CN201292510Y - 分段顶推法架设悬索桥主桁所采用的重物滚移装置 - Google Patents
分段顶推法架设悬索桥主桁所采用的重物滚移装置 Download PDFInfo
- Publication number
- CN201292510Y CN201292510Y CNU2008201996876U CN200820199687U CN201292510Y CN 201292510 Y CN201292510 Y CN 201292510Y CN U2008201996876 U CNU2008201996876 U CN U2008201996876U CN 200820199687 U CN200820199687 U CN 200820199687U CN 201292510 Y CN201292510 Y CN 201292510Y
- Authority
- CN
- China
- Prior art keywords
- change gear
- suspension bridge
- bridge main
- boatswain chair
- incremental launching
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
本实用新型涉一种分段顶推法架设悬索桥主桁所采用的重物滚移装置,吊索固定在主缆上,四根吊索与上吊板紧固连接,与上吊板紧固连接的两根高差调整索的下端分别与垂直千斤顶的活塞杆紧固连接,垂直千斤顶安装在油缸支架中,油缸支架与下吊板连为一体;下吊板通过大销轴与纵向分配梁铰接,纵向分配梁两侧通过小销轴与辊子式挂轮的上孔铰接,辊柱滚动配合安装在挂轮的槽孔中;在钢桁梁上方用高强度螺栓安装铸钢轨道,挂轮的辊柱与铸钢轨道滚动配合。本实用新型能平移百千吨的重物滚移装置,以满足分段顶推架设悬索桥主桁的方法的需要,将跨度为数百米或千米以上的悬索桥主桁分成多段,逐段分别顶推来架设。
Description
技术领域
本实用新型涉及一种架设悬索桥主桁所采用的设备,特别是一种分段顶推法架设悬索桥主桁所采用的重物滚移装置。
背景技术
连续梁桥采用顶推法施工,具有占地少、孔内不需支架、施工安全方便、设备少、成本低廉的优点,是中小跨度连续梁桥中最具有竞争力的一种架桥工艺。由于顶推设备及主梁跨度限制,连续梁桥整体全长顶推工艺难以应用于大跨度的桥梁施工;特别是至今,还没有关于采用顶推法架设悬索桥主桁及能平移百千吨重物的的配套设备的报导。
发明内容
本实用新型要解决的技术问题是提供一种能平移百千吨的重物滚移装置,以满足分段顶推架设悬索桥主桁的方法的需要,将跨度为数百米或千米以上的悬索桥主桁分成多段,逐段分别顶推来架设。
为解决上述技术问题,本实用新型的技术方案是:一种分段顶推法架设悬索桥主桁所采用的重物滚移装置,索夹固定在主缆上,吊索紧固在索夹上;四根吊索与上吊板紧固连接,与上吊板紧固连接的两根高差调整索的下端分别与垂直千斤顶的活塞杆紧固连接,垂直千斤顶安装在油缸支架中,油缸支架与下吊板连为一体;下吊板通过大销轴与纵向分配梁铰接,纵向分配梁两侧通过小销轴与辊子式挂轮的上孔铰接,辊柱滚动配合安装在挂轮的槽孔中;在钢桁梁上方用高强度螺栓安装铸钢轨道,挂轮的辊柱与铸钢轨道滚动配合。
本实用新型的有益效果是:由于本实用新型能平移百千吨的钢桁梁组段,使得顶推架设的方法能推广到架设跨度为数百米或千米以上的悬索桥;分段顶推架设悬索桥主桁的方法具有占地少、孔内不需支架、施工安全方便、设备少、成本较低的优点。
附图说明
图1是分段顶推架桥方法所采用的重物滚移装置的结构示意图
图2是图1的左视图。
图3是辊子式挂轮的结构示意图。
图4是图3的B-B剖视图。
具体实施方式
下面结合附图和实施例对本实用新型进一步说明。
实施例如图1-4所示:一种分段顶推法架设悬索桥主桁所采用的重物滚移装置,索夹2固定在主缆1上,吊索3紧固在索夹2上;四根吊索3与上吊板5紧固连接,与上吊板5紧固连接的两根高差调整索6的下端分别与垂直千斤顶8的活塞杆紧固连接,垂直千斤顶8安装在油缸支架7中,油缸支架7与下吊板9连为一体;下吊板9通过大销轴14与纵向分配梁10铰接,纵向分配梁10两侧通过小销轴15与辊子式挂轮11的上孔铰接,辊柱13滚动配合安装在挂轮11的槽孔中;在钢桁梁4上方用高强度螺栓16安装铸钢轨道12,挂轮11的辊柱23与铸钢轨道12滚动配合。在钢桁梁4下方安装牵引索及水平千斤顶,以便将钢桁梁4从左右两岸的组拼台座顶推至悬索桥中部的指定位置。
采用双向对拉顶推法水平移动到位后,采用四台非负重行走的跨缆吊机进行钢桁梁4提升,并为其安装与主缆1相连接的吊杆3。
Claims (1)
1.一种分段顶推法架设悬索桥主桁所采用的重物滚移装置,其特征在于:索夹(2)固定在主缆(1)上,吊索(3)紧固在索夹(2)上;四根吊索(3)与上吊板(5)紧固连接,与上吊板(5)紧固连接的两根高差调整索(6)的下端分别与垂直千斤顶(8)的活塞杆紧固连接,垂直千斤顶(8)安装在油缸支架(7)中,油缸支架(7)与下吊板(9)连为一体;下吊板(9)通过大销轴(14)与纵向分配梁(10)铰接,纵向分配梁(10)两侧通过小销轴(15)与辊子式挂轮(11)的上孔铰接,辊柱(13)滚动配合安装在挂轮(11)的槽孔中;在钢桁梁(4)上方用高强度螺栓(16)安装铸钢轨道(12),挂轮(11)的辊柱(23)与铸钢轨道(12)滚动配合。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2008201996876U CN201292510Y (zh) | 2008-12-25 | 2008-12-25 | 分段顶推法架设悬索桥主桁所采用的重物滚移装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2008201996876U CN201292510Y (zh) | 2008-12-25 | 2008-12-25 | 分段顶推法架设悬索桥主桁所采用的重物滚移装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201292510Y true CN201292510Y (zh) | 2009-08-19 |
Family
ID=41005979
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNU2008201996876U Expired - Lifetime CN201292510Y (zh) | 2008-12-25 | 2008-12-25 | 分段顶推法架设悬索桥主桁所采用的重物滚移装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201292510Y (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102277837A (zh) * | 2011-05-10 | 2011-12-14 | 吴江市明港道桥工程有限公司 | 一种转体桥梁施工的顶推装置 |
CN114892522A (zh) * | 2022-05-17 | 2022-08-12 | 柳州欧维姆机械股份有限公司 | 一种自适应的大跨径空间缆悬索桥吊索 |
-
2008
- 2008-12-25 CN CNU2008201996876U patent/CN201292510Y/zh not_active Expired - Lifetime
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102277837A (zh) * | 2011-05-10 | 2011-12-14 | 吴江市明港道桥工程有限公司 | 一种转体桥梁施工的顶推装置 |
CN114892522A (zh) * | 2022-05-17 | 2022-08-12 | 柳州欧维姆机械股份有限公司 | 一种自适应的大跨径空间缆悬索桥吊索 |
CN114892522B (zh) * | 2022-05-17 | 2024-02-13 | 柳州欧维姆机械股份有限公司 | 一种自适应的大跨径空间缆悬索桥吊索 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206941397U (zh) | Hzp500单梁节段拼接架桥机 | |
CN201068369Y (zh) | 轮胎式全液压悬臂门架式起重机 | |
CN202090286U (zh) | 一种适用于自锚式双索面悬索桥的牵引系统 | |
CN102094389B (zh) | 分离式大节段桁架梁液压提升装置 | |
CN201943007U (zh) | 活动支架不变幅架梁吊机 | |
CN103790114B (zh) | 液压牵引与滚轮行走结合的缆载吊机及其行走方法 | |
CN202881852U (zh) | 悬索桥缆索安装系统 | |
CN101446068A (zh) | 分段顶推架设悬索桥主桁的方法及所采用的重物滚移装置 | |
CN103031811A (zh) | 适用于极小曲线半径桥梁架设的节段拼装架桥机 | |
CN101793010A (zh) | 大吨位多跨组合拱桥带拱整体顶推方法 | |
CN105970833A (zh) | 预制节段逐跨拼装造桥机 | |
CN201376848Y (zh) | 双塔桅巨型自升降起重设备 | |
CN111717798A (zh) | 上跨在建铁路路堑公路桥箱梁多机协同吊装系统及工艺 | |
CN101481903B (zh) | 跨缆吊机倒退拼装架设山区悬索桥主桁方法 | |
CN102758404B (zh) | 空间倒八字索斜拉桥前支点挂篮行走装置 | |
CN102296585B (zh) | 一种液压顶升式强夯机 | |
CN201292510Y (zh) | 分段顶推法架设悬索桥主桁所采用的重物滚移装置 | |
CN114808747A (zh) | 一种多功能架桥机及架桥施工方法 | |
CN203049471U (zh) | 后支点三角托架挂篮 | |
CN204849595U (zh) | 适用于在大坡度情况下架设预制梁的架桥机支腿 | |
CN202755311U (zh) | 新型下承式悬浇施工挂篮 | |
CN101929129A (zh) | 用于顶推施工的新型滑道梁 | |
CN108086168A (zh) | 骑索式桥面吊机 | |
CN104591003B (zh) | 万吨级可移动式门式起重机 | |
CN217350492U (zh) | 一种新型桥面安装用起吊装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C56 | Change in the name or address of the patentee | ||
CP01 | Change in the name or title of a patent holder |
Address after: 410004 Hunan province Changsha Yuhua District of Shaoshan City Road No. 239 Patentee after: Hunan Road & Bridge Construction Group Co., Ltd. Address before: 410004 Hunan province Changsha Yuhua District of Shaoshan City Road No. 239 Patentee before: Hunan Road & Bridge Construction Group Corp. |
|
CX01 | Expiry of patent term |
Granted publication date: 20090819 |
|
CX01 | Expiry of patent term |