CN201176566Y - External tower type retractable construction platform at end of staying cable tower - Google Patents
External tower type retractable construction platform at end of staying cable tower Download PDFInfo
- Publication number
- CN201176566Y CN201176566Y CNU2007203004601U CN200720300460U CN201176566Y CN 201176566 Y CN201176566 Y CN 201176566Y CN U2007203004601 U CNU2007203004601 U CN U2007203004601U CN 200720300460 U CN200720300460 U CN 200720300460U CN 201176566 Y CN201176566 Y CN 201176566Y
- Authority
- CN
- China
- Prior art keywords
- platform
- tower
- construction
- pylon
- oblique tensile
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model discloses a stay cable tower end exterior tower type telescopic construction platform, which comprises a tower frame of a truss structure which is arranged on a bridge tower column, a climbing-frame foot platform with a lifting frame is arranged on the tower frame, and a telescopic movable platform is arranged on the climbing-frame foot platform. The stay cable tower end exterior tower type telescopic construction platform has convenient installation and use and very high safety performance, the design adopts the telescopic foot platform, the adaptability is strong, and good operability is available. The design and use of the stay cable tower exterior construction platform greatly enrich the construction technique of a stay cable, and the device has good effect in bridge construction, which is convenient for construction and guarantees the construction progress.
Description
Technical field
The utility model belongs to the construction frock, is specifically related to a kind of tower scalable operation platform that is used for the outside construction of oblique tensile tower end.
Background technology
Suspension cable is torn constructions such as worker's rigging and suspension cable PE protection open in the lifting of tower end, traction, angle adjustment, peace; be to carry out drag-line around tower full hall pin hand platform or cage to hang construction traditionally; workload is big and not easy to operate; strong to the tower crane dependence; very easily be subjected to wind effect; to be difficult to guarantee constructor's safety, and be unfavorable for the protection of suspension cable PE.Long and heavy for suspension cable, long, the big bridge of traction anchored force of hauling distance when hanging, conventional single soft traction or draw technology firmly and can not satisfy the construction needs.
Summary of the invention
The purpose of this utility model is to provide a kind of oblique tensile tower end outside tower scalable operation platform, to address the above problem.
The technical solution of the utility model is: the outside tower scalable operation platform of oblique tensile tower end, it comprises the pylon that is located at the trussed construction on the bridge king-post, establish the climbing frame job platform that has jacking frame on the pylon, the climbing frame job platform is provided with telescopic movable platform.
Described telescopic movable platform comprises platform floor, establishes guardrail on the platform floor, the guide beam that platform floor connects, and guide beam is located on the roller.
Roller is located on the climbing frame job platform.
The utility model install and easy to use, have a very high security performance; Scalable job platform is adopted in design, and compliance is strong and have a good operability.Oblique tensile tower is the design and the use of operation platform outward, has greatly enriched the construction technology of suspension cable.This device has good effect in bridge construction, made things convenient for construction, has guaranteed construction speed.Be applicable to large and medium-sized cable stayed bridge oblique tensile tower end construction under this is practical, tear the operating platform of operations such as worker's rigging and suspension cable PE protection as suspension cable in the lifting of tower end, traction, angle adjustment, peace open.
Description of drawings
The outside tower scalable operation platform schematic diagram of Fig. 1 oblique tensile tower end.
Fig. 2 climbing frame job platform schematic diagram.
The telescopic movable platform structural representation of Fig. 3.
The specific embodiment
As shown in Figure 1, the trussed construction of pylon 1 is that the standard knot spelling by tower crane forms, and pylon 1 vertically is arranged in upper king-post strut staying cable anchorage zone 3, is supported on the steel corbel 2 that is fixed on the tower limb, and arranges one attached wall stull 4 every 12m.Pylon also is the vertical passageway of going up lower platform.Establish the climbing frame job platform 5 that has jacking frame on the pylon 1, climbing frame job platform 5 is provided with telescopic movable platform 6.
As shown in Figure 2, the jacking frame 7 on the climbing frame job platform 5 adopts the jacking frame of tower crane, and platform (platform is by the rope side) is set in the above.Jacking frame 7 carries job platform and can move up and down along pylon, is fixed on the pylon behind the arrival construction location.
As shown in Figure 3, telescopic movable platform 6 comprises platform floor 10, establishes guardrail 11 on the platform floor 10, the guide beam 12 that platform floor 10 connects, and guide beam 12 is located on the roller 13.Roller 13 is located on the climbing frame job platform 5, is provided with in pairs up and down.Establish stationary positioned hole 16 on the guide beam 12.After telescopic movable platform 6 flexible the putting in place, can be telescopic movable platform 6 is fixing with climbing frame job platform 5 by locating hole 16 and bolt.Connect drive unit on the telescopic movable platform 6.Drive unit comprises be articulated and connected cramp bar 14 on platform floor of an end, and the other end of cramp bar 14 is connected manually or on the electric block 15, manually or electric block 15 be movably connected on the pylon 1.
For construction safety, jacking frame peripheral hardware falling proof device is guaranteed construction installation and personnel's safety.
For making things convenient for about the personnel, reduce personnel's walking intensity of climbing, access to elevators is set outside tower at a certain distance, access to elevators is communicated with pylon.When the staff by elevator on behind the access to elevators, by on the passage to pylon, hang up operation by carrying out suspension cable to job platform on the cat ladder in the pylon again.
Claims (6)
1, the outside tower scalable operation platform of a kind of oblique tensile tower end, it comprises the pylon that is located at the trussed construction on the bridge king-post, establish the climbing frame job platform that has jacking frame on the pylon, it is characterized in that described climbing frame job platform is provided with telescopic movable platform.
2, the outside tower scalable operation platform of oblique tensile tower end according to claim 1 is characterized in that described telescopic movable platform comprises platform floor, establishes guardrail on the platform floor, the guide beam that platform floor connects, and guide beam is located on the roller.
3, as the outside tower scalable operation platform of oblique tensile tower end as described in the claim 2, it is characterized in that roller is located on the climbing frame job platform.
4, as the outside tower scalable operation platform of oblique tensile tower end as described in the claim 2, it is characterized in that connecting drive unit on the telescopic movable platform.
5, as the outside tower scalable operation platform of oblique tensile tower end as described in the claim 4, it is characterized in that described drive unit comprises be articulated and connected cramp bar on platform floor of an end, the other end of cramp bar is connected manually or on the electric block, manual or electric block is movably connected on the pylon.
6, as the outside tower scalable operation platform of oblique tensile tower end as described in the claim 2, it is characterized in that establishing on the guide beam stationary positioned hole.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2007203004601U CN201176566Y (en) | 2007-12-27 | 2007-12-27 | External tower type retractable construction platform at end of staying cable tower |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2007203004601U CN201176566Y (en) | 2007-12-27 | 2007-12-27 | External tower type retractable construction platform at end of staying cable tower |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201176566Y true CN201176566Y (en) | 2009-01-07 |
Family
ID=40216584
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNU2007203004601U Expired - Fee Related CN201176566Y (en) | 2007-12-27 | 2007-12-27 | External tower type retractable construction platform at end of staying cable tower |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201176566Y (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102774745A (en) * | 2012-06-26 | 2012-11-14 | 河北金环钢结构工程有限公司 | Combined crane tower for stayed-cable bridge cable tower installation and installation method of combined crane tower |
CN104420641A (en) * | 2013-09-03 | 2015-03-18 | 中铁建工集团有限公司 | Extensible lifting construction platform |
CN106087760A (en) * | 2016-08-09 | 2016-11-09 | 中铁大桥局集团有限公司 | A kind of jack up hanging cable stage apparatus |
CN107939301A (en) * | 2017-12-20 | 2018-04-20 | 平煤建工集团特殊凿井工程有限公司 | A kind of drilling tool assembles tower |
CN110203858A (en) * | 2019-06-24 | 2019-09-06 | 山东电力建设第三工程有限公司 | Extendible dynamic formula job platform in heat absorption tower |
CN111979916A (en) * | 2019-12-31 | 2020-11-24 | 中铁十一局集团第一工程有限公司 | Cable-stayed bridge tower part suspension construction method and suspension operation platform device |
CN114457699A (en) * | 2022-03-31 | 2022-05-10 | 江苏润扬大桥发展有限责任公司 | Platform device for transportation equipment of extra-large cable bridge |
-
2007
- 2007-12-27 CN CNU2007203004601U patent/CN201176566Y/en not_active Expired - Fee Related
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102774745A (en) * | 2012-06-26 | 2012-11-14 | 河北金环钢结构工程有限公司 | Combined crane tower for stayed-cable bridge cable tower installation and installation method of combined crane tower |
CN102774745B (en) * | 2012-06-26 | 2015-04-29 | 金环建设集团有限公司 | installation method of combined crane tower for stayed-cable bridge cable tower installation |
CN104420641A (en) * | 2013-09-03 | 2015-03-18 | 中铁建工集团有限公司 | Extensible lifting construction platform |
CN104420641B (en) * | 2013-09-03 | 2016-08-24 | 中铁建工集团有限公司 | A kind of telescopic elevating construction platform |
CN106087760A (en) * | 2016-08-09 | 2016-11-09 | 中铁大桥局集团有限公司 | A kind of jack up hanging cable stage apparatus |
CN107939301A (en) * | 2017-12-20 | 2018-04-20 | 平煤建工集团特殊凿井工程有限公司 | A kind of drilling tool assembles tower |
CN107939301B (en) * | 2017-12-20 | 2024-04-19 | 平煤建工集团特殊凿井工程有限公司 | Drilling tool assembling tower |
CN110203858A (en) * | 2019-06-24 | 2019-09-06 | 山东电力建设第三工程有限公司 | Extendible dynamic formula job platform in heat absorption tower |
CN111979916A (en) * | 2019-12-31 | 2020-11-24 | 中铁十一局集团第一工程有限公司 | Cable-stayed bridge tower part suspension construction method and suspension operation platform device |
CN114457699A (en) * | 2022-03-31 | 2022-05-10 | 江苏润扬大桥发展有限责任公司 | Platform device for transportation equipment of extra-large cable bridge |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201176566Y (en) | External tower type retractable construction platform at end of staying cable tower | |
CN103523683B (en) | Construction method for dismantling tower crane by use of small hoisting equipment | |
CN202882378U (en) | Attached type lifting scaffold | |
CN204625039U (en) | A kind of safe tower crane | |
CN201334769Y (en) | Attached type lifting scaffold with double guide rails | |
CN208088097U (en) | A kind of three-tower suspension bridge erection of main beam constructing structure | |
CN202509754U (en) | High-altitude steel structure node construction working platform | |
CN201495051U (en) | Crane jib for flat-top tower crane | |
CN109989350A (en) | A kind of bridge Sarasota construction method | |
CN205873594U (en) | Special construction elevator of cooling tower section of thick bamboo wall | |
CN106245984B (en) | Jack up Multifunctional creeping gin pole | |
CN205171979U (en) | Integrated form all steel lift platform | |
CN210289116U (en) | Safe self-locking device for external wall template | |
CN202744232U (en) | Tower crane long suspension arm lifting steel rope supporting device | |
CN201460186U (en) | Adhesive lifting scaffold | |
CN206769526U (en) | Jack up Multifunctional creeping gin pole | |
CN110886214B (en) | Mounting and dismounting method of maintenance platform for bridge maintenance vehicle | |
CN202000647U (en) | Base device for lifting scaffold in elevator shaft | |
CN107059654A (en) | The compound overlength Hanging basket on front support of single cable plane and its installation method | |
CN210886923U (en) | Maintenance system of straight pylon of double-cable-plane cable-stayed bridge | |
CN209779465U (en) | main tower erects cable-stay bridge's string cable construction system that changes | |
CN106245530A (en) | A kind of universal rod body CABLEWAY ERECTION SYSTEM removes engineering method | |
CN206800201U (en) | The compound Hanging basket on front support of single cable plane | |
CN207244453U (en) | A kind of suspension bridge light anchorage mast apparatus | |
CN217201523U (en) | A boat crane device for narrow and small space operations such as deep well |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20090107 Termination date: 20161227 |
|
CF01 | Termination of patent right due to non-payment of annual fee |