CN201381511Y - 一种钢管桩沉桩用桩帽 - Google Patents
一种钢管桩沉桩用桩帽 Download PDFInfo
- Publication number
- CN201381511Y CN201381511Y CN200920069437U CN200920069437U CN201381511Y CN 201381511 Y CN201381511 Y CN 201381511Y CN 200920069437 U CN200920069437 U CN 200920069437U CN 200920069437 U CN200920069437 U CN 200920069437U CN 201381511 Y CN201381511 Y CN 201381511Y
- Authority
- CN
- China
- Prior art keywords
- pile
- steel pipe
- impact block
- cylindrical shell
- pipe pile
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
- Piles And Underground Anchors (AREA)
Abstract
本实用新型公开了一种钢管桩沉桩用桩帽,包括钢管桩(1)、桩帽体(2)、内冲击块(3)、缓冲垫(4)、打击垫铁(5),钢管桩(1)的内孔定位于内冲击块(3)下端面的凸台外圆上;钢管桩1的外圆定位于由筒体(21)内壁下部按筒体(21)的几何中心均匀焊接固定的12-24个导向筋板(27)所形成的内孔中;阻挡圈(32)与内冲击块(3)之间的凹槽内放置钢丝绳(33),绕成圆环状布置,分为2-3层。本桩帽可以满足大型柴油打桩锤进行钢管桩的沉桩作业需要,避免出现打击偏心的情况,有效改善桩帽的受力状况,大大减少沉桩作业的能量损失,使柴油打桩锤的工作效率得到有效提高。
Description
技术领域
本实用新型涉及一种钢管桩沉桩用桩帽,更具体地说,涉及一种建筑地基工程用的钢管桩沉桩用桩帽。
背景技术
目前,在海上工程和大型建筑的基础施工中,桩径和桩深分别达到Ф1500mm和70m以上,通常采用大型柴油打桩锤进行沉桩作业。现有技术的桩帽主要由打击垫块、衬垫、桩帽体和冲击块等组成,在沉桩过程中,因钢管桩与由桩帽体内壁之间存在一定的间隙,使柴油打桩锤沉桩时产生横向分力,使柴油打桩锤的打击能量大大降低;同时,横向分力易使桩帽体受力变形开裂,加剧桩帽的早期磨损,大大减少了桩帽的使用寿命,并降低柴油打桩锤的作业效率,给海上工程桩基的沉桩作业带来不便,增加施工单位的维护成本。
发明内容
本实用新型的目的在于根据现有技术中存在的不足,提供一种是提供能减少柴油打桩锤在沉桩作业中的能量损耗、降低桩帽体开裂损坏的发生概率、延长桩帽的使用寿命、提高柴油打桩锤的工作效率和减少维护成本的钢管桩沉桩用桩帽。
本实用新型是通过以下技术方案来实现的:
一种钢管桩沉桩用桩帽,包括钢管桩1、桩帽体2、内冲击块3、缓冲垫4、打击垫铁5,桩帽体2的一端为筒体21,筒体21内壁端部固定有挡块22,按筒体21的几何中心均匀焊接固定在筒体21内壁端部,数量为12-24个;筒体21外圆的上部和下部固定加强圈23和加强筋板24,加强筋板24按筒体21的几何中心均匀焊接固定在筒体21的外圆上,数量为12-24个;桩帽体2的另一端固定连接板25,连接板25的另一端固定有笼口26;筒体21通孔内壁下部固定导向筋板27,筒体21内壁下端面开有喇叭口28;钢管桩1的外圆置于导向筋板27所形成的内孔中,钢管桩1的内孔置于内冲击块3下端面的凸台外圆上;内冲击块3固定于筒体21内壁上部的内孔中,内冲击块3上端面固定有吊耳31,按内冲击块3的几何中心均匀焊接固定在内冲击块3的上端面外侧,数量为12-24个;内冲击块3上端面固定阻挡圈32,阻挡圈32与内冲击块3之间的凹槽内放置钢丝绳33;钢丝绳33之间固定有弧形隔板34,按内冲击块3外圆的几何中心均匀焊接固定在阻挡圈32与内冲击块3之间的凹槽圆周面上,数量为6-8个;在冲击块3上端面中央的圆形凹腔内放置缓冲垫块4和打击垫铁5。
本实用新型可以是,导向筋板27数量为12-24个,按筒体21的几何中心均匀焊接固定在筒体21的内壁下部。
本实用新型还可以是,钢丝绳33绕成圆环状布置,分为2-3层。
本实用新型还可以是,打击垫铁1为扁状圆柱体,厚度在300-400mm之间。
本实用新型通过采用对钢管桩的外圆和内孔有效定位和大厚度打击垫块的钢管桩沉桩用桩帽,能满足大吨位柴油锤的沉桩作业需要,使柴油打桩锤的冲击力不产生横向分力,能有效改善桩帽的受力状况,延长桩帽的使用寿命,减少施工单位的维护成本。同时,大大减少沉桩作业的能量损失,能有效提高柴油打桩锤的工作效率。
附图说明
下面结合附图和实施例对本实用新型作进一步描述:
图1为现有管桩桩帽的结构示意图;
图2为本实用新型钢管桩沉桩用桩帽的俯视图;
图3为图2的A-A剖视图。
具体实施方式
如图2和图3所示,一种钢管桩沉桩用桩帽,包括钢管桩1、桩帽体2、内冲击块3、缓冲垫4、打击垫铁5,桩帽体2的一端为筒体21,筒体21内壁的端部固定挡块22,数量为12-24个,按筒体21的几何中心均匀焊接固定在筒体21内壁端部;筒体21外圆的上部和下部焊接固定加强圈23,在加强圈23之间固定加强筋板24,数量为12-24个,按筒体21的几何中心均匀焊接固定在筒体21的外圆上;桩帽体2的另一端焊接固定连接板25,连接板25的另一端焊接固定笼口26;筒体21通孔内壁下部固定导向筋板27,数量为12-24个,按筒体21的几何中心均匀焊接固定在筒体21的内壁下部;筒体21内壁下端面开有喇叭口28;钢管桩1的外圆置于筒体21内壁下部的导向筋板27所形成的内孔中,钢管桩1的内孔置于内冲击块3下端面的凸台外圆上;内冲击块3焊接固定于筒体2上部的内孔中,内冲击块3上端面固定有吊耳31和阻挡圈32,吊耳31的数量为12-24个,按内冲击块3的几何中心均匀焊接固定在内冲击块3的上端面外侧;阻挡圈32与内冲击块3之间的凹槽内放置钢丝绳33,钢丝绳33绕成圆环状布置,分为2-3层;在钢丝绳33之间有弧形隔板34,数量为12-24个,焊接固定在阻挡圈32与内冲击块3之间的凹槽圆周面;在冲击块3上端面中央的圆形凹腔内放置缓冲垫块4和打击垫铁5。
当柴油打桩锤进行沉桩作业时,首先在桩架的立柱导杆上安装好筒式柴油打桩锤,并将桩帽体2上的笼口26安装到桩架的立柱导杆上,用起重设备将钢管桩1吊起,因筒体21内壁下端面开有喇叭口28,可使钢管桩1方便地进入桩帽体2的筒体21内壁,钢管桩1的内孔定位于内冲击块3下端面的凸台外圆上,而钢管桩1的外圆定位于由筒体21内壁下部由12-24个均匀焊接固定的导向筋板27所形成的内孔中。柴油打桩锤所产生的冲击力就通过打击垫铁5、缓冲垫4、内冲击块3和筒体21作用到钢管桩1的顶部,由于导向筋板26具有较大的长度,对钢管桩1起到很好的导向作用,避免发生打击偏心的现象,改善了桩帽的受力状况,能有效延长其使用寿命,减少施工单位的维护成本。同时,大大减少柴油打桩锤沉桩作业的能量损失,能有效提高柴油打桩锤的工作效率。
Claims (4)
1、一种钢管桩沉桩用桩帽,包括钢管桩(1)、桩帽体(2)、内冲击块(3)、缓冲垫(4)、打击垫铁(5),桩帽体(2)的一端为筒体(21),筒体(21)内壁端部固定有挡块(22),按筒体(21)的几何中心均匀焊接固定在筒体(21)内壁端部,数量为12-24个;筒体(21)外圆的上部和下部固定加强圈(23)和加强筋板(24),加强筋板(24)按筒体(21)的几何中心均匀焊接固定在筒体(21)的外圆上,数量为12-24个;桩帽体(2)的另一端固定连接架(25),连接架(25)的另一端固定有笼口(26);筒体(21)通孔内壁下部固定导向筋板(27),筒体(21)内壁下端面开有喇叭口(28);钢管桩(1)的外圆置于导向筋板(27)所形成的内孔中,钢管桩(1)的内孔置于内冲击块(3)下端面的凸台外圆上;内冲击块(3)固定于筒体(21)内壁上部的内孔中,内冲击块(3)上端面固定有吊耳(31),按内冲击块(3)的几何中心均匀焊接固定在内冲击块(3)的上端面外侧,数量为12-24个;内冲击块(3)上端面固定阻挡圈(32),阻挡圈(32)与内冲击块(3)之间的凹槽内放置钢丝绳(33);钢丝绳(33)之间固定有弧形隔板(34),按内冲击块(3)外圆的几何中心均匀焊接固定在阻挡圈(32)与内冲击块(3)之间的凹槽圆周面上,数量为6-8个;在内冲击块(3)上端面中央的圆形凹腔内放置缓冲垫块(4)和打击垫铁(5)。
2、根据权利要求1所述的钢管桩沉桩用桩帽,其特征在于导向筋板(27)数量为12-24个,按筒体(21)的几何中心均匀焊接固定在筒体(21)的内壁下部。
3、根据权利要求1所述的钢管桩沉桩用桩帽,其特征在于钢丝绳(33)绕成圆环状布置,分为2-3层。
4、根据权利要求1所述的钢管桩沉桩用桩帽,其特征在于打击垫铁(5)为扁状圆柱体,厚度在300-400mm之间,采用钢锻件制作而成。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN200920069437U CN201381511Y (zh) | 2009-03-26 | 2009-03-26 | 一种钢管桩沉桩用桩帽 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN200920069437U CN201381511Y (zh) | 2009-03-26 | 2009-03-26 | 一种钢管桩沉桩用桩帽 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201381511Y true CN201381511Y (zh) | 2010-01-13 |
Family
ID=41524985
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN200920069437U Expired - Lifetime CN201381511Y (zh) | 2009-03-26 | 2009-03-26 | 一种钢管桩沉桩用桩帽 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201381511Y (zh) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103225302A (zh) * | 2013-05-07 | 2013-07-31 | 中国石油大学(北京) | 一种用于海上隔水导管的六翼结构打桩帽 |
CN103321227A (zh) * | 2013-05-24 | 2013-09-25 | 中国海洋石油总公司 | 一种海上隔水导管打桩帽装置 |
CN103485382A (zh) * | 2013-10-17 | 2014-01-01 | 上海工程机械厂有限公司 | 一种铣槽机前端切割箱 |
CN104746518A (zh) * | 2015-04-01 | 2015-07-01 | 广西壮族自治区冶金建设公司 | 一种简易打桩帽及施工方法 |
CN105297724A (zh) * | 2015-12-02 | 2016-02-03 | 福建省闽工新型建材有限公司 | 一种预制混凝土板桩的沉桩施工方法 |
CN107060764A (zh) * | 2017-03-28 | 2017-08-18 | 广东力源液压机械有限公司 | 一种改进结构的锤击式破碎机及破碎方法 |
CN109914391A (zh) * | 2019-03-28 | 2019-06-21 | 上海工程机械厂有限公司 | 一种液压锤桩帽 |
CN110984146A (zh) * | 2019-12-30 | 2020-04-10 | 广东力源液压机械有限公司 | 板桩围护结构的打桩方法及吊架式打桩锤 |
CN111395329A (zh) * | 2020-03-23 | 2020-07-10 | 中国五冶集团有限公司 | 一种钢护筒安装装置及安装方法 |
-
2009
- 2009-03-26 CN CN200920069437U patent/CN201381511Y/zh not_active Expired - Lifetime
Cited By (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103225302B (zh) * | 2013-05-07 | 2015-05-27 | 中国石油大学(北京) | 一种用于海上隔水导管的六翼结构打桩帽 |
CN103225302A (zh) * | 2013-05-07 | 2013-07-31 | 中国石油大学(北京) | 一种用于海上隔水导管的六翼结构打桩帽 |
CN103321227A (zh) * | 2013-05-24 | 2013-09-25 | 中国海洋石油总公司 | 一种海上隔水导管打桩帽装置 |
CN103485382B (zh) * | 2013-10-17 | 2016-04-20 | 上海工程机械厂有限公司 | 一种铣槽机前端切割箱 |
CN103485382A (zh) * | 2013-10-17 | 2014-01-01 | 上海工程机械厂有限公司 | 一种铣槽机前端切割箱 |
CN104746518A (zh) * | 2015-04-01 | 2015-07-01 | 广西壮族自治区冶金建设公司 | 一种简易打桩帽及施工方法 |
CN105297724A (zh) * | 2015-12-02 | 2016-02-03 | 福建省闽工新型建材有限公司 | 一种预制混凝土板桩的沉桩施工方法 |
CN107060764A (zh) * | 2017-03-28 | 2017-08-18 | 广东力源液压机械有限公司 | 一种改进结构的锤击式破碎机及破碎方法 |
CN109914391A (zh) * | 2019-03-28 | 2019-06-21 | 上海工程机械厂有限公司 | 一种液压锤桩帽 |
CN109914391B (zh) * | 2019-03-28 | 2024-04-30 | 上海工程机械厂有限公司 | 一种液压锤桩帽 |
CN110984146A (zh) * | 2019-12-30 | 2020-04-10 | 广东力源液压机械有限公司 | 板桩围护结构的打桩方法及吊架式打桩锤 |
CN110984146B (zh) * | 2019-12-30 | 2024-03-29 | 广东力源液压机械有限公司 | 板桩围护结构的打桩方法及吊架式打桩锤 |
CN111395329A (zh) * | 2020-03-23 | 2020-07-10 | 中国五冶集团有限公司 | 一种钢护筒安装装置及安装方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201381511Y (zh) | 一种钢管桩沉桩用桩帽 | |
CN207143947U (zh) | 活动式替打桩帽 | |
CN1888328A (zh) | 一种用于打桩的水锤 | |
CN1326035A (zh) | 冲击锤系统和方法 | |
CN101798815A (zh) | 一种钢混组合结构的海上风电机组地基基础 | |
CN102286970B (zh) | 沉管灌注桩全过程施工方法及其专用装置 | |
CN206693007U (zh) | 一种道路施工用夯实机 | |
CN102296585B (zh) | 一种液压顶升式强夯机 | |
GB2472666A (en) | A hydraulic pile driver with cushions to reduce impact noise | |
CN2923825Y (zh) | 可调节缸锤配重的导杆式柴油打桩锤 | |
CN201024947Y (zh) | 液压套管整形器 | |
CN2913315Y (zh) | 地埋式垃圾中转站升降液压装置 | |
CN211104708U (zh) | 一种混凝土管桩成型生产装置 | |
CN103498469A (zh) | 混凝土管桩与构件通用强拉螺帽及钢筋 | |
CN202214717U (zh) | 一种液压顶升式强夯机 | |
CN215211022U (zh) | 一种活动式替打桩帽 | |
CN206008805U (zh) | 单缸液压圆锥式破碎机 | |
CN102398862B (zh) | 一种船用起重机的塔身结构 | |
CN212612465U (zh) | 筒式摆支液压打桩锤 | |
CN213476871U (zh) | 筒式液压打桩锤 | |
CN2687137Y (zh) | 一种低噪音钢球表面强化机 | |
CN109132883B (zh) | 一种基于扁平异形回转平台起重机 | |
CN208415251U (zh) | 差动式液压打桩锤 | |
CN108239978B (zh) | 差动式液压打桩锤 | |
CN217601555U (zh) | 一种带有挡管的液压破碎锤壳体 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
AV01 | Patent right actively abandoned |
Granted publication date: 20100113 Effective date of abandoning: 20141016 |
|
C20 | Patent right or utility model deemed to be abandoned or is abandoned |