CN201224661Y - 小空间室内大型设备的安装装置 - Google Patents
小空间室内大型设备的安装装置 Download PDFInfo
- Publication number
- CN201224661Y CN201224661Y CNU2008200293036U CN200820029303U CN201224661Y CN 201224661 Y CN201224661 Y CN 201224661Y CN U2008200293036 U CNU2008200293036 U CN U2008200293036U CN 200820029303 U CN200820029303 U CN 200820029303U CN 201224661 Y CN201224661 Y CN 201224661Y
- Authority
- CN
- China
- Prior art keywords
- equipment
- driving roller
- roller bracket
- bracket
- turning rolls
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
本实用新型涉及一种小空间室内大型设备的安装装置,其可在土建后与各专业安装同时运行,缩短了工期,能有效防止传统施工方法中土建作业时对已安装设备的损伤,简单易操作且安全可靠,本实用新型包括龙门架,龙门架上装有吊具和转动轮,龙门架下方设置有主动滚轮架和被动滚轮架,主动滚轮架、被动滚轮架与设备中心线形成一夹角,滚轮架中心线各自放置平行,主动滚轮架和被动滚轮架与设备中心线形成10-30°夹角。
Description
一、技术领域:
本实用新型涉及一种设备安装装置,尤其是涉及一种小空间室内大型设备的安装装置。
二、背景技术:
背景技术中,室内大型设备的安装,传统的施工方法是先安装设备,后土建施工盖厂房,以避免由于土建作业后,有些设备由于体积及重量的原因不易进入安装车间就位,给安装造成较大难度甚至出现大面积土建拆除的现象。随着现代建设工程的发展,工程工期越来越短,常常出现土建专业先主体施工完毕后各专业安装再同时进行,以缩短工期或由于建设方规划不到位,出现了一些本该在土建专业作业前搞的安装工作放在了土建作业后,进行对于一些小设备,往往影响不大,而对于一些大面积,大重量,安装作业空间小的设备,往往数倍的提高了安装难度甚至造成不能安装的局面。
三、实用新型内容:
本实用新型为了解决上述背景技术中的不足之处,提供一种小空间室内大型设备的安装装置,其可在土建后与各专业安装同时运行,缩短了工期,能有效防止传统施工方法中土建作业时对已安装设备的损伤,简单易操作且安全可靠,
为实现上述目的,本实用新型采用的技术方案为:
一种小空间室内大型设备的安装装置,其特征在于:包括龙门架,龙门架上装有吊具和转动轮,龙门架下方设置有主动滚轮架和被动滚轮架,主动滚轮架、被动滚轮架与设备中心线形成一夹角,滚轮架中心线各自放置平行。
上述主动滚轮架和被动滚轮架与设备中心线形成10--30°夹角。
与现有技术相比,本实用新型具有的优点和效果如下:
1、不必延用传统的大型设备先安装再土建再安装的安装模式,可在土建后各专业安装同时运行,缩短了工期。
2、能有效防止传统施工方法中土建作业时对已安装设备的损伤。
3、简单易操作且安全可靠,并可减少大型机械的使用率降低了施工成本和安全事故的发生。
4、由于在室内安装,可减少环境因素对工期造成的不必要影响同时可改善作业人员的作业环境。
5、适用于各类室内及室外卧式大型分片及整体设备安装作业、移位。
四、附图说明:
图1为本实用新型的结构示意图;
图2为龙门架的结构示意图;
图3和图4为安装到位车间空间图。
图中,1-车间一,2-车间二,3-设备单筒节,4-龙门架,5-被动滚轮架,6-车间隔墙,7-设备筒体,8-主动滚轮架,9-龙门架行走轨道,10-龙门架行走轨道,11-吊具。
五、具体实施方式:
参见图1和图2,包括龙门架4,龙门架4上装有吊具11和转动轮,龙门架4下方设置有主动滚轮架8和被动滚轮架5,主动滚轮架8及被动滚轮架5为现有产品,主动滚轮架8、被动滚轮架5与设备中心线形成一夹角,滚轮架中心线各自放置平行,主动滚轮架8和被动滚轮架5与设备中心线形成10--30°夹角。根据安装车间及被吊装设备体积的大小,以被吊装设备重量为参数,考虑安全因素,采用衍架式吊装龙门架。在龙门架上安装吊装用的手动或电动吊具,并安装转动轮,使其可在铺设有轨道的安装车间内平稳移动,实现车间内任意位置的吊装和设备移位作业。主动滚轮架8、被动滚轮架5与设备中心线成一定的夹角,主动滚轮架8旋转时,设备带动被动滚轮架5旋转,在夹角力的作用力,随着主动滚动架8的旋转,设备在轴线方向上缓缓向前移动,而达到就位的目的。
操作要点:
1、根据安装空间、被吊物重量,设计制作衍架式龙门架,并为其安装转动轮与吊具。
2、在吊装作业范围内铺设轨道使龙门吊可实现作业范围内的任意位置吊装及设备移位。
3、把分段设备从预留口送入安装车间,用龙门吊吊装分段设备并在人力或机械力的作用下移动龙门架到适当位置,放下吊装的分段设备完成移位工作后,开始下一个分段设备吊装。
4、用龙门吊辅助分段组对及安装作业。
5、根据设备重量计算并选择适当配重的滚轮架。
6、滚轮架放置时被动滚轮架与主动滚轮架中心线成一定夹角,被动滚轮架中心平行。
7、转动主滚轮架,设备在小空间移位,通过变换主滚轮与被动滚轮架的夹角角度及调整主滚轮架标高,调整空间的移位速度。
以某公司引射筒安装为例说明(试验例):
某公司引射筒规格为φ6150/φ6000mm41m×δ 30/δ25,总重183吨,安装在两个相邻的两个车间内(引射间和消音间)标高6m处(设备中心),引射间土建已全部封顶封闭,留10.1m×3m安装预留洞一个,相邻的消音间也全部封闭,设备安装到位只能依靠两车间隔断墙上的φ6.5m的安装基础墙洞,设备最里端在消音车间内距墙20m处,设备安装到位后,设备在车间内上方,左右方和建筑物的空间都不足1米。参见图3和图4安装到位车间空间图。
引射间车间内空间为10.1m(高)×8m(宽),用φ219×7螺旋管制作1台9.5m(高)×7m(跨度)×3m(衍架宽度)衍架式龙门架1个下方安置自制转动轮4副。车间内铺设24号轻轨,龙门架上安装4个5吨电动葫芦。用吊车把分段筒体从预留洞送入引射间,把分段设备(每段重8吨)用龙门吊吊起通过人力(4—6)人推动龙门架到引射间另一端,放好第一段设备,再把龙门吊移动到预留口,起吊第二节………实现了车间内分段设备的安装初次移位。安装时,用龙门吊提升及移动设备,辅助分段组对和安装。
采用4副50吨被动滚轮架及1副50吨主动滚轮架,安装前,从基础墙洞将两个被动滚轮架置于已封闭的消音间内,主动滚轮架置于引射架的隔断墙处,两车间滚轮架中心线各自放置平行,并与设备中心线形成10--30°夹角,两节组对好的分段设备用龙门吊吊装到引射间的滚轮架上,开始组对焊接,组对焊接时旋转主滚轮,设备边安装焊接边向消音间移动……。
此龙门吊用料φ219×7螺旋管90m,4人3天制作完成,制作成本仅1.53万元,解决了全工地180吨设备的吊装问题,仅节约吊装费一项就有10万元,并提高了效率,缩短了工期,避免了安全事故。
Claims (2)
1、一种小空间室内大型设备的安装装置,其特征在于:包括龙门架(4),龙门架(4)上装有吊具(11)和转动轮,龙门架(4)下方设置有主动滚轮架(8)和被动滚轮架(5),主动滚轮架(8)、被动滚轮架(5)与设备中心线形成一夹角,滚轮架中心线各自平行。
2、根据权利要求1所述的小空间室内大型设备的安装装置,其特征在于:主动滚轮架(8)和被动滚轮架(5)与设备中心线形成10--30°夹角。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2008200293036U CN201224661Y (zh) | 2008-06-06 | 2008-06-06 | 小空间室内大型设备的安装装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2008200293036U CN201224661Y (zh) | 2008-06-06 | 2008-06-06 | 小空间室内大型设备的安装装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201224661Y true CN201224661Y (zh) | 2009-04-22 |
Family
ID=40597543
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNU2008200293036U Expired - Lifetime CN201224661Y (zh) | 2008-06-06 | 2008-06-06 | 小空间室内大型设备的安装装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201224661Y (zh) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102110520A (zh) * | 2010-12-30 | 2011-06-29 | 陕西化建工程有限责任公司 | 大型变压器安装、调试施工工艺 |
CN102190249A (zh) * | 2010-03-17 | 2011-09-21 | 五冶集团上海有限公司 | 位于多层框架平台底层设备的吊装方法 |
WO2012088653A1 (zh) * | 2010-12-27 | 2012-07-05 | 中国二十冶集团有限公司 | 大型工矿设备预先组装、提升移动就位方法 |
WO2012088654A1 (zh) * | 2010-12-27 | 2012-07-05 | 中国二十冶集团有限公司 | 大型工矿设备预先组装、提升移动就位装置 |
CN108222567A (zh) * | 2017-12-28 | 2018-06-29 | 上海二十冶建设有限公司 | 一种空间狭小厂房内大型水处理设备安装方法 |
-
2008
- 2008-06-06 CN CNU2008200293036U patent/CN201224661Y/zh not_active Expired - Lifetime
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102190249A (zh) * | 2010-03-17 | 2011-09-21 | 五冶集团上海有限公司 | 位于多层框架平台底层设备的吊装方法 |
CN102190249B (zh) * | 2010-03-17 | 2014-10-01 | 五冶集团上海有限公司 | 位于多层框架平台底层设备的吊装方法 |
WO2012088653A1 (zh) * | 2010-12-27 | 2012-07-05 | 中国二十冶集团有限公司 | 大型工矿设备预先组装、提升移动就位方法 |
WO2012088654A1 (zh) * | 2010-12-27 | 2012-07-05 | 中国二十冶集团有限公司 | 大型工矿设备预先组装、提升移动就位装置 |
CN102110520A (zh) * | 2010-12-30 | 2011-06-29 | 陕西化建工程有限责任公司 | 大型变压器安装、调试施工工艺 |
CN108222567A (zh) * | 2017-12-28 | 2018-06-29 | 上海二十冶建设有限公司 | 一种空间狭小厂房内大型水处理设备安装方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104563528B (zh) | 预制装配式建筑预制墙板快速就位装置及方法 | |
CN201224661Y (zh) | 小空间室内大型设备的安装装置 | |
CN101864842A (zh) | 一种核电厂工程的施工方法 | |
CN206753188U (zh) | 一种设有预制桩基础的通信塔 | |
CN106150049A (zh) | 喷涂机器人 | |
CN106193000B (zh) | 液压全回转套管钻机 | |
CN209144821U (zh) | 用于基坑侧墙找平层施工的喷射混凝土滑膜施工装置 | |
CN204691326U (zh) | 移动式多功能构件加工车间 | |
CN101979800B (zh) | 电动爬升模板系统 | |
CN107313793B (zh) | 一种自移式巷道支护金属支架安装机 | |
CN213015280U (zh) | 一种可移动式上料平台 | |
CN105804115A (zh) | 装配式地连墙或预制桩与装配式地下车站一体化施工装置及施工方法 | |
CN108194111A (zh) | 一种隧道顶拱防水板、钢筋网片铺设辅助设备 | |
CN208717918U (zh) | 一种下穿高压线或高架桥的地铁车站基坑围护结构 | |
CN109653518B (zh) | 一种可质检和电磁起重精调的装配式构件高效预拼装设备 | |
CN105731271A (zh) | 一种用于屋顶施工的组合塔吊及其施工方法 | |
CN110282557A (zh) | 辅助安装平台和用桥式起重机安装车间内高空管道的方法 | |
CN102465686B (zh) | 新型塔式抽油机的滚动移机装置 | |
CN203555689U (zh) | 竖井电动吊篮 | |
CN102989773B (zh) | 一种提高钢管穿孔机机架对中精度的施工方法 | |
CN212837557U (zh) | 一种便于双钢板箱式钢板墙钢梁安装焊接的组合爬梯 | |
CN107700854B (zh) | 一种超高层核心筒的钢板墙滑移安装装置和安装方法 | |
CN105804087A (zh) | 大型深基坑支护梁下钢结构安装方法 | |
CN104989274A (zh) | 一种输电线路岩石锚杆钻机定位及移动装置 | |
CN215854861U (zh) | 一种用于土木工程施工便于移动的支撑装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term | ||
CX01 | Expiry of patent term |
Granted publication date: 20090422 |