CN201394885Y - Device used for preventing form board from grout leakage during precasting of beam and plate - Google Patents

Device used for preventing form board from grout leakage during precasting of beam and plate Download PDF

Info

Publication number
CN201394885Y
CN201394885Y CN2009200932068U CN200920093206U CN201394885Y CN 201394885 Y CN201394885 Y CN 201394885Y CN 2009200932068 U CN2009200932068 U CN 2009200932068U CN 200920093206 U CN200920093206 U CN 200920093206U CN 201394885 Y CN201394885 Y CN 201394885Y
Authority
CN
China
Prior art keywords
rubber
channel
grout leakage
grout
section steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009200932068U
Other languages
Chinese (zh)
Inventor
彭军志
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Construction Bridge Engineering Bureau Electrification Engineering Co Ltd
Original Assignee
China Railway 13th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 13th Bureau Group Co Ltd filed Critical China Railway 13th Bureau Group Co Ltd
Priority to CN2009200932068U priority Critical patent/CN201394885Y/en
Application granted granted Critical
Publication of CN201394885Y publication Critical patent/CN201394885Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

A device used for preventing a form board from grout leakage during precasting of beams and plates belongs to the technical field of bridge engineering. The device is characterized in that channel steels are respectively arranged at the parts where a baseplate, a web plate, wing plates and a top plate form board are spliced, and rubber strips are padded in the channel steels; a modular form rubberstrip at a flange plate edge is used for padding the channel steel, and rubber sawteeth are used to mesh and clamp a reinforcement bar. The device has the beneficial effects that the anti-grout leakage technology of using rubber pipes to pad channel steels is adopted, the seams between the side dies and the bottom die are tight without grout leakage, thereby effectively preventing grout leakage at the footing, the construction process is simple, the installation and the form removal by workers are convenient, only simple reinforcement is required, the process of blocking form board gaps is saved, and the precasting of the box girders is greatly enhanced. By utilizing the upper and lower meshing of the sawtooth rubber, reinforcement bar pore passages are reserved, not only no grout leakagefrom the pre-buried reinforcement bars can be guaranteed, but also the position of the pre-buried reinforcement bars can be guaranteed; thin rubber strips are utilized to be served as a spacer between form boards, not only grout leakage can be prevented, but also the form boards can be protected.

Description

Precast beam prevents template spillage device
Technical field
The utility model belongs to technical field of bridge engineering.
Background technology:
In carrying out the beam prefabricated work progress of case in the past, spillage takes place at the position of base plate and web, wing plate and roof plate template splicing and the notch place that reinforcing bar stretches out outside the template in discovery easily, even employing sponge adhesive tape is stopped up the slit between the template, still can not reach anti-spillage effect.Concrete splices imprecision and reinforcing bar and template junction from template and spills, part condenses into piece attached to Liang Tishang, the spillage at wing plate position even past dirty along the beam body, pollute the beam body, greatly influence the presentation quality of prefabricated case beam, employed closing seam gap material does not play anti-spillage effect.
The method of the beam prefabricated spillage of conventional treatment case is to come slit between the fully sheathed case beam forms with the sponge adhesive tape, but the sponge adhesive tape is a water-absorbing material, and material is thin soft, and cracky in the construction does not have due effect to anti-spillage; And the sponge adhesive tape is that disposable material can not be recycling, and waste of material is big.The workman will paste sponge strip repeatedly before each prefabricated, and the labour consumes greatly.Flange plate place template utilizes U shaped steel plate to do the leakproof pulp material at first, can only prevent spillage with the plug loose hemp fiber between the reinforcing bar up and down, and effect is bad, and U shaped steel plate easily produces distortion during form removal.
Summary of the invention
The purpose of this utility model is: provide a kind of precast beam to prevent template spillage device, it has solved the problem of template spillage effectively.
The technical solution of the utility model is: the position in base plate and web, wing plate and roof plate template splicing is provided with channel-section steel, filled rubber bar in the channel-section steel; Edge of a wing edges of boards modular form is clogged channel-section steel with rubber strip, grips reinforcing bar with the interlock of rubber sawtooth.
The beneficial effects of the utility model are: the anti-spillage technology that adopts rubber tube filling channel-section steel, closely connected and the spillage not of side form and bed die seam, effectively stop the footing spillage, construction technology is simple, workman's installation and form removal are convenient, only need simple the reinforcing to get final product, saved obstruction template slit operation, improve the beam prefabricated speed of case greatly.Utilize the interlock up and down of sawtooth rubber, the reserved steel bar duct had both guaranteed to guarantee the position of embedded bar again not from the embedded bar spillage; Utilize pad between TR thin rubber row culture template, not only stop spillage but also play the effect of protecting template.
Elastomeric material is bought convenient, can use repeatedly, improves the closed matereial cycle rate, saves cost.Easily the form removal easy cleaning is economic and practical.Reduce concrete unnecessary waste, reduced the beam prefabricated cost of case, improved economic benefit.
Description of drawings
Fig. 1 is a side form front view before the ground tire cast concrete;
Fig. 2 is a side form side view before the ground tire cast concrete;
Fig. 3 is a side form vertical view before the ground tire cast concrete;
Fig. 4 is that the flange plate template adopts edge rubber strip top structure chart in the channel-section steel;
Fig. 5 is that the flange plate template adopts edge rubber strip lower part structure chart in the channel-section steel;
Fig. 6 is that the flange plate template adopts edge rubber strip upper and lower part integrated structure figure in the channel-section steel;
The specific embodiment
Below in conjunction with accompanying drawing the utility model is described further:
Shown in Fig. 1,2 and 3,1 is that pre-buried channel-section steel, 2 is that reserving hole channel, 3 is that rubber tube, 4 is the ground tire.
Before ground tire 4 cast concretes, be connected with ground tire reinforcing bar at pre-buried channel-section steel 1 bottom welding U shaped steel muscle, and utilize pvc pipe reserving hole channel 2 before 4 cast of ground tire, the side form bottom utilizes ground tire 4 reserving hole channels 2, reinforces by Screw arbor with nut at both-ends.φ 30mm steel pipe is adopted at the side form top, wears φ 18 reinforcing bars in the steel pipe and carries out drawing.During the template assembling, rubber tube 3 is filled in 1, side form is installed then.
Shown in Fig. 4,5 and 6,5 is that channel-section steel, 6 is that rubber strip sawtooth, 7 is the reinforcing bar preformed hole.
The flange plate template adopts edge rubber strip in the channel-section steel, the inner outline that is set in rubber strip in the channel-section steel 5 and channel-section steel is identical substantially, the rubber strip that is exposed at channel-section steel outward encases channel-section steel b leg width, make rubber strip and channel-section steel facade in one plane, and exposed parts rubber strip 6 is processed into zigzag fashion, on rubber strip 6, be reserved with wet joint reinforced hole 7, fixedly lower part rubber strip and channel-section steel before colligation flange plate reinforcing bar, press from both sides rubber strip between channel-section steel plane and roof plate template, and utilize capable bolt of T and roof plate template to reinforce at the channel-section steel two ends; After the top board reinforcing bar binding is intact, be pressed into the top rubber strip, arrange out a reinforcing bar to be pressed into earlier in the reserved steel bar hole 7 before and after wanting when being pressed into, mutually meshing the upper and lower two slat gum bars of rubber strip again, tightly fasten reinforcing bar, effectively prevent the spillage phenomenon between box beam flange and the top board, solved the spillage problem of pre-buried wet seam reinforcing bar and template intersection.Because flange plate place concrete height is little, to fixedly connected between lower part flange plate and roof plate template, face down bonding two annulus outside the first half and the latter half channel-section steel utilize channel-section steel about iron wire or the bolting.

Claims (1)

1, a kind of precast beam prevents template spillage device, it is characterized in that: the position in base plate and web, wing plate and roof plate template splicing is provided with channel-section steel, filled rubber bar in the channel-section steel; Edge of a wing edges of boards modular form is clogged channel-section steel with rubber strip, grips reinforcing bar with the interlock of rubber sawtooth.
CN2009200932068U 2009-03-18 2009-03-18 Device used for preventing form board from grout leakage during precasting of beam and plate Expired - Fee Related CN201394885Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009200932068U CN201394885Y (en) 2009-03-18 2009-03-18 Device used for preventing form board from grout leakage during precasting of beam and plate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009200932068U CN201394885Y (en) 2009-03-18 2009-03-18 Device used for preventing form board from grout leakage during precasting of beam and plate

Publications (1)

Publication Number Publication Date
CN201394885Y true CN201394885Y (en) 2010-02-03

Family

ID=41617381

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009200932068U Expired - Fee Related CN201394885Y (en) 2009-03-18 2009-03-18 Device used for preventing form board from grout leakage during precasting of beam and plate

Country Status (1)

Country Link
CN (1) CN201394885Y (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101804662A (en) * 2010-03-30 2010-08-18 中国第一冶金建设有限责任公司 Method for preventing concrete grout leakage from bottom of prefabricated beam or plate in prefabrication process
CN105599116A (en) * 2015-12-30 2016-05-25 中交一公局桥隧工程有限公司 Prefabricate reactive powder concrete box girder template mortar leakage preventing device
CN106003384A (en) * 2016-06-08 2016-10-12 安徽海龙建筑工业有限公司 Mortise-and-tenon butt joint type mould side plate
CN106760516A (en) * 2017-01-05 2017-05-31 温森元 A kind of elastomeric composition stops slurry bar
CN107791366A (en) * 2017-12-07 2018-03-13 山东明达建筑科技有限公司 A kind of prefabricated components leakage muscle hole mortar leakage prevention rubber stopper
CN109318352A (en) * 2018-11-09 2019-02-12 中民筑友科技投资有限公司 A kind of quick cloth mold device
CN112077985A (en) * 2020-09-03 2020-12-15 中交一公局集团有限公司 Precast beam base reinforcing sealing device
CN113090015A (en) * 2021-04-14 2021-07-09 中冶建工集团有限公司 Beam plate post-cast strip formwork supporting method

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101804662A (en) * 2010-03-30 2010-08-18 中国第一冶金建设有限责任公司 Method for preventing concrete grout leakage from bottom of prefabricated beam or plate in prefabrication process
CN105599116A (en) * 2015-12-30 2016-05-25 中交一公局桥隧工程有限公司 Prefabricate reactive powder concrete box girder template mortar leakage preventing device
CN106003384A (en) * 2016-06-08 2016-10-12 安徽海龙建筑工业有限公司 Mortise-and-tenon butt joint type mould side plate
CN106003384B (en) * 2016-06-08 2018-05-29 安徽海龙建筑工业有限公司 Plate by Tenon dock mold
CN106760516B (en) * 2017-01-05 2024-02-20 温森元 Elastic combined grout stop strip
CN106760516A (en) * 2017-01-05 2017-05-31 温森元 A kind of elastomeric composition stops slurry bar
CN107791366A (en) * 2017-12-07 2018-03-13 山东明达建筑科技有限公司 A kind of prefabricated components leakage muscle hole mortar leakage prevention rubber stopper
CN109318352A (en) * 2018-11-09 2019-02-12 中民筑友科技投资有限公司 A kind of quick cloth mold device
CN109318352B (en) * 2018-11-09 2023-12-29 中民筑友科技投资有限公司 Quick die distribution device
CN112077985A (en) * 2020-09-03 2020-12-15 中交一公局集团有限公司 Precast beam base reinforcing sealing device
CN112077985B (en) * 2020-09-03 2024-04-26 中交一公局集团有限公司 Reinforcing sealing device for precast beam base
CN113090015A (en) * 2021-04-14 2021-07-09 中冶建工集团有限公司 Beam plate post-cast strip formwork supporting method
CN113090015B (en) * 2021-04-14 2022-10-25 中冶建工集团有限公司 Beam plate post-cast strip formwork supporting method

Similar Documents

Publication Publication Date Title
CN201394885Y (en) Device used for preventing form board from grout leakage during precasting of beam and plate
CN101832026B (en) Construction method of sole plate post-poured strip form bracing system
CN203834526U (en) Reinforced concrete bottom plate construction joint waterproof structure formed in sequence method
CN103696359B (en) A kind of prefabricated and cast-in-place bridge pier body structure of combining and construction method
CN203440837U (en) Bottom plate construction joint concrete binding off net device
CN204982970U (en) Mould is fixed to bottom plate steel limit rubber waterstop
CN201037313Y (en) Edge joint T-shape adhesive tape
CN110593320A (en) Early sealing structure for outer wall post-cast strip and construction method thereof
CN106049704B (en) Prefabrication cast-in-place combined type fair-faced concrete outer wall structure and construction method
CN206457854U (en) A kind of raft foundation vertical construction joints construction
CN210421180U (en) Expansion joint waterproof steel plate rubber ring closing water stop belt
CN202787242U (en) Concrete-grouting and model-overhanging device of pile head of cut-off prestressed concrete pipe pile
CN201649639U (en) Supporting system of post-pouring belt template on foundation soleplate
CN218205681U (en) Board strip of assembled building superimposed sheet leaks thick liquid controlling means
CN114718312B (en) Temporary plugging structure for waterproof concrete construction joint and construction method
CN106836592A (en) Overlapped hollow floor system after partial precast assembled
CN206448272U (en) Roadbed side slope arched framework one-time-shaped mould
CN215562827U (en) Intercepting device is assembled to regularization post-cast strip
CN216865262U (en) Waterproof construction of lid excavation reverse construction method side wall horizontal construction seam
CN206769379U (en) Shear wall formwork exempts from drilling construction structure
CN213979911U (en) Basement outer wall post-cast strip template structure
CN210002853U (en) turnover formwork system for horizontal member construction of reverse construction method
CN206289865U (en) A kind of steel pipe and half prefabricated half cast-in-place construction refuse regenerated concrete combination column
CN114319454A (en) Waterproof construction of lid excavation reverse construction method side wall horizontal construction seam
CN206859263U (en) A kind of large formwork construction device of subway station side wall

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: CHINA RAILWAY 13TH BUREAU GROUP ELECTRIFICATION EN

Free format text: FORMER OWNER: CHINA RAILWAY 13TH BUREAU GROUP CO., LTD.

Effective date: 20110906

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 130033 CHANGCHUN, JILIN PROVINCE TO: 300011 HEDONG, TIANJIN

TR01 Transfer of patent right

Effective date of registration: 20110906

Address after: Hedong District of Tianjin City, 300011 open 46 new Guanfu building room 1201

Patentee after: CR13G Electric Engineering Co., Ltd.

Address before: 130033 science and Technology Department, China Railway thirteen Bureau, No. 2138 East Ling Road, two district, Jilin, Changchun

Patentee before: China Railway 13th Bureau Group Co., Ltd.

C56 Change in the name or address of the patentee

Owner name: CHINA RAILWAY CONSTRUCTION BRIDGE ENGINEERING GROU

Free format text: FORMER NAME: CHINA RAILWAY 13TH BUREAU GROUP ELECTRICAL SERVICE ENGINEERING CO., LTD.

CP01 Change in the name or title of a patent holder

Address after: Hedong District of Tianjin City, 300011 open 46 new Guanfu building room 1201

Patentee after: CR13G ELECTRIC ENGINEERING CO., LTD.

Address before: Hedong District of Tianjin City, 300011 open 46 new Guanfu building room 1201

Patentee before: CR13G Electric Engineering Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100203

Termination date: 20170318