CN102817375A - Assembly type precast reinforced concrete inspection well system - Google Patents
Assembly type precast reinforced concrete inspection well system Download PDFInfo
- Publication number
- CN102817375A CN102817375A CN2012103077650A CN201210307765A CN102817375A CN 102817375 A CN102817375 A CN 102817375A CN 2012103077650 A CN2012103077650 A CN 2012103077650A CN 201210307765 A CN201210307765 A CN 201210307765A CN 102817375 A CN102817375 A CN 102817375A
- Authority
- CN
- China
- Prior art keywords
- well
- chamber
- regulating block
- pit shaft
- well chamber
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
The invention discloses an assembly type precast reinforced concrete inspection well system, which comprises a well chamber, a well necking section, a well cylinder and a well ring. The lower end of the well chamber is connected with a bottom plate by a tenon and a mortise in an insertion way, a well chamber regulating block is connected by a tenon and a mortise in an insertion way between the upper end of the well chamber and the well necking section, the lower end of the well cylinder is connected with the upper end of the well necking section by a tenon and a mortise in an insertion way, a well cylinder regulating block is connected by a tenon and a mortise in an insertion way between the upper end of the well cylinder and the lower end of the well ring, the upper end of the well ring is provided with a well cover, the well chamber, the well necking section, the well cylinder, the well ring, the well chamber regulating block and the well cylinder regulating block are respectively provided with a lifting hole, and the well cylinder and the well chamber are provided with a pipeline interface. Compared with inspection wells of other construction types, the assembly type precast reinforced concrete inspection well can be constructed more conveniently and rapidly, has the advantages of better overall stability, higher strength, higher permeation resistance, low manufacturing cost, mature suspension and roller processes and flexible and convenient production, and is an ideal product to substitute the inspection wells of other construction types.
Description
Technical field
The present invention relates to prefabricated steel concrete manhole system.
Background technology
For implementing a scientific outlook on development and adhering to resource-effective theory; The ban of forbidding loam brick without exception about all cities in 2010 according to nation-building portion, the Committee of Development and Reform, Ministry of Land and Resources, four ministries and commissions of the Ministry of Agriculture; And " about in town road is built, progressively eliminating the notice of brick formula manhole " spirit is assigned by Hefei City's in April, 2011 town and country capital construction commission; My scientific research personnel of company organization, a line technical backbone in production; Prefabricated steel concrete manhole is produced in research and development, and succeeds in developing in March, 2012.This product design is beautiful, structure is excellent, intensity is high, anti-leakage is strong, compliance is extensive.Product has used proof in engineering, operation is simple and easy when construction, installation is fast, the time and labour saving, and each item technical indicator all satisfies the national building standard requirement.
Summary of the invention
The purpose of this invention is to provide prefabricated steel concrete manhole system, assembled steel reinforced concrete inspection well is built formal check well construction more convenient and quicker by laying bricks or stones than other, and resistance to overturning is better; Intensity is higher; Impermeability is stronger, and cost is low, the outstanding mature production technology of rolling; Producing flexiblely, is to substitute other to build the ideal product of formula manhole by laying bricks or stones.
Technical scheme of the present invention is following:
Prefabricated steel concrete manhole system; Include well chamber, well closing in section, pit shaft, walling crib; It is characterized in that: lower end, well chamber employing tenon tongue-and-groove grafting base plate, upper end, well chamber and well close up and adopt the tenon tongue-and-groove to be plugged with well chamber regulating block between the section, adopt the tenon tongue-and-groove to peg graft between the upper end of the lower end of pit shaft and well closing in section; Adopt the tenon tongue-and-groove to be plugged with the pit shaft regulating block between pit shaft upper end and the walling crib lower end; The upper end of walling crib is equipped with well lid, leaves hole for hoist respectively on well chamber, well closing in section, pit shaft, walling crib, well chamber regulating block, the pit shaft regulating block, and pit shaft, well leave pipe joint on the chamber.
Described well chamber and well close up, and interface is provided with the watertight rubber circle between the section.
Compared with present technology, beneficial effect of the present invention is following:
1, good integrity.Manhole base plate, well chamber, the big tongue and groove flexible interface connection of employing (placing the watertight rubber circle in the tongue and groove) between section, the pit shaft of closing up; Regulating block also adopts big tongue and groove flexible interface to connect between the well chamber, between pit shaft; The manhole base plate also can use the groove type interface to be connected with the well chamber; Fill with the 1:2 waterproof cement mortar, the manhole resistance to overturning is good.
2, save time, the saving of labor.Because easy construction is quick, has saved the engineering time, has accelerated construction speed.Minimum needs of the manhole in-place forming time that common brick is built by laying bricks or stones are more than 2 days, and the minimum needs of concrete building block manhole are more than 1 day, and prefabricated steel concrete manhole only needs 2 hours, saves a large amount of artificial simultaneously.
3, the inside and outside borehole wall need not to whitewash.The outside gets final product with the jointing of 1:2 waterproof cement mortar in only needing.
4, adopt big tongue and groove step tenon, tongue-and-groove kiss connection interface (placing the watertight rubber circle in the tongue and groove).The water shutoff performance is good, and is impervious strong.
5, intensity is high, and cost is low.Since adopted the prefabricated production technology of batch production, stream curing, the roll welding reinforcing bar, shaft bottom plate, well chamber, the section that closes up, pit shaft design concrete strength reach design standard C30, and its cost is lower than concrete building block manhole.
6, be applicable to airport, square, park, building sub-district, general industry and municipal drainage engineering.
7, low-carbon (LC), environmental protection.Produce, use assembled steel reinforced concrete manhole can save limited land resources and run off, need not to use coal and clay resource, belong to the green building material product.
Three, the specification of prefabricated steel concrete manhole and index
1, strength grade of concrete>=C30, impervious grade>=S6, maximum water/binder ratio are 0.5, and minimum cement dosage is 300kg/m3, and maximum chloride ion content 0.1%, maximum alkali content are 3.0 ㎏/m
3
2, longitudinal stress reinforcing bar and helical ring muscle adopt HRB400 level hot-rolled reinforced bar, and stirrup adopts HRB335 level hot-rolled reinforced bar.The longitudinal stress reinforcing bar adopts φ 8, and the helical ring muscle adopts φ 8, is double-layer double-direction.Shaft bottom slab muscle adopt φ 10HPB235 level hot calendering round bar with
φ12HRB335 level hot-rolled reinforced bar adds ring muscle and stirrup and is linked into an integral body with the base plate reinforcing bar on the base plate tongue and groove.The hoisting ring reinforcing bar adopts HPB300 level φ 12 hot calendering round bars respectively.
3, Minimum Concrete Protective Coating Thickness: well chamber base plate lower floor muscle and cover plate lower floor tendon protective layer are 40mm, and other positions are 35mm.
4, manhole wall thickness 15cm; Base plate thick 10cm in well chamber establishes the high steel bar concrete annular of 10cm tongue and groove on the base plate of well chamber, adopt 4 φ, 8 plain bars and connect into an integral body with stirrup and base plate reinforcing bar, and this interface is again a little outrigger of annular.Both save material, alleviated base plate weight again, and stressed better, strengthened base plate entire compression intensity, strengthened trust, the interface of satisfying socket purposes is arranged, better effects if.
5, the watertight rubber circle adopts good corrosion resistance, the material that cubical expansivity is little, chemical degradation should not take place.
6, adopt circular prefabricated steel concrete manhole when pipeline aperture≤1200 (mm), adopt the prefabricated steel concrete manhole of rectangle when pipeline aperture>1200 (mm).
Four, the structure of prefabricated steel concrete manhole
Prefabricated steel concrete manhole is formed (specifically seeing accompanying drawing) by base plate, well chamber, close up section, pit shaft, walling crib and well lid six parts; Wherein well lid partly is the outsourcing finished parts; Other prefabricated components are equipped with hoisting ring or hole for hoist, all adopt the prefabricated production of batch production.
1, base plate and closing in section are according to the prefabricated production of finalizing the design of manhole specification factory.
2, well chamber.Can reserve the optional position as requested, different size, preformed hole at any angle.
3, well chamber height is regulated.Well capable of using chamber type regulating block can be regulated arbitrarily and reaches designing requirement height.
4, the adjusting of pit shaft height.Utilize pit shaft type regulating block, can regulate arbitrarily and reach designing requirement height.
5, well chamber and pipe joint adopt horseshoe type or two kinds of forms of spigot-and-socket.The horseshoe type interface first pipe laying that suits, back installation check well.The spigot-and-socket interface first installation check well that suits, back pipe laying.
Five, the production technology of prefabricated steel concrete manhole
1, adopts the outstanding technology of rolling.
2, seam welder welded reinforcement.
3, steam curing, rapid shaping.
Prefabricated steel concrete manhole adopts to hang and rolls explained hereafter, belongs to domestic first production, and equipment advanced person, technical maturity are stablized workable, are fit to batch production production.
Six, the economic index analysis of prefabricated steel concrete manhole
φ 1000 sewage manholes
φ 1250 sewage manholes
φ 1500 sewage manholes
Description of drawings
Fig. 1 is a structural representation of the present invention.
The specific embodiment
Referring to accompanying drawing; Prefabricated steel concrete manhole system; Include well chamber 1, well closing in section 2, pit shaft 3, walling crib 4, tenon tongue-and-groove grafting base plate 5 is adopted in 1 lower end, well chamber, and 1 upper end, well chamber and well close up, and employing tenon tongue-and-groove is plugged with well chamber regulating block 6 between the section 2; Adopt the tenon tongue-and-groove to peg graft between the upper end of the lower end of pit shaft 3 and well closing in section 2; Adopt the tenon tongue-and-groove to be plugged with pit shaft regulating block 7 between pit shaft 3 upper ends and walling crib 4 lower ends, the upper end of walling crib is equipped with well lid 8, leaves hole for hoist 9 respectively on well chamber, well closing in section, pit shaft, walling crib, well chamber regulating block, the pit shaft regulating block; Leave pipe joint 10 on pit shaft, the well chamber, well chamber 1 and well close up, and interface is provided with the watertight rubber circle between the section.
Claims (2)
1. prefabricated steel concrete manhole system; Include well chamber, well closing in section, pit shaft, walling crib; It is characterized in that: lower end, well chamber employing tenon tongue-and-groove grafting base plate, upper end, well chamber and well close up and adopt the tenon tongue-and-groove to be plugged with well chamber regulating block between the section, adopt the tenon tongue-and-groove to peg graft between the upper end of the lower end of pit shaft and well closing in section; Adopt the tenon tongue-and-groove to be plugged with the pit shaft regulating block between pit shaft upper end and the walling crib lower end; The upper end of walling crib is equipped with well lid, leaves hole for hoist respectively on well chamber, well closing in section, pit shaft, walling crib, well chamber regulating block, the pit shaft regulating block, and pit shaft, well leave pipe joint on the chamber.
2. prefabricated steel concrete manhole according to claim 1 system, it is characterized in that: described well chamber and well close up, and interface is provided with the watertight rubber circle between the section.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012103077650A CN102817375A (en) | 2012-08-27 | 2012-08-27 | Assembly type precast reinforced concrete inspection well system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012103077650A CN102817375A (en) | 2012-08-27 | 2012-08-27 | Assembly type precast reinforced concrete inspection well system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102817375A true CN102817375A (en) | 2012-12-12 |
Family
ID=47301789
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2012103077650A Pending CN102817375A (en) | 2012-08-27 | 2012-08-27 | Assembly type precast reinforced concrete inspection well system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102817375A (en) |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103031856A (en) * | 2012-12-20 | 2013-04-10 | 上海燃气工程设计研究有限公司 | Valve well for PE (polyethylene) valves |
CN104863180A (en) * | 2015-06-12 | 2015-08-26 | 石昌远 | Building block type inspection well device |
CN105089073A (en) * | 2014-05-24 | 2015-11-25 | 厦门嘉达环保建造工程有限公司 | Precast concrete inspection well module |
CN106400844A (en) * | 2016-06-13 | 2017-02-15 | 朱凤起 | Whole assembly type multifunctional inspection well |
CN107030876A (en) * | 2017-06-09 | 2017-08-11 | 西安市恒兴市政工程公司 | A kind of method for prefabricating of assembled rectangular well room |
CN107175754A (en) * | 2017-06-09 | 2017-09-19 | 西安市恒兴市政工程公司 | A kind of mould of prefabricated rectangle well |
CN107806113A (en) * | 2017-11-03 | 2018-03-16 | 中冶建工集团有限公司 | A kind of construction method of assembled concrete Circular Shaft |
CN108867844A (en) * | 2018-07-25 | 2018-11-23 | 安徽建川市政工程有限公司 | Combined-type sewage well prefabricated component |
CN110924438A (en) * | 2019-12-06 | 2020-03-27 | 安徽建川市政工程有限公司 | Prefabricated member of assembled rectangular inspection well |
CN111779030A (en) * | 2020-06-28 | 2020-10-16 | 中国二十冶集团有限公司 | Wellbore installation method |
CN112726784A (en) * | 2020-12-29 | 2021-04-30 | 福建省泷澄建筑工业有限公司 | Fully-prefabricated PC sewer inspection well component assembly type structure and construction method |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002309598A (en) * | 2001-04-10 | 2002-10-23 | Nippon Telegr & Teleph Corp <Ntt> | Manhole structure |
CN2866614Y (en) * | 2005-10-25 | 2007-02-07 | 文彦 | Antileakaging combined concrete manhole |
CN2903185Y (en) * | 2006-04-06 | 2007-05-23 | 广州市市政工程维修综合发展公司 | Assembling type precast manhole |
CN202208931U (en) * | 2011-08-04 | 2012-05-02 | 杜萍 | Individual combination type inspection well |
CN102587419A (en) * | 2012-03-01 | 2012-07-18 | 安徽省方大水泥制品有限公司 | Assembly type manhole |
-
2012
- 2012-08-27 CN CN2012103077650A patent/CN102817375A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002309598A (en) * | 2001-04-10 | 2002-10-23 | Nippon Telegr & Teleph Corp <Ntt> | Manhole structure |
CN2866614Y (en) * | 2005-10-25 | 2007-02-07 | 文彦 | Antileakaging combined concrete manhole |
CN2903185Y (en) * | 2006-04-06 | 2007-05-23 | 广州市市政工程维修综合发展公司 | Assembling type precast manhole |
CN202208931U (en) * | 2011-08-04 | 2012-05-02 | 杜萍 | Individual combination type inspection well |
CN102587419A (en) * | 2012-03-01 | 2012-07-18 | 安徽省方大水泥制品有限公司 | Assembly type manhole |
Cited By (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103031856A (en) * | 2012-12-20 | 2013-04-10 | 上海燃气工程设计研究有限公司 | Valve well for PE (polyethylene) valves |
CN105089073A (en) * | 2014-05-24 | 2015-11-25 | 厦门嘉达环保建造工程有限公司 | Precast concrete inspection well module |
CN104863180A (en) * | 2015-06-12 | 2015-08-26 | 石昌远 | Building block type inspection well device |
CN104863180B (en) * | 2015-06-12 | 2017-01-04 | 石昌远 | Building block type inspection well device |
CN106400844A (en) * | 2016-06-13 | 2017-02-15 | 朱凤起 | Whole assembly type multifunctional inspection well |
CN107175754A (en) * | 2017-06-09 | 2017-09-19 | 西安市恒兴市政工程公司 | A kind of mould of prefabricated rectangle well |
CN107030876A (en) * | 2017-06-09 | 2017-08-11 | 西安市恒兴市政工程公司 | A kind of method for prefabricating of assembled rectangular well room |
CN107806113A (en) * | 2017-11-03 | 2018-03-16 | 中冶建工集团有限公司 | A kind of construction method of assembled concrete Circular Shaft |
CN108867844A (en) * | 2018-07-25 | 2018-11-23 | 安徽建川市政工程有限公司 | Combined-type sewage well prefabricated component |
CN110924438A (en) * | 2019-12-06 | 2020-03-27 | 安徽建川市政工程有限公司 | Prefabricated member of assembled rectangular inspection well |
CN111779030A (en) * | 2020-06-28 | 2020-10-16 | 中国二十冶集团有限公司 | Wellbore installation method |
CN111779030B (en) * | 2020-06-28 | 2022-03-01 | 中国二十冶集团有限公司 | Wellbore installation method |
CN112726784A (en) * | 2020-12-29 | 2021-04-30 | 福建省泷澄建筑工业有限公司 | Fully-prefabricated PC sewer inspection well component assembly type structure and construction method |
CN112726784B (en) * | 2020-12-29 | 2024-02-02 | 福建省泷澄建筑工业有限公司 | Full-prefabricated PC sewer inspection well component assembly structure and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102817375A (en) | Assembly type precast reinforced concrete inspection well system | |
CN100386487C (en) | Multi-rib structure system and its connection construction method | |
CN103015565B (en) | Prefabricated and assembled type integrated reinforced concrete load bearing wall and building construction method | |
CN107313517B (en) | Connecting node for laminated wall and laminated floor slab in middle layer | |
CN106121039A (en) | Villages and small towns masonry structure assembled integral ring beam and construction column combination technique | |
CN204690783U (en) | A kind of prefabricated assembled single cabin municipal administration synthesis pipe gallery | |
CN108331198A (en) | A kind of novel fabricated reinforced concrete circle beam-constructional column method of construction | |
CN203795722U (en) | Hollow steel pipe concrete pile | |
CN101285330A (en) | Environment protection type structure thermal insulation concrete block, masonry and method for anti-knock domestic architecture | |
CN105421652A (en) | Composite heat-preserving wallboard | |
CN102248577B (en) | Superlight-foamed-cement-based manufacturing process for thermal-insulation bearing wall panel | |
CN207110167U (en) | One kind assembling flat close rib building roof of superposed type two dimension prestressing | |
CN105401654A (en) | Environment-friendly assembled type ecological house and construction method thereof | |
CN202787570U (en) | Prefabricated integral reinforced concrete load bearing wall | |
CN104410030A (en) | Light concrete laminated slab assembly type cable trench and forming method thereof | |
Thorat et al. | Hollow concrete blocks-A new trend | |
CN102518254A (en) | Steel wire mesh sheet bended formed type reinforced-rebar special-shaped section concrete column-wall board shock isolation house and method thereof | |
CN204040026U (en) | Prefabricated sleeve-cast-in-place combined pile for strong corrosion environment | |
CN203603261U (en) | Connecting structure for balcony slab and superposed beam | |
CN201224941Y (en) | Environment protection type structure thermal insulation concrete building block, masonry and anti-vibration residential building | |
CN201495627U (en) | Gypsum-concrete mixed energy saving housing construction structure | |
CN104389360A (en) | Externally suspended insulation board type reinforcement brickwork shear wall system and construction method thereof | |
CN103993672A (en) | Tenon type connecting joint structure of low-rise fabricated composite wall house | |
CN204238264U (en) | A kind of sole plate post-poured strip structure | |
CN102644375A (en) | Construction method for multi-ribbed composite wall |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20121212 |