A kind of in-situ reinforced concrete slab preformed hole mould
Technical field
The utility model relates to a kind of cast-in-situ steel reinforced concrete mould, particularly a kind of in-situ reinforced concrete slab preformed hole mould.
Background technology
In the construction work, when the upper and lower conduit road passes through the cast-in-situ steel reinforced concrete template, need to reserve the aperture on the floor; at present; generally the mode that adopts is, is placed on the position of preformed hole with waste and old pipe or fragment of brick, sticks in or blocks with nail; but this mode is very unstable; in the time of concreting, be easy to generate displacement or be stuck, be difficult for the demoulding or rejecting; thereby it is very inconvenient and in case cause and build failure, can cause very big waste again.
Summary of the invention
Problem to be solved in the utility model is: a kind of accurate positioning is provided and can build the wasting in-situ reinforced concrete slab preformed hole mould of failure because of reserving the aperture.
In order to solve the problems of the technologies described above, in-situ reinforced concrete slab preformed hole mould of the present utility model, comprise cope match-plate pattern, lower bolster and side template, it is characterized in that: also comprise a bolt that runs through cope match-plate pattern and lower bolster, be set in plastic pipe and cross iron jig on the bolt, described cross iron jig comprises two mutual vertical and fixedly connected iron bars, the center of described cross iron jig is provided with a screwed hole, and described bolt is fixedlyed connected with the screwed hole on the cross iron jig after passing cope match-plate pattern.
In order to allow bolt from plastic pipe, deviate from smoothly, in-situ reinforced concrete slab preformed hole mould of the present utility model, the diameter of described bolt is 6mm, the internal diameter of described plastic pipe is greater than the diameter of bolt.
The beneficial effect that the utility model is obtained is: by bolt plastic pipe is positioned, with the cross iron jig bolt tightly is fixed on cope match-plate pattern and the lower bolster then, avoided moving of in the process of building plastic pipe, therefore not only accurate positioning, and can not build failure and cause damage because of reserving the aperture.
Description of drawings
Fig. 1 is a structural representation of the present utility model.
Fig. 2 is the structural representation of cross iron jig.
Among the figure: 1, side template, 2, cope match-plate pattern, 3, bolt, 4, the cross iron jig, 5, plastic pipe, 6, lower bolster, 7, screwed hole, 8, iron bar.
The specific embodiment
As depicted in figs. 1 and 2, in-situ reinforced concrete slab preformed hole mould of the present utility model, comprise cope match-plate pattern 2, lower bolster 6 and side template 1, also comprise a bolt 3 that runs through cope match-plate pattern 2 and lower bolster 6, be set in plastic pipe 5 and cross iron jig 4 on the bolt 3, described cross iron jig 4 comprises two mutual vertical and fixedly connected iron bars 8, the center of described cross iron jig 4 is provided with a screwed hole 7, and described bolt 3 passes cope match-plate pattern 2 backs fixedlys connected with the screwed hole 7 on the cross iron jig 4; The diameter of described bolt 3 is 6mm, and the internal diameter of described plastic pipe 5 is greater than the diameter of bolt 3.
When using, bolt 3 is passed from lower bolster 6, plastic pipe 5 is nested on the bolt 3, and then bolt 3 passed cope match-plate pattern 2, rotation cross iron jig 4 makes bolt 3 be fixed on firmly on cope match-plate pattern 2 and the lower bolster 6, just can build at last.
Build finish after because the internal diameter of plastic pipe 5 is greater than the diameter of bolt 3, thus the reinforced concrete floor that bolt 3 is easy to after build extract out, in order to using again next time.
In-situ reinforced concrete slab preformed hole mould of the present utility model positions by 3 pairs of plastic pipes 5 of bolt, and it is accurate to guarantee to reserve the position, aperture, and can also guarantee that can not build failure because of the reservation aperture causes waste.