CN202727092U - Plugging device for position of straight rib of side mold of precast concrete component of wall - Google Patents
Plugging device for position of straight rib of side mold of precast concrete component of wall Download PDFInfo
- Publication number
- CN202727092U CN202727092U CN 201220293257 CN201220293257U CN202727092U CN 202727092 U CN202727092 U CN 202727092U CN 201220293257 CN201220293257 CN 201220293257 CN 201220293257 U CN201220293257 U CN 201220293257U CN 202727092 U CN202727092 U CN 202727092U
- Authority
- CN
- China
- Prior art keywords
- diameter
- wall
- boss
- chassis
- side mold
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Moulds, Cores, Or Mandrels (AREA)
Abstract
Description
技术领域 technical field
本实用新型涉及一种建筑物施工机械设备,具体的说,是涉及一种墙体混凝土预制构件边模直筋位置封堵装置。 The utility model relates to a building construction machinery and equipment, in particular to a sealing device for the position of the straight reinforcement of the side mold of the wall concrete prefabricated component. the
背景技术 Background technique
在装配式混凝土结构中,要求墙体混凝土预制构件水平筋及竖向筋伸出构件,以作为预制构件安装时节点连接用。为此需要在墙体生产的模具上预留出筋孔洞,而为了拆模的方便预留钢筋与模具间必然会存在较大的缝隙,在混凝土浇筑作业时会由此部位漏浆。 In the prefabricated concrete structure, the horizontal reinforcement and vertical reinforcement of the concrete prefabricated component of the wall are required to protrude from the component, which is used for the node connection during the installation of the prefabricated component. For this reason, it is necessary to reserve a rib hole on the mold produced by the wall body, and there must be a large gap between the reserved steel bar and the mold for the convenience of form removal, and the grout will leak from this position during the concrete pouring operation. the
墙体混凝土预制构件在生产过程中,需要针对模具上预留出筋孔洞进行封堵,防止漏浆问题的发生。现有施工方式中,对预留孔进行封堵主要采用泡沫棒或钢板封堵,此两种封堵方式第一种封堵材料的周转次数有限,会增加封堵材料的投入费用;第二种方式不利于工人的安装及拆除操作,效率较低。 During the production process of wall concrete prefabricated components, it is necessary to seal the holes reserved on the mould, so as to prevent the occurrence of grout leakage. In the existing construction methods, foam rods or steel plates are mainly used to block the reserved holes. The first of these two plugging methods has a limited turnover of the plugging material, which will increase the input cost of the plugging material; the second This way is unfavorable for the installation and removal operation of workers, and the efficiency is low. the
实用新型内容 Utility model content
针对上述现有技术中的不足,本实用新型提供一种能够解决预留孔漏浆难题的墙体混凝土预制构件边模直筋位置封堵装置。 Aiming at the deficiencies in the above-mentioned prior art, the utility model provides a position sealing device for the straight reinforcement of the side form of the wall concrete prefabricated member which can solve the problem of grout leakage from the reserved hole. the
本实用新型所采取的技术方案是: The technical scheme that the utility model takes is:
一种墙体混凝土预制构件边模直筋位置封堵装置,由圆形阶梯轴组成,所述圆形阶梯轴由底盘和凸台组成,所述凸台的直径与边模开孔直径相适配,所述底盘直径大于凸台直径;所述圆形阶梯轴设置有中心孔。 A device for blocking the position of the straight reinforcement of the side formwork of a prefabricated wall concrete component, which is composed of a circular stepped shaft, the circular stepped shaft is composed of a chassis and a boss, and the diameter of the boss is suitable for the diameter of the opening of the side formwork Matching, the diameter of the chassis is greater than the diameter of the boss; the circular stepped shaft is provided with a central hole.
所述底盘直径大于凸台直径20mm。 The diameter of the chassis is 20mm larger than the diameter of the boss. the
所述凸台与底盘的厚度均为10mm。 The thicknesses of the boss and the chassis are both 10mm. the
所述中心孔直径至少小于墙体出筋直径1mm。 The diameter of the central hole is at least 1 mm smaller than the diameter of the ribs on the wall. the
本实用新型相对现有技术的有益效果: The utility model has the beneficial effects relative to the prior art:
本实用新型墙体混凝土预制构件边模直筋位置封堵装置,可以规范生产方式,简化施工操作,提高劳动效率;解决墙体生产时预留孔漏浆的问题;减少持续投入,节约制造成本,保证了预制构件的质量。 The utility model provides a plugging device for the position of the straight reinforcement of the side mold of the wall concrete prefabricated member, which can standardize the production mode, simplify the construction operation, and improve labor efficiency; solve the problem of grout leakage in the reserved holes during wall production; reduce continuous investment and save manufacturing costs , to ensure the quality of prefabricated components.
附图说明 Description of drawings
图1是本实用新型墙体混凝土预制构件边模直筋位置封堵装置主视结构示意图; Fig. 1 is the front structural schematic diagram of the plugging device for the side formwork straight rib position of the concrete prefabricated member of the wall body of the utility model;
图2是本实用新型墙体混凝土预制构件边模直筋位置封堵装置侧视结构示意图。 Fig. 2 is a side view structural diagram of the sealing device for the position of the straight reinforcement of the side form of the wall concrete prefabricated member of the utility model.
附图中主要部件符号说明: Explanation of symbols of main components in the drawings:
图中: In the picture:
1、凸台 2、底盘
1.
3、中心孔 。 3. Center hole.
具体实施方式 Detailed ways
以下参照附图及实施例对本实用新型进行详细的说明: The utility model is described in detail below with reference to accompanying drawing and embodiment:
附图1至2可知,一种墙体混凝土预制构件边模直筋位置封堵装置,由圆形阶梯轴组成,所述圆形阶梯轴由底盘和凸台组成,所述凸台的直径与边模开孔直径相适配,所述底盘直径大于凸台直径;所述圆形阶梯轴设置有中心孔;所述底盘直径大于凸台直径20mm;所述凸台与底盘的厚度均为10mm;所述中心孔直径至少小于墙体出筋直径1mm。
As can be seen from accompanying
本实用新型墙体混凝土预制构件边模直筋位置封堵装置,可以规范生产方式,简化施工操作,提高劳动效率;解决墙体生产时预留孔漏浆的问题;减少持续投入,节约成本,保证了预制构件的质量。 The utility model wall concrete prefabricated component side mold straight rib position sealing device can standardize the production mode, simplify the construction operation, improve labor efficiency; solve the problem of grout leakage in the reserved holes during wall production; reduce continuous investment, save costs, The quality of prefabricated components is guaranteed. the
本实用新型墙体混凝土预制构件边模直筋位置封堵装置由橡胶制成,外形尺寸可按照出筋直径的不同进行调整。 The utility model wall concrete prefabricated member side formwork straight rib position sealing device is made of rubber, and the external dimension can be adjusted according to the difference of the diameter of the rib. the
本实用新型墙体混凝土预制构件边模直筋位置封堵装置工作方式为: The working mode of the sealing device for the position of the straight reinforcement of the side form of the wall concrete prefabricated member of the utility model is as follows:
在钢筋绑扎完毕边模固定后将伸出边模的钢筋穿入墙体混凝土预制构件边模直筋位置封堵装置的中心圆孔内,该装置沿钢筋向边模移近直到凸台顶进边模孔内,底盘边顶在边模上为止;混凝土预制构件成型后将本实用新型从预留孔拆卸下来即可。本实用新型墙体混凝土预制构件边模直筋位置封堵装置可以重复使用,因此提高劳动效率,节约制造成本。 After the steel bars are bound and the side formwork is fixed, the steel bars protruding from the side formwork are inserted into the central circular hole of the plugging device for the position of the straight bars of the side formwork of the prefabricated concrete component of the wall. In the side formwork hole, the chassis edge is pushed against the side formwork; after the concrete prefabricated component is formed, the utility model can be disassembled from the reserved hole. The utility model can repeatedly use the sealing device for the position of the straight reinforcement of the side form of the concrete prefabricated member of the wall body, so that the labor efficiency is improved and the manufacturing cost is saved.
Claims (4)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN 201220293257 CN202727092U (en) | 2012-06-21 | 2012-06-21 | Plugging device for position of straight rib of side mold of precast concrete component of wall |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN 201220293257 CN202727092U (en) | 2012-06-21 | 2012-06-21 | Plugging device for position of straight rib of side mold of precast concrete component of wall |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN202727092U true CN202727092U (en) | 2013-02-13 |
Family
ID=47652833
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN 201220293257 Expired - Lifetime CN202727092U (en) | 2012-06-21 | 2012-06-21 | Plugging device for position of straight rib of side mold of precast concrete component of wall |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN202727092U (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106042172A (en) * | 2016-05-25 | 2016-10-26 | 中交第航务工程局有限公司 | Rubber blanket slurry stopping process for position of prefabricated part protruding bars |
| CN110318526A (en) * | 2018-03-31 | 2019-10-11 | 中国二十冶集团有限公司 | Overhanging channel steel hole device and its application method for concrete prefabricated element |
| CN115534071A (en) * | 2022-10-09 | 2022-12-30 | 金鹏装配式建筑有限公司 | Mold plugging structure and laminated panel production line for prefabricated laminated panel production |
-
2012
- 2012-06-21 CN CN 201220293257 patent/CN202727092U/en not_active Expired - Lifetime
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106042172A (en) * | 2016-05-25 | 2016-10-26 | 中交第航务工程局有限公司 | Rubber blanket slurry stopping process for position of prefabricated part protruding bars |
| CN110318526A (en) * | 2018-03-31 | 2019-10-11 | 中国二十冶集团有限公司 | Overhanging channel steel hole device and its application method for concrete prefabricated element |
| CN115534071A (en) * | 2022-10-09 | 2022-12-30 | 金鹏装配式建筑有限公司 | Mold plugging structure and laminated panel production line for prefabricated laminated panel production |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN202644997U (en) | Simple plugging device for wall-penetrating holes of wall | |
| CN103029204B (en) | Modularized side form for prefabricating superimposed sheet | |
| CN202727092U (en) | Plugging device for position of straight rib of side mold of precast concrete component of wall | |
| CN201376314Y (en) | Prefabricated part forming die | |
| CN202131618U (en) | Seepage-prevention joint device for underground diaphragm wall | |
| CN202164698U (en) | Steel die for sewage inspection well | |
| CN202622993U (en) | Side mold plugging device at hoop position of wall concrete prefabricated member | |
| CN204001723U (en) | The detachable combined steel tool of a kind of shear wall reserved opening | |
| CN203821456U (en) | Outer side plugging structure of basement outer wall post-pouring joint | |
| CN206769180U (en) | A kind of shaped steel hole prefabricated section through walls | |
| CN211775704U (en) | building wood formwork | |
| CN206201157U (en) | A kind of prefab-form | |
| CN105041340A (en) | Structure and construction method for increasing arch crown concrete pouring speed in tunnel engineering | |
| CN105569092B (en) | Underground pipe gallery deformation joint water-stopping belt transmission rod position integrated template construction method | |
| CN205244648U (en) | Novel prestressing force steel cylinder concrete jack pipe | |
| CN204748888U (en) | Prefabricated coincide floor preparation leaking stoppage piece and have mould of this leaking stoppage piece for mould | |
| CN204510810U (en) | A kind of formwork structure for shutoff exterior wall reserved opening | |
| CN204525753U (en) | A kind of cement pipe molding mould | |
| CN203188250U (en) | Basement exterior wall post-cast strip construction structure | |
| CN205976497U (en) | Capillary groove design mould | |
| CN211729620U (en) | Precast concrete superimposed sheet mould | |
| CN204590605U (en) | Building steel door and window hole large form | |
| CN207538061U (en) | A kind of foundation forms for independent bearing platform construction | |
| CN211397147U (en) | Windowsill coping structure | |
| CN203668962U (en) | Bottom-section open caisson with waterproof structure |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CX01 | Expiry of patent term |
Granted publication date: 20130213 |
|
| CX01 | Expiry of patent term |