitudinally on the mast are all active wheel boxes. The first two groups of wheel box groups 7 are set on the upper chord 17 of the steel truss beam with steel sleepers + rail tracks, and the last two groups of wheel box groups 8 are on the existing The erected concrete bridge deck is laid with sleepers + steel rails to walk on.

电动葫芦9起吊重量30KN,挂设在门架联接梁底面,用来铺拆架板机走行轨道,以便实现桥面板架设的全机械化作业。The electric hoist 9 has a lifting weight of 30KN and is hung on the bottom surface of the gantry connecting beam, which is used to spread and disassemble the running track of the trigger plate, so as to realize the fully mechanized operation of bridge deck erection.

所需材料与机具设备Required materials and equipment

  序号 名称 重量(t) 备注 1 万能杆件 125.3 包括15%的螺栓重量 2 新制杆件 47.1 包括15%的螺栓重量 3 卷扬机及走行天车 15.0 4 500KN天车 1个 5 30KN电动葫芦 2个 6 走行减速器 6个 7 7.5KW电机 6个 serial number name Weight (t) Remark 1 Universal rod 125.3 Include 15% of bolt weight 2 New bar 47.1 Include 15% of bolt weight 3 Hoist and traveling crane 15.0 4 500KN Crane 1 5 30KN electric hoist 2 6 travel reducer 6 7 7.5KW motor 6

简易架板机主要受力桁架采用的是桥梁建筑企业施工中常规的万能杆件材料,为了将在桁架走道梁上行走的起重桁架结构和砼板重量直接传递至已架设的正桥钢桁梁上,门架上立柱在门架平面上选用了1m的异型结构,该部分杆件斜杆、横杆与节点板均为新制件。The main force-bearing truss of the simple erecting machine adopts the conventional universal rod material in the construction of bridge construction enterprises. On the beam, the column on the portal frame adopts a special-shaped structure of 1m on the portal frame plane, and the oblique bars, cross bars and gusset plates of this part are all new parts.

在简易架板机其纵、横向受力可简化成刚性门架模式,设计时对架板机门架纵、横向横梁的挠度按f≤L/700、稳定倾覆系数K≥1.3、自振周期T≤[T]=0.3s进行强度、刚度、整体稳定和自振周期校核。The longitudinal and lateral forces of the simple erecting machine can be simplified into a rigid mast mode, and the deflection of the longitudinal and transverse beams of the mast of the erecting machine is designed according to f≤L/700, the stable overturning coefficient K≥1.3, and the natural vibration period T≤[T]=0.3s to check the strength, stiffness, overall stability and natural vibration period.

砼桥面板架设工艺流程:Concrete bridge deck erection process:

砼桥面板吊装、运输→用高架龙门吊机架设前三个节间砼桥面板→框架式简易架板机拼装→砼桥面板运输、提升(用高架龙门吊机)→桥面上砼桥面板运输至架板位置→架设中板17→架设边板18→砼桥面板固定→架板机轨道铺设→架板机前移至下一节间→架设下一节间砼桥面板。Hoisting and transportation of the concrete bridge deck → Erection of the first three inter-node concrete bridge decks with an elevated gantry crane → Assembly of the frame-type simple erection machine → Transportation and lifting of the concrete bridge deck (with an elevated gantry crane) → Transport of the concrete bridge deck on the bridge surface to The position of the erecting plate → erecting the middle plate 17 → erecting the side plate 18 → fixing the concrete bridge deck → laying the track of the erecting machine → moving the erecting machine forward to the next section → erecting the concrete bridge deck of the next section.

用桥头地面高架龙门吊机架设前三节间钢桁梁顶砼桥面板,用高架龙门吊机和50t汽车吊机拼装架板机走行轨道、框架式架板机构架,并试吊。Use the ground elevated gantry crane at the bridge head to erect the steel truss girder top concrete bridge deck between the first three sections, use the elevated gantry crane and 50t truck crane to assemble the running track of the plate machine, the frame plate frame, and test the hoisting.

用高架龙门吊机将从预制场运到的砼桥面板提升,吊放在板面上的运板车上,运输车前移(从后支点起重桁架梁下穿过),运送砼桥面板至框架式简易架板机跨内(见图3)。Use the overhead gantry crane to lift the concrete bridge deck transported from the precast yard, hang it on the pallet truck on the deck, and move the transport truck forward (passing under the lifting truss beam from the rear fulcrum), and transport the concrete bridge deck to the The frame-type simple shelf machine spans inside (see Figure 3).

起重小车后移,起吊砼桥面中板(砼桥面中板与边板在钢桁梁上的布置见图4),起重桁架横向移动,对准待架板的位置(中板位置),起重小车再前移至架设节间,下落、架设砼桥面中板;起重小车再用同样的方法分别架设该节间的另一块中板和两侧边板。The lifting trolley moves backward, lifts the middle plate of the concrete bridge deck (see Figure 4 for the arrangement of the middle plate and side plates of the concrete bridge deck on the steel truss girder), and the lifting truss moves laterally to align with the position of the plate to be erected (the position of the middle plate ), the lifting trolley moves forward to the erection section, falls and erects the middle plate of the concrete bridge deck; the lifting trolley uses the same method to erect another middle plate and two side panels of the intersection respectively.

用门架联结梁下挂设的3t电动葫芦,安装下一节间主纵梁上架板机前支点走行轮轨道10(钢枕+钢轨)和架板机后支点走行轮轨道11(枕木+钢轨),用起重桁架安装砼桥面上运输车运板走道。Use the 3t electric hoist hung under the gantry connecting beam to install the running wheel track 10 (steel sleeper + rail) at the front fulcrum of the trigger on the main longitudinal beam in the next section and the running wheel track 11 (steel sleeper + steel rail) at the rear fulcrum of the trigger ), use the lifting truss to install the transport vehicle board walkway on the concrete bridge surface.

架板机整机前移至下一节间,按以上步骤进行下一节间砼桥面板架设。The erection machine is moved forward to the next section, and the concrete bridge deck of the next section is erected according to the above steps.

Claims (4)

1、高空框架式简易架板机,其特征是包括门架联结梁、门架上立柱、门架下立柱、起重桁架走道梁、起重桁架、起重小车和走行系统;其中门架联结梁与门架上立柱相接,门架上立柱与起重桁架走道梁相接,起重桁架走道梁与门架下立柱相接,起重小车设在起重桁架上,起重桁架前、后端点座落在起重桁架走道梁上,走行系统中的前走行轮箱组、后走行轮箱组设置在门架下立柱的下方;各节间钢桁梁上弦杆通过上弦节点联成整体,走行系统中的前走行轮箱组在钢桁梁上弦杆上的前走行轮轨道上、后走行轮箱组在已架设的砼桥面板上的后走行轮轨道上;运输车运板走道布置在砼桥面板中板上;电动葫芦挂设在门架联接梁的底面。1. The high-altitude frame-type simple lifting machine is characterized by including the gantry connecting beam, the gantry upper column, the gantry lower column, the lifting truss aisle beam, the lifting truss, the lifting trolley and the running system; The beam is connected with the upper column of the gantry, the upper column of the gantry is connected with the aisle beam of the lifting truss, the aisle beam of the lifting truss is connected with the lower column of the gantry, the lifting trolley is set on the lifting truss, the front of the lifting truss, The rear end point is located on the aisle beam of the hoisting truss, and the front wheel box group and the rear wheel box group in the running system are set under the lower column of the mast; the upper chords of the steel truss beams in each section are connected as a whole through the upper chord nodes , the front wheel box group in the running system is on the front wheel track on the steel truss upper chord, and the rear wheel box set is on the rear wheel track on the erected concrete bridge deck; On the middle plate of the concrete bridge deck; the electric hoist is hung on the bottom surface of the portal frame connecting beam. 2、根据权利要求1所述的高空框架式简易架板机,其特征是四个走行轮支点按横向12m、纵向26m的大间距布置。2. The high-altitude frame-type simple lifting machine according to claim 1, characterized in that the four traveling wheel fulcrums are arranged at a large interval of 12m in the horizontal direction and 26m in the vertical direction. 3、根据权利要求1所述的高空框架式简易架板机,其特征起重桁架架高设置,砼板运输车从后支点起重桁架走道梁下直接运至起重桁架跨内;门架联结梁下挂设电动葫芦安装走行轮轨道设备。3. The high-altitude frame-type simple erecting machine according to claim 1, characterized in that the height of the lifting truss is set, and the concrete slab transport vehicle is directly transported from the rear fulcrum under the lifting truss aisle beam to the inner span of the lifting truss; An electric hoist is hung under the connecting beam to install the traveling wheel track equipment. 4、根据权利要求1所述的高空框架式简易架板机,其特征是采用建筑工程常规的万能杆件结构拼装。4. The high-altitude frame-type simple erecting machine according to claim 1, characterized in that it is assembled by using a conventional universal rod structure in construction engineering.
CNB200710130865XA 2007-08-21 2007-08-21 High-altitude framework type simple plate supporting machine Active CN100497833C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB200710130865XA CN100497833C (en) 2007-08-21 2007-08-21 High-altitude framework type simple plate supporting machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB200710130865XA CN100497833C (en) 2007-08-21 2007-08-21 High-altitude framework type simple plate supporting machine

Publications (2)

Publication Number Publication Date
CN101117794A CN101117794A (en) 2008-02-06
CN100497833C true CN100497833C (en) 2009-06-10

Family

ID=39054046

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB200710130865XA Active CN100497833C (en) 2007-08-21 2007-08-21 High-altitude framework type simple plate supporting machine

Country Status (1)

Country Link
CN (1) CN100497833C (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102020204A (en) * 2010-08-06 2011-04-20 中铁八局集团第一工程有限公司 Assembly type ultrahigh heavy-load portal crane
CN105648920B (en) * 2016-01-26 2017-09-26 盈都桥梁钢构工程有限公司 A kind of construction method for hanging of bridge floor shoulder pole girder
CN106800245B (en) * 2017-01-25 2019-01-25 中铁大桥局集团第一工程有限公司 Hanger, hoisting device and hoisting method for bridge deck hoisting
CN106760684B (en) * 2017-02-28 2024-01-09 中国五冶集团有限公司 Bleacher board installation system and installation method
CN110374009B (en) * 2019-07-22 2020-12-29 中铁大桥局集团有限公司 A method for improving the construction efficiency of a full-rotating bridge erecting machine
CN111441250A (en) * 2020-04-02 2020-07-24 中交一公局集团有限公司 Method for transporting upper bridge deck in double-layer steel-concrete composite beam
CN113979318A (en) * 2021-11-15 2022-01-28 中铁大桥局集团有限公司 Truss car for railway bridge deck system in steel truss girder and using method thereof
CN116607417B (en) * 2023-04-13 2023-12-29 中铁大桥局集团第二工程有限公司 Synchronous erection device for straddle type track beam and maintenance channel and construction method thereof

Also Published As

Publication number Publication date
CN101117794A (en) 2008-02-06

Similar Documents

Publication Publication Date Title
CN100497833C (en) High-altitude framework type simple plate supporting machine
CN203529768U (en) Portal crane walking for operation on building surface
CN109183618B (en) Bridge girder erection machine for rapid construction of prefabricated bridge
CN104097253B (en) Cross-saddle single-track traffic environment protection movable formula pre-track beam forms system
CN109024291A (en) A kind of integration Bridge Erector and its working method
CN110158486B (en) Bridge girder erection machine for erecting spliced wide beams and construction method
CN115058957B (en) Dual-purpose trestle support structure
CN102154988A (en) Arch-after-girder construction method of large-span steel box tacked arch bridge
CN101481903B (en) The method of erecting the main truss of the suspension bridge in mountainous area by reversing the cable-span crane
CN204109135U (en) Cross-saddle single-track traffic environment protection movable formula pre-track beam forms system
CN110130937B (en) Tunnel construction trolley
CN114808747A (en) Multifunctional bridge girder erection machine and bridge girder erection construction method
CN112211112A (en) Steel box girder installation method adopting double-guide-girder erection machine on existing bridge
CN109680614B (en) Method and equipment for quickly transferring ultra-large bridge girder erection machine of assembled steel-concrete combined bridge
CN104746432B (en) The feasible bridge guidance tape in plate-beam transports installs car
CN212505899U (en) Lightweight prestressing trackless construction hanging basket
CN221142500U (en) Steel truss girder falling construction tool
CN116043698B (en) Construction method of side prefabricated field frame beam
CN216377240U (en) Truss car for railway bridge deck system in steel truss girder
KR102584444B1 (en) Installation method of bridge superstructure using temporary through truss
CN201106154Y (en) Upper air frame type simple racking machine
CN102535351B (en) Web plate type bridge fabrication machine for constructing bridge under strong wind and high altitude conditions and construction process
CN118979438A (en) A construction method for erecting and installing large-span steel trusses in sections and pieces
CN201891087U (en) Auxiliary girder feeding platform of transport rack integrated machine
CN212714587U (en) Equipment for removing and rebuilding superstructure of widened bridge across electrified railway

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant