CN201280724Y - Glass fibre reinforced plastic sand inclusion well chamber - Google Patents

Glass fibre reinforced plastic sand inclusion well chamber Download PDF

Info

Publication number
CN201280724Y
CN201280724Y CNU2008202184692U CN200820218469U CN201280724Y CN 201280724 Y CN201280724 Y CN 201280724Y CN U2008202184692 U CNU2008202184692 U CN U2008202184692U CN 200820218469 U CN200820218469 U CN 200820218469U CN 201280724 Y CN201280724 Y CN 201280724Y
Authority
CN
China
Prior art keywords
well
well chamber
fiberglass reinforced
reinforced mortar
main body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2008202184692U
Other languages
Chinese (zh)
Inventor
孙文兵
苏晓亮
张宪
董永志
张晓旭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHENYANG HUAFEI PIPE INDUSTRY Co Ltd
Original Assignee
SHENYANG HUAFEI PIPE INDUSTRY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHENYANG HUAFEI PIPE INDUSTRY Co Ltd filed Critical SHENYANG HUAFEI PIPE INDUSTRY Co Ltd
Priority to CNU2008202184692U priority Critical patent/CN201280724Y/en
Application granted granted Critical
Publication of CN201280724Y publication Critical patent/CN201280724Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model relates to drain well technical field and in particular relates to a fiberglass reinforced mortar well which comprises a well and a cover board; the fiberglass reinforced mortar well is made of fiberglass wound with reinforcing hot setting resin and filled with quartz sand; the cover board is arranged at the upper part of the well main body; a soleplate is arranged at the lower part of the well main body; and a sub water pipe interface is arranged on the well main body. Compared with conventional wells, the fiberglass reinforced mortar well has the advantages of excellent corrosion resistance and long service life; the fiberglass reinforced mortar well has excellent water seepage prevention property and is leakage-free all the life; the roughness of the inner surface is far lower than that of the conventional wells, and the fiberglass reinforced mortar well is high in compressive strength and short in construction period and can be operated with water; the fiberglass reinforced mortar well is light in deadweight and has low bearing capacity requirement to the foundation; and the silt can be cleared regularly, so no dead corners exist. The fiberglass reinforced mortar well is simple in structure, large in water-collecting capacity, small in detection pressure, large in bearing pressure, small in roughness at the inner surface and large in annular drawing and radial drawing strength. Therefore, when appearing in the market, the fiberglass reinforced mortar well can bring considerable social and economic benefits to the drain well field, and the fiberglass reinforced mortar well has a promising prospect.

Description

Glass fibre reinforced plastic sand inclusion well chamber
Technical field
The utility model relates to the technical field of a kind of hydrophobic well chamber, relates in particular to a kind of glass fibre reinforced plastic sand inclusion well chamber.
Background technology
The hydrophobic well chamber that tradition is used generally all is brick, or be built into concrete, setting up of this well chamber is cumbersome, building a well chamber just needs to build to annotate once, so just prolonged the duration, the course of work is also more loaded down with trivial details, if set up a plurality of wells chamber, just need expend a large amount of man power and materials and build the well chamber.And the waterproof of these conventional well chambers and remittance, branch water flow effects neither be very desirable.
The utility model content
The utility model is the problem that exists at prior art, a kind of remittance is provided, divides current big, and a kind of glass fibre reinforced plastic sand inclusion well chamber that bearing pressure is big, the hoop hot strength is big.
The utility model is realized by the following technical solutions:
Glass fibre reinforced plastic sand inclusion well chamber, it comprises well chamber and cover plate; It is to twine enhancing thermosetting resin folder quartz sand by glass fiber to form; Main body 1 top, described well chamber is provided with cover plate 2, and main body 1 bottom, well chamber is provided with base plate 3; Well chamber main body 1 is provided with the distributive pipe interface.
Described enhancing thermosetting resin comprises unsaturated polyester resin.
Described well chamber main body 1 is a cylindrical-shaped structure.
The borehole wall and the shaft bottom of described well chamber main body 1 are structure as a whole.
Described distributive pipe interface is that two logical, threeway, four-way or five-way structure all can; The distributive pipe interface is socket joint or flange connection.
Described distributive pipe interface is provided with more than 1 at least.
Described cover plate 2 is provided with opening.
Glass fibre reinforced plastic sand inclusion well chamber described in the utility model and conventional well chamber relatively have following advantage:
1, superior decay resistance, application life is more than 50 years;
2, superior sealing anti-permeability, lifelong leakproof;
3, inside surface roughness has only 0.0084 far below the conventional well chamber;
4, compressive strength height;
5, short construction period, but submersible;
6,, require low to foundation bearing capacity from heavy and light;
7, desilting does not regularly have the dead angle.
In sum, the utlity model has simple in structurely, characteristics such as the charge for remittance amount is big, measuring pressure is little, bearing pressure is big, the inner surface absolute roughness is little, hoop stretches and axial tensile strength is big.Product described in the utility model promptly can bring appreciable economic benefit and social benefit to this area once appearing on the market, and its market prospects are considerable.
Description of drawings
Fig. 1 is the utility model structural representation.
Among the figure: well chamber main body 1, cover plate 2, base plate 3, manhole well lid 4, manhole 5.
The specific embodiment
Embodiment:
As shown in Figure 1, Fig. 1 is the utility model structural representation.
Glass fibre reinforced plastic sand inclusion well chamber described in the utility model is that twine to strengthen thermosetting resin by glass fiber be unsaturated polyester resin, folder quartz sand and making; Wherein glass fiber is clockwise direction and counterclockwise twines the unsaturated polyester resin multilayer and form, and other technology is the traditional handicraft manufacturing and forms.
Well described in the utility model chamber main body 1 is a cylindrical-shaped structure, and the borehole wall and shaft bottom are the structure of one.Top in well chamber main body 1 also is provided with precast concrete cover 2, and main body 1 bottom, well chamber is provided with precast concrete base plate 3.
Also be provided with a plurality of distributive pipe interfaces on the described well chamber main body 1, can be provided with 1,2,3,4 when specifically implementing ... the five equilibrium waterpipe jointing.This distributive pipe interface can all can for two logical, threeway, four-way or five-way structure; The distributive pipe interface adopts socket joint or flange connection.
During concrete enforcement, glass fibre reinforced plastic sand inclusion well chamber described in the utility model acted on catchment in carrying ground and to dredge pipeline along the line unimpeded and converge, divide the current part.
During enforcement, precast concrete base plate 3 described in the utility model is placed bottom, well chamber main body 1 is disposed thereon, this moment is at the distributive pipe line that can connect unlike material on the distributive pipe interface on the well chamber main body 1, as glass reinforced plastic sand pipe FWRPMP, pre-stress steel cylinder concrete pipe PCCP, plastic pipe PE, HDPE, PVC, PP etc., ductile iron pipe, steel pipe etc.At this moment, place precast concrete cover 2 again on main body 1 top, well chamber.For manhole 5 brick or that concrete is made, on manhole 5, cover manhole well lid 4 at last and promptly finish on the described cover plate 2.Top, well chamber backfill height can be decided in its sole discretion according to horizontal absolute altitude.
Important technological parameters of the present utility model is as follows:
(1) hoop stretch modulus 26GPa;
(2) hoop bending modulus 11GPa;
(3) poisson's ratio 0.3;
(4) carrying: earthing is pressed 10 meters, vapour-20 grade loaded vehicle wheel load.

Claims (7)

1, glass fibre reinforced plastic sand inclusion well chamber, it comprises well chamber and cover plate; It is characterized in that: it is to twine enhancing thermosetting resin folder quartz sand by glass fiber to form; Described well chamber main body (1) top is provided with cover plate (2), and well chamber main body (1) bottom is provided with base plate (3); Well chamber main body (1) is provided with the distributive pipe interface.
2, glass fibre reinforced plastic sand inclusion well chamber according to claim 1 is characterized in that described enhancing thermosetting resin comprises unsaturated polyester resin.
3, glass fibre reinforced plastic sand inclusion well chamber according to claim 1 is characterized in that described well chamber main body (1) is cylindrical-shaped structure.
4, glass fibre reinforced plastic sand inclusion well chamber according to claim 1 is characterized in that the borehole wall and the shaft bottom of described well chamber main body (1) is structure as a whole.
5, glass fibre reinforced plastic sand inclusion well chamber according to claim 1 is characterized in that described distributive pipe interface is that two logical, threeway, four-way or five-way structure all can; The distributive pipe interface is socket joint or flange connection.
6, glass fibre reinforced plastic sand inclusion well chamber according to claim 1, it is characterized in that described distributive pipe interface be provided with at least (1) individual more than.
7, glass fibre reinforced plastic sand inclusion well chamber according to claim 1 is characterized in that described cover plate (2) is provided with opening.
CNU2008202184692U 2008-10-14 2008-10-14 Glass fibre reinforced plastic sand inclusion well chamber Expired - Fee Related CN201280724Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008202184692U CN201280724Y (en) 2008-10-14 2008-10-14 Glass fibre reinforced plastic sand inclusion well chamber

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008202184692U CN201280724Y (en) 2008-10-14 2008-10-14 Glass fibre reinforced plastic sand inclusion well chamber

Publications (1)

Publication Number Publication Date
CN201280724Y true CN201280724Y (en) 2009-07-29

Family

ID=40927603

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008202184692U Expired - Fee Related CN201280724Y (en) 2008-10-14 2008-10-14 Glass fibre reinforced plastic sand inclusion well chamber

Country Status (1)

Country Link
CN (1) CN201280724Y (en)

Similar Documents

Publication Publication Date Title
CN201390961Y (en) Concrete novel combination column
CN101949148A (en) Method for constructing artificial dug pile at reduced well point ground water level
CN102817375A (en) Assembly type precast reinforced concrete inspection well system
CN201495558U (en) Plastic inspection chamber
CN203701127U (en) Underwater gravity type foundation
CN203639903U (en) Side friction enhancement type precast tube pile structure
CN2856170Y (en) Light drum compound pile with vertical drainage action
CN101381999A (en) Glass fibre reinforced plastic sand inclusion well chamber
CN201621382U (en) Prestressed concrete and glass fiber reinforced plastic composite jack pipe
CN201280724Y (en) Glass fibre reinforced plastic sand inclusion well chamber
CN202247719U (en) Corresponding corrugated pre-stressed anti-sedimentation culvert pipe for bridge
CN107152034A (en) A kind of pipe gallery and its construction method
CN212896462U (en) Grid reinforced composite structure underground well
CN207498991U (en) A kind of exhaust valve pit
CN101967834A (en) Pulp concentration pool underground base structure with anti-floating function
CN202850062U (en) Water buoyant control device for construction or for structures
CN202450615U (en) Glass reinforced plastic (GRP) sand inclusion well chamber
CN202852223U (en) Steel bar reinforced glass fiber reinforced plastic composite tube
CN204370378U (en) A kind of flexible blocking slag dam structure
CN202831185U (en) Plastic inspection well provided with reinforced bottom
CN202430750U (en) Anti-floating structure using supporting pile
CN1308174A (en) Saving liquid tank and its building method
CN216007059U (en) Underground anti-floating water pool
CN205259175U (en) Lower part enlarges compound foundation pile of diameter section
Yeon Polymer concrete as construction materials

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090729

Termination date: 20091116