CN105648920B - A kind of construction method for hanging of bridge floor shoulder pole girder - Google Patents

A kind of construction method for hanging of bridge floor shoulder pole girder Download PDF

Info

Publication number
CN105648920B
CN105648920B CN201610052382.1A CN201610052382A CN105648920B CN 105648920 B CN105648920 B CN 105648920B CN 201610052382 A CN201610052382 A CN 201610052382A CN 105648920 B CN105648920 B CN 105648920B
Authority
CN
China
Prior art keywords
floorings
shoulder pole
pole girder
bridge
steel wire
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201610052382.1A
Other languages
Chinese (zh)
Other versions
CN105648920A (en
Inventor
黄修生
张才伦
胡晓金
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
YINGDU BRIDGE STEEL STRUCTURE ENGINEERING Co Ltd
Original Assignee
YINGDU BRIDGE STEEL STRUCTURE ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by YINGDU BRIDGE STEEL STRUCTURE ENGINEERING Co Ltd filed Critical YINGDU BRIDGE STEEL STRUCTURE ENGINEERING Co Ltd
Priority to CN201610052382.1A priority Critical patent/CN105648920B/en
Publication of CN105648920A publication Critical patent/CN105648920A/en
Application granted granted Critical
Publication of CN105648920B publication Critical patent/CN105648920B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention belongs to field of bridge construction, and in particular to a kind of construction method for hanging of bridge floor shoulder pole girder, comprise the following steps:Step 1: setting horizontal shoulder pole girder on cable suspension hook, control cable crane steel wire rope length tilts shoulder pole girder;Step 2: the corresponding two ends of floorings hang steel wire rope lifting floorings on shoulder pole girder, two floorings are once lifted by crane;Step 3: the first floorings of cable crane dolly handling are to installation site, highly, then the first floorings low side is positioned to bridge location screens, and shoulder pole girder continues to reduce for shoulder pole girder reduction, and the high-end positioning of the first floorings completes the first floorings and installed to bridge location;Step 4: the positioning construction of the second floorings is identical with the first floorings;Shoulder pole girder two ends hang the different steel wire rope of length respectively, and contraposition is assembled during facilitating floorings to fall beam.

Description

A kind of construction method for hanging of bridge floor shoulder pole girder
Technical field
The invention belongs to field of bridge construction, and in particular to a kind of construction method for hanging of bridge floor shoulder pole girder.
Background technology
Bridge steel box-girder, because bridge location geographical position is special, the multiple factors such as bridge structure complexity take cable crane to bridge Component is lifted.In bridge floor Slab element carries out installation process, former construction method is to use cable crane monolithic bridge counter plate list Element is installed, and there is lifting progress slowly, installation effectiveness is low.In view of this, the applicant provides a kind of bridge floor shoulder pole girder Construction method for hanging, thus this case produce.
The content of the invention
It is an object of the invention to provide a kind of construction method for hanging of bridge floor shoulder pole girder, shoulder pole girder two ends hang length respectively The different steel wire rope of degree, contraposition is assembled during facilitating floorings to fall beam.
To achieve the above object, the technical scheme that the utility model is specifically provided is:A kind of lifting of bridge floor shoulder pole girder is applied Work method, comprises the following steps:
Step 1: setting horizontal shoulder pole girder on cable suspension hook, control cable crane steel wire rope length tilts shoulder pole girder;
Step 2: the corresponding two ends of floorings hang steel wire rope lifting floorings on shoulder pole girder, two bridge floors are once lifted by crane Plate;
Step 3: the first floorings of cable crane dolly handling are to installation site, shoulder pole girder reduces height, then the first floorings Low side is positioned to bridge location screens, and shoulder pole girder continues to reduce, and the high-end positioning of the first floorings completes the first floorings peace to bridge location Dress;
Step 4: the second floorings of cable crane dolly handling are to installation site, shoulder pole girder reduces height, then the second floorings Low side is positioned to one end screens of the first floorings, and shoulder pole girder continues to reduce, and the high-end positioning of the second floorings is completed to bridge location The installation of integrated deck plate;Step 5: repeat the above steps two to four, the installation up to completing integrated deck plate.
Further, in the step one:Cable crane steel wire rope length is controlled to make the inclined angle of shoulder pole girder be 5 degree to 15 Degree.
Beneficial effects of the present invention:First, the construction method after improving, substantially increases the lifting speed of live floorings, The daily workload that can be only done five was lifted with cable crane monolithic in the past, by eight plain films can be completed after improvement daily, was pacified Dress efficiency is doubled, and shortens installation period, to completing construction task on schedule there is provided powerful guarantee.
2nd, in-site installation cost is substantially reduced, and the operating efficiency of workman and plant equipment is substantially increased after improvement, is reduced The unnecessary work holdup and plant equipment are idle, greatly save construction cost.
3rd, compared with before improvement, assembled Quality advance.The lifting of shoulder pole girder point two, is easy to assembled positioning, to the big of appearance Gap, beam section torsional deformation, can more accurately judge adjustment, improve the assembled welding quality of beam section
Brief description of the drawings
Fig. 1 is present invention construction simple diagram.
Embodiment
As shown in figure 1, disclose is a kind of construction method for hanging of bridge floor shoulder pole girder to the present invention, comprise the following steps:
Step 1: setting horizontal shoulder pole girder 1 on cable suspension hook, control cable crane steel wire rope length tilts shoulder pole girder Angle is 5 degree to 15 degree, typically takes 10 degree;
Step 2: the corresponding two ends of floorings hang steel wire rope lifting floorings on shoulder pole girder 1, two bridge floors are once lifted by crane Plate;
Step 3: the first floorings of cable crane dolly handling 2 are to installation site, shoulder pole girder reduces height, then the first bridge floor The low side of plate 2 is positioned to bridge location screens, and shoulder pole girder continues to reduce, and the high-end positioning of the first floorings 2 completes the first bridge floor to bridge location Plate 2 is installed;
Step 4: the second floorings of cable crane dolly handling 3 are to installation site, shoulder pole girder reduces height, then the second bridge floor The low side of plate 3 is positioned to one end screens of the first floorings 2, and shoulder pole girder continues to reduce, the high-end positioning of the second floorings 3 to bridge Position, completes the installation of integrated deck plate;
Step 5: repeat the above steps two to four, the installation up to completing integrated deck plate.

Claims (2)

1. a kind of construction method for hanging of bridge floor shoulder pole girder, it is characterised in that comprise the following steps:Step 1: in cable suspension hook Upper to set horizontal shoulder pole girder, control cable crane steel wire rope length tilts shoulder pole girder;
Step 2: the corresponding two ends of floorings hang steel wire rope lifting floorings on shoulder pole girder, two floorings are once lifted by crane;
Step 3: the first floorings of cable crane dolly handling are to installation site, shoulder pole girder reduces height, then the first floorings low side Positioning is to bridge location screens, and shoulder pole girder continues to reduce, and the high-end positioning of the first floorings completes the first floorings and installed to bridge location;
Step 4: the second floorings of cable crane dolly handling are to installation site, shoulder pole girder reduces height, then the second floorings low side Position to one end screens of the first floorings, shoulder pole girder continues to reduce, the high-end positioning of the second floorings to bridge location;
Step 5: repeat the above steps two to four, the installation up to completing integrated deck plate.
2. a kind of construction method for hanging of bridge floor shoulder pole girder according to claim 1, it is characterised in that the step one In:Cable crane steel wire rope length is controlled to make the inclined angle of shoulder pole girder be 5 degree to 15 degree.
CN201610052382.1A 2016-01-26 2016-01-26 A kind of construction method for hanging of bridge floor shoulder pole girder Expired - Fee Related CN105648920B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610052382.1A CN105648920B (en) 2016-01-26 2016-01-26 A kind of construction method for hanging of bridge floor shoulder pole girder

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610052382.1A CN105648920B (en) 2016-01-26 2016-01-26 A kind of construction method for hanging of bridge floor shoulder pole girder

Publications (2)

Publication Number Publication Date
CN105648920A CN105648920A (en) 2016-06-08
CN105648920B true CN105648920B (en) 2017-09-26

Family

ID=56486955

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610052382.1A Expired - Fee Related CN105648920B (en) 2016-01-26 2016-01-26 A kind of construction method for hanging of bridge floor shoulder pole girder

Country Status (1)

Country Link
CN (1) CN105648920B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106012854B (en) * 2016-06-22 2017-07-28 青岛蓝天创先科技服务有限公司 The transporting equipment of prefabricated assembled overpass bridge plate

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101029470A (en) * 2007-03-17 2007-09-05 何富荣 Hydraulic spile bridge and dyke construction
CN100497833C (en) * 2007-08-21 2009-06-10 中铁大桥局集团第四工程有限公司 High-altitude framework type simple plate supporting machine
JP4777319B2 (en) * 2007-09-13 2011-09-21 三井住友建設株式会社 Bridge erection method
US7669272B2 (en) * 2008-01-28 2010-03-02 Powers James M Method of launching bridge spans in bridge construction
CN101294369B (en) * 2008-05-22 2010-10-06 中铁大桥局股份有限公司 Method and apparatus for hanging and transferring mobile mould frame support bracket
CN101717035B (en) * 2010-01-04 2011-11-30 山东高速青岛公路有限公司 Special hanger for hoisting super huge block steel box girder
JP4787381B1 (en) * 2011-03-15 2011-10-05 株式会社小山 Girder bridge suspension method using girder bridge suspension jig
CN203754224U (en) * 2014-04-08 2014-08-06 中交二公局第二工程有限公司 Lifting appliance for lifting bridge cable
CN104594206B (en) * 2014-12-22 2017-01-04 中铁大桥局集团有限公司 Steel truss girder longitudinal moving hanging type dragging anchor seat and method

Also Published As

Publication number Publication date
CN105648920A (en) 2016-06-08

Similar Documents

Publication Publication Date Title
CN202299464U (en) Steel column rapid hoisting and in-position correcting device
CN203188121U (en) Cast-in-place bridge floor suspending mold of half-through or through arch bridge
CN106812328B (en) The whole two step lifting construction methods of string prestressed steel structure rack with hanging layer
CN202787928U (en) Construction device for steel plate wall
CN104674992A (en) Supporting method and structure of suspended steel bar truss deck
CN105484502B (en) A kind of industrial premises steel structural roof purlin and support bar combined installation method
CN108532968A (en) A kind of assembled support device of steel bar truss floor support plate composite floor system
CN204588444U (en) Prefabricated superimposed sheet special hanger
CN105648920B (en) A kind of construction method for hanging of bridge floor shoulder pole girder
CN102061810B (en) Construction method of safe flat net positioned on periphery of building
CN204738233U (en) Assembled frame scaffold
CN204280974U (en) A kind of template hoisting device
CN103061514A (en) Long-span steel structure corridor construction method
CN203361642U (en) Cast-in-place stair steel formwork of assembled structure
CN205575534U (en) Lattice formula groined type support body lifting means
CN203716062U (en) Integral type pier body decorating hanging basket
CN208534069U (en) The assembled support device of steel bar truss floor support plate composite floor system
CN102864935A (en) Novel purline mounting method
CN102383376B (en) Ground moulding and integral hoisting method for large-tonnage steel bar bound finished product member
CN202449171U (en) Construction device based on sectioned pull-in method
CN114215366B (en) Lifting construction method for dense hanging points of large-span arched roof
CN204960324U (en) Suspension type floor formwork support device
CN204224149U (en) Steel structure secondary member hoisting device
CN204873403U (en) A supplementary steel pipe that is used for hoisting simultaneously room roof beam purlin
CN204663009U (en) Steel work pulley lifting bracket

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170926

CF01 Termination of patent right due to non-payment of annual fee