CN202031374U - Intensive cemetery placing room - Google Patents
Intensive cemetery placing room Download PDFInfo
- Publication number
- CN202031374U CN202031374U CN2011201186353U CN201120118635U CN202031374U CN 202031374 U CN202031374 U CN 202031374U CN 2011201186353 U CN2011201186353 U CN 2011201186353U CN 201120118635 U CN201120118635 U CN 201120118635U CN 202031374 U CN202031374 U CN 202031374U
- Authority
- CN
- China
- Prior art keywords
- chamber
- laing
- room
- manhole
- boss
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
The utility model relates to a casket storage placing room with a plate structure, in particular to a three-dimensional family intensive cemetery placing room, which is characterized in that a rectangular hollow three-dimensional room body is arranged underground, and the back part of the inside of the room is divided into placing racks for storing caskets by a longitudinal partition plate and a transverse partition plate; an ancestral room is arranged at the front part of the inside of the room, and a manhole is arranged on a top plate above the ancestral room; and a sealed cover plate is arranged on the manhole. The intensive cemetery placing room has the advantages of simple structure, land saving, lower cost, and is convenient to use for a long time, and is convenient for the family to make sacrifices.
Description
Technical field
The utility model relates to a kind of plank frame cinerary-casket storing chamber, the particularly Li Ti familial graveyard position, chamber of laing.
Background technology
The tomb position of China all is a people one tomb position at present, and floor space is wanted 1 square metre at least.Along with the mankind's procreation and growth, land resources is more and more valuable, has caused the graveyard price more and more expensive, even part low-income groups " has been stubbornly refused ", and this will cause serious social concern.Simultaneously, owing to the expensive reason in graveyard, and government has put into effect the rules that prevent illegal profiteering graveyard for the interests of numerous people, make the deceased's of family graveyard not concentrate in together, therefore caused the date people of the annual sacrifice tired phenomenon of running around here and there, also cause traffic congestion, caused social economy's loss huge.And because modern work rhythm is more and more faster, family grave is dispersed placement again, and people can not offer a sacrifice to gods or ancestors ancestors, and this just makes a lot of offsprings not understand own elder generation's history, and our national cohesion has gradually also weakened.
In order to solve land resources problem in short supply day by day, the funeral and interment mode in saving soils such as the civil affairs department of government is promoting arbor burial for many years always, flower is buried, tower is buried, but but do not accepted by the vast Chinese common people, its reason is exactly the culture of burying that these funeral and interment modes do not meet Chinese traditional.If adopt compulsory means to carry out, the harmony that will destroy society also can be destroyed the distinctive cultural tradition of the Chinese nation with stable.
The utility model content
The purpose of this utility model is to provide the position, chamber of laing, a kind of intensive graveyard, and it is simple in structure, saves the soil, and cost is lower, is convenient to long-term use, makes things convenient for family to concentrate and offers a sacrifice to gods or ancestors.
The technical scheme that its technical problem that solves the utility model adopts is: rectangular hollow cube chamber body is set under the surface, soil, indoor rear portion is divided into the frame of laing of depositing cinerary casket with longitudinal divider and transverse partition panel, indoor front portion is space, ancestral temple chamber, the top board of top, ancestral temple chamber is provided with manhole, disposes seal cover board on the manhole.
The locular wall of described chamber body and top board are whole reinforced concrete prefabricated board, and the chamber opening of laing that respectively is separated into is equipped with the chamber door, on each chamber door photo frame is housed, and have boss around the manhole, have the corresponding cavity that matches with the boss shape and size on the cover plate.
The external wall in whole chamber scribbles water-repellent paint, and inwall is equipped with ceramic tile or slabstone, and the boss of people hole site has corresponding identical gradient with the cavity of cover plate, and the contact surface of cover plate and boss is equipped with elastic sealing gasket.
The beneficial effects of the utility model are: adopted the three-dimensional shelf structure of laing in underground coffin chamber; under limited floor space, can deposit more cinerary casket; family tomb position is concentrated in together become possibility; also reduced simultaneously taking of land resources; protected environment; alleviated the burden that common people's funeral expenses are used, the tradition that has kept the most of nationalitys of China is simultaneously again buried culture, helps the continuity of cultural custom.Around manhole boss is set, and at the contact surface of cover plate and boss sealing mat is set, the chamber locular wall of laing has moistureproof water-repellent paint, ceramic tile or slabstone, can be damp proof effectively, mildew-resistant, insect protected, and the lay long-term use of position, chamber of assurance.Whole locular wall and top board adopt the reinforced concrete prefabricated board preparation, help transportation and carrying, need carry out national major project when building when running into the position, graveyard, and low cost is finished the resettlement matters easily.
Description of drawings
Fig. 1 is a structural representation of the present utility model.
Fig. 2 is a cover plate of the present utility model and the schematic diagram that combines of boss.
Wherein: soil 1, locular wall 2, boss 3, cover plate 4, manhole 5, demarcation strip 6, photo frame 7, chamber door 8, ancestral temple chamber 9, top board 10, sealing mat 11.
The specific embodiment
Below in conjunction with accompanying drawing embodiment, the utility model is further described.
Referring to Fig. 1, the locular wall 2 of position, Ben Cuo chamber and top board 10 is prepared into rectangular hollow cube chamber body for whole reinforced concrete prefabricated board, and the chamber body of the chamber of laing is embedded in the hole under 1 surface, soil.The rear portion of chamber body is divided into the frame of laing of depositing cinerary casket with longitudinal divider 6 and transverse partition panel 6, and two cinerary caskets can be deposited in each chamber of independently laing, and each chamber opening of independently laing is equipped with chamber door 8, on each chamber door 8 photo frame 7 is housed, the spouses's that can pack into photograph.The indoor front portion of position, Ben Cuo chamber is the space of ancestral temple chamber 9, and the top board 10 of 9 tops, ancestral temple chamber is provided with manhole 5, disposes seal cover board 4 on the manhole 5, the size of manhole with a people conveniently enter be operating as suitable.Be provided with the high boss 3 that rises around the manhole 5, make rainwater can not enter manhole 5, boss 3 has gradient, the inboard of cover plate 4 also has the corresponding cavity that matches with the boss shape and size, cover plate 4 is equipped with elastic sealing gasket 11 with the contact surface of boss 3, under the action of gravity of cover plate 4, can cover more and more tightlyer, isolated with the air in the external world and dust, the long-term use of the position, chamber that guarantees to lay.The external wall in whole chamber scribbles water-repellent paint, and inwall is equipped with ceramic tile or slabstone, has played the effect of seeping water in the soil of preventing.
Claims (3)
1. the position, chamber of laing, an intensive graveyard, it is characterized in that: rectangular hollow cube chamber body is set under the surface, soil, indoor rear portion is divided into the frame of laing of depositing cinerary casket with longitudinal divider and transverse partition panel, indoor front portion is space, ancestral temple chamber, the top board of top, ancestral temple chamber is provided with manhole, disposes seal cover board on the manhole.
2. by the position, chamber of laing, the described intensive graveyard of claim 1, it is characterized in that: the locular wall of chamber body and top board are whole reinforced concrete prefabricated board, the chamber opening of laing that respectively is separated into is equipped with the chamber door, on each chamber door photo frame is housed, have boss around the manhole, have the corresponding cavity that matches on the cover plate with the boss shape and size.
3. by the position, chamber of laing, the described intensive graveyard of claim 2, it is characterized in that: the external wall in whole chamber scribbles water-repellent paint, inwall is equipped with ceramic tile or slabstone, and the boss of people hole site has corresponding identical gradient with the cavity of cover plate, and the contact surface of cover plate and boss is equipped with elastic sealing gasket.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011201186353U CN202031374U (en) | 2011-04-21 | 2011-04-21 | Intensive cemetery placing room |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011201186353U CN202031374U (en) | 2011-04-21 | 2011-04-21 | Intensive cemetery placing room |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202031374U true CN202031374U (en) | 2011-11-09 |
Family
ID=44893676
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011201186353U Expired - Fee Related CN202031374U (en) | 2011-04-21 | 2011-04-21 | Intensive cemetery placing room |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202031374U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109215991A (en) * | 2018-08-22 | 2019-01-15 | 江苏宝亨新电气有限公司 | A kind of fixed device of emitting underground transformer standby fusible core |
-
2011
- 2011-04-21 CN CN2011201186353U patent/CN202031374U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109215991A (en) * | 2018-08-22 | 2019-01-15 | 江苏宝亨新电气有限公司 | A kind of fixed device of emitting underground transformer standby fusible core |
CN109215991B (en) * | 2018-08-22 | 2024-04-19 | 江苏宝亨新电气有限公司 | Backup molten core fixing device of buried transformer |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202031374U (en) | Intensive cemetery placing room | |
CN204920426U (en) | Cave formula bone ash cemetery park | |
CN202441105U (en) | Deeply buried type cemetery | |
CN201106306Y (en) | Solid coffin chamber | |
CN210264135U (en) | Terrace ring mountain underground cemetery | |
CN103147618A (en) | Cave-type soil tomb group | |
CN204609442U (en) | A kind of collective share memorial monument grave | |
CN201763038U (en) | Gravestone | |
CN214576160U (en) | Grid type household burial grave system | |
CN202299587U (en) | Wall burying device with folding supplying tables | |
CN207553728U (en) | A kind of novel solid is buried | |
CN205382752U (en) | Environmental protection reduces funeral and interment building of land used | |
CN201763036U (en) | Gravestone | |
CN205089035U (en) | Memorial park eight diagrams body structure hole palace | |
CN205370082U (en) | Non - font bone ash memorial park of nature massif tunnel type | |
CN204876780U (en) | Familial combination tombstone | |
CN106760905A (en) | Environmental protection reduces the funeral building of land used | |
CN205577589U (en) | Coffin chamber structure that contains built -in tombstone | |
CN201406866Y (en) | Concealed type combined grave | |
CN201420416Y (en) | Family type combination gravestone | |
CN108691453A (en) | Multifunction combined ecology cemetery | |
CN203223043U (en) | Graveyard wall | |
CN204609439U (en) | Two memorial monument grave, a kind of four caves | |
CN209712495U (en) | Military cemetery offers a sacrifice to gods or ancestors pavilion | |
KR200474236Y1 (en) | The dimer of the cinerary facilities installed into underground |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20111109 Termination date: 20140421 |