CN206174598U - Integrative many caves multi -burial tomb - Google Patents
Integrative many caves multi -burial tomb Download PDFInfo
- Publication number
- CN206174598U CN206174598U CN201621178278.9U CN201621178278U CN206174598U CN 206174598 U CN206174598 U CN 206174598U CN 201621178278 U CN201621178278 U CN 201621178278U CN 206174598 U CN206174598 U CN 206174598U
- Authority
- CN
- China
- Prior art keywords
- coffin pit
- tomb
- grave
- pit
- coffin
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 235000019994 cava Nutrition 0.000 title claims abstract description 16
- 238000009933 burial Methods 0.000 title abstract description 3
- 239000004575 stone Substances 0.000 claims abstract description 16
- 239000000463 material Substances 0.000 abstract description 7
- 238000000034 method Methods 0.000 abstract description 4
- QORWJWZARLRLPR-UHFFFAOYSA-H tricalcium bis(phosphate) Chemical compound [Ca+2].[Ca+2].[Ca+2].[O-]P([O-])([O-])=O.[O-]P([O-])([O-])=O QORWJWZARLRLPR-UHFFFAOYSA-H 0.000 abstract description 2
- 238000007789 sealing Methods 0.000 abstract 1
- 238000007600 charging Methods 0.000 description 3
- 230000001419 dependent effect Effects 0.000 description 2
- 238000001467 acupuncture Methods 0.000 description 1
- 239000000919 ceramic Substances 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000010354 integration Effects 0.000 description 1
- 238000000465 moulding Methods 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Landscapes
- Road Paving Structures (AREA)
Abstract
The utility model discloses an integrative many caves multi -burial tomb, including base, the tomb body, grave blanket, coffin pit, inner sealing plate and epitaph, the tomb body is integrated into one piece including the upper part of the body and the lower part of the body, the tomb body, base and coffin pit, upper part of the body and lower part of the body an organic whole are " L " type, and the coffin pit includes upper coffin pit, lower floor coffin pit and back layer coffin pit, and upper coffin pit, lower floor coffin pit and back layer coffin pit be corresponding first grave blanket, second grave blanket and the third grave blanket of being equipped with respectively, upper strata coffin pit, a lower floor coffin pit and a back layer coffin pit be a set of, can increase the quantity in coffin pit according to actual conditions at both ends, and appearance structure is not influenced, feeding method be supremely and down or to after forward or from a left side to the right side or from right to multiple feeding method such as left sides. The utility model discloses the tomb body, base and coffin pit be stone material integrated into one piece, and this can preserve the stone material under nos exogenic action more than the centuries, can the make full use of tomb internal space, greatly sparingly space resources makes things convenient for putting into of bone ash can, convenient operation.
Description
Technical field
The utility model is related to tomb cell structure, and in particular to one kind meets modern society, and many caves of the one saved the area are closed
Bury tomb.
Background technology
Funeral and interment has been the important custom since the history of China, but China's land resources are limited, and original burial in the ground mode is
The situation of land resource shortage is not adapted to, and graveyard resource pressure continues to increase, it is very necessary to release new method.
It is one of funeral and interment form that the Chinese government advocates and promotes mainly that cremate bone ash is buried.But, it is developed into today, new lance
Shield problem is constantly emerged in large numbers in many areas.For example, some cemetery grave acupuncture points are die-offed, or even well sold and in short supply, expensive, many caves occur
Burying conjunction tomb can play a part of to improve imbalance between supply and demand.But current many caves are buried conjunction tomb and are mainly the type of piecing together, such as Publication No.
Combination tomb body structure, the close-coupled cave room disclosed in Publication No. CN102003105A saved the area disclosed in CN201581685U
Structure reusable save land tomb and disclosed in Publication No. CN103850516A module assembled family family tree ceramics gravestone, publication number
It is double that many people disclosed in CNC204418786U bury in the same grave four caves disclosed in tomb body structure and cemetery and Publication No. CN204609439U
Monument grave, the type coffin pit combined type is single, and in the case of in order to cater to moulding, the waste in space is still serious.
Utility model content
The problem that the utility model is solved is to provide a kind of handsome in appearance, and save space, the convenient integration of charging are more
Bury in the same grave tomb in cave.
To achieve these goals, the utility model is achieved through the following technical solutions:
Integrally tomb, including base, tomb body, grave blanket, coffin pit, inner sealed board and epitaph are buried in the same grave in many caves, and the tomb body includes upper
Body and lower body, the tomb body, base and coffin pit are formed in one;The upper body and lower body integrally connected make section in " L " or fall
T-shape, the coffin pit includes upper strata coffin pit, lower floor coffin pit and rear layer coffin pit, the upper strata coffin pit, lower floor coffin pit and rear layer coffin pit
The first grave blanket, the second grave blanket and the 3rd grave blanket are correspondingly provided with respectively;The upper strata coffin pit is arranged on tomb body upper body, the rear layer tomb
Cave is arranged on position corresponding with upper strata coffin pit in tomb body lower body, the lower floor coffin pit be arranged on tomb body lower body and with rear layer coffin pit
In same level position, the lower floor coffin pit is correspondingly arranged with the second grave blanket, and the rear layer coffin pit is correspondingly arranged with the 3rd grave blanket,
The inner sealed board is arranged between coffin pit and grave blanket.
Further, second grave blanket is connected with the vertical edge of upper body and the parallel edges of lower body respectively.
Further, the second grave blanket lower section is provided with stone bolt, and the tomb body is provided with connecting hole corresponding with stone bolt.
Further, the epitaph includes gravestone and pillar, and one end of the pillar is integrally formed or combines with gravestone
Connection, the pillar other end is connected with the first grave blanket.
Further, first tomb is covered and is provided with groove, and the pillar passes through to be connected with the first grave blanket in embedded groove.
Further, the upper strata coffin pit, lower floor coffin pit and rear layer coffin pit are at least respectively one.Upper strata coffin pit, lower floor
Coffin pit and rear layer coffin pit are one group, can increase the quantity in coffin pit at two ends according to actual conditions, and surface structure is unaffected.
Further, the feeding manner in the upper strata coffin pit and lower floor coffin pit is from top to down, the rear layer coffin pit
Feeding manner is to before backward or from left to right or from right to left.
Tomb is buried in the same grave in many caves of the utility model one, and its advantage is:
(1) tomb body, base and coffin pit are integrally formed for stone material, and stone material sheet can preserve the centuries under without external force effect
More than;After full five clothes, stone tomb can again be had a shave and cleared up cella, come into operation again, save stone material and land used.
(2) on the upper strata of tomb body, lower floor and rear layer are equipped with coffin pit, can make full use of the space in portion in tomb body, significantly
Save space resource.
(3) feeding manner of urn for from top to bottom, to various chargings such as before backward or from left to right or from right to left
Mode, facilitates being put into for urn, easy to operate, and the difference of feeding manner also can significantly make full use of the space in portion in tomb body.
(4) coffin pit quantity can be increased with the size of stone material according to demand, also dependent on situation by parallel pendulum between tomb and tomb
Put to form tomb, because the side of tomb is plane, formed tomb when between tomb and tomb zero distance piece together, greatly save
Space.
Brief description of the drawings
In order to illustrate more clearly of the utility model embodiment or technical scheme of the prior art, below will be to embodiment
Or the accompanying drawing to be used needed for description of the prior art is briefly described, it should be apparent that, drawings in the following description are only
It is some embodiments of the present utility model, for those of ordinary skill in the art, before creative labor is not paid
Put, other accompanying drawings can also be obtained according to these accompanying drawings.
Fig. 1 is the L-shaped front view in the utility model section;
Fig. 2 is side view of the utility model section in " L ";
Fig. 3 is the structural representation of the second grave blanket in the utility model;
1- tomb bodies, 2- bases, 3- inner sealed boards, 4- epitaphs, 5- upper bodies, 6- lower bodies, 7- upper stratas coffin pit, 8- lower floors coffin pit,
Layer coffin pit after 9-, the grave blankets of 10- first, the grave blankets of 11- second, the grave blankets of 12- the 3rd, 13- stone bolts, 14- gravestones, 15- pillars, 16- is recessed
Groove.
Specific embodiment
The utility model is further described with reference to specific embodiment and accompanying drawing.
Integrally tomb is buried in the same grave as Figure 1-3 in many caves, including base 2, tomb body 1, grave blanket, coffin pit, inner sealed board 3 and epitaph 4,
Tomb body 1 includes upper body 5 and lower body 6, and tomb body 1, base 2 and coffin pit are formed in one;Upper body 5 and the body section of lower body 6 one are in " L "
Type, coffin pit includes upper strata coffin pit 7, lower floor coffin pit 8 and rear layer coffin pit 9, and upper strata coffin pit 7, lower floor coffin pit 8 and rear layer coffin pit 9 are distinguished
It is correspondingly provided with the first grave blanket 10, the second grave blanket 11 and the 3rd grave blanket 12;Upper strata coffin pit 7 is arranged on tomb body upper body 5, afterwards layer coffin pit 9
Be arranged in tomb body lower body 6 with the corresponding position in upper strata coffin pit 7, lower floor coffin pit 8 be arranged on tomb body lower body 6 and with rear layer coffin pit 9
In same level position, lower floor coffin pit 8 is correspondingly arranged with the second grave blanket 11, and layer coffin pit 9 is correspondingly arranged with the 3rd grave blanket 12 afterwards, interior
Shrouding 3 is arranged between coffin pit and grave blanket, and the second grave blanket 11 is connected with the vertical edge of upper body 5 and the parallel edges of lower body 6 respectively, the
The lower section of two grave blanket 11 is provided with stone bolt 13, and tomb body is provided with and passes through the He of stone bolt 13 with the corresponding connecting hole of stone bolt 13, the second grave blanket 11
The correspondence of connecting hole is fastened on lower body, and epitaph 4 includes gravestone 14 and pillar 15, one end and the gravestone 14 1 of pillar 15
Body formed or combination connection, the first grave blanket 10 is provided with groove 16, and the other end of pillar 15 is connected with the first grave blanket 10 by groove 16
Connect.The charging side at least respectively one, upper strata coffin pit 7, lower floor coffin pit 8 and rear layer coffin pit 9, upper strata coffin pit 7 and lower floor coffin pit 8
Formula is from top to down, and the feeding manner in layer coffin pit 9 is to before backward afterwards.Upper strata coffin pit 7, lower floor coffin pit 8 and rear layer coffin pit 9 are
One group, size that can be according to actual conditions in stone material increases coffin pit quantity, also dependent on situation by laid parallel between tomb and tomb
Form tomb, because the side of tomb is plane, formed tomb when between tomb and tomb zero distance piece together, greatly save sky
Between.
The technical scheme that the utility model embodiment is provided is described in detail above, it is used herein specifically
Individual example is set forth to the principle and implementation method of the utility model embodiment, and the explanation of above example is only applicable to side
Assistant solves the principle of the utility model embodiment;Simultaneously for those of ordinary skill in the art, implement according to the utility model
Example, will change in specific embodiment and range of application, and in sum, this specification content should not be construed as
To limitation of the present utility model.
Claims (6)
1. tomb, including base (2), tomb body (1), grave blanket, coffin pit, inner sealed board (3) and epitaph (4) are buried in the same grave in many caves of one, and it is special
Levy and be:The tomb body (1) includes upper body (5) and lower body (6), and the tomb body (1), base (2) and coffin pit are formed in one;Institute
Stating upper body (5) and lower body (6) integrally connected makes section in " L " or inverted " t " type, and the coffin pit includes upper strata coffin pit (7), lower floor's tomb
Cave (8) and rear layer coffin pit (9), the upper strata coffin pit (7), lower floor coffin pit (8) and rear layer coffin pit (9) are correspondingly provided with the first tomb respectively
Lid (10), the second grave blanket (11) and the 3rd grave blanket (12);The upper strata coffin pit (7) is arranged on tomb body upper body (5), the rear layer tomb
Cave (9) is arranged on position corresponding with upper strata coffin pit (7) in tomb body lower body (6), and the lower floor coffin pit (8) is arranged on tomb body lower body
(6) and with rear layer coffin pit (9) in same level position, the lower floor coffin pit (8) is correspondingly arranged with the second grave blanket (11), it is described after
Layer coffin pit (9) is correspondingly arranged with the 3rd grave blanket (12), and the inner sealed board (3) is arranged between coffin pit and grave blanket.
2. tomb is buried in the same grave in many caves of one according to claim 1, it is characterised in that:Second grave blanket (11) respectively with upper body
(5) the parallel edges connection of vertical edge and lower body (6).
3. tomb is buried in the same grave in many caves of one according to claim 1, it is characterised in that:Second grave blanket (11) lower section is provided with stone bolt
(13), the tomb body is provided with connecting hole corresponding with stone bolt (13).
4. tomb is buried in the same grave in many caves of one according to claim 1, it is characterised in that:The epitaph (4) including gravestone (14) and
Pillar (15), one end of the pillar (15) is integrally formed or combines connection with gravestone (14), pillar (15) other end with
First grave blanket (10) is connected.
5. tomb is buried in the same grave in many caves of one according to claim 4, it is characterised in that:First grave blanket (10) is provided with groove
(16), the pillar (15) with the first grave blanket (10) in embedded groove (16) by being connected.
6. tomb is buried in the same grave in many caves of one according to claim 1, it is characterised in that:The upper strata coffin pit (7), lower floor coffin pit (8)
One is at least respectively with rear layer coffin pit (9).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621178278.9U CN206174598U (en) | 2016-11-03 | 2016-11-03 | Integrative many caves multi -burial tomb |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621178278.9U CN206174598U (en) | 2016-11-03 | 2016-11-03 | Integrative many caves multi -burial tomb |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206174598U true CN206174598U (en) | 2017-05-17 |
Family
ID=58681740
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621178278.9U Expired - Fee Related CN206174598U (en) | 2016-11-03 | 2016-11-03 | Integrative many caves multi -burial tomb |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206174598U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106639615A (en) * | 2016-11-03 | 2017-05-10 | 毛家雨 | Integrated multi-grave joint burial tomb |
-
2016
- 2016-11-03 CN CN201621178278.9U patent/CN206174598U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106639615A (en) * | 2016-11-03 | 2017-05-10 | 毛家雨 | Integrated multi-grave joint burial tomb |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206174598U (en) | Integrative many caves multi -burial tomb | |
CN106639615A (en) | Integrated multi-grave joint burial tomb | |
CN205382752U (en) | Environmental protection reduces funeral and interment building of land used | |
CN205577589U (en) | Coffin chamber structure that contains built -in tombstone | |
CN207033025U (en) | Bone ash placement hall is buried in the same grave by the family of palace moulding | |
CN210768084U (en) | Tripod-shaped tomb crown and tomb structure | |
CN202299587U (en) | Wall burying device with folding supplying tables | |
CN202031374U (en) | Intensive cemetery placing room | |
CN106760905A (en) | Environmental protection reduces the funeral building of land used | |
CN209653536U (en) | Follow-on tomb that saves land up and down | |
CN207131166U (en) | A kind of electronics ancestral hall | |
CN202520049U (en) | Land-saving burial chamber | |
CN201227383Y (en) | Concrete coffin | |
CN215107847U (en) | Front and back double graves made of land-saving fiber high polymer material | |
CN201763036U (en) | Gravestone | |
CN216142510U (en) | Double-circular composite material grave | |
CN205330212U (en) | Multi -functional sauna combination wayside pavilion | |
CN201714134U (en) | Family cemetery graveyard | |
CN215168623U (en) | Family combined tombstone | |
CN201158959Y (en) | Grave | |
CN206548768U (en) | A kind of shockproof good fortune case | |
CN206360458U (en) | A kind of giant Buddha formula cemetery | |
CN206337889U (en) | A kind of raised gravestone | |
CN219630049U (en) | Bone ash tube for burial | |
CN208380243U (en) | A kind of combined flag platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170517 |