CN105648920B - A kind of construction method for hanging of bridge floor shoulder pole girder - Google Patents
A kind of construction method for hanging of bridge floor shoulder pole girder Download PDFInfo
- Publication number
- CN105648920B CN105648920B CN201610052382.1A CN201610052382A CN105648920B CN 105648920 B CN105648920 B CN 105648920B CN 201610052382 A CN201610052382 A CN 201610052382A CN 105648920 B CN105648920 B CN 105648920B
- Authority
- CN
- China
- Prior art keywords
- floorings
- shoulder pole
- pole girder
- bridge
- steel wire
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 17
- 238000009408 flooring Methods 0.000 claims abstract description 40
- 238000009434 installation Methods 0.000 claims abstract description 15
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 13
- 239000010959 steel Substances 0.000 claims abstract description 13
- 239000000725 suspension Substances 0.000 claims abstract description 4
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000011900 installation process Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
The invention belongs to field of bridge construction, and in particular to a kind of construction method for hanging of bridge floor shoulder pole girder, comprise the following steps:Step 1: setting horizontal shoulder pole girder on cable suspension hook, control cable crane steel wire rope length tilts shoulder pole girder;Step 2: the corresponding two ends of floorings hang steel wire rope lifting floorings on shoulder pole girder, two floorings are once lifted by crane;Step 3: the first floorings of cable crane dolly handling are to installation site, highly, then the first floorings low side is positioned to bridge location screens, and shoulder pole girder continues to reduce for shoulder pole girder reduction, and the high-end positioning of the first floorings completes the first floorings and installed to bridge location;Step 4: the positioning construction of the second floorings is identical with the first floorings;Shoulder pole girder two ends hang the different steel wire rope of length respectively, and contraposition is assembled during facilitating floorings to fall beam.
Description
Technical field
The invention belongs to field of bridge construction, and in particular to a kind of construction method for hanging of bridge floor shoulder pole girder.
Background technology
Bridge steel box-girder, because bridge location geographical position is special, the multiple factors such as bridge structure complexity take cable crane to bridge
Component is lifted.In bridge floor Slab element carries out installation process, former construction method is to use cable crane monolithic bridge counter plate list
Element is installed, and there is lifting progress slowly, installation effectiveness is low.In view of this, the applicant provides a kind of bridge floor shoulder pole girder
Construction method for hanging, thus this case produce.
The content of the invention
It is an object of the invention to provide a kind of construction method for hanging of bridge floor shoulder pole girder, shoulder pole girder two ends hang length respectively
The different steel wire rope of degree, contraposition is assembled during facilitating floorings to fall beam.
To achieve the above object, the technical scheme that the utility model is specifically provided is:A kind of lifting of bridge floor shoulder pole girder is applied
Work method, comprises the following steps:
Step 1: setting horizontal shoulder pole girder on cable suspension hook, control cable crane steel wire rope length tilts shoulder pole girder;
Step 2: the corresponding two ends of floorings hang steel wire rope lifting floorings on shoulder pole girder, two bridge floors are once lifted by crane
Plate;
Step 3: the first floorings of cable crane dolly handling are to installation site, shoulder pole girder reduces height, then the first floorings
Low side is positioned to bridge location screens, and shoulder pole girder continues to reduce, and the high-end positioning of the first floorings completes the first floorings peace to bridge location
Dress;
Step 4: the second floorings of cable crane dolly handling are to installation site, shoulder pole girder reduces height, then the second floorings
Low side is positioned to one end screens of the first floorings, and shoulder pole girder continues to reduce, and the high-end positioning of the second floorings is completed to bridge location
The installation of integrated deck plate;Step 5: repeat the above steps two to four, the installation up to completing integrated deck plate.
Further, in the step one:Cable crane steel wire rope length is controlled to make the inclined angle of shoulder pole girder be 5 degree to 15
Degree.
Beneficial effects of the present invention:First, the construction method after improving, substantially increases the lifting speed of live floorings,
The daily workload that can be only done five was lifted with cable crane monolithic in the past, by eight plain films can be completed after improvement daily, was pacified
Dress efficiency is doubled, and shortens installation period, to completing construction task on schedule there is provided powerful guarantee.
2nd, in-site installation cost is substantially reduced, and the operating efficiency of workman and plant equipment is substantially increased after improvement, is reduced
The unnecessary work holdup and plant equipment are idle, greatly save construction cost.
3rd, compared with before improvement, assembled Quality advance.The lifting of shoulder pole girder point two, is easy to assembled positioning, to the big of appearance
Gap, beam section torsional deformation, can more accurately judge adjustment, improve the assembled welding quality of beam section
Brief description of the drawings
Fig. 1 is present invention construction simple diagram.
Embodiment
As shown in figure 1, disclose is a kind of construction method for hanging of bridge floor shoulder pole girder to the present invention, comprise the following steps:
Step 1: setting horizontal shoulder pole girder 1 on cable suspension hook, control cable crane steel wire rope length tilts shoulder pole girder
Angle is 5 degree to 15 degree, typically takes 10 degree;
Step 2: the corresponding two ends of floorings hang steel wire rope lifting floorings on shoulder pole girder 1, two bridge floors are once lifted by crane
Plate;
Step 3: the first floorings of cable crane dolly handling 2 are to installation site, shoulder pole girder reduces height, then the first bridge floor
The low side of plate 2 is positioned to bridge location screens, and shoulder pole girder continues to reduce, and the high-end positioning of the first floorings 2 completes the first bridge floor to bridge location
Plate 2 is installed;
Step 4: the second floorings of cable crane dolly handling 3 are to installation site, shoulder pole girder reduces height, then the second bridge floor
The low side of plate 3 is positioned to one end screens of the first floorings 2, and shoulder pole girder continues to reduce, the high-end positioning of the second floorings 3 to bridge
Position, completes the installation of integrated deck plate;
Step 5: repeat the above steps two to four, the installation up to completing integrated deck plate.
Claims (2)
1. a kind of construction method for hanging of bridge floor shoulder pole girder, it is characterised in that comprise the following steps:Step 1: in cable suspension hook
Upper to set horizontal shoulder pole girder, control cable crane steel wire rope length tilts shoulder pole girder;
Step 2: the corresponding two ends of floorings hang steel wire rope lifting floorings on shoulder pole girder, two floorings are once lifted by crane;
Step 3: the first floorings of cable crane dolly handling are to installation site, shoulder pole girder reduces height, then the first floorings low side
Positioning is to bridge location screens, and shoulder pole girder continues to reduce, and the high-end positioning of the first floorings completes the first floorings and installed to bridge location;
Step 4: the second floorings of cable crane dolly handling are to installation site, shoulder pole girder reduces height, then the second floorings low side
Position to one end screens of the first floorings, shoulder pole girder continues to reduce, the high-end positioning of the second floorings to bridge location;
Step 5: repeat the above steps two to four, the installation up to completing integrated deck plate.
2. a kind of construction method for hanging of bridge floor shoulder pole girder according to claim 1, it is characterised in that the step one
In:Cable crane steel wire rope length is controlled to make the inclined angle of shoulder pole girder be 5 degree to 15 degree.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610052382.1A CN105648920B (en) | 2016-01-26 | 2016-01-26 | A kind of construction method for hanging of bridge floor shoulder pole girder |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610052382.1A CN105648920B (en) | 2016-01-26 | 2016-01-26 | A kind of construction method for hanging of bridge floor shoulder pole girder |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105648920A CN105648920A (en) | 2016-06-08 |
CN105648920B true CN105648920B (en) | 2017-09-26 |
Family
ID=56486955
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610052382.1A Expired - Fee Related CN105648920B (en) | 2016-01-26 | 2016-01-26 | A kind of construction method for hanging of bridge floor shoulder pole girder |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105648920B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106012854B (en) * | 2016-06-22 | 2017-07-28 | 青岛蓝天创先科技服务有限公司 | The transporting equipment of prefabricated assembled overpass bridge plate |
Family Cites Families (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101029470A (en) * | 2007-03-17 | 2007-09-05 | 何富荣 | Hydraulic spile bridge and dyke construction |
CN100497833C (en) * | 2007-08-21 | 2009-06-10 | 中铁大桥局集团第四工程有限公司 | High-altitude framework type simple plate supporting machine |
JP4777319B2 (en) * | 2007-09-13 | 2011-09-21 | 三井住友建設株式会社 | Bridge erection method |
US7669272B2 (en) * | 2008-01-28 | 2010-03-02 | Powers James M | Method of launching bridge spans in bridge construction |
CN101294369B (en) * | 2008-05-22 | 2010-10-06 | 中铁大桥局股份有限公司 | Method and apparatus for hanging and transferring mobile mould frame support bracket |
CN101717035B (en) * | 2010-01-04 | 2011-11-30 | 山东高速青岛公路有限公司 | Special hanger for hoisting super huge block steel box girder |
JP4787381B1 (en) * | 2011-03-15 | 2011-10-05 | 株式会社小山 | Girder bridge suspension method using girder bridge suspension jig |
CN203754224U (en) * | 2014-04-08 | 2014-08-06 | 中交二公局第二工程有限公司 | Lifting appliance for lifting bridge cable |
CN104594206B (en) * | 2014-12-22 | 2017-01-04 | 中铁大桥局集团有限公司 | Steel truss girder longitudinal moving hanging type dragging anchor seat and method |
-
2016
- 2016-01-26 CN CN201610052382.1A patent/CN105648920B/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
CN105648920A (en) | 2016-06-08 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202299464U (en) | Steel column rapid hoisting and in-position correcting device | |
CN203188121U (en) | Cast-in-place bridge floor suspending mold of half-through or through arch bridge | |
CN106812328B (en) | The whole two step lifting construction methods of string prestressed steel structure rack with hanging layer | |
CN202787928U (en) | Construction device for steel plate wall | |
CN104674992A (en) | Supporting method and structure of suspended steel bar truss deck | |
CN105484502B (en) | A kind of industrial premises steel structural roof purlin and support bar combined installation method | |
CN108532968A (en) | A kind of assembled support device of steel bar truss floor support plate composite floor system | |
CN204588444U (en) | Prefabricated superimposed sheet special hanger | |
CN105648920B (en) | A kind of construction method for hanging of bridge floor shoulder pole girder | |
CN102061810B (en) | Construction method of safe flat net positioned on periphery of building | |
CN204738233U (en) | Assembled frame scaffold | |
CN204280974U (en) | A kind of template hoisting device | |
CN103061514A (en) | Long-span steel structure corridor construction method | |
CN203361642U (en) | Cast-in-place stair steel formwork of assembled structure | |
CN205575534U (en) | Lattice formula groined type support body lifting means | |
CN203716062U (en) | Integral type pier body decorating hanging basket | |
CN208534069U (en) | The assembled support device of steel bar truss floor support plate composite floor system | |
CN102864935A (en) | Novel purline mounting method | |
CN102383376B (en) | Ground moulding and integral hoisting method for large-tonnage steel bar bound finished product member | |
CN202449171U (en) | Construction device based on sectioned pull-in method | |
CN114215366B (en) | Lifting construction method for dense hanging points of large-span arched roof | |
CN204960324U (en) | Suspension type floor formwork support device | |
CN204224149U (en) | Steel structure secondary member hoisting device | |
CN204873403U (en) | A supplementary steel pipe that is used for hoisting simultaneously room roof beam purlin | |
CN204663009U (en) | Steel work pulley lifting bracket |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170926 |
|
CF01 | Termination of patent right due to non-payment of annual fee |