CN202031374U - Intensive cemetery placing room - Google Patents

Intensive cemetery placing room Download PDF

Info

Publication number
CN202031374U
CN202031374U CN2011201186353U CN201120118635U CN202031374U CN 202031374 U CN202031374 U CN 202031374U CN 2011201186353 U CN2011201186353 U CN 2011201186353U CN 201120118635 U CN201120118635 U CN 201120118635U CN 202031374 U CN202031374 U CN 202031374U
Authority
CN
China
Prior art keywords
chamber
laing
room
manhole
boss
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011201186353U
Other languages
Chinese (zh)
Inventor
张冀晋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2011201186353U priority Critical patent/CN202031374U/en
Application granted granted Critical
Publication of CN202031374U publication Critical patent/CN202031374U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The utility model relates to a casket storage placing room with a plate structure, in particular to a three-dimensional family intensive cemetery placing room, which is characterized in that a rectangular hollow three-dimensional room body is arranged underground, and the back part of the inside of the room is divided into placing racks for storing caskets by a longitudinal partition plate and a transverse partition plate; an ancestral room is arranged at the front part of the inside of the room, and a manhole is arranged on a top plate above the ancestral room; and a sealed cover plate is arranged on the manhole. The intensive cemetery placing room has the advantages of simple structure, land saving, lower cost, and is convenient to use for a long time, and is convenient for the family to make sacrifices.

Description

The position, chamber of laing, intensive graveyard
Technical field
The utility model relates to a kind of plank frame cinerary-casket storing chamber, the particularly Li Ti familial graveyard position, chamber of laing.
Background technology
The tomb position of China all is a people one tomb position at present, and floor space is wanted 1 square metre at least.Along with the mankind's procreation and growth, land resources is more and more valuable, has caused the graveyard price more and more expensive, even part low-income groups " has been stubbornly refused ", and this will cause serious social concern.Simultaneously, owing to the expensive reason in graveyard, and government has put into effect the rules that prevent illegal profiteering graveyard for the interests of numerous people, make the deceased's of family graveyard not concentrate in together, therefore caused the date people of the annual sacrifice tired phenomenon of running around here and there, also cause traffic congestion, caused social economy's loss huge.And because modern work rhythm is more and more faster, family grave is dispersed placement again, and people can not offer a sacrifice to gods or ancestors ancestors, and this just makes a lot of offsprings not understand own elder generation's history, and our national cohesion has gradually also weakened.
In order to solve land resources problem in short supply day by day, the funeral and interment mode in saving soils such as the civil affairs department of government is promoting arbor burial for many years always, flower is buried, tower is buried, but but do not accepted by the vast Chinese common people, its reason is exactly the culture of burying that these funeral and interment modes do not meet Chinese traditional.If adopt compulsory means to carry out, the harmony that will destroy society also can be destroyed the distinctive cultural tradition of the Chinese nation with stable.
The utility model content
The purpose of this utility model is to provide the position, chamber of laing, a kind of intensive graveyard, and it is simple in structure, saves the soil, and cost is lower, is convenient to long-term use, makes things convenient for family to concentrate and offers a sacrifice to gods or ancestors.
The technical scheme that its technical problem that solves the utility model adopts is: rectangular hollow cube chamber body is set under the surface, soil, indoor rear portion is divided into the frame of laing of depositing cinerary casket with longitudinal divider and transverse partition panel, indoor front portion is space, ancestral temple chamber, the top board of top, ancestral temple chamber is provided with manhole, disposes seal cover board on the manhole.
The locular wall of described chamber body and top board are whole reinforced concrete prefabricated board, and the chamber opening of laing that respectively is separated into is equipped with the chamber door, on each chamber door photo frame is housed, and have boss around the manhole, have the corresponding cavity that matches with the boss shape and size on the cover plate.
The external wall in whole chamber scribbles water-repellent paint, and inwall is equipped with ceramic tile or slabstone, and the boss of people hole site has corresponding identical gradient with the cavity of cover plate, and the contact surface of cover plate and boss is equipped with elastic sealing gasket.
The beneficial effects of the utility model are: adopted the three-dimensional shelf structure of laing in underground coffin chamber; under limited floor space, can deposit more cinerary casket; family tomb position is concentrated in together become possibility; also reduced simultaneously taking of land resources; protected environment; alleviated the burden that common people's funeral expenses are used, the tradition that has kept the most of nationalitys of China is simultaneously again buried culture, helps the continuity of cultural custom.Around manhole boss is set, and at the contact surface of cover plate and boss sealing mat is set, the chamber locular wall of laing has moistureproof water-repellent paint, ceramic tile or slabstone, can be damp proof effectively, mildew-resistant, insect protected, and the lay long-term use of position, chamber of assurance.Whole locular wall and top board adopt the reinforced concrete prefabricated board preparation, help transportation and carrying, need carry out national major project when building when running into the position, graveyard, and low cost is finished the resettlement matters easily.
Description of drawings
Fig. 1 is a structural representation of the present utility model.
Fig. 2 is a cover plate of the present utility model and the schematic diagram that combines of boss.
Wherein: soil 1, locular wall 2, boss 3, cover plate 4, manhole 5, demarcation strip 6, photo frame 7, chamber door 8, ancestral temple chamber 9, top board 10, sealing mat 11.
The specific embodiment
Below in conjunction with accompanying drawing embodiment, the utility model is further described.
Referring to Fig. 1, the locular wall 2 of position, Ben Cuo chamber and top board 10 is prepared into rectangular hollow cube chamber body for whole reinforced concrete prefabricated board, and the chamber body of the chamber of laing is embedded in the hole under 1 surface, soil.The rear portion of chamber body is divided into the frame of laing of depositing cinerary casket with longitudinal divider 6 and transverse partition panel 6, and two cinerary caskets can be deposited in each chamber of independently laing, and each chamber opening of independently laing is equipped with chamber door 8, on each chamber door 8 photo frame 7 is housed, the spouses's that can pack into photograph.The indoor front portion of position, Ben Cuo chamber is the space of ancestral temple chamber 9, and the top board 10 of 9 tops, ancestral temple chamber is provided with manhole 5, disposes seal cover board 4 on the manhole 5, the size of manhole with a people conveniently enter be operating as suitable.Be provided with the high boss 3 that rises around the manhole 5, make rainwater can not enter manhole 5, boss 3 has gradient, the inboard of cover plate 4 also has the corresponding cavity that matches with the boss shape and size, cover plate 4 is equipped with elastic sealing gasket 11 with the contact surface of boss 3, under the action of gravity of cover plate 4, can cover more and more tightlyer, isolated with the air in the external world and dust, the long-term use of the position, chamber that guarantees to lay.The external wall in whole chamber scribbles water-repellent paint, and inwall is equipped with ceramic tile or slabstone, has played the effect of seeping water in the soil of preventing.

Claims (3)

1. the position, chamber of laing, an intensive graveyard, it is characterized in that: rectangular hollow cube chamber body is set under the surface, soil, indoor rear portion is divided into the frame of laing of depositing cinerary casket with longitudinal divider and transverse partition panel, indoor front portion is space, ancestral temple chamber, the top board of top, ancestral temple chamber is provided with manhole, disposes seal cover board on the manhole.
2. by the position, chamber of laing, the described intensive graveyard of claim 1, it is characterized in that: the locular wall of chamber body and top board are whole reinforced concrete prefabricated board, the chamber opening of laing that respectively is separated into is equipped with the chamber door, on each chamber door photo frame is housed, have boss around the manhole, have the corresponding cavity that matches on the cover plate with the boss shape and size.
3. by the position, chamber of laing, the described intensive graveyard of claim 2, it is characterized in that: the external wall in whole chamber scribbles water-repellent paint, inwall is equipped with ceramic tile or slabstone, and the boss of people hole site has corresponding identical gradient with the cavity of cover plate, and the contact surface of cover plate and boss is equipped with elastic sealing gasket.
CN2011201186353U 2011-04-21 2011-04-21 Intensive cemetery placing room Expired - Fee Related CN202031374U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011201186353U CN202031374U (en) 2011-04-21 2011-04-21 Intensive cemetery placing room

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011201186353U CN202031374U (en) 2011-04-21 2011-04-21 Intensive cemetery placing room

Publications (1)

Publication Number Publication Date
CN202031374U true CN202031374U (en) 2011-11-09

Family

ID=44893676

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011201186353U Expired - Fee Related CN202031374U (en) 2011-04-21 2011-04-21 Intensive cemetery placing room

Country Status (1)

Country Link
CN (1) CN202031374U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109215991A (en) * 2018-08-22 2019-01-15 江苏宝亨新电气有限公司 A kind of fixed device of emitting underground transformer standby fusible core

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109215991A (en) * 2018-08-22 2019-01-15 江苏宝亨新电气有限公司 A kind of fixed device of emitting underground transformer standby fusible core
CN109215991B (en) * 2018-08-22 2024-04-19 江苏宝亨新电气有限公司 Backup molten core fixing device of buried transformer

Similar Documents

Publication Publication Date Title
CN202031374U (en) Intensive cemetery placing room
CN202441105U (en) Deeply buried type cemetery
CN201106306Y (en) Solid coffin chamber
CN210264135U (en) Terrace ring mountain underground cemetery
CN107327205A (en) A kind of novel solid is buried
CN103147618A (en) Cave-type soil tomb group
CN204609442U (en) A kind of collective share memorial monument grave
CN201763038U (en) Gravestone
CN214576160U (en) Grid type household burial grave system
CN202299587U (en) Wall burying device with folding supplying tables
CN207553728U (en) A kind of novel solid is buried
CN205382752U (en) Environmental protection reduces funeral and interment building of land used
CN201763036U (en) Gravestone
CN205089035U (en) Memorial park eight diagrams body structure hole palace
CN205370082U (en) Non - font bone ash memorial park of nature massif tunnel type
CN204876780U (en) Familial combination tombstone
CN106760905A (en) Environmental protection reduces the funeral building of land used
CN205577589U (en) Coffin chamber structure that contains built -in tombstone
CN201406866Y (en) Concealed type combined grave
CN201420416Y (en) Family type combination gravestone
CN108691453A (en) Multifunction combined ecology cemetery
CN203223043U (en) Graveyard wall
CN204609439U (en) Two memorial monument grave, a kind of four caves
CN209712495U (en) Military cemetery offers a sacrifice to gods or ancestors pavilion
KR200474236Y1 (en) The dimer of the cinerary facilities installed into underground

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20111109

Termination date: 20140421