CN201534947U - Yudong plain county rural highway cement concrete pavement structure - Google Patents

Yudong plain county rural highway cement concrete pavement structure Download PDF

Info

Publication number
CN201534947U
CN201534947U CN2009200914801U CN200920091480U CN201534947U CN 201534947 U CN201534947 U CN 201534947U CN 2009200914801 U CN2009200914801 U CN 2009200914801U CN 200920091480 U CN200920091480 U CN 200920091480U CN 201534947 U CN201534947 U CN 201534947U
Authority
CN
China
Prior art keywords
cement concrete
thick
rendzinas
surface layer
concrete pavement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009200914801U
Other languages
Chinese (zh)
Inventor
华学礼
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGQIU YUDONG HIGHWAY PROSPECTING DESIGN CO Ltd
Original Assignee
SHANGQIU YUDONG HIGHWAY PROSPECTING DESIGN CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGQIU YUDONG HIGHWAY PROSPECTING DESIGN CO Ltd filed Critical SHANGQIU YUDONG HIGHWAY PROSPECTING DESIGN CO Ltd
Priority to CN2009200914801U priority Critical patent/CN201534947U/en
Application granted granted Critical
Publication of CN201534947U publication Critical patent/CN201534947U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses a Yudong plain county rural highway cement concrete pavement structure, which comprises a surface layer, and a base layer in a three-layer or two-layer structure, wherein the surface layer adopts the cement concrete, and the base layer adopts the cement stabilized soil or gravel, lime stabilized soil or gravel soil, cement and lime stabilized soil, cement stabilized crushed stone, graded gravel and natural gravel. The typical pavement structure of the utility model enables the pavement structural design to be standardized and charted, has convenient use, greatly shortens the cycle of the design, reduces the design workload, improves the work efficiency and saves the design cost.

Description

The Henan former counties and townships highway cement concrete pavement structure of conquering east
Technical field
The utility model relates to the highway pavement structure, especially relates to the Henan former counties and townships highway cement concrete pavement structure of conquering east.
Background technology
Henan conquers east that the problem that exists in the highway construction of former counties and townships is that grade is low, road conditions are poor, local road structure use single, lack maintenance, lack problems such as effective quality, technical management, show that mainly roadbed, pavement compaction degree are not enough, side slope is stable inadequately, the gutter excavation is lack of standardization, the barricade instability, the road surface multiple labour of exceeding the time limit, the subgrade and pavement disease is more, the road conditions quality is lower, adding a certain period of traffic increases suddenly suddenly, the particularly increase of heavy load causes road surface and bridge collapse to speed up, and harm is serious.As because of arterial highway project under construction enclosure portion road section traffic volume, counties and townships' traffic volume of highway of periphery is increased, heavy load increases, and substantially exceeds the accumulative equivalent axles of design, has therefore reduced service life and life-span.Though some substandard highways are through transforming for many years, many highway sections still do not reach the technical standard requirement, bring many sequelae to maintainer.The road surface breakage situation is serious, has almost contained all types of damage of flexible pavement.Some highway sections are surveyed deflection value in fact and have been surpassed design deflection value in actual useful year.Lack maintenance, it is low that counties and townships' highway pipe is supported rate, and it is big that difficulty is carried out in administration of highways work, lacks effective quality, technical management, and some basic technical problems are still restricting the raising of workmanship so far.As basic unit's stability problem of cement concrete pavement etc., in counties and townships' highway construction, mostly do not obtain due attention.The counties and townships' highway that has is direct overlay table place surface layer in weak basic units such as rendzinas or plaster knot rubble, is difficult to stand vehicular load and sleet and corrodes.Some places even some jejune construction technologies being applied to blindly caused workmanship hidden danger in the construction.
Summary of the invention
The technical problems to be solved in the utility model is: under China's pavement design standard instructs, weather, soil geological conditions and material source etc. according to an area carry out rational road structure design, make road structure design specificationsization, pictorialization, reduce the design work amount, optimize the road structure design, make aspects such as the road structure designer selects at material, thickness is determined that bigger range of choice be arranged, thereby determine road structure safe and reliable, economical rationality.
The technical solution adopted in the utility model is: this Henan former counties and townships highway cement concrete pavement structure of conquering east is to adopt three layers or two-layer structure of surface layer and basic unit, and surface layer adopts cement concrete, and basic unit adopts cement and lime soil or rendzinas.
As one of technical scheme optimal way is that the surface layer of cement concrete pavement structure is the thick cement concrete of 22cm, and basic unit is 10% a thick rendzinas of 12% thick rendzinas of 16cm and 16cm.
As two of technical scheme optimal way is that the surface layer of cement concrete pavement structure is the thick cement concrete of 20cm, and basic unit is 10% a thick rendzinas of 12% thick rendzinas of 18cm and 18cm.
As three of technical scheme optimal way is that the surface layer of cement concrete pavement structure is the thick cement concrete of 22cm, and basic unit is 10% a thick rendzinas of thick cement and lime soil of 15cm and 16cm.
As four of technical scheme optimal way is that the surface layer of cement concrete pavement structure is the thick cement concrete of 20cm, and basic unit is 10% a thick rendzinas of thick cement and lime soil of 15cm and 18cm.
As five of technical scheme optimal way is that the surface layer of cement concrete pavement structure is the thick cement concrete of 20cm, and basic unit is 10% a thick rendzinas of 12% thick rendzinas of 18cm and 15cm.
As six of technical scheme optimal way is that the surface layer of cement concrete pavement structure is the thick cement concrete of 18cm, and basic unit is 10% a thick rendzinas of 12% thick rendzinas of 16cm and 15cm.
As seven of technical scheme optimal way is that the surface layer of cement concrete pavement structure is the thick cement concrete of 20cm, and basic unit is 12% a thick rendzinas of 15cm.
As eight of technical scheme optimal way is that the surface layer of cement concrete pavement structure is the thick cement concrete of 18cm, and basic unit is 12% a thick rendzinas of 15cm.
As nine of technical scheme optimal way is that the surface layer of cement concrete pavement structure is the thick cement concrete of 16cm, and basic unit is 12% a thick rendzinas of 15cm.
The technique effect that the utility model produces is: adopt typical road structure of the present utility model, make the road structure design specificationsization, pictorialization, form is eye-catching, with strong points, easy to use, shortened the design cycle greatly, reduce the design work amount, improved operating efficiency, saved design cost, improve workman's construction technology qualification, prolong road application life, investment promotion is effectively balanced and the road structure designer is selected at material, there is bigger range of choice aspects such as thickness is definite, do not need to do big calculating and just can determine safe and reliable, the road structure of economical rationality, thus avoid owing to the structure selection improper or thickness to determine that the improper road structure that causes is uneconomical or dangerous.
Description of drawings
Fig. 1 is three layers of road structure schematic diagram of the utility model.
In Fig. 1,1, surface layer; 2, basic unit one; 3, basic unit two.
The specific embodiment
Show from the data of the former counties and townships highway cement concrete pavement structure investigation of being conquered east in Henan, the material that surface layer adopts is a cement concrete, thickness is generally: cement concrete 18cm, basic unit are cement stabilized soil, cement, lime comprehensive stable soil mostly, and thickness is 15~18cm.
Cement concrete pavement structure comprises surface layer and basic unit, and surface layer can adopt cement concrete, and basic unit can adopt cement stabilized soil or gravel, lime stabilized soil or gravelly soil, cement and lime Stabilized Soil, cement stabilized macadam, graded broken stone, natural gravel.Cement concrete pavement structure can be selected two types road structure, and is specific as follows:
1, when traffic grade interval be 30~50 (* 10 4) time:
Soil matrix classification 30MPa≤S 1During≤40Mpa, the cement concrete pavement typical structure should be: cement concrete 22cm, cement and lime soil 15cm and 10% rendzinas 16cm;
Soil matrix classification 40MPa≤S 1During≤50Mpa, the cement concrete pavement typical structure should be: cement concrete 22cm, 12% rendzinas 16cm and 10% rendzinas 16cm;
Soil matrix classification 50MPa≤S 1During≤65Mpa, the cement concrete pavement typical structure should be: cement concrete 20cm, 12% rendzinas 18cm, 10% rendzinas 18cm;
2, when traffic grade interval be 10~30 (* 10 4) time:
Soil matrix classification 30MPa≤S 1During≤40Mpa, the cement concrete pavement typical structure should be: cement concrete 20cm, cement and lime soil 15cm and 10% rendzinas 18cm;
Soil matrix classification 40MPa≤S 1During≤50Mpa, the cement concrete pavement typical structure should be: cement concrete 20cm, 12% rendzinas 18cm and 10% rendzinas 15cm;
Soil matrix classification 50MPa≤S 1During≤65Mpa, the cement concrete pavement typical structure should be: cement concrete 18cm, 12% rendzinas 16cm and 10% rendzinas 15cm.
3, when traffic grade interval be 5~10 (* 10 4) time:
Soil matrix classification 30MPa≤S 1During≤40Mpa, the cement concrete pavement typical structure should be: cement concrete 20cm and 12% rendzinas 15cm;
Soil matrix classification 40MPa≤S 1During≤50Mpa, the cement concrete pavement typical structure should be: cement concrete 18cm and 12% rendzinas 15cm;
Soil matrix classification 50MPa≤S 1During≤65Mpa, the cement concrete pavement typical structure should be: cement concrete 16cm and 12% rendzinas 15cm.
When definite road structure type, should consider from the following aspects:
(1) gathers materials on the spot, reduce cost;
(2) at the reality of unit in charge of construction, suitable simple, the easy road structure of facility of adopting process;
(3) consider to build and supervisor's reality, should use the structure types of construction and managerial experiences maturation.

Claims (10)

1. a Henan former counties and townships highway cement concrete pavement structure of conquering east is characterized in that this road structure comprises three layers or two-layer structure of surface layer and basic unit, and described surface layer adopts cement concrete, and described basic unit adopts cement and lime soil or rendzinas.
2. road structure according to claim 1 is characterized in that, the surface layer of described cement concrete pavement structure is the thick cement concrete of 22cm, and basic unit is 10% a thick rendzinas of 12% thick rendzinas of 16cm and 16cm.
3. road structure according to claim 1 is characterized in that, the surface layer of described cement concrete pavement structure is the thick cement concrete of 20cm, and basic unit is 10% a thick rendzinas of 12% thick rendzinas of 18cm and 18cm.
4. road structure according to claim 1 is characterized in that, the surface layer of described cement concrete pavement structure is the thick cement concrete of 22cm, and basic unit is 10% a thick rendzinas of thick cement and lime soil of 15cm and 16cm.
5. road structure according to claim 1 is characterized in that, the surface layer of described cement concrete pavement structure is the thick cement concrete of 20cm, and basic unit is 10% a thick rendzinas of thick cement and lime soil of 15cm and 18cm.
6. road structure according to claim 1 is characterized in that, the surface layer of described cement concrete pavement structure is the thick cement concrete of 20cm, and basic unit is 10% a thick rendzinas of 12% thick rendzinas of 18cm and 15cm.
7. road structure according to claim 1 is characterized in that, the surface layer of described cement concrete pavement structure is the thick cement concrete of 18cm, and basic unit is 10% a thick rendzinas of 12% thick rendzinas of 16cm and 15cm.
8. road structure according to claim 1 is characterized in that, the surface layer of described cement concrete pavement structure is the thick cement concrete of 20cm, and basic unit is 12% a thick rendzinas of 15cm.
9. road structure according to claim 1 is characterized in that, the surface layer of described cement concrete pavement structure is the thick cement concrete of 18cm, and basic unit is 12% a thick rendzinas of 15cm.
10. road structure according to claim 1 is characterized in that, the surface layer of described cement concrete pavement structure is the thick cement concrete of 16cm, and basic unit is 12% a thick rendzinas of 15cm.
CN2009200914801U 2009-07-04 2009-07-04 Yudong plain county rural highway cement concrete pavement structure Expired - Fee Related CN201534947U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009200914801U CN201534947U (en) 2009-07-04 2009-07-04 Yudong plain county rural highway cement concrete pavement structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009200914801U CN201534947U (en) 2009-07-04 2009-07-04 Yudong plain county rural highway cement concrete pavement structure

Publications (1)

Publication Number Publication Date
CN201534947U true CN201534947U (en) 2010-07-28

Family

ID=42534728

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009200914801U Expired - Fee Related CN201534947U (en) 2009-07-04 2009-07-04 Yudong plain county rural highway cement concrete pavement structure

Country Status (1)

Country Link
CN (1) CN201534947U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104631272A (en) * 2015-01-29 2015-05-20 洛阳瑞泽石化工程有限公司 Pavement structure of automobile loading and unloading facility site, as well as construction method
CN109137667A (en) * 2018-08-10 2019-01-04 天津府宁建筑工程有限公司 A kind of construction method of backroad

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104631272A (en) * 2015-01-29 2015-05-20 洛阳瑞泽石化工程有限公司 Pavement structure of automobile loading and unloading facility site, as well as construction method
CN109137667A (en) * 2018-08-10 2019-01-04 天津府宁建筑工程有限公司 A kind of construction method of backroad

Similar Documents

Publication Publication Date Title
CN103924501A (en) Reinforcing construction method in partial failure repairing of rural cement pavement
CN109440571A (en) The construction method for building road is faced in a kind of laying of prefabricated board
CN108532406A (en) Can rapid construction high-bearing capacity pervious surface and laying method
CN205804068U (en) Town road structure
CN201534947U (en) Yudong plain county rural highway cement concrete pavement structure
CN109826065A (en) A kind of high-fill roadbed guard system and its construction method
CN211922135U (en) Prevent subsiding highway subgrade
CN205329446U (en) Upper and lower staggered floor precast reinforced concrete basic unit of permeating water
CN208748462U (en) Can rapid construction high-bearing capacity pervious surface
CN206553848U (en) Embankment section road surface edge structure
CN102535297B (en) Polypropylene fiber concrete roadway structure suitable for large-tonnage cars and construction method
CN205688299U (en) A kind of stable road structure
CN205134120U (en) Super thick cement stabilized macadam base
CN209652672U (en) A kind of Anti-settling device of highway subgrade
CN204326098U (en) The road structure of underpass of freeways next-door neighbour Bridge Pier
CN103449784B (en) Be applicable to the cement-based waterproof anticracking material of swelled ground area railway cutting bedding
KR101351075B1 (en) Underground apparatus for prevention of differential settlement of block pavement using multi-vertex mesh and method thereof
CN206486756U (en) A kind of anti-subsidence structure in expressway
CN205636402U (en) Anti pavement deflection formula permeable pavement
CN211227911U (en) Municipal administration road local reinforcement structure
CN219951585U (en) Pavement repair structure
CN206477202U (en) A kind of staking subgrade support retainer structure
CN213447904U (en) A road bed reinforcing apparatus for highway construction
CN216514935U (en) Rural highway cement concrete pavement structure of small traffic
CN214882672U (en) Highway subgrade reinforced structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100728

Termination date: 20110704