CN206289865U - A kind of steel pipe and half prefabricated half cast-in-place construction refuse regenerated concrete combination column - Google Patents

A kind of steel pipe and half prefabricated half cast-in-place construction refuse regenerated concrete combination column Download PDF

Info

Publication number
CN206289865U
CN206289865U CN201621287417.1U CN201621287417U CN206289865U CN 206289865 U CN206289865 U CN 206289865U CN 201621287417 U CN201621287417 U CN 201621287417U CN 206289865 U CN206289865 U CN 206289865U
Authority
CN
China
Prior art keywords
steel pipe
prefabricated
column
core column
ribbed stiffener
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621287417.1U
Other languages
Chinese (zh)
Inventor
林天翔
兰鹏
王泳康
薛景丹
王鑫焱
刘学文
雷斌
熊进刚
李召行
晏育松
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanchang University
Original Assignee
Nanchang University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanchang University filed Critical Nanchang University
Priority to CN201621287417.1U priority Critical patent/CN206289865U/en
Application granted granted Critical
Publication of CN206289865U publication Critical patent/CN206289865U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of steel pipe and half prefabricated half cast-in-place construction refuse regenerated concrete combination column, it is characterized in that, coupled column cylinder is made up of steel pipe and regeneration monolith prefabricated core column and the cast-in-place regenerated aggregate concrete between steel pipe and prefabricated core column, steel pipe inner side carries ribbed stiffener, place regeneration monolith prefabricated core column with one heart in steel pipe cavity, and regenerated aggregate concrete is poured between steel pipe and regeneration monolith prefabricated core column.Steel pipe of the present utility model and half prefabricated half cast-in-place regeneration concrete coupled column, integral manufacturing are convenient, high financial profit, improve the bearing capacity of structure and improve its deformation performance, increase the ductility of component.Design of the steel pipe with ribbed stiffener can make steel pipe cementing with regeneration concrete more closely, improve the globality of steel tube regeneration concrete combination column.The utility model is applied to heavy duty, industrial premises, the structure such as skyscraper and large span.

Description

A kind of steel pipe and half prefabricated half cast-in-place construction refuse regenerated concrete combination column
Technical field
The utility model belongs to technical field of civil engineering, and in particular to construction refuse regenerated concrete is used as the material filled The concrete filled steel tube column preparation method of material.
Background technology
Building waste accounts for the 30%~40% of rubbish total amount among municipal refuse.In future, with urban construction from extensional mode Develop and developed simultaneously with the extensive reconstruction of the old city town of connotative, China's building waste yield will sustainable growth.In face of increasingly serious Land supply that environmental pollution, day are becoming tight and increasingly exhaust mineral resources the problems such as, the building waste of enormous amount certainly will The contradiction situation between people, environment, resource can be aggravated, the coordinated development of urban ecological environment is influenceed, carry out the comprehensive of building waste Close using very urgent.
According to statistics, the building waste that China produces every year, only discarded concrete total amount is just up to more than 120,000,000 tons.To build Discarded concrete in building refuse manufactures the component in building structure as regenerated aggregate after crushing, can solve natural aggregate money The nervous problem in source, realizes the regeneration of concrete and recycles, and realizes sustainable development.
The construction development of current domestic city high-rise building is swift and violent, and concrete filled steel tube is used as a kind of emerging combination knot Structure, in having been widely used for super-high building structure.Mainly based on the compression member of axial compression and active force small eccentricity, It is widely used in frame structure (such as factory building and high level).Steel tube regeneration concrete combination column knot involved by the utility model Conventional steel concrete technology maturity and the big advantage of the two of China's building waste amount are closed, has been fabricated to and is carried on tube wall The coupled column of ribbed stiffener, preferably improves overall performance, stress performance and the workability of steel pipe column, with low cost, applies Work is simple, and the duration is shorter, and many merits such as be conducive to preferably preserving the ecological environment.
Utility model content
In order to solve the above technical problems, the utility model provides a kind of energy-conserving and environment-protective, overall performance is good, and intensity is very The cast-in-place construction refuse regenerated concrete combination column of steel pipe and half prefabricated half high.By steel pipe and the regeneration prefabricated core of monolith Post and cast-in-place regenerated aggregate concrete composition, with construction refuse regenerated between steel pipe and regeneration monolith prefabricated core column Aggregate concrete is poured, so as to prepare a kind of steel pipe and half prefabricated half cast-in-place construction refuse regenerated concrete combination column.
In order to solve the above problems and realizing above-mentioned requirements, the utility model takes following technical solution:It is a kind of Steel pipe and half prefabricated half cast-in-place construction refuse regenerated concrete combination column, including steel pipe, regeneration monolith prefabricated core column and Interlayer between steel pipe and regeneration monolith prefabricated core column.
1st, spinous process of the seventh cervical vertebra frame selects steel pipe.The length and width of steel tube body and the size appropriate according to practice of construction requirement selection high;It is internal Regeneration monolith prefabricated core column length and width and the size appropriate according to practice of construction requirement selection high.
2nd, steel pipe upper band ribbed stiffener at regular intervals.Ribbed stiffener is uniformly distributed around pipe direction, spacing 10cm, vertical direction Interval 15cm.
3rd, the prismoid groove of depth 30cm in is opened on regeneration monolith prefabricated core column top, is pushed up on prismoid groove Face is the square of length of side 20cm, and bottom surface is the square of length of side 15cm, while regenerating monolith prefabricated core column bottom A square projection of 25cm high is done, the square length of side is 10cm, upper prop section can be made raised upper and lower with hypomere post section groove It is mutually butted, cement mortar is closed admittedly in junction, forms overall.
4th, the interlayer between steel pipe and regeneration monolith prefabricated core column is poured using regenerated aggregate concrete.
5th, the construction technology of monolith prefabricated core column is regenerated:Forming panel is made in the way of keeping flat, and it is pre- in advance Bury and lift crotch, waste and old concrete block is fully watered in advance wetting.When pouring, pre-wetting is delivered in forming panel Waste and old concrete block, add novel concrete, the weight ratio of regeneration monolith and novel concrete is 2:1-4:Between 1 It is optimal.Block is for old buildings, structures, road, bridge or dykes and dams are removed and remove protection used by regeneration monolith Waste and old concrete block after layer and all or part of reinforcing bar.The size of block should be according to reality used by regeneration monolith Design requirement is chosen, unsuitable excessive or too small.Poured using novel concrete between block, it is ensured that the globality of structure.
Advantage of the present utility model:
1. the utility model is applied to the mixed structure of steel and concrete, regeneration block coagulation prefabricated core column factory metaplasia Produce, intensity is high, corrosion-resistant, excellent in durability, it is convenient to construct.
2nd, with the design of steel pipe of the surface with ribbed stiffener, regenerated aggregate concrete is being poured, steel pipe and coagulation can be being increased Soil Interface cohesive force, significantly improves ultimate bearing capacity, deformability and the ductility of component, effectively prevents steel pipe and coagulation pedosphere Emaciated face is empty, and improves effect of contraction of the steel pipe to core concrete, can keep more preferable stability, it is ensured that structure it is strong Degree.
3rd, from construction refuse regenerated concrete, normal concrete, green, energy-conservation, high-strength light and durability be instead of Well, while greatly reducing cost.
4. the groove and bulge-structure of monolith prefabricated core column upper and lower ends are regenerated, can be interconnected, Ke Yiguang It is general to apply to skyscraper, make construction work facilitation, sequencing.
5th, do prefabricated core column using regenerating monolith, enormously simplify when waste and old concrete is recycled it is broken, The processing procedures such as screening, purification, save a large amount of manpowers, time and the energy, and the efficient circulation for being capable of achieving building waste is utilized.Remove Outside this, from monolith, it is possible to achieve the globality of well-formed.Greatly improve the intensity of the cylinder.
Brief description of the drawings:
Fig. 1 is that a kind of square-section steel pipe regenerates monolith prefabricated core column top view with circular cross-section.
In figure:1-steel pipe;2-cast-in-place regenerated aggregate concrete;3-regeneration monolith prefabricated core column;
4-ribbed stiffener.
Fig. 2 is that a kind of circular cross-section steel pipe regenerates monolith prefabricated core column top view with circular cross-section.
Fig. 3 is that a kind of circular cross-section steel pipe regenerates monolith prefabricated core column top view with square-section.
Fig. 4 is that a kind of square-section steel pipe regenerates monolith prefabricated core column top view with square-section.
Fig. 5 is a kind of steel pipe and half prefabricated half cast-in-place construction refuse regenerated concrete combination column shaft side figure.
In figure:3-regeneration monolith prefabricated core column;5-raised;6-groove.
Specific embodiment
The utility model is further described with reference to Figure of description 1-5.
As illustrated, a kind of steel pipe described in the utility model embodiment and half prefabricated half cast-in-place construction refuse regenerated concrete Coupled column, the coupled column is by regeneration aggregate coagulation cast-in-place between steel pipe 1 and steel pipe and regeneration monolith prefabricated core column Soil 2 and regeneration monolith prefabricated core column 3 are constituted.Inside regenerates monolith prefabricated core column 3 has template to be obtained, steel pipe 1 inner side carries ribbed stiffener 4, and regeneration monolith prefabricated core column 3 is concentric with steel pipe 1 to be placed.A kind of steel pipe of the utility model Half cast-in-place construction refuse regenerated concrete combination column prefabricated with half replace conventional steel bar concrete post, steel pipe of the present utility model with Half prefabricated half cast-in-place construction refuse regenerated concrete combination column, the convenient high financial profit of integral manufacturing, and knot can be effectively improved The bearing capacity of structure and its deformation performance of improvement, increase the ductility of component.Wherein design of the steel pipe 1 with ribbed stiffener 4 can make steel Pipe more preferably, improves the globality of coupled column with regenerated aggregate concrete adhesive property.
Embodiment 1:
1. the steel plate of the suitable dimension of suitable intensity grade is selected, thereon continuous rolling ribbed stiffener 4, the height of ribbed stiffener 4 Suitably, be steel pipe 1 and the radius of regeneration monolith prefabricated core column 3 difference 1/4, then the steel plate of ribbed stiffener 4 is bent Welding, is made the steel pipes 1 of the difference d more than 10cm of a cavity inside diameter and the prefabricated radius of regeneration monolith stem 3.
2. make forming panel in the way of keeping flat, shift to an earlier date when making regeneration monolith prefabricated core column 3 and pre-buried hang well Dress crotch, and wetting that waste and old concrete block is fully watered.When pouring, the waste and old mixed of pre-wetting is delivered in forming panel Solidifying soil block body, adds novel concrete, part by weight 2:1.
3. the prismoid groove 6 of depth 30cm in, prismoid groove 6 are opened in the top of regeneration monolith prefabricated core column 3 Upper top surface is that the length of side is the square of 20cm, and the bottom surface length of side is the square of 15cm, while regenerating the prefabricated core of monolith A square projection 5 of evagination 25cm is done in the bottom of post 3, and the square length of side is 10cm.
4. when installing, prefabricated regeneration monolith stem is transported to job site, it is fully watered first Wetting, is first fixed the regeneration monolith sections of moistened surface by lifting crotch using loop wheel machine, then installs steel pipe with one heart 1。
5. regenerated aggregate concrete 2 is poured to the sandwich portion of steel pipe 1 and regeneration monolith prefabricated core column 3, and inserted Enter vibrating head fully to vibrate, until the space inside steel pipe 1 is filled, maintenance is finally smeared to hardening in the external application mortar of steel pipe 1 Face, steel pipe and half prefabricated half cast-in-place construction refuse regenerated concrete combination column are obtained after it solidifies.
Embodiment 2:
1. the steel plate of the suitable dimension of suitable intensity grade is selected, thereon continuous rolling ribbed stiffener 4, the height of ribbed stiffener 4 Suitably, be steel pipe 1 and the radius of regeneration monolith prefabricated core column 3 difference 1/4, then the steel plate of ribbed stiffener 4 is bent Welding, is made the steel pipes 1 of the difference d more than 10cm of a cavity inside diameter and prefabricated regeneration monolith column radius.
2. make forming panel in the way of keeping flat, shift to an earlier date when making regeneration monolith prefabricated core column 3 and pre-buried hang well Dress crotch, and wetting that waste and old concrete block is fully watered.When pouring, the waste and old mixed of pre-wetting is delivered in forming panel Solidifying soil block body, adds novel concrete, part by weight 3:1.
3. the prismoid groove 6 of depth 30cm in, prismoid groove 6 are opened in the top of regeneration monolith prefabricated core column 3 Upper top surface is that the length of side is the square of 20cm, and the bottom surface length of side is the square of 15cm, while regenerating the prefabricated core of monolith A square projection 5 of evagination 25cm is done in the bottom of post 3, and the square length of side is 10cm.
4. when installing, prefabricated regeneration monolith stem is transported to job site, it is fully watered first Wetting, is first fixed the regeneration concrete sections of moistened surface by lifting crotch using loop wheel machine, then installs steel pipe 1 with one heart.
5. regenerated aggregate concrete 2 is poured to the sandwich portion of steel pipe 1 and regeneration monolith prefabricated core column 3, and inserted Enter vibrating head fully to vibrate, until the space inside steel pipe 1 is filled, maintenance is finally smeared to hardening in the external application mortar of steel pipe 1 Face, steel pipe and half prefabricated half cast-in-place construction refuse regenerated concrete combination column are obtained after it solidifies.
Embodiment 3:
1. the steel plate of the suitable dimension of suitable intensity grade is selected, thereon continuous rolling ribbed stiffener 4, the height of ribbed stiffener 4 Suitably, be steel pipe 1 and the radius of regeneration monolith prefabricated core column 3 difference 1/4, then the steel plate of ribbed stiffener 4 is bent Welding, is made the steel pipes 1 of the difference d more than 10cm of a cavity inside diameter and prefabricated regeneration monolith column internal diameter.
2. make forming panel in the way of keeping flat, shift to an earlier date when making regeneration monolith prefabricated core column 3 and pre-buried hang well Dress crotch, and wetting that waste and old concrete block is fully watered.When pouring, the waste and old mixed of pre-wetting is delivered in forming panel Solidifying soil block body, adds novel concrete, part by weight 4:1.
3. the prismoid groove 6 of depth 30cm in, prismoid groove 6 are opened in the top of regeneration monolith prefabricated core column 3 Upper top surface is that the length of side is the square of 20cm, and the bottom surface length of side is the square of 15cm, while regenerating the prefabricated core of monolith A square projection 5 of evagination 25cm is done in the bottom of post 3, and the square length of side is 10cm.
4. when installing, prefabricated regeneration monolith stem is transported to job site, it is fully watered first Wetting, is first fixed the regeneration monolith sections of moistened surface by lifting crotch using loop wheel machine, then installs steel pipe with one heart 1。
5. regenerated aggregate concrete 2 is poured to the sandwich portion of steel pipe 1 and regeneration monolith prefabricated core column 3, and inserted Enter vibrating head fully to vibrate, until the space inside steel pipe 1 is filled, maintenance is finally smeared to hardening in the external application mortar of steel pipe 1 Face, steel pipe and half prefabricated half cast-in-place construction refuse regenerated concrete combination column are obtained after it solidifies.
In specific implementation, the ribbed stiffener 4 preferably on steel pipe 1 can be various forms, and rib end can be square, triangle Shape, trapezoidal or formation steel wire.
More than, preferred embodiment only of the present utility model, but protection domain of the present utility model is not limited thereto, and appoints What those familiar with the art the change that can readily occur in or replaces in the technical scope that the utility model is disclosed Change, should all cover in protection domain of the present utility model.Therefore, protection domain of the present utility model should be with claim The protection domain for being defined is defined.

Claims (3)

1. a kind of steel pipe and half prefabricated half cast-in-place construction refuse regenerated concrete combination column:It is characterised in that it includes as the spinous process of the seventh cervical vertebra The firm pipe of frame, the length and width of steel tube body and the size appropriate according to practice of construction requirement selection high;Internal regeneration monolith The length and width of prefabricated core column and the size appropriate according to practice of construction requirement selection high, steel pipe upper band ribbed stiffener at regular intervals, A prismoid groove is opened on regeneration monolith prefabricated core column top, while regenerating monolith prefabricated core column bottom does one Individual square is raised, is interlayer that regenerated aggregate concrete is poured between steel pipe and regeneration monolith prefabricated core column.
2. a kind of steel pipe according to claim 1 and half prefabricated half cast-in-place construction refuse regenerated concrete combination column, it is special Levy and be, steel pipe is welded by the steel plate with ribbed stiffener, be the form of remaining silent, ribbed stiffener is distributed on the one side of steel plate, The inner side of steel plate, the ribbed stiffener on steel plate is continuous or interrupted.
3. a kind of steel pipe according to claim 1 and half prefabricated half cast-in-place construction refuse regenerated concrete combination column, it is special Levy and be, the ribbed stiffener length on steel plate is the 1/4 of the difference for regenerating monolith prefabricated core column and steel pipe radius, ribbed stiffener around The spacing in pipe direction is 10cm, and the spacing of ribbed stiffener is 15cm on vertical direction.
CN201621287417.1U 2016-11-29 2016-11-29 A kind of steel pipe and half prefabricated half cast-in-place construction refuse regenerated concrete combination column Expired - Fee Related CN206289865U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621287417.1U CN206289865U (en) 2016-11-29 2016-11-29 A kind of steel pipe and half prefabricated half cast-in-place construction refuse regenerated concrete combination column

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621287417.1U CN206289865U (en) 2016-11-29 2016-11-29 A kind of steel pipe and half prefabricated half cast-in-place construction refuse regenerated concrete combination column

Publications (1)

Publication Number Publication Date
CN206289865U true CN206289865U (en) 2017-06-30

Family

ID=59100487

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621287417.1U Expired - Fee Related CN206289865U (en) 2016-11-29 2016-11-29 A kind of steel pipe and half prefabricated half cast-in-place construction refuse regenerated concrete combination column

Country Status (1)

Country Link
CN (1) CN206289865U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106437034A (en) * 2016-11-29 2017-02-22 南昌大学 Steel tube and semi-prefabricated semi-cast-in-place construction waste recycled concrete combined column and preparation method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106437034A (en) * 2016-11-29 2017-02-22 南昌大学 Steel tube and semi-prefabricated semi-cast-in-place construction waste recycled concrete combined column and preparation method thereof

Similar Documents

Publication Publication Date Title
CN106437034A (en) Steel tube and semi-prefabricated semi-cast-in-place construction waste recycled concrete combined column and preparation method thereof
CN206070562U (en) Subassembly formula underground structure
CN106869386A (en) A kind of recycled concrete superposed beam of high-strength construction waste and its construction method
CN206737118U (en) A kind of prefabricated regeneration concrete bean column node of reinforcement
CN102677901B (en) Construction method of horizontal combined member by using large-size waste concrete block
CN106812248A (en) A kind of construction refuse regenerated concrete superposed column and its construction technology
CN109707052A (en) Assembled beam and plate connecting node
CN206599918U (en) A kind of construction refuse regenerated concrete superposed column
CN204266136U (en) Stone arch bridge cover arch rib shotcrete ruggedized construction
CN109162289B (en) Prefabricated bearing pier structure and construction method thereof
CN110344844A (en) A kind of track engineering section of track well construction method
CN206289865U (en) A kind of steel pipe and half prefabricated half cast-in-place construction refuse regenerated concrete combination column
CN109356185A (en) A kind of prefabricated pier foundation of regeneration monolith and its construction method
CN106337530B (en) A kind of construction of frame beam seams stifled construction method
CN109811613B (en) Temporary ground facility and integrated construction method thereof
CN106381956A (en) Concrete prefabricated shell-regenerated mixed concrete combination column and preparation method thereof
CN206722094U (en) A kind of rectangular steel-tube concrete column and beam and slab type superstructure attachment means
CN207919891U (en) A kind of assembled partial precast part external wrapping concrete combination beam
CN207672389U (en) Roadbed concrete curb cast-in-place mould
CN206289866U (en) A kind of FRP pipes and half prefabricated half cast-in-place construction refuse regenerated concrete combination column
CN110130271A (en) A kind of construction method of side wall concrete single-sided formwork reinforcement
CN210946354U (en) Temporary road with in-situ prefabricated reinforced concrete prefabricated slab
CN205314372U (en) Steel reinforcement cage protective layer cushion
CN206599895U (en) A kind of recycled concrete superposed beam of high-strength construction waste
CN211735374U (en) Reinforcement structure of prestressing force tubular pile defect

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170630

Termination date: 20181129

CF01 Termination of patent right due to non-payment of annual fee