CN201227383Y - Concrete coffin - Google Patents

Concrete coffin Download PDF

Info

Publication number
CN201227383Y
CN201227383Y CNU2008200721594U CN200820072159U CN201227383Y CN 201227383 Y CN201227383 Y CN 201227383Y CN U2008200721594 U CNU2008200721594 U CN U2008200721594U CN 200820072159 U CN200820072159 U CN 200820072159U CN 201227383 Y CN201227383 Y CN 201227383Y
Authority
CN
China
Prior art keywords
coffin
concrete coffin
concrete
cover
color paint
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2008200721594U
Other languages
Chinese (zh)
Inventor
陈彦秋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNU2008200721594U priority Critical patent/CN201227383Y/en
Application granted granted Critical
Publication of CN201227383Y publication Critical patent/CN201227383Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Fencing (AREA)

Abstract

The utility model discloses a concrete coffin which is composed of a concrete coffin body, a concrete coffin bottom and a concrete coffin cover, wherein the concrete coffin body is fixed on the concrete coffin bottom, or the concrete coffin bottom is integrated with the concrete coffin body; the concrete coffin cover is arranged on the concrete coffin body; reinforced steel bars penetrate through the inner parts of the concrete coffin bottom, the concrete coffin body and the concrete coffin cover; the inner parts of the concrete coffin bottom, the concrete coffin body and the concrete coffin cover are provided with a plurality of through holes, the exposed junctions of the through holes are used for blockage; the outer surface of the concrete coffin is orderly coated with one layer of lacquer putty and rosewood-color paint, or the outer surface of the concrete coffin is only coated with one layer of rosewood-color paint. The external appearance of the concrete coffin is the same as that of a traditional wooden coffin, and the intensity is higher than that of the traditional wooden coffin. The concrete coffin accords with traditional Chinese funeral ideas, and the bereaved family and the deceased can accept the concrete coffin. The concrete coffin can be made without wood so that a large mount of wood can not be cut down. Thus, the ecological environment can not be damaged so as to be favorable for environmental protection.

Description

The concrete coffin
Technical field
This utility model relates to a kind of coffin, particularly a kind of concrete coffin.
Background technology
Now, though China forbids burial in the ground, but, in some remote area or remote mountain areas, owing to have inconvenient traffic, still burial in the ground is carried out in permission, the wooden coffin of the general use of the coffin of burial in the ground usefulness, though Paper coffin is arranged now, but, because its quality is softer, especially after moisture or water logging are met in the underground, under the superincumbent native weight, Paper coffin and grave tomb easily subside, and bring worried and ominous sense for the deceased's family members, so, according to the traditional view of China, still use the wooden coffin of hard during burial in the ground.Use wooden coffin burial in the ground, certainly will will use a large amount of timber, cut down a large amount of trees, environment is caused great destruction, promptly produce phenomenons such as soil erosion, desertification.
Summary of the invention
The purpose of this utility model is the problem to environmental disruption of using wooden coffin burial in the ground to bring in order to solve, and a kind of concrete coffin is provided, and this concrete coffin does not use timber, can ecological environment not damaged, and also meets the traditional funeral idea of China.
This utility model by concrete coffin body, concrete coffin at the bottom of, concrete coffin lid forms, wherein, on concrete coffin body is fixed at the bottom of the concrete coffin, or at the bottom of the concrete coffin and concrete coffin body one-body molded, the concrete coffin covers on one's body the concrete coffin.
In addition, in order to increase the intensity of concrete coffin, can be at the bottom of the concrete coffin, concrete coffin body and concrete coffin lid inside placed stiffener.
Secondly,, move so that lift in order to alleviate the weight of concrete coffin, can be at the bottom of the concrete coffin, concrete coffin body and inner several through holes of laying of concrete coffin lid, the exposed junction of this through hole is with the plug shutoff.
Moreover, for appearance and the color that makes the concrete coffin is identical with traditional wooden coffin, can be covered with one deck putty and Lignum pterocarpi indici color paint successively, or only cover one deck Lignum pterocarpi indici color paint at the outer surface of concrete coffin at the outer surface of concrete coffin.
The beneficial effects of the utility model are:
1, its outward appearance quality is identical with traditional wooden coffin, and intensity is higher than traditional wooden coffin, meets the traditional funeral idea of China, and the deceased family members and the deceased can both receive before death.
Timber is not used in the making of 2 these concrete coffins, and then need not cut down a large amount of trees, can not damage ecological environment, helps environmental protection.
Description of drawings
Fig. 1 is the cutaway view of this utility model embodiment.
Fig. 2 is the partial sectional view of this utility model embodiment plug shutoff through hole.
The specific embodiment
See also Fig. 1, shown in Figure 2, be embodiment of the present utility model, by at the bottom of the concrete coffin 1, concrete coffin body 2, concrete coffin lid 3 form, wherein, concrete coffin body 2 is fixed at the bottom of the concrete coffin on 1, or 1 one-body molded at the bottom of the concrete coffin with concrete coffin body 2, concrete coffin lid 3 covers on one's body the concrete coffin;
In addition, in order to increase the intensity of concrete coffin, at the bottom of the concrete coffin 1, concrete coffin body 3 and concrete coffin cover 3 inside and placed stiffener 4;
Secondly, in order to alleviate the weight of concrete coffin, move so that lift, at the bottom of the concrete coffin 1, concrete coffin body 2 and concrete coffin lid 3 inner several through holes 5 of laying, the exposed junction of this through hole is to fill in 6 shutoff;
Moreover, for appearance and the color that makes the concrete coffin is identical with traditional wooden coffin, be covered with one deck putty 7 and Lignum pterocarpi indici color paint 8 from the inside to the outside successively, or only cover one deck Lignum pterocarpi indici color paint 8 at the outer surface of concrete coffin at the outer surface of concrete coffin.

Claims (7)

1, a kind of concrete coffin, it is characterized in that: by at the bottom of concrete coffin body, the concrete coffin, concrete coffin lid forms, wherein, on concrete coffin body is fixed at the bottom of the concrete coffin, or one-body molded at the bottom of the concrete coffin with concrete coffin body, the concrete coffin covers on one's body the concrete coffin.
2, a kind of concrete coffin according to claim 1 is characterized in that: at the bottom of the described concrete coffin, concrete coffin body and concrete coffin lid inside placed stiffener.
3, a kind of concrete coffin according to claim 1 and 2 is characterized in that: at the bottom of the described concrete coffin, inner several through holes of laying of concrete coffin body and concrete coffin lid, the exposed junction of this through hole is with the plug shutoff.
4, a kind of concrete coffin according to claim 3 is characterized in that: the outer surface of described concrete coffin is covered with one deck Lignum pterocarpi indici color paint.
5, a kind of concrete coffin according to claim 1 and 2 is characterized in that: the outer surface of described concrete coffin is covered with one deck Lignum pterocarpi indici color paint.
6, a kind of concrete coffin according to claim 3 is characterized in that: the outer surface of described concrete coffin is covered with one deck putty, Lignum pterocarpi indici color paint from the inside to the outside successively.
7, a kind of concrete coffin according to claim 1 and 2 is characterized in that: the outer surface of described concrete coffin is covered with one deck putty, Lignum pterocarpi indici color paint from the inside to the outside successively.
CNU2008200721594U 2008-07-23 2008-07-23 Concrete coffin Expired - Fee Related CN201227383Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008200721594U CN201227383Y (en) 2008-07-23 2008-07-23 Concrete coffin

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008200721594U CN201227383Y (en) 2008-07-23 2008-07-23 Concrete coffin

Publications (1)

Publication Number Publication Date
CN201227383Y true CN201227383Y (en) 2009-04-29

Family

ID=40632343

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008200721594U Expired - Fee Related CN201227383Y (en) 2008-07-23 2008-07-23 Concrete coffin

Country Status (1)

Country Link
CN (1) CN201227383Y (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101966114A (en) * 2010-09-21 2011-02-09 东南大学 Stereo buried cylindrical concrete coffin for deep-well tomb hole and preparation method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101966114A (en) * 2010-09-21 2011-02-09 东南大学 Stereo buried cylindrical concrete coffin for deep-well tomb hole and preparation method thereof
CN101966114B (en) * 2010-09-21 2012-08-15 东南大学 Stereo buried cylindrical concrete coffin for deep-well tomb hole and preparation method thereof

Similar Documents

Publication Publication Date Title
CN201227383Y (en) Concrete coffin
CN102995948B (en) Group burial deep well grave with built-in bundling plastic pipe and building method thereof
CN205476802U (en) From generation to generation with family's coffin chamber
CN101966114B (en) Stereo buried cylindrical concrete coffin for deep-well tomb hole and preparation method thereof
CN201798879U (en) Three-dimensionally buried cylindrical concrete coffin for deep-well type tomb holes
CN204418786U (en) A kind of many people bury in the same grave tomb body structure and cemetery
CN210264135U (en) Terrace ring mountain underground cemetery
CN1171480A (en) Plant-type cemetery without graves
CN201810024U (en) Plastic honeycomb shaft type grave for three-dimensional burying of urns
CN206174598U (en) Integrative many caves multi -burial tomb
CN101230760A (en) Golgotha of green zoology general cemetery as well as funeral and interment method
CN204609439U (en) Two memorial monument grave, a kind of four caves
CN207048443U (en) Lift gravestone device systems
CN205382752U (en) Environmental protection reduces funeral and interment building of land used
CN107339005A (en) Lift gravestone device systems
CN215362626U (en) Storage device for building waterproof glue
CN106760905A (en) Environmental protection reduces the funeral building of land used
CN201158959Y (en) Grave
CN201635477U (en) Green and ecological cemetery graveyard
KR100680029B1 (en) A construction method and the structure of pro-environ mental charnel house of the public cemetery utilizing the used briquet ashes
CN203708944U (en) Shielding cover for upwards convex three-dimensional contouring bionic tree pit
CN206548768U (en) A kind of shockproof good fortune case
CN201714134U (en) Family cemetery graveyard
CN202031374U (en) Intensive cemetery placing room
KR100555908B1 (en) Tree-Tomb

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090429

Termination date: 20100723