CN203834526U - Reinforced concrete bottom plate construction joint waterproof structure formed in sequence method - Google Patents

Reinforced concrete bottom plate construction joint waterproof structure formed in sequence method Download PDF

Info

Publication number
CN203834526U
CN203834526U CN201420234291.6U CN201420234291U CN203834526U CN 203834526 U CN203834526 U CN 203834526U CN 201420234291 U CN201420234291 U CN 201420234291U CN 203834526 U CN203834526 U CN 203834526U
Authority
CN
China
Prior art keywords
steel plate
steel
reinforced concrete
constuction joint
sealing water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420234291.6U
Other languages
Chinese (zh)
Inventor
韩潇
邹厚存
施枢
裴树龙
薛天怡
曹德华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU YANGJIAN GROUP CO Ltd
Original Assignee
JIANGSU YANGJIAN GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU YANGJIAN GROUP CO Ltd filed Critical JIANGSU YANGJIAN GROUP CO Ltd
Priority to CN201420234291.6U priority Critical patent/CN203834526U/en
Application granted granted Critical
Publication of CN203834526U publication Critical patent/CN203834526U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model discloses a reinforced concrete bottom plate construction joint waterproof structure formed in a sequence method. The structure comprises longitudinal steel ribs, transverse steel ribs, a water stop steel plate, steel rib screen pieces, double-layer dense screens and an additional steel rib for fixing the water stop steel plate, wherein the longitudinal steel ribs and the transverse steel ribs are arranged on the top and on the bottom of a basic bottom plate. The additional steel rib is arranged on the basic bottom plate in the horizontal direction of a construction joint, the water stop steel plate is arranged on the additional steel rib, the vertical steel rib screen pieces are arranged above and below the middle of the water stop steel plate respectively, and the inner sides of the steel rib screen pieces are provided with the double-layer dense screens. The structure is simple, practical and easy and convenient to operate, can effectively solve the problems that slurry leaked into seams in original post-cast strip construction of mass concrete is much and difficult to clean, and can achieve the effects of being safe, reliable and free of leakage and saving cost.

Description

Reinforced concrete floor " jumping storehouse method " constuction joint water proof structure
Technical field
The utility model belongs to construction work overlarge area, large volume underplate concrete " jumping storehouse method " constuction joint water proof structure technical field.
Background technology
Along with social development, construction work is constantly to development aspect overlarge area, large volume, and what bring is engineering foundation base areas super large thereupon, and base plate thickness is thicker.The structure of constuction joint is very important to the waterproof of underground construction, the seepage of some Important Project all derives from constuction joint, and the setting of constuction joint is very big for overlarge area, large volume underplate concrete construction quality relation, therefore the structure of constuction joint is very important to the waterproof of underground construction.Engineering was mainly taked the construction method of indwelling " ater-casting " in the past, can bring template to be difficult to install and remove to constuction joint; Mould and spillage are run in cast-in-situ concrete; Ponding in ater-casting, foreign material are difficult to process, remove; And extend the construction period etc. problems.Overlarge area, mass concrete invert have adopted " jumping storehouse method " construction technology now, have replaced the construction of original " ater-casting ", bring great benefit to site operation, make construction technology level increase new technical field.
Utility model content
The purpose of this utility model is to provide a kind of reinforced concrete floor " jumping storehouse method " constuction joint water proof structure, constructing operation is easy, Rigidity and strength better, resistance to overturning is strong, it is simple to install and reinforce, and cast concrete product surfacing and apparent mass is out better.
The purpose of this utility model is achieved through the following technical solutions, reinforced concrete floor " jumping storehouse method " constuction joint water proof structure, comprise longitudinal reinforcement and the transverse reinforcement of sole plate top, bottom, also be provided with steel plate for sealing water, reinforced mesh, double-deck Dense mesh screen, fix the additional bar that steel plate for sealing water is used, sole plate arranges additional bar along constuction joint horizontal direction, steel plate for sealing water is set on additional bar, the above and below at steel plate for sealing water middle part arranges respectively vertical reinforcement net sheet, and reinforced mesh inner side arranges double-deck Dense mesh screen.
Further, described additional bar top is positioned at the middle part of sole plate short transverse, and the distance of adjacent additional bar is 50cm, and additional bar comprises bottom reinforcement bars and T shape bearing bar, and T shape bearing bar is arranged on bottom reinforcement bars end.
Further, described additional bar is connected with the longitudinal reinforcement colligation of sole plate bottom.
Further, described additional bar and steel plate for sealing water are welded to connect.
Further, described reinforced mesh and steel plate for sealing water are welded to connect.
Further, described double-deck Dense mesh screen is connected with reinforced mesh colligation.
Further, the two ends of described steel plate for sealing water are bent upwards, the opening of steel plate for sealing water upstream face dorsad, and the specification of steel plate for sealing water is that 400mm is wide, 3mm is thick.
Further, described double-deck Dense mesh screen bottom is fixed on the waterproof bed course of described sole plate below by steel nail.
Compared with prior art, the utlity model has following beneficial effect: the first, this reinforced concrete floor " jumping storehouse method " constuction joint water proof structure, can effectively solve the original ater-casting constuction joint of concrete in mass and bring template to be difficult to install and remove; Mould and spillage are run in cast-in-situ concrete; Ponding in ater-casting, foreign material are difficult to process, remove; And extend the construction period etc. problems; Second, the utility model constuction joint water proof structure can reach the not problem of spillage, cost saving, constructing operation is easy, and Rigidity and strength better, resistance to overturning is strong, it is simple to install and reinforce, and cast concrete product surfacing and apparent mass is out better; The 3rd, the utility model is simple and practical, easy and simple to handle, can effectively solve original " ater-casting " the constuction joint spillage of concrete in mass many, clear up difficult problem, and can reach effect safe, reliable, non-leakage, cost saving.
Brief description of the drawings
Fig. 1 is the structural representation of reinforced concrete floor " jumping storehouse method " constuction joint water proof structure;
In figure: 1 longitudinal reinforcement; 2 transverse reinforcements; 3 high-performance (low contraction) concrete; 4 base concrete bed course and fish tail and waterproof layers; 5 fixing steel plate for sealing water additional bars; 6 reinforced mesh; 7 double-layer wire Dense mesh screens; 8 steel nails; 9 steel plate for sealing water.
Detailed description of the invention
As shown in Figure 1, reinforced concrete floor " jumping storehouse method " constuction joint water proof structure, comprise the longitudinal reinforcement 1 of sole plate top, bottom and transverse reinforcement 2, steel plate for sealing water 9, reinforced mesh 6, double-layer wire Dense mesh screen 7, fixing 7 additional bars 5 for steel plate for sealing water, sole plate arranges additional bar along constuction joint horizontal direction, steel plate for sealing water is set on additional bar, the above and below at steel plate for sealing water middle part arranges respectively vertical reinforcement net sheet, and reinforced mesh inner side arranges double-deck Dense mesh screen.
Additional bar top is positioned at the middle part of sole plate short transverse, and the distance of adjacent additional bar is 50cm, and additional bar comprises bottom reinforcement bars and T shape bearing bar, and T shape bearing bar is arranged on bottom reinforcement bars end.
Additional bar is connected with the longitudinal reinforcement colligation of sole plate bottom.
Additional bar and steel plate for sealing water are welded to connect.
Reinforced mesh and steel plate for sealing water are welded to connect.
Double-deck Dense mesh screen is connected with reinforced mesh colligation.
The two ends of steel plate for sealing water are bent upwards, the opening of steel plate for sealing water upstream face dorsad, and the specification of steel plate for sealing water is that 400mm is wide, 3mm is thick.
Double-deck Dense mesh screen bottom is fixed on the waterproof bed course of described sole plate below by steel nail.
Reinforced concrete floor " jump storehouse method " constuction joint water proof structure: by fixing additional bar 5 for steel plate for sealing water, weld vertical reinforcement net sheet 6, double-deck Dense mesh screen 7, steel plate for sealing water 9, steel nail 8, high-performance (low contraction) concrete 3 and form.Reinforced concrete floor structure construction seam along continuous straight runs, the every 50cm of spacing arranges the additional bar that fixing steel plate for sealing water is used, on additional bar, fix steel plate for sealing water, along underplate concrete side at steel plate for sealing water welded wire fabric sheet setting up and down, the double-deck Dense mesh screen of colligation inside reinforced mesh, under the double-deck Dense mesh screen of downside, hang and slightly grow to bed course upper surface, be fixed on bed course with steel nail.
The utility model carries out after base concrete bed course and fish tail and waterproof layer 4 complete; first the horizontal steel bar 2 of colligation sole plate downside; the longitudinal reinforcement 1 of rear colligation sole plate downside; again on reinforced concrete floor downside longitudinal reinforcement along constuction joint direction; additional bar 5 for steel plate for sealing water is fixed in the every 50cm colligation of spacing, and fixing steel plate for sealing water is the middle part in whole base thickness with additional bar upside height.Weld in the vertical vertical reinforcement net sheet 6 height to fixing steel plate for sealing water additional bar highest point, colligation double-layer wire Dense mesh screen 7 inside reinforced mesh, under double-layer wire Dense mesh screen, extension slightly grows to bed course upper surface, is fixed on bed course with steel nail 8.At fixing steel plate for sealing water, with welding on additional bar, 400mm is wide, the thick steel plate for sealing water 9 of 3mm.Steel plate for sealing water opening upstream face dorsad.Then at steel plate for sealing water upside welding vertical reinforcement net sheet 6, colligation double-layer wire Dense mesh screen inside vertical reinforcement net sheet.Longitudinal reinforcement 1 and the horizontal reinforcement 2 of last colligation sole plate upside.Complete these operations, handle subsurface work acceptance qualified after, build sole plate high-performance (low contraction) concrete 3.Before after concrete final set, next section concrete is built, constuction joint structure place laitance is cleaned out, upper and lower steel plate for sealing water reinforced mesh and double-layer wire Dense mesh screen are removed totally, and by constuction joint place concrete side hacking, built the front moistening constuction joint of water of lower section concrete place concrete.
The utility model reinforced concrete floor " jumping storehouse method " constuction joint water proof structure, can effectively solve the original ater-casting constuction joint of concrete in mass and bring template to be difficult to install and remove; Mould and spillage are run in cast-in-situ concrete; Ponding in ater-casting, foreign material are difficult to process, remove; And extend the construction period etc. problems.
The utility model constuction joint water proof structure can reach the not problem of spillage, cost saving, and constructing operation is easy, and Rigidity and strength better, resistance to overturning is strong, it is simple to install and reinforce, and cast concrete product surfacing and apparent mass is out better.
The utility model is simple and practical, easy and simple to handle, can effectively solve original " ater-casting " the constuction joint spillage of concrete in mass many, clear up difficult problem, and can reach effect safe, reliable, non-leakage, cost saving.

Claims (8)

1. reinforced concrete floor " jumping storehouse method " constuction joint water proof structure, comprise longitudinal reinforcement and the transverse reinforcement of sole plate top, bottom, it is characterized in that, be provided with steel plate for sealing water, reinforced mesh, double-deck Dense mesh screen, fix the additional bar that steel plate for sealing water is used, sole plate arranges additional bar along constuction joint horizontal direction, steel plate for sealing water is set on additional bar, and the above and below at steel plate for sealing water middle part arranges respectively vertical reinforcement net sheet, and reinforced mesh inner side arranges double-deck Dense mesh screen.
2. reinforced concrete floor according to claim 1 " jumping storehouse method " constuction joint water proof structure, it is characterized in that, described additional bar top is positioned at the middle part of sole plate short transverse, the distance of adjacent additional bar is 50cm, additional bar comprises bottom reinforcement bars and T shape bearing bar, and T shape bearing bar is arranged on bottom reinforcement bars end.
3. reinforced concrete floor according to claim 2 " jumping storehouse method " constuction joint water proof structure, is characterized in that, described additional bar is connected with the longitudinal reinforcement colligation of sole plate bottom.
4. reinforced concrete floor according to claim 1 " jumping storehouse method " constuction joint water proof structure, is characterized in that, described additional bar and steel plate for sealing water are welded to connect.
5. reinforced concrete floor according to claim 1 " jumping storehouse method " constuction joint water proof structure, is characterized in that, described reinforced mesh and steel plate for sealing water are welded to connect.
6. reinforced concrete floor according to claim 1 " jumping storehouse method " constuction joint water proof structure, is characterized in that, described double-deck Dense mesh screen is connected with reinforced mesh colligation.
7. reinforced concrete floor according to claim 1 " jumping storehouse method " constuction joint water proof structure, is characterized in that, the two ends of described steel plate for sealing water are bent upwards, the opening of steel plate for sealing water upstream face dorsad, and the specification of steel plate for sealing water is that 400mm is wide, 3mm is thick.
8. reinforced concrete floor according to claim 1 " jumping storehouse method " constuction joint water proof structure, is characterized in that, described double-deck Dense mesh screen bottom is fixed on the waterproof bed course of described sole plate below by steel nail.
CN201420234291.6U 2014-05-09 2014-05-09 Reinforced concrete bottom plate construction joint waterproof structure formed in sequence method Expired - Fee Related CN203834526U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420234291.6U CN203834526U (en) 2014-05-09 2014-05-09 Reinforced concrete bottom plate construction joint waterproof structure formed in sequence method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420234291.6U CN203834526U (en) 2014-05-09 2014-05-09 Reinforced concrete bottom plate construction joint waterproof structure formed in sequence method

Publications (1)

Publication Number Publication Date
CN203834526U true CN203834526U (en) 2014-09-17

Family

ID=51512386

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420234291.6U Expired - Fee Related CN203834526U (en) 2014-05-09 2014-05-09 Reinforced concrete bottom plate construction joint waterproof structure formed in sequence method

Country Status (1)

Country Link
CN (1) CN203834526U (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104963357A (en) * 2015-07-08 2015-10-07 中国十七冶集团有限公司 Large-area RC basement structure sequence construction method
CN105649113A (en) * 2015-02-05 2016-06-08 中国建筑第四工程局有限公司 Structure and construction method of basement post-cast strip
CN106013254A (en) * 2014-11-10 2016-10-12 苏州多固工程设计有限公司 Construction method of cavity die with framework in concrete engineering
CN107139311A (en) * 2017-05-10 2017-09-08 广东省基础工程集团有限公司 A kind of prefabricated components and preparation method
CN108396899A (en) * 2018-03-23 2018-08-14 中国十七冶集团有限公司 A kind of ground library concrete plate surface jumps block formula pouring structure and its construction method
CN111894151A (en) * 2020-06-19 2020-11-06 中国华冶科工集团有限公司 Construction method and device for seepage-proof wallboard construction joint
CN112412008A (en) * 2020-10-12 2021-02-26 中如建工集团有限公司 Seamless construction method for accurate slope finding of super-large concrete flat roof structure
CN114737616A (en) * 2022-04-11 2022-07-12 中国一冶集团有限公司 Method for retaining construction joint of basement bottom plate by chamber jumping method

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106013254A (en) * 2014-11-10 2016-10-12 苏州多固工程设计有限公司 Construction method of cavity die with framework in concrete engineering
CN105649113A (en) * 2015-02-05 2016-06-08 中国建筑第四工程局有限公司 Structure and construction method of basement post-cast strip
CN105649113B (en) * 2015-02-05 2018-04-20 中国建筑第四工程局有限公司 The structure and construction method of a kind of basement post-pouring zone
CN104963357A (en) * 2015-07-08 2015-10-07 中国十七冶集团有限公司 Large-area RC basement structure sequence construction method
CN107139311A (en) * 2017-05-10 2017-09-08 广东省基础工程集团有限公司 A kind of prefabricated components and preparation method
CN108396899A (en) * 2018-03-23 2018-08-14 中国十七冶集团有限公司 A kind of ground library concrete plate surface jumps block formula pouring structure and its construction method
CN111894151A (en) * 2020-06-19 2020-11-06 中国华冶科工集团有限公司 Construction method and device for seepage-proof wallboard construction joint
CN112412008A (en) * 2020-10-12 2021-02-26 中如建工集团有限公司 Seamless construction method for accurate slope finding of super-large concrete flat roof structure
CN114737616A (en) * 2022-04-11 2022-07-12 中国一冶集团有限公司 Method for retaining construction joint of basement bottom plate by chamber jumping method

Similar Documents

Publication Publication Date Title
CN203834526U (en) Reinforced concrete bottom plate construction joint waterproof structure formed in sequence method
CN103696359B (en) A kind of prefabricated and cast-in-place bridge pier body structure of combining and construction method
CN205712079U (en) A kind of reusable circulation product mud sizing device
CN204676609U (en) The reinforced waterproof construction of a kind of basement bottom plate rear pouring tape
CN106760196B (en) The construction method of cross box-type section steel column structure
CN204001701U (en) Be applicable to the construction formwork system of multilayer rammed earth wall
CN105298020A (en) Semi-precast circular steel pipe regenerated mixed concrete pillar and preparation method thereof
CN201394885Y (en) Device used for preventing form board from grout leakage during precasting of beam and plate
CN203834524U (en) Concrete streaming preventing device for H-type steel connector grout stop plate at underground continuous wall chase section
CN106836592A (en) Overlapped hollow floor system after partial precast assembled
CN203924102U (en) Building implements foundation bolt preformed hole construction mould
CN201649639U (en) Supporting system of post-pouring belt template on foundation soleplate
CN204139466U (en) A kind of concrete prefabricated cushion block
CN103882992A (en) Connection piece with annular steel bar
CN206839486U (en) A kind of prefabricated box culvert framework of steel reinforcement welding tooling
CN105946099A (en) Grouted fabricated concrete beam and construction method thereof
CN206273557U (en) A kind of band bottom inspection shaft pours shaped device
CN206467846U (en) A kind of assembled goes along with sb. to guard him Side fascia transverse joint node component
CN205636493U (en) A device that is used for high mound of hollow thin wall of bridge to bind
CN205497749U (en) Prefabricated mould of prefabricated section
CN203531244U (en) Steel wire mesh template for construction of post-cast strips or construction joints
CN204781252U (en) Can cross escape canal of heavy vehicle and apron thereof
CN204252329U (en) Masonry and post steel tie pre-embedded steel slab support
CN206428864U (en) A kind of inner wall structure
CN203821832U (en) Precast structure horizontal joint grouting steel formwork

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140917