CN106917360A - Lift leg formula frame plate machine and its frame plate method - Google Patents
Lift leg formula frame plate machine and its frame plate method Download PDFInfo
- Publication number
- CN106917360A CN106917360A CN201710152158.4A CN201710152158A CN106917360A CN 106917360 A CN106917360 A CN 106917360A CN 201710152158 A CN201710152158 A CN 201710152158A CN 106917360 A CN106917360 A CN 106917360A
- Authority
- CN
- China
- Prior art keywords
- leg
- crane
- bridge deck
- outriggers
- steel bridge
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D22/00—Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/12—Grating or flooring for bridges; Fastening railway sleepers or tracks to bridges
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Carriers, Traveling Bodies, And Overhead Traveling Cranes (AREA)
Abstract
本发明公开了一种抬腿式架板机及其架板方法,涉及桥梁维修加固改造工程施工技术领域,包括:主体结构,其包括两个相对设置的主梁,两个主梁的两端固定有第一横梁和第二横梁,主梁采用分节式结构。支撑机构,包括固定在两个主梁上的前支腿、中支腿和后支腿,前支腿、中支腿和后支腿均设有伸缩装置,伸缩装置可使前支腿、中支腿和后支腿伸长和收缩,后支腿包括与第一横梁相连的翻折装置,翻折装置驱使后支腿绕第一横梁翻折,中支腿和后支腿的下部设有走行装置,走行装置可沿桥梁纵向和横向走行。起吊装置,包括天车和吊具,吊具设置在天车下方,天车可上收和下放吊具,其还能沿桥梁纵向和横向移动。本发明拆装方便,且同时具有纵移和横移功能。
The invention discloses a leg lifting type erecting machine and its erecting method, and relates to the technical field of bridge maintenance, reinforcement and transformation engineering construction, comprising: a main structure, which includes two oppositely arranged main beams, two ends of the two main beams The first beam and the second beam are fixed, and the main beam adopts a segmented structure. The supporting mechanism includes front outriggers, middle outriggers and rear outriggers fixed on the two main beams. The front outriggers, middle outriggers and rear outriggers are equipped with telescopic devices. The telescopic devices can make the front outriggers, middle outriggers Outriggers and rear outriggers are extended and contracted. The rear outriggers include a turning device connected to the first crossbeam. The turning device drives the rear outriggers to turn around the first crossbeam. The running device can run longitudinally and laterally along the bridge. The hoisting device includes a crown block and a spreader. The spreader is arranged under the crown block. The crown block can retract and lower the spreader, and it can also move longitudinally and laterally along the bridge. The invention is convenient to assemble and disassemble, and has the functions of longitudinal movement and lateral movement at the same time.
Description
技术领域technical field
本发明涉及桥梁维修加固改造工程施工技术领域,具体涉及一种抬腿式架板机及其架板方法。The invention relates to the technical field of bridge maintenance, reinforcement and transformation engineering construction, in particular to a leg-lifting type erecting machine and a method for erecting the plank.
背景技术Background technique
九江长江大桥是继武汉长江大桥之后,我国首批大型公铁两用桥梁,也是我国如今最长、工程量最大的公铁两用桥梁。随着使用年限的增长和车流量的不断增加,原公路桥混凝土桥面板已出现破损、脱落现象,因下方为铁路营业线,对列车的安全运营存在着极为严重的安全隐患,2015年正式对其展开了全面的加固改造,本次加固改造的主要内容是将原有混凝土桥面板更换为寿命较长的钢桥面板,新制钢桥面板受既有铁路桁架结构影响分块较大,最大为9.01×9.94米。三大拱结构和半幅施工造成施工空间高度和宽度受到很大限制。既有结构承载能力有限,对架设设备具有重量限制。平弦区和三大拱区应分块不同,架设设备需具有横移功能。半幅施工造成设备需多次拆装,基于上述条件,造成现有的吊装设备、架桥机、架梁机等均无法满足新制钢桥面板的安装需求。The Jiujiang Yangtze River Bridge is the first batch of large road-rail bridges in my country after the Wuhan Yangtze River Bridge, and it is also the longest road-rail bridge in my country with the largest engineering volume. With the increase of service life and traffic volume, the concrete deck of the original highway bridge has been damaged and fallen off. Because the railway business line underneath, there is a very serious safety hazard to the safe operation of the train. In 2015, it was formally inspected It has launched a comprehensive reinforcement and transformation. The main content of this reinforcement and transformation is to replace the original concrete bridge deck with a steel bridge deck with a longer life. The new steel bridge deck is affected by the existing railway truss structure. 9.01 x 9.94 meters. The height and width of the construction space are greatly limited due to the three arch structures and half-width construction. The existing structure has limited bearing capacity and has weight restrictions on the erection equipment. The flat chord area and the three major arch areas should be divided into different blocks, and the erection equipment must have the function of lateral movement. Due to the half-width construction, the equipment needs to be disassembled and assembled multiple times. Based on the above conditions, the existing hoisting equipment, bridge erecting machines, and girder erecting machines cannot meet the installation requirements of the new steel bridge deck.
发明内容Contents of the invention
针对现有技术中存在的缺陷,本发明的目的在于提供一种拆除方便,且同时具有纵移和横移功能的抬腿式架板机。In view of the defects existing in the prior art, the object of the present invention is to provide a leg-lifting trigger that is easy to dismantle and has the functions of longitudinal and lateral movement.
为达到以上目的,本发明采取的技术方案是:For achieving above object, the technical scheme that the present invention takes is:
一种抬腿式架板机,包括:A leg lifter, comprising:
主体结构,其包括两个相对设置的主梁,两个所述主梁的两端固定有连接两个所述主梁的第一横梁和第二横梁,所述主梁为分节式结构;The main structure includes two main beams arranged opposite to each other, the two ends of the two main beams are fixed with a first beam and a second beam connecting the two main beams, and the main beam is a segmented structure;
支撑机构,其包括固定在两个所述主梁上的前支腿、中支腿和后支腿,所述前支腿、中支腿和后支腿均设有伸缩装置,所述伸缩装置可使所述前支腿、中支腿和后支腿伸长和收缩,所述后支腿还包括翻折装置,所述翻折装置与所述第一横梁相连,所述翻折装置驱使所述后支腿绕所述第一横梁翻折,所述中支腿和后支腿的下部还设有走行装置,所述走行装置可沿桥梁纵向和横向走行;以及A supporting mechanism, which includes front outriggers, middle outriggers and rear outriggers fixed on the two main beams, the front outriggers, middle outriggers and rear outriggers are all equipped with telescopic devices, and the telescopic devices The front outrigger, the middle outrigger and the rear outrigger can be extended and contracted, and the rear outrigger also includes a turning device connected to the first beam, and the turning device drives The rear outriggers are folded around the first beam, and the lower parts of the middle outriggers and the rear outriggers are also equipped with running devices, and the running devices can run longitudinally and laterally along the bridge; and
起吊装置,其包括天车和吊具,所述吊具设置在所述天车下方,所述天车可上收和下放所述吊具,且所述天车还能沿桥梁纵向和横向移动。Lifting device, which includes a crown block and a spreader, the spreader is arranged under the crown block, the crown block can retract and lower the spreader, and the crown block can also move longitudinally and laterally along the bridge .
在上述技术方案的基础上,所述伸缩装置包括套柱和伸缩节,所述伸缩节的外壁抵持在所述套柱的内壁上,且所述伸缩节可与所述套柱相对滑动,所述套柱和伸缩节均设有多个不同高度位置的销孔,所述套柱和伸缩节相对滑动时,所述套柱和伸缩节上的销孔可连通。On the basis of the above technical solution, the telescopic device includes a sleeve and a telescopic joint, the outer wall of the telescopic joint is held against the inner wall of the sleeve, and the telescopic joint can slide relative to the sleeve, Both the sleeve column and the expansion joint are provided with a plurality of pin holes at different heights, and when the sleeve column and the expansion joint slide relative to each other, the pin holes on the sleeve column and the expansion joint can be connected.
在上述技术方案的基础上,所述中支腿和后支腿的底端还设有可旋转法兰,所述走行装置与所述可旋转法兰相连,所述可旋转法兰可绕垂直于桥面的轴线旋转。On the basis of the above technical solution, the bottom ends of the middle outrigger and the rear outrigger are also provided with rotatable flanges, the running device is connected with the rotatable flanges, and the rotatable flanges can rotate around the vertical Rotate about the axis of the bridge deck.
在上述技术方案的基础上,所述后支腿还包括后支腿上横梁,所述翻折装置的一端与所述第一横梁相连,另一端与所述后支腿横梁相连。On the basis of the above technical solution, the rear outrigger further includes an upper beam on the rear outrigger, one end of the folding device is connected to the first beam, and the other end is connected to the rear outrigger beam.
在上述技术方案的基础上,所述翻折装置为液压油缸。On the basis of the above technical solution, the turning device is a hydraulic cylinder.
在上述技术方案的基础上,所述天车还包括纵移机构,所述主梁设有主梁轨道,所述纵移机构可沿所述主梁轨道滑行。On the basis of the above technical solution, the crane further includes a longitudinal movement mechanism, the main beam is provided with a main beam track, and the longitudinal movement mechanism can slide along the main beam track.
在上述技术方案的基础上,所述天车还包括横移机构,所述横移机构驱使所述天车沿桥梁横向移动。On the basis of the above technical solution, the crane further includes a traversing mechanism, and the traversing mechanism drives the crane to move laterally along the bridge.
在上述技术方案的基础上,所述横移机构为液压油缸。On the basis of the above technical solution, the traverse mechanism is a hydraulic oil cylinder.
与此同时,本发明还提供一种在施工空间高度和宽度受到限制以及既有结构承载能力有限情况下,实现钢桥面板的高效、稳定、安全的架板方法。At the same time, the present invention also provides an efficient, stable and safe erection method for the steel bridge deck under the condition that the height and width of the construction space are limited and the bearing capacity of the existing structure is limited.
为达到以上目的,本发明采取的技术方案是:For achieving above object, the technical scheme that the present invention takes is:
一种利用上述抬腿式架板机架板的方法,该方法包括以下步骤:A method of using the above-mentioned leg-lifting rack rack, the method includes the following steps:
铺设架板机轨道,将天车移至抬腿式架板机最后端,前支腿抬起,抬腿式架板机前移至下一节间,前支腿下放并固定在铁路主桁横梁上,完成过孔,同时采用运板车将钢桥面板运至抬腿式架板机后方;Lay the erecting machine track, move the crane to the rear end of the leg-lifting erecting machine, lift the front outrigger, move the leg-lifting erecting machine forward to the next section, lower the front outrigger and fix it on the railway main truss On the beam, complete the hole, and at the same time, use the pallet truck to transport the steel bridge panel to the rear of the leg lifter;
将天车移至抬腿式架板机最前端,后支腿向上翻折,运板车运输钢桥面板至后支腿和中支腿之间;Move the crown block to the front end of the leg-lifting frame machine, fold the rear outrigger upwards, and transport the steel bridge panel to the space between the rear outrigger and the middle outrigger with the trolley;
将后支腿放下,天车移至钢桥面板上方,下放吊具与钢桥面板连接,提起钢桥面板,运板车退出;Put down the rear outriggers, move the crane to the top of the steel bridge deck, lower the spreader to connect with the steel bridge deck, lift up the steel bridge deck, and exit the trolley;
中支腿抬起,天车载着钢桥面板沿桥梁纵向移动,使钢桥面板移至设计安装位置,钢桥面板前移过中支腿后,将中支腿放下;The middle outrigger is lifted, and the crane carries the steel bridge deck to move longitudinally along the bridge, so that the steel bridge deck moves to the designed installation position, and the steel bridge deck moves forward to pass the middle outrigger, and then puts down the middle outrigger;
当天车纵桥向移动到位后,对钢桥面板横桥向位置进行调整,天车下放吊具,使钢桥面板放置在安装位置;After the vertical bridge movement of the overhead crane is in place, adjust the horizontal bridge position of the steel bridge deck, and lower the spreader on the crane to place the steel bridge deck at the installation position;
解除吊具与钢桥面板的连接,将吊具向上收起,天车移至抬腿式架板机最后方,前支腿向上抬起,铺设架板机轨道,循环至下一块钢桥面板安装,直至施工完成。Release the connection between the spreader and the steel bridge deck, put the spreader upwards, move the crane to the rear of the leg-lifting erector, lift the front legs upward, lay the erector track, and cycle to the next steel bridge deck installation until construction is complete.
在上述技术方案的基础上,采用横移机构驱动所述钢桥面板沿桥梁横向移动来对钢桥面板横桥向位置进行调整。On the basis of the above technical solution, a transverse movement mechanism is used to drive the steel bridge deck to move laterally along the bridge to adjust the transverse position of the steel bridge deck.
与现有技术相比,本发明的优点在于:Compared with the prior art, the present invention has the advantages of:
(1)本发明中的抬腿式架板机的主梁采用分节式结构,接头采用内销轴连接,拆除简便。(1) The main girder of the leg lifting type erecting machine in the present invention adopts a segmented structure, and the joints are connected by inner pins, which is easy to dismantle.
(2)后支腿翻折和中支腿伸缩功能,在架板机宽度受限的情况下,为大体积钢桥面板在架设过程中的位置转换提供了足够的空间。(2) The functions of rear outrigger folding and middle outrigger telescopic function provide enough space for the position conversion of the large-volume steel bridge deck during the erection process when the width of the erecting machine is limited.
(3)天车采用下沉式的U型梁,降低了整机高度,满足了空间高度受限要求。(3) The crane adopts a sunken U-shaped beam, which reduces the height of the whole machine and meets the requirements of limited space height.
(3)本发明中设置拉杆后,有效的限制了抬腿式架板机的整机前倾,避免了柔性前支腿因整机前倾造成的安全事故。(3) After the tie rod is set in the present invention, the forward tilt of the whole machine of the leg-lifting type trigger is effectively limited, and the safety accident caused by the forward tilt of the whole machine due to the flexible front legs is avoided.
(4)抬腿式架板机中、后支腿下部连接设计为可旋转的法兰,通过旋转可以实现架板机的纵移和横移走行功能。(4) The lower connection of the middle and rear outriggers of the leg-lifting crane is designed as a rotatable flange, and the vertical and lateral movement functions of the crane can be realized through rotation.
(5)在抬腿式架板机走行过孔和喂板过程中,天车分别位于抬腿式架板机的最后方和最前方,从而可以利用天车进行配重,有效的降低了整机自重,且提高了整机稳定性。(5) During the process of walking through the hole and feeding the board of the leg-lifting crane, the cranes are respectively located at the rear and the front of the leg-lifting crane, so that the crane can be used for counterweight, which effectively reduces the overall load. The weight of the machine is reduced, and the stability of the whole machine is improved.
附图说明Description of drawings
图1为本发明中抬腿式架板机总体结构示意图的结构示意图;Fig. 1 is the structure schematic diagram of the overall structure schematic diagram of leg-lifting type board machine in the present invention;
图2为本发明中主体结构的结构示意图;Fig. 2 is the structural representation of main structure among the present invention;
图3为本发明中前支腿的正视图;Fig. 3 is the front view of front supporting leg among the present invention;
图4为本发明中前支腿的左视图;Fig. 4 is the left side view of front support leg among the present invention;
图5为本发明中中支腿的正视图;Fig. 5 is the front view of middle support leg in the present invention;
图6为本发明中中支腿的左视图;Fig. 6 is the left side view of middle supporting leg in the present invention;
图7为本发明中后支腿的正视图;Figure 7 is a front view of the rear outrigger in the present invention;
图8为本发明中后支腿的左视图;Fig. 8 is a left view of the rear outrigger in the present invention;
图9为本发明中天车的正视图;Fig. 9 is the front view of the crane of the present invention;
图10为本发明中天车的左视图;Fig. 10 is the left view of the crane of the present invention;
图11为本发明中抬腿式架板机过孔走行及运板示意图;Fig. 11 is a schematic diagram of running through the hole and transporting the board of the leg-lifting board machine in the present invention;
图12为本发明中抬腿式架板机喂板示意图Fig. 12 is a schematic diagram of the feeding board of the leg lifting type board machine in the present invention
图13为本发明中抬腿式架板机天车提板示意图Fig. 13 is a schematic diagram of the crane lifting plate of the leg lifting type lifting machine in the present invention
图14为本发明中抬腿式架板机天车载板前移示意图Fig. 14 is a schematic diagram of the forward movement of the platform of the leg-lifting platform crane in the present invention
图15为本发明中抬腿式架板机天车落板示意图Fig. 15 is a schematic diagram of the lowering of the crane of the leg-lifting crane in the present invention
图16为本发明中抬腿式架板机天车收起吊具示意图Fig. 16 is a schematic diagram of the lifting device of the crane of the leg-lifting plank crane in the present invention
图中:1-主体结构,11-主梁,12-第一横梁,13-第二横梁,14-主梁腹板,2-支撑机构,21-前支腿,211-前支腿上铰座,212-前支腿连接销轴,213-前支腿上横梁,214-前支腿下横梁,215-锁紧机构,216-桁架结构,217-前支腿起升油缸,22-中支腿,221-中支腿起升油缸,222-中支腿销轴,23-后支腿,231-翻折装置,232-后支腿上横梁,233-后支腿下横梁,234-后支腿连接销轴,235-支撑部,236-拉杆,3-起吊装置,31-天车,311-纵移机构,312-横移机构,313-定滑轮机构,314-卷扬,315-联系梁,316-钢丝绳,317-U型梁,32-吊具,4-伸缩装置,41-套柱,42-伸缩节,43-销孔,5-走行装置,6-可旋转法兰,7-运板车,8-钢桥面板,9-铁路主桁横梁,100-架板机轨道。In the figure: 1-main structure, 11-main beam, 12-first beam, 13-second beam, 14-web plate of main beam, 2-supporting mechanism, 21-front outrigger, 211-top hinge of front outrigger Seat, 212-connection pin of front outrigger, 213-upper crossbeam of front outrigger, 214-lower crossbeam of front outrigger, 215-locking mechanism, 216-truss structure, 217-lift cylinder of front outrigger, 22-middle Outrigger, 221-middle outrigger lifting cylinder, 222-middle outrigger pin, 23-rear outrigger, 231-folding device, 232-rear outrigger upper beam, 233-rear outrigger lower beam, 234- Rear outrigger connecting pin, 235-supporting part, 236-tie rod, 3-lifting device, 31-crown, 311-longitudinal movement mechanism, 312-transverse movement mechanism, 313-fixed pulley mechanism, 314-winch, 315 -Contact beam, 316-wire rope, 317-U-beam, 32-sling, 4-telescopic device, 41-column, 42-telescopic joint, 43-pin hole, 5-running device, 6-rotatable flange , 7-carriage plate, 8-steel bridge deck, 9-railway main truss beam, 100-plate machine track.
具体实施方式detailed description
以下结合附图对本发明作进一步详细说明。The present invention will be described in further detail below in conjunction with the accompanying drawings.
参见图1和图2所示,本发明提供一种抬腿式架板机,其包括主体结构1、支撑机构2、起吊装置3。Referring to FIG. 1 and FIG. 2 , the present invention provides a leg lifter, which includes a main structure 1 , a supporting mechanism 2 , and a lifting device 3 .
主体结构1包括两个相对设置的主梁11,两个主梁11的两端固定有连接两个主梁11的第一横梁12和第二横梁13,为了防止主梁11旁弯和“八”字变形,主梁11采用分节式结构,相邻两节的接头采用内销轴连接,拆除简便。其中主梁腹板14设置为孔洞结构,减少迎风面积,提高整体稳定性。The main body structure 1 comprises two opposite main beams 11, the two ends of the two main beams 11 are fixed with the first cross beam 12 and the second cross beam 13 connecting the two main beams 11, in order to prevent the main beam 11 side bending and "eight The "" character is deformed, the main beam 11 adopts a segmented structure, and the joints of two adjacent segments are connected by inner pins, which is easy to dismantle. Wherein the main girder web 14 is set as a hole structure, which reduces the windward area and improves the overall stability.
支撑机构2包括固定在两个主梁11上的前支腿21、中支腿22和后支腿23。前支腿21、中支腿22和后支腿23均设有伸缩装置4,伸缩装置4可使前支腿21、中支腿22和后支腿23伸长和收缩。The supporting mechanism 2 includes a front leg 21 , a middle leg 22 and a rear leg 23 fixed on two main beams 11 . Front supporting leg 21, middle supporting leg 22 and rear supporting leg 23 are all provided with telescopic device 4, and telescopic device 4 can make front supporting leg 21, middle supporting leg 22 and rear supporting leg 23 elongation and contraction.
参见图3和图4所示,本发明中,伸缩装置4包括套柱41和伸缩节42,伸缩节42的外壁抵持在套柱41的内壁上,在外力作用下,伸缩节42可与套柱41相对滑动,通常可用起升油缸来提供所需的外力。套柱41和伸缩节42均设有多个不同高度位置的销孔43,套柱41和伸缩节42相对滑动时,套柱41和伸缩节42上的销孔43可连通。由于设置了多个不同高度位置的销孔43,故可以改变前支腿21、中支腿22和后支腿23的高度。Referring to Fig. 3 and Fig. 4, in the present invention, the telescopic device 4 includes a sleeve column 41 and a telescopic joint 42. The sleeve column 41 slides relatively, and the required external force can usually be provided by a lifting cylinder. Both the sleeve column 41 and the expansion joint 42 are provided with a plurality of pin holes 43 at different heights. When the sleeve column 41 and the expansion joint 42 slide relatively, the pin holes 43 on the sleeve column 41 and the expansion joint 42 can communicate. Since a plurality of pin holes 43 at different height positions are provided, the heights of the front leg 21 , the middle leg 22 and the rear leg 23 can be changed.
前支腿21主要由前支腿上铰座211、前支腿连接销轴212、前支腿上横梁213、前支腿下横梁214、锁紧机构215、桁架结构216、前支腿起升油缸217、套柱41和伸缩节42组成。前支腿21通过前支腿连接销轴212穿过前支腿上铰座211与主梁11连接。采用此柔性安装方式,保证过孔作业末,前支腿21垂直稳定的支撑于铁路主桁横梁9上,确保过孔后自适应铁路主桁横梁9顶面。上端增设桁架结构216,可以防止四边形结构跑偏、旁弯以及增强支腿稳定性。在前支腿下横梁214上安装锁紧机构215,使整个支腿底部落在铁路主桁横梁9上,利用螺纹顶紧。中间铺设尼龙垫或毛毡,将支腿与铁路主桁横梁9完全固定,保证架梁作业的稳定。Front outrigger 21 is mainly composed of front outrigger upper hinge seat 211, front outrigger connecting pin 212, front outrigger upper beam 213, front outrigger lower beam 214, locking mechanism 215, truss structure 216, front outrigger lifting Oil cylinder 217, sleeve post 41 and expansion joint 42 form. The front leg 21 passes through the upper hinge seat 211 of the front leg and is connected to the main beam 11 through the front leg connecting pin shaft 212 . Adopting this flexible installation method ensures that the front outrigger 21 is vertically and stably supported on the railway main truss beam 9 at the end of the hole-passing operation, ensuring that the top surface of the railway main truss beam 9 is self-adaptive after the hole is passed. A truss structure 216 is added at the upper end, which can prevent the quadrilateral structure from running off, side bending and enhance the stability of the outriggers. Locking mechanism 215 is installed on the lower beam 214 of the front supporting leg, so that the bottom of the whole supporting leg falls on the main truss beam 9 of the railway, and is tightened by screw thread. Nylon pads or felts are laid in the middle, and the supporting legs are completely fixed with the railway main truss beam 9 to ensure the stability of the beam erection operation.
参见图5和图6所示,中支腿22由中支腿起升油缸221、套柱41、中支腿伸缩节42、中支腿销轴222和走行装置5组成。中支腿22采用油缸伸缩,利用中支腿销轴222承载。套柱41和伸缩节42利用销孔43改变支腿高度。中支腿22的底端还设有可旋转法兰6,走行装置5与可旋转法兰6相连,可旋转法兰6可绕垂直于桥面的轴线为轴旋转。旋转可旋转法兰6,将走行装置5调整90°时,即可实现纵移走行和横移走行之间的切换。5 and 6 , the middle leg 22 is composed of a middle leg lifting cylinder 221 , a sleeve column 41 , a middle leg expansion joint 42 , a middle leg pin 222 and a running device 5 . The middle leg 22 is telescopic by means of an oil cylinder and carried by the pin shaft 222 of the middle leg. The sleeve column 41 and the telescopic joint 42 utilize the pin hole 43 to change the height of the legs. The bottom end of the middle leg 22 is also provided with a rotatable flange 6, the traveling device 5 is connected with the rotatable flange 6, and the rotatable flange 6 can rotate around an axis perpendicular to the bridge deck. When the rotatable flange 6 is rotated and the traveling device 5 is adjusted by 90°, the switch between the longitudinal movement and the lateral movement can be realized.
参见图7和图8所示,后支腿23由翻折装置231、后支腿上横梁232、套柱41、伸缩节42、后支腿下横梁233、后支腿连接销轴234、走行装置5、支撑部235和拉杆236组成。本发明中的翻折装置231为液压油缸,其中翻折装置231的一端与第一横梁12相连,另一端与后支腿上横梁232相连。喂梁时后支腿23利用翻折装置231向后上方翻折,为运板车7运板驶入提供足够的空间。下设支撑部235,带有锁紧螺母,伸出至桥面板支撑,在架板过程中与前支腿21形成稳定支撑面。后支腿23的底端还设有可旋转法兰6,走行装置5与可旋转法兰6相连,可旋转法兰6可绕垂直于桥面的轴线为轴旋转。旋转可旋转法兰6,将走行装置5调整90°时,即可实现纵移走行和横移走行之间的切换。设置拉杆236可以起到纵向限位作用,防止抬腿式架板机前倾。7 and 8, the rear leg 23 is composed of a folding device 231, a rear leg upper beam 232, a sleeve column 41, an expansion joint 42, a rear leg lower beam 233, a rear leg connecting pin 234, and a running The device 5, the supporting part 235 and the pull rod 236 are composed. The folding device 231 in the present invention is a hydraulic oil cylinder, wherein one end of the folding device 231 is connected with the first beam 12 , and the other end is connected with the upper beam 232 of the rear leg. Back support leg 23 utilizes turning device 231 to turn back upwards when feeding the beam, and provides enough space for transporting plate trolley 7 transport plates to enter. A supporting part 235 is provided below, with locking nuts, extending to the bridge deck for support, and forming a stable supporting surface with the front leg 21 during the erection process. The bottom end of the rear supporting leg 23 is also provided with a rotatable flange 6, and the traveling device 5 is connected with the rotatable flange 6, and the rotatable flange 6 can rotate around an axis perpendicular to the bridge deck. When the rotatable flange 6 is rotated and the traveling device 5 is adjusted by 90°, the switch between the longitudinal movement and the lateral movement can be realized. Setting the pull rod 236 can play a role of longitudinal limit, preventing the leg-lifting trigger from tilting forward.
参见图9和图10所示,起吊装置3包括天车31和吊具32,吊具32设置在天车31下方,天车31可上收和下放吊具32。天车31还包括纵移机构311、横移机构312、定滑轮机构313、卷扬314、联系梁315、钢丝绳316和U型梁317。其中,主梁11设有主梁轨道,纵移机构311利用主梁轨道,采用钢轮走行。横移则采用横移机构312推动定滑轮机构313移动实现。其中,横移机构312为液压油缸。左右纵移机构311一侧采用固定连接,一侧采用铰接,形成一刚一柔结构,能自适应轨道宽度,方便调整。吊具32设置副钩进行钢桥面板8起吊时调平。此外,采用下沉式的U型梁317,降低了抬腿式架板机的整机高度。Referring to Fig. 9 and Fig. 10, the hoisting device 3 includes a crane 31 and a spreader 32, the spreader 32 is arranged under the crane 31, and the crane 31 can retract and lower the spreader 32. The crane 31 also includes a longitudinal movement mechanism 311 , a transverse movement mechanism 312 , a fixed pulley mechanism 313 , a winch 314 , a connecting beam 315 , a wire rope 316 and a U-shaped beam 317 . Wherein, the main beam 11 is provided with a main beam track, and the longitudinal movement mechanism 311 utilizes the main beam track and travels on steel wheels. Lateral movement then adopts transverse movement mechanism 312 to push fixed pulley mechanism 313 to move and realize. Wherein, the traverse mechanism 312 is a hydraulic oil cylinder. One side of the left and right vertical movement mechanism 311 is fixedly connected and the other side is hinged to form a rigid and flexible structure, which can adapt to the width of the track and is convenient for adjustment. The hanger 32 is provided with an auxiliary hook for leveling when the steel bridge deck 8 is hoisted. In addition, the sunken U-shaped beam 317 is adopted to reduce the height of the whole machine of the leg lifter.
本发明还提供一种利用上述抬腿式架板机架板的方法,该方法包括以下步骤:The present invention also provides a method for using the above-mentioned leg-lifting rack rack, the method includes the following steps:
S1.参见图11所示,铺设架板机轨道100,将天车31移至抬腿式架板机最后端,前支腿21抬起,抬腿式架板机前移至下一节间,前支腿21下放并固定在铁路主桁横梁9上,完成过孔,同时采用运板车7将钢桥面板8运至抬腿式架板机后方。S1. As shown in Figure 11, lay the erection machine track 100, move the crane 31 to the rearmost end of the leg lifter, lift the front leg 21, and move the leg lifter forward to the next section , the front outrigger 21 is lowered and fixed on the railway main truss beam 9 to complete the hole, and at the same time, the steel bridge deck 8 is transported to the rear of the leg-lifting type erecting machine by using the pallet truck 7 .
S2.参见图12所示,将天车31移至抬腿式架板机最前端,后支腿23向上翻折,运板车7运输钢桥面板8至后支腿23和中支腿22之间。S2. As shown in Figure 12, move the crown block 31 to the front end of the leg-lifting frame machine, fold the rear outrigger 23 upwards, and transport the steel bridge deck 8 to the rear outrigger 23 and middle outrigger 22 with the trolley 7 between.
S3.参见图13所示,将后支腿23放下,天车31移至钢桥面板8上方,下放吊具32与钢桥面板8连接,提起钢桥面板8,运板车7退出。S3. Referring to Fig. 13, put down the rear outrigger 23, move the crane 31 to the top of the steel bridge deck 8, lower the hanger 32 to connect with the steel bridge deck 8, lift the steel bridge deck 8, and the trolley 7 exits.
S4.参见图14所示,中支腿22抬起,天车31载着钢桥面板8沿桥梁纵向移动,使钢桥面板8移至设计安装位置,钢桥面板8前移过中支腿22后,将中支腿22放下。S4. As shown in Figure 14, the middle outrigger 22 is lifted, and the crane 31 carries the steel bridge deck 8 to move longitudinally along the bridge, so that the steel bridge deck 8 moves to the designed installation position, and the steel bridge deck 8 moves forward to pass the middle outrigger After 22, the middle support leg 22 is put down.
S5.参见图15所示,当天车31纵桥向移动到位后,对钢桥面板8横桥向位置进行调整,天车31下放吊具32,使钢桥面板8放置在安装位置。S5. Referring to Fig. 15, after the crane 31 is moved in the longitudinal bridge direction, adjust the position of the steel bridge deck 8 in the transverse bridge direction, and the crane 31 lowers the spreader 32, so that the steel bridge deck 8 is placed at the installation position.
S6.参见图16所示,解除吊具32与钢桥面板8的连接,将吊具32向上收起,天车31移至抬腿式架板机最后方,前支腿21向上抬起,铺设架板机轨道,循环至下一块钢桥面板8安装,直至施工完成。S6. Referring to Fig. 16, remove the connection between the spreader 32 and the steel bridge deck 8, put the spreader 32 upwards, move the crane 31 to the rearmost side of the leg lifter, and lift the front legs 21 upwards, Lay the erection machine track, cycle to the next steel bridge deck 8 for installation, until the construction is completed.
本发明不局限于上述实施方式,对于本技术领域的普通技术人员来说,在不脱离本发明原理的前提下,还可以做出若干改进和润饰,这些改进和润饰也视为本发明的保护范围之内。本说明书中未作详细描述的内容属于本领域专业技术人员公知的现有技术。The present invention is not limited to the above-mentioned embodiments. For those of ordinary skill in the art, without departing from the principle of the present invention, some improvements and modifications can also be made, and these improvements and modifications are also considered protection of the present invention. within range. The content not described in detail in this specification belongs to the prior art known to those skilled in the art.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201710152158.4A CN106917360A (en) | 2017-03-15 | 2017-03-15 | Lift leg formula frame plate machine and its frame plate method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201710152158.4A CN106917360A (en) | 2017-03-15 | 2017-03-15 | Lift leg formula frame plate machine and its frame plate method |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN106917360A true CN106917360A (en) | 2017-07-04 |
Family
ID=59461238
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201710152158.4A Pending CN106917360A (en) | 2017-03-15 | 2017-03-15 | Lift leg formula frame plate machine and its frame plate method |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN106917360A (en) |
Cited By (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109837837A (en) * | 2019-03-06 | 2019-06-04 | 上海市基础工程集团有限公司 | Mounting device and method for concrete-steel Beam prefabricated bridge |
| CN110804958A (en) * | 2019-11-26 | 2020-02-18 | 中铁第五勘察设计院集团有限公司 | A method for changing the frame of a whole-hole beam |
| CN110904863A (en) * | 2019-12-09 | 2020-03-24 | 中铁第五勘察设计院集团有限公司 | Beam changing method with foldable beam changing machine |
| CN111441250A (en) * | 2020-04-02 | 2020-07-24 | 中交一公局集团有限公司 | Method for transporting upper bridge deck in double-layer steel-concrete composite beam |
| CN113699902A (en) * | 2021-09-28 | 2021-11-26 | 中铁第五勘察设计院集团有限公司 | Beam changing equipment |
| CN113756198A (en) * | 2021-09-15 | 2021-12-07 | 上海市基础工程集团有限公司 | Light device for mounting prefabricated full-width bridge deck of steel-concrete composite beam |
| CN114319145A (en) * | 2021-12-28 | 2022-04-12 | 中交路桥华南工程有限公司 | Bridge erecting method using bridge erecting machine |
| CN114481835A (en) * | 2021-12-13 | 2022-05-13 | 中铁第五勘察设计院集团有限公司 | Stepless span changing device and method for suspension point of bridge girder erection machine |
Citations (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN201933415U (en) * | 2010-12-30 | 2011-08-17 | 邯郸市北恒工程机械有限公司 | Highway and railway twin-girder bridge erection machine |
| CN202247701U (en) * | 2011-10-13 | 2012-05-30 | 浙江中建路桥设备有限公司 | Rotatable middle support leg |
| CN102720142A (en) * | 2011-03-31 | 2012-10-10 | 江苏恩纳斯重工机械有限公司 | Special crane for bridge erecting machine capable of passing through dogleg |
| JP2012202076A (en) * | 2011-03-24 | 2012-10-22 | Toda Constr Co Ltd | Construction device of overhead viaduct and construction method of overhead viaduct |
| CN202688901U (en) * | 2012-07-25 | 2013-01-23 | 吴立新 | Double-beam bridge erecting machine |
| CN203373664U (en) * | 2013-07-01 | 2014-01-01 | 中铁科工集团有限公司 | Foldable rear supporting leg of tunnel-through bridge girder erection machine |
| CN104631335A (en) * | 2015-02-05 | 2015-05-20 | 郑州新大方重工科技有限公司 | Novel large-tonnage bridge girder erection machine and construction method thereof |
| CN104762885A (en) * | 2015-03-31 | 2015-07-08 | 中铁工程机械研究设计院有限公司 | Large-tonnage beam erection and transportation system in tunnel and beam erection span change procedure thereof |
-
2017
- 2017-03-15 CN CN201710152158.4A patent/CN106917360A/en active Pending
Patent Citations (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN201933415U (en) * | 2010-12-30 | 2011-08-17 | 邯郸市北恒工程机械有限公司 | Highway and railway twin-girder bridge erection machine |
| JP2012202076A (en) * | 2011-03-24 | 2012-10-22 | Toda Constr Co Ltd | Construction device of overhead viaduct and construction method of overhead viaduct |
| CN102720142A (en) * | 2011-03-31 | 2012-10-10 | 江苏恩纳斯重工机械有限公司 | Special crane for bridge erecting machine capable of passing through dogleg |
| CN202247701U (en) * | 2011-10-13 | 2012-05-30 | 浙江中建路桥设备有限公司 | Rotatable middle support leg |
| CN202688901U (en) * | 2012-07-25 | 2013-01-23 | 吴立新 | Double-beam bridge erecting machine |
| CN203373664U (en) * | 2013-07-01 | 2014-01-01 | 中铁科工集团有限公司 | Foldable rear supporting leg of tunnel-through bridge girder erection machine |
| CN104631335A (en) * | 2015-02-05 | 2015-05-20 | 郑州新大方重工科技有限公司 | Novel large-tonnage bridge girder erection machine and construction method thereof |
| CN104762885A (en) * | 2015-03-31 | 2015-07-08 | 中铁工程机械研究设计院有限公司 | Large-tonnage beam erection and transportation system in tunnel and beam erection span change procedure thereof |
Cited By (11)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109837837A (en) * | 2019-03-06 | 2019-06-04 | 上海市基础工程集团有限公司 | Mounting device and method for concrete-steel Beam prefabricated bridge |
| CN110804958A (en) * | 2019-11-26 | 2020-02-18 | 中铁第五勘察设计院集团有限公司 | A method for changing the frame of a whole-hole beam |
| CN110804958B (en) * | 2019-11-26 | 2021-06-25 | 中铁第五勘察设计院集团有限公司 | A method for changing the frame of a whole-hole beam |
| CN110904863A (en) * | 2019-12-09 | 2020-03-24 | 中铁第五勘察设计院集团有限公司 | Beam changing method with foldable beam changing machine |
| CN111441250A (en) * | 2020-04-02 | 2020-07-24 | 中交一公局集团有限公司 | Method for transporting upper bridge deck in double-layer steel-concrete composite beam |
| CN113756198A (en) * | 2021-09-15 | 2021-12-07 | 上海市基础工程集团有限公司 | Light device for mounting prefabricated full-width bridge deck of steel-concrete composite beam |
| CN113699902A (en) * | 2021-09-28 | 2021-11-26 | 中铁第五勘察设计院集团有限公司 | Beam changing equipment |
| CN114481835A (en) * | 2021-12-13 | 2022-05-13 | 中铁第五勘察设计院集团有限公司 | Stepless span changing device and method for suspension point of bridge girder erection machine |
| CN114481835B (en) * | 2021-12-13 | 2023-04-07 | 中铁第五勘察设计院集团有限公司 | Stepless span changing device and method for suspension point of bridge girder erection machine |
| CN114319145A (en) * | 2021-12-28 | 2022-04-12 | 中交路桥华南工程有限公司 | Bridge erecting method using bridge erecting machine |
| CN114319145B (en) * | 2021-12-28 | 2024-02-06 | 中交路桥华南工程有限公司 | Bridge erection method using bridge girder erection machine |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN101851898B (en) | Bridge girder erection machine capable of passing through tunnel and realizing girder erection and bridging process thereof | |
| CN110130229A (en) | It a kind of several juxtaposed double cantilever erections machines and its sets a roof beam in place and passing method | |
| CN100476076C (en) | Mobile integral construction platform, construction method and special spreader | |
| CN102071650B (en) | Universal bridging machine inside and outside Railway Tunnel | |
| CN106400701B (en) | A kind of list girder low level balanced cantilever assembly Bridge Erector | |
| CN218712236U (en) | External mold device applied to continuous beam construction | |
| WO2024087901A1 (en) | Cantilever casting and locomotion all-in-one machine | |
| CN109024291A (en) | A kind of integration Bridge Erector and its working method | |
| RU2381326C1 (en) | Device for lifting and erecting units of superstructure | |
| CN105970833B (en) | Prefabricated subsection splicing span by span bridge fabrication machine | |
| CN208121587U (en) | Auxiliary leg before Large span bridging machine variable-span multi-stage expansion | |
| CN111675112B (en) | A height-adjustable bridge pier hoisting machine, construction method and overpass method | |
| CN108149589B (en) | Large span tunnel box girder bridge erecting machine | |
| CN220486256U (en) | Small-radius curve descending type segment assembly bridge girder erection machine | |
| CN116427283A (en) | A construction method for erecting prefabricated girders of small-radius bridges in mountainous areas | |
| CN111335185A (en) | Large-tonnage box girder erection construction system for realizing height control and erection method thereof | |
| CN110195411A (en) | A kind of self-propelled bridge formwork Mobile workbench | |
| CN102071641B (en) | Cement beam packs bridge machine cloth supporting leg type integration of transporting and building Bridge Erector and bridge formation engineering method thereof | |
| CN114476962A (en) | A steel-concrete composite beam erection system based on bridge deck crane | |
| CN117303228A (en) | Mast type hollow girder erecting crane | |
| CN219793657U (en) | Large-tonnage segmental assembling bridge girder erection machine end hanger | |
| CN108532462A (en) | A kind of symmetrically set a roof beam in place and its is set a roof beam in place, passing method at formula Bridge Erector | |
| CN111851301A (en) | a bridge erecting machine | |
| CN104746432A (en) | Carriageway slab transportation and installation vehicle capable of traveling on slab and beam | |
| CN209686254U (en) | A kind of folding retractable support leg device |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| RJ01 | Rejection of invention patent application after publication | ||
| RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170704 |