CN104631272A - Pavement structure of automobile loading and unloading facility site, as well as construction method - Google Patents

Pavement structure of automobile loading and unloading facility site, as well as construction method Download PDF

Info

Publication number
CN104631272A
CN104631272A CN201510046053.1A CN201510046053A CN104631272A CN 104631272 A CN104631272 A CN 104631272A CN 201510046053 A CN201510046053 A CN 201510046053A CN 104631272 A CN104631272 A CN 104631272A
Authority
CN
China
Prior art keywords
thickness
cement
automobile loading
road structure
surface layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510046053.1A
Other languages
Chinese (zh)
Inventor
任春来
康福娜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
LUOYANG RUIZE PETROCHEMICAL ENGINEERING Co Ltd
Original Assignee
LUOYANG RUIZE PETROCHEMICAL ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by LUOYANG RUIZE PETROCHEMICAL ENGINEERING Co Ltd filed Critical LUOYANG RUIZE PETROCHEMICAL ENGINEERING Co Ltd
Priority to CN201510046053.1A priority Critical patent/CN104631272A/en
Publication of CN104631272A publication Critical patent/CN104631272A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C9/00Special pavings; Pavings for special parts of roads or airfields
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C7/00Coherent pavings made in situ
    • E01C7/08Coherent pavings made in situ made of road-metal and binders
    • E01C7/32Coherent pavings made in situ made of road-metal and binders of courses of different kind made in situ

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)

Abstract

The invention relates to a pavement structure of an automobile loading and unloading facility site, as well as a construction method. The pavement structure comprises a cushion layer (1), a base layer (2) and a surface layer (3) from bottom to top, wherein the cushion layer (1) is manufactured by limestone soil with the thickness being 30cm, the base layer (2) is manufactured by cement stable rubbles with the thickness being 30cm, and the surface layer (3) is manufactured by cement concrete with the thickness being 30cm. the construction method of the pavement structure comprises the following steps: a. clearing and compacting the roadbed; b. paving the cushion layer (1) with limestone and compacting; c. paving the base layer (2) with cement stable rubbles, and compacting; d. paving the surface layer (3) with cement concrete with the strength grade of C30 and compacting; and e. maintaining the pavement to complete the construction. According to the technical scheme, the pavement structure can bear a 70-tonnage truck without early cracking and sinking, and can meet the automobile loading and unloading demand.

Description

The road structure in automobile loading unloading facilities place and construction method thereof
Technical field
The invention belongs to petrochemical industry, the road structure relating generally to automobile loading unloading facilities place and the impact of paving retentively face stability thereof.
Background technology
Because the production scale of present petrochemical enterprise is increasing, and automobile loading unloading facilities is the clustering area of petrochemical industry chemical enterprise lorry, and vehicle is many, and tonnage is large.Maximum 50 tons of the lorry of national regulation, but the maximum tonnage of petrochemical enterprise lorry can reach 70 tons under actual conditions, in this case, if only paved, even if the needs of supporting capacity also cannot be met according to maximum value according to petroleum chemical industry standard SHT101-2009 " cement concrete pavement and place are paved ".
Describe in detail below in conjunction with accompanying drawing, Fig. 1 is the maximum value that required three-layer-material thickness is paved in existing general place, be surface layer 3 ' is from top to down respectively 220mm, and basic unit 2 ' is 180mm, and bed course 1 ' is 150mm.The combination of this thickness can be born standard axle load and be added up effect 1423500 times, and day effect number of times is 500 times.So-called standard axle load refers to two-wheel group uniaxial load 100KN.Namely 4 wheel tonnages are vehicle day of 10 tons act on 500 times.And the truck of 70 tons is generally two-wheel six axle, namely 24 wheel tonnages are the car of 70 tons.Its weight conversion is 1.17 times of standard axle load, very large to the destruction of floor slab.Regulation according to JTGD40-2011 " highway cement concrete pavement design specifications " 3.0.6: N s = Σ i = 1 n N i ( P i P s ) 16
N s---the effect number of times that design axle carries;
N i---the effect number of times that i level axle carries;
The axle of n---various spindle-type carries a grade figure place;
P s---design axle load-carrying (KN);
P i---i-th grade of axle load (KN), shaft coupling is by each root axle separately.
Can be calculated by secondary formula, standard axle load allows to roll 500 times, and the lorry of 70 tons can only roll 41 times.Obviously cannot meet the needs of automobile loading-unloading vehicle, therefore SHT101-2009 " cement concrete pavement and place are paved " has not been suitable for automobile loading unloading facilities place paves.
Because the road surface that above-mentioned existing general place is paved cannot meet the defect that 70 tons of trucks travel, the present inventor works out the present invention, and meaning of the present invention is mainly used in solving the problem.
Summary of the invention
The object of the invention is to, the defect that the road structure overcoming existing automobile loading unloading facilities place exists, and a kind of road structure and construction method thereof of novel automobile loading unloading facilities place are provided, technical problem to be solved avoids place premature rupture sinking because wagon load is excessive, thus be more suitable for practicality.
The object of the invention to solve the technical problems realizes by the following technical solutions.The road structure in a kind of automobile loading unloading facilities place proposed according to the present invention, wherein this road structure is made up of bed course (1) from bottom to top, basic unit (2) and surface layer (3); The material of wherein said bed course (1) is rendzinas, its thickness is 30-36cm, and the material of described basic unit (2) is cement stabilized macadam, and its thickness is 30-36cm, the material of described surface layer (3) is cement concrete, and its thickness is 30-36cm.
The object of the invention to solve the technical problems also can be applied to the following technical measures to achieve further.
Preferably, the thickness of wherein said bed course (1) is 30cm, and the thickness of described basic unit (2) is 30cm, and described surface layer (3) thickness is 30cm.
Preferably, the strength grade of wherein said cement concrete is C30.
The object of the invention to solve the technical problems also realizes by the following technical solutions.The construction method of the road structure in the automobile loading unloading facilities place proposed according to the present invention, it comprises the following steps: a, clears up roadbed, tamps; B, laying bed course (1): rendzinas is layed on roadbed, then compacting; C, lay basic unit (2): make the raw material of cement stabilized macadam, make aggregate and cementitious material and mortar with graded broken stone and stir and form, pave on bed course (1), then compacting; D, laying surface layer (3): making strength grade is the cement concrete of C30, is layed in by described cement concrete on basic unit (2), then adopt steamroller 5-10 time with compacting; E, road pavement carry out maintenance, complete construction.
The object of the invention to solve the technical problems also can be applied to the following technical measures to achieve further.
Preferably, to be the raw material every cubic metre weight proportion of the cement concrete of C30 be the strength grade described in its steps d: cement: 250-380kg/m 3, sand: 500-750kg/m 3, stone: 1100-1300kg/m 3, water: 140-190kg/m 3.
Preferably, the strength grade wherein described in steps d is the raw material every cubic metre weight proportion of the cement concrete of C30: cement: 280kg/m 3, sand: 680kg/m 3, stone: 1250kg/m 3, water: 180kg/m 3.
By technique scheme, road structure and the construction method thereof in automobile loading unloading facilities place of the present invention at least have following advantages: road structure of the present invention can bear the traveling and sinking of prematurely ftractureing that reach 70 tons of trucks, and can meet the needs of current automobile loading-unloading vehicle.
Above-mentioned explanation is only the general introduction of technical solution of the present invention, in order to technological means of the present invention can be better understood, and can be implemented according to the content of manual, and can become apparent to allow above and other object of the present invention, feature and advantage, below especially exemplified by preferred embodiment, and coordinate accompanying drawing, be described in detail as follows.
Accompanying drawing explanation
Fig. 1 is the schematic diagram selecting maximum cross section according to SHT101-2009 " cement concrete pavement and place are paved ".
Fig. 2 is the schematic diagram in the cross section of the road structure in automobile loading unloading facilities place of the present invention.
[critical element symbol description]
1,1 ': bed course
2,2 ': basic unit
3,3 ': surface layer
Detailed description of the invention
For further setting forth the present invention for the technological means reaching predetermined goal of the invention and take and effect, below in conjunction with accompanying drawing and preferred embodiment, to its detailed description of the invention of road structure in automobile loading unloading facilities place proposed according to the present invention, structure, construction method, feature and effect thereof, be described in detail as follows.
How to calculate because all specifications all do not design road thickness, according to practical experience and reasoning, can bed course be strengthened, the thickness of basic unit and surface layer, as shown in figure 2 of the drawings.Fig. 2 is the schematic diagram in the cross section of the road structure in automobile loading unloading facilities place of the present invention.
The road structure being applicable to the automobile loading unloading facilities place of 70 tons of trucks of the present invention.Wherein this road structure is made up of bed course 1 from bottom to top, basic unit 2 and surface layer 3; The material of wherein said bed course 1 is rendzinas, and its thickness is 30-36cm, and the material of described basic unit 2 is cement stabilized macadams, and its thickness is 30-36cm, and the material of described surface layer 3 is cement concretes, and its thickness is 30-36cm.The strength grade of wherein said cement concrete is C30.
The construction method of its road structure, it comprises the following steps: a, clears up roadbed, tamps; B, laying bed course 1: rendzinas is layed on roadbed, then compacting; C, lay basic unit 2: make the raw material of cement stabilized macadam, make aggregate and cementitious material and mortar with graded broken stone and stir and form, pave on bed course 1, then compacting; D, laying surface layer 3: making strength grade is the cement concrete of C30, is layed in by described cement concrete on basic unit 2, then adopt steamroller 5-10 time with compacting; E, road pavement carry out maintenance, complete construction.
Strength grade described in its steps d is the raw material every cubic metre weight proportion of the cement concrete of C30: cement: 250-380kg/m3, sand: 500-750kg/m3, stone: 1100-1300kg/m3, water: 140-190kg/m3.
Through inspection, the road structure being applicable to the automobile loading unloading facilities place of 70 tons of trucks of the present invention.
Embodiment 1
The thickness of the road structure bed course 1 in automobile loading unloading facilities place of the present invention is 30cm, and the thickness of described basic unit 2 is 30cm, and described surface layer 3 thickness is 30cm.The material of wherein said surface layer 3 is cement concretes.The raw material every cubic metre weight proportion of wherein said cement concrete is: cement: 280kg/m3, sand: 680kg/m3, stone: 1250kg/m3, water: 180kg/m3.
Embodiment 2
The thickness of the road structure bed course 1 in automobile loading unloading facilities place of the present invention is 32cm, and the thickness of described basic unit 2 is 32cm, and described surface layer 3 thickness is 32cm.The material of wherein said surface layer 3 is cement concretes.The raw material every cubic metre weight proportion of wherein said cement concrete is: cement: 290kg/m3, sand: 690kg/m3, stone: 1260kg/m3, water: 185kg/m3.
Embodiment 3
The thickness of the road structure bed course 1 in automobile loading unloading facilities place of the present invention is 34cm, and the thickness of described basic unit 2 is 34cm, and described surface layer 3 thickness is 34cm.The material of wherein said surface layer 3 is cement concretes.The raw material every cubic metre weight proportion of wherein said cement concrete is: cement: 300kg/m3, sand: 700kg/m3, stone: 1270kg/m3, water: 186kg/m3.
Embodiment 4
The thickness of the road structure bed course 1 in automobile loading unloading facilities place of the present invention is 36cm, and the thickness of described basic unit 2 is 36cm, and described surface layer 3 thickness is 36cm.The material of wherein said surface layer 3 is cement concretes.The raw material every cubic metre weight proportion of wherein said cement concrete is: cement: 310kg/m3, sand: 710kg/m3, stone: 1280kg/m3, water: 190kg/m3.
In sum, by facts have proved, each layer thickness of the road structure in automobile loading unloading facilities place of the present invention can well solve the place problem that premature rupture sinks because wagon load is excessive.
The above, it is only preferred embodiment of the present invention, not any pro forma restriction is done to the present invention, although the present invention discloses as above with preferred embodiment, but and be not used to limit the present invention, any those skilled in the art, do not departing within the scope of technical solution of the present invention, make a little change when the technology contents of above-mentioned announcement can be utilized or be modified to the Equivalent embodiments of equivalent variations, in every case be the content not departing from technical solution of the present invention, according to technical spirit of the present invention to any simple modification made for any of the above embodiments, equivalent variations and modification, all still belong in the scope of technical solution of the present invention.

Claims (6)

1. the road structure in automobile loading unloading facilities place, is characterized in that: this road structure is made up of bed course (1) from bottom to top, basic unit (2) and surface layer (3);
The material of wherein said bed course (1) is rendzinas, its thickness is 30-36cm, and the material of described basic unit (2) is cement stabilized macadam, and its thickness is 30-36cm, the material of described surface layer (3) is cement concrete, and its thickness is 30-36cm.
2. the road structure in automobile loading unloading facilities place according to claim 1, it is characterized in that: the thickness of wherein said bed course (1) is 30cm, the thickness of described basic unit (2) is 30cm, and described surface layer (3) thickness is 30cm.
3. the road structure in automobile loading unloading facilities place according to claim 2, is characterized in that: the strength grade of wherein said cement concrete is C30.
4. a construction method for the road structure in the automobile loading unloading facilities place as described in claim arbitrary in claims 1 to 3, is characterized in that comprising the following steps:
A, roadbed is cleared up, tamp;
B, laying bed course (1): rendzinas is layed on roadbed, then compacting;
C, lay basic unit (2): make the raw material of cement stabilized macadam, make aggregate and cementitious material and mortar with graded broken stone and stir and form, pave on bed course (1), then compacting;
D, laying surface layer (3): making strength grade is the cement concrete of C30, is layed in by described cement concrete on basic unit (2), then adopt steamroller 5-10 time with compacting;
E, road pavement carry out maintenance, complete construction.
5. the construction method of the road structure in automobile loading unloading facilities place according to claim 4, is characterized in that: to be the raw material every cubic metre weight proportion of the cement concrete of C30 be the strength grade described in steps d:
Cement: 250-380kg/m 3,
Sand: 500-750kg/m 3,
Stone: 1100-1300kg/m 3,
Water: 140-190kg/m 3.
6. the construction method of the road structure in automobile loading unloading facilities place according to claim 5, is characterized in that: to be the raw material every cubic metre weight proportion of the cement concrete of C30 be the strength grade described in steps d:
Cement: 280kg/m 3,
Sand: 680kg/m 3,
Stone: 1250kg/m 3,
Water: 180kg/m 3.
CN201510046053.1A 2015-01-29 2015-01-29 Pavement structure of automobile loading and unloading facility site, as well as construction method Pending CN104631272A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510046053.1A CN104631272A (en) 2015-01-29 2015-01-29 Pavement structure of automobile loading and unloading facility site, as well as construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510046053.1A CN104631272A (en) 2015-01-29 2015-01-29 Pavement structure of automobile loading and unloading facility site, as well as construction method

Publications (1)

Publication Number Publication Date
CN104631272A true CN104631272A (en) 2015-05-20

Family

ID=53210473

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510046053.1A Pending CN104631272A (en) 2015-01-29 2015-01-29 Pavement structure of automobile loading and unloading facility site, as well as construction method

Country Status (1)

Country Link
CN (1) CN104631272A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106245485A (en) * 2016-08-08 2016-12-21 中国建筑土木建设有限公司 Sand real estate feed bin stockyard and method of construction thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6454489B1 (en) * 1996-08-16 2002-09-24 Mitsubishi Materials Corporation NOx removing pavement structure
CN101082199A (en) * 2007-07-05 2007-12-05 吴永芳 Road surface structure and construction method therefor
CN101638877A (en) * 2009-08-20 2010-02-03 天津市市政工程设计研究院 Bituminous pavement structure based on traffic condition of soft foundation and heavy load and subgrade processing method
CN201534947U (en) * 2009-07-04 2010-07-28 商丘市豫东公路勘察设计有限公司 Yudong plain county rural highway cement concrete pavement structure
CN204491350U (en) * 2015-01-29 2015-07-22 洛阳瑞泽石化工程有限公司 The road structure in automobile loading unloading facilities place

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6454489B1 (en) * 1996-08-16 2002-09-24 Mitsubishi Materials Corporation NOx removing pavement structure
CN101082199A (en) * 2007-07-05 2007-12-05 吴永芳 Road surface structure and construction method therefor
CN201534947U (en) * 2009-07-04 2010-07-28 商丘市豫东公路勘察设计有限公司 Yudong plain county rural highway cement concrete pavement structure
CN101638877A (en) * 2009-08-20 2010-02-03 天津市市政工程设计研究院 Bituminous pavement structure based on traffic condition of soft foundation and heavy load and subgrade processing method
CN204491350U (en) * 2015-01-29 2015-07-22 洛阳瑞泽石化工程有限公司 The road structure in automobile loading unloading facilities place

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
中交公路规划设计院有限公司主编: "《公路水泥混凝土路面设计规范 JTG D40-2011》", 《中华人民共和国行业标准》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106245485A (en) * 2016-08-08 2016-12-21 中国建筑土木建设有限公司 Sand real estate feed bin stockyard and method of construction thereof

Similar Documents

Publication Publication Date Title
Harrington et al. Guide for roller-compacted concrete pavements
CN101638877B (en) Bituminous pavement structure based on traffic condition of soft foundation and heavy load and subgrade processing method
CN202787044U (en) Longitudinal crack treatment structure for bituminous concrete pavement
EP2202359A1 (en) Semi-flexible multi-layer paving
CN104452510B (en) Immediate construction method of rural road
CN101532273B (en) Anti-rutting road surface RS2000 modified asphalt mixture proportion and construction technology
CN104446156A (en) Mixture for constructing emulsified asphalt and dilute slurry mixture bituminous penetration road
CN111455768A (en) Flexible roadbed asphalt concrete structure and construction method thereof
US20150110555A1 (en) Method for producing a fibre concrete slab for paving low-traffic roads, concrete slab, and method for paving low-traffic roads
CN204491350U (en) The road structure in automobile loading unloading facilities place
CN104631272A (en) Pavement structure of automobile loading and unloading facility site, as well as construction method
Hakim et al. UK airfield pavement design using French asphalts
CN102535298B (en) Cement concrete roadway structure suitable for large-tonnage cars and construction method
CN215405359U (en) Lane pavement structure
CN216663671U (en) Highway road surface pavement structure
CN212152994U (en) Road surface structure of high-capacity bus rapid transit system station
CN211713556U (en) Energy-concerving and environment-protective cement regeneration asphalt concrete pavement structure
Schary Case studies on geocell-based reinforced roads, railways and ports
CN102535297A (en) Polypropylene fiber concrete roadway structure suitable for large-tonnage cars and construction method
RU2505639C1 (en) Method for construction of asphalt concrete pavement
Wang Construction Technology and Safety Monitoring Measures of Road and Bridge Engineering
Song et al. Study on anti-sliding performance of asphalt pavement with Mafilon thaw material
CN109112918A (en) A kind of anti-settling roadbed and its construction method
CN215329124U (en) Prefabricated road plate and road surface applying same
CN108049272A (en) A kind of construction method on road surface

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20150520