CN201176566Y - External tower type retractable construction platform at end of staying cable tower - Google Patents

External tower type retractable construction platform at end of staying cable tower Download PDF

Info

Publication number
CN201176566Y
CN201176566Y CNU2007203004601U CN200720300460U CN201176566Y CN 201176566 Y CN201176566 Y CN 201176566Y CN U2007203004601 U CNU2007203004601 U CN U2007203004601U CN 200720300460 U CN200720300460 U CN 200720300460U CN 201176566 Y CN201176566 Y CN 201176566Y
Authority
CN
China
Prior art keywords
platform
tower
construction
pylon
oblique tensile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2007203004601U
Other languages
Chinese (zh)
Inventor
张鸿
刘先鹏
杨秀礼
罗承斌
陈鸣
李少芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Second Harbor Engineering Co
Original Assignee
CCCC Second Harbor Engineering Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Second Harbor Engineering Co filed Critical CCCC Second Harbor Engineering Co
Priority to CNU2007203004601U priority Critical patent/CN201176566Y/en
Application granted granted Critical
Publication of CN201176566Y publication Critical patent/CN201176566Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a stay cable tower end exterior tower type telescopic construction platform, which comprises a tower frame of a truss structure which is arranged on a bridge tower column, a climbing-frame foot platform with a lifting frame is arranged on the tower frame, and a telescopic movable platform is arranged on the climbing-frame foot platform. The stay cable tower end exterior tower type telescopic construction platform has convenient installation and use and very high safety performance, the design adopts the telescopic foot platform, the adaptability is strong, and good operability is available. The design and use of the stay cable tower exterior construction platform greatly enrich the construction technique of a stay cable, and the device has good effect in bridge construction, which is convenient for construction and guarantees the construction progress.

Description

The outside tower scalable operation platform of oblique tensile tower end
Technical field
The utility model belongs to the construction frock, is specifically related to a kind of tower scalable operation platform that is used for the outside construction of oblique tensile tower end.
Background technology
Suspension cable is torn constructions such as worker's rigging and suspension cable PE protection open in the lifting of tower end, traction, angle adjustment, peace; be to carry out drag-line around tower full hall pin hand platform or cage to hang construction traditionally; workload is big and not easy to operate; strong to the tower crane dependence; very easily be subjected to wind effect; to be difficult to guarantee constructor's safety, and be unfavorable for the protection of suspension cable PE.Long and heavy for suspension cable, long, the big bridge of traction anchored force of hauling distance when hanging, conventional single soft traction or draw technology firmly and can not satisfy the construction needs.
Summary of the invention
The purpose of this utility model is to provide a kind of oblique tensile tower end outside tower scalable operation platform, to address the above problem.
The technical solution of the utility model is: the outside tower scalable operation platform of oblique tensile tower end, it comprises the pylon that is located at the trussed construction on the bridge king-post, establish the climbing frame job platform that has jacking frame on the pylon, the climbing frame job platform is provided with telescopic movable platform.
Described telescopic movable platform comprises platform floor, establishes guardrail on the platform floor, the guide beam that platform floor connects, and guide beam is located on the roller.
Roller is located on the climbing frame job platform.
The utility model install and easy to use, have a very high security performance; Scalable job platform is adopted in design, and compliance is strong and have a good operability.Oblique tensile tower is the design and the use of operation platform outward, has greatly enriched the construction technology of suspension cable.This device has good effect in bridge construction, made things convenient for construction, has guaranteed construction speed.Be applicable to large and medium-sized cable stayed bridge oblique tensile tower end construction under this is practical, tear the operating platform of operations such as worker's rigging and suspension cable PE protection as suspension cable in the lifting of tower end, traction, angle adjustment, peace open.
Description of drawings
The outside tower scalable operation platform schematic diagram of Fig. 1 oblique tensile tower end.
Fig. 2 climbing frame job platform schematic diagram.
The telescopic movable platform structural representation of Fig. 3.
The specific embodiment
As shown in Figure 1, the trussed construction of pylon 1 is that the standard knot spelling by tower crane forms, and pylon 1 vertically is arranged in upper king-post strut staying cable anchorage zone 3, is supported on the steel corbel 2 that is fixed on the tower limb, and arranges one attached wall stull 4 every 12m.Pylon also is the vertical passageway of going up lower platform.Establish the climbing frame job platform 5 that has jacking frame on the pylon 1, climbing frame job platform 5 is provided with telescopic movable platform 6.
As shown in Figure 2, the jacking frame 7 on the climbing frame job platform 5 adopts the jacking frame of tower crane, and platform (platform is by the rope side) is set in the above.Jacking frame 7 carries job platform and can move up and down along pylon, is fixed on the pylon behind the arrival construction location.
As shown in Figure 3, telescopic movable platform 6 comprises platform floor 10, establishes guardrail 11 on the platform floor 10, the guide beam 12 that platform floor 10 connects, and guide beam 12 is located on the roller 13.Roller 13 is located on the climbing frame job platform 5, is provided with in pairs up and down.Establish stationary positioned hole 16 on the guide beam 12.After telescopic movable platform 6 flexible the putting in place, can be telescopic movable platform 6 is fixing with climbing frame job platform 5 by locating hole 16 and bolt.Connect drive unit on the telescopic movable platform 6.Drive unit comprises be articulated and connected cramp bar 14 on platform floor of an end, and the other end of cramp bar 14 is connected manually or on the electric block 15, manually or electric block 15 be movably connected on the pylon 1.
For construction safety, jacking frame peripheral hardware falling proof device is guaranteed construction installation and personnel's safety.
For making things convenient for about the personnel, reduce personnel's walking intensity of climbing, access to elevators is set outside tower at a certain distance, access to elevators is communicated with pylon.When the staff by elevator on behind the access to elevators, by on the passage to pylon, hang up operation by carrying out suspension cable to job platform on the cat ladder in the pylon again.

Claims (6)

1, the outside tower scalable operation platform of a kind of oblique tensile tower end, it comprises the pylon that is located at the trussed construction on the bridge king-post, establish the climbing frame job platform that has jacking frame on the pylon, it is characterized in that described climbing frame job platform is provided with telescopic movable platform.
2, the outside tower scalable operation platform of oblique tensile tower end according to claim 1 is characterized in that described telescopic movable platform comprises platform floor, establishes guardrail on the platform floor, the guide beam that platform floor connects, and guide beam is located on the roller.
3, as the outside tower scalable operation platform of oblique tensile tower end as described in the claim 2, it is characterized in that roller is located on the climbing frame job platform.
4, as the outside tower scalable operation platform of oblique tensile tower end as described in the claim 2, it is characterized in that connecting drive unit on the telescopic movable platform.
5, as the outside tower scalable operation platform of oblique tensile tower end as described in the claim 4, it is characterized in that described drive unit comprises be articulated and connected cramp bar on platform floor of an end, the other end of cramp bar is connected manually or on the electric block, manual or electric block is movably connected on the pylon.
6, as the outside tower scalable operation platform of oblique tensile tower end as described in the claim 2, it is characterized in that establishing on the guide beam stationary positioned hole.
CNU2007203004601U 2007-12-27 2007-12-27 External tower type retractable construction platform at end of staying cable tower Expired - Fee Related CN201176566Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2007203004601U CN201176566Y (en) 2007-12-27 2007-12-27 External tower type retractable construction platform at end of staying cable tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2007203004601U CN201176566Y (en) 2007-12-27 2007-12-27 External tower type retractable construction platform at end of staying cable tower

Publications (1)

Publication Number Publication Date
CN201176566Y true CN201176566Y (en) 2009-01-07

Family

ID=40216584

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2007203004601U Expired - Fee Related CN201176566Y (en) 2007-12-27 2007-12-27 External tower type retractable construction platform at end of staying cable tower

Country Status (1)

Country Link
CN (1) CN201176566Y (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102774745A (en) * 2012-06-26 2012-11-14 河北金环钢结构工程有限公司 Combined crane tower for stayed-cable bridge cable tower installation and installation method of combined crane tower
CN104420641A (en) * 2013-09-03 2015-03-18 中铁建工集团有限公司 Extensible lifting construction platform
CN106087760A (en) * 2016-08-09 2016-11-09 中铁大桥局集团有限公司 A kind of jack up hanging cable stage apparatus
CN107939301A (en) * 2017-12-20 2018-04-20 平煤建工集团特殊凿井工程有限公司 A kind of drilling tool assembles tower
CN110203858A (en) * 2019-06-24 2019-09-06 山东电力建设第三工程有限公司 Extendible dynamic formula job platform in heat absorption tower
CN111979916A (en) * 2019-12-31 2020-11-24 中铁十一局集团第一工程有限公司 Cable-stayed bridge tower part suspension construction method and suspension operation platform device
CN114457699A (en) * 2022-03-31 2022-05-10 江苏润扬大桥发展有限责任公司 Platform device for transportation equipment of extra-large cable bridge

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102774745A (en) * 2012-06-26 2012-11-14 河北金环钢结构工程有限公司 Combined crane tower for stayed-cable bridge cable tower installation and installation method of combined crane tower
CN102774745B (en) * 2012-06-26 2015-04-29 金环建设集团有限公司 installation method of combined crane tower for stayed-cable bridge cable tower installation
CN104420641A (en) * 2013-09-03 2015-03-18 中铁建工集团有限公司 Extensible lifting construction platform
CN104420641B (en) * 2013-09-03 2016-08-24 中铁建工集团有限公司 A kind of telescopic elevating construction platform
CN106087760A (en) * 2016-08-09 2016-11-09 中铁大桥局集团有限公司 A kind of jack up hanging cable stage apparatus
CN107939301A (en) * 2017-12-20 2018-04-20 平煤建工集团特殊凿井工程有限公司 A kind of drilling tool assembles tower
CN107939301B (en) * 2017-12-20 2024-04-19 平煤建工集团特殊凿井工程有限公司 Drilling tool assembling tower
CN110203858A (en) * 2019-06-24 2019-09-06 山东电力建设第三工程有限公司 Extendible dynamic formula job platform in heat absorption tower
CN111979916A (en) * 2019-12-31 2020-11-24 中铁十一局集团第一工程有限公司 Cable-stayed bridge tower part suspension construction method and suspension operation platform device
CN114457699A (en) * 2022-03-31 2022-05-10 江苏润扬大桥发展有限责任公司 Platform device for transportation equipment of extra-large cable bridge

Similar Documents

Publication Publication Date Title
CN201176566Y (en) External tower type retractable construction platform at end of staying cable tower
CN103523683B (en) Construction method for dismantling tower crane by use of small hoisting equipment
CN202882378U (en) Attached type lifting scaffold
CN204625039U (en) A kind of safe tower crane
CN201334769Y (en) Attached type lifting scaffold with double guide rails
CN208088097U (en) A kind of three-tower suspension bridge erection of main beam constructing structure
CN202509754U (en) High-altitude steel structure node construction working platform
CN201495051U (en) Crane jib for flat-top tower crane
CN109989350A (en) A kind of bridge Sarasota construction method
CN205873594U (en) Special construction elevator of cooling tower section of thick bamboo wall
CN106245984B (en) Jack up Multifunctional creeping gin pole
CN205171979U (en) Integrated form all steel lift platform
CN210289116U (en) Safe self-locking device for external wall template
CN202744232U (en) Tower crane long suspension arm lifting steel rope supporting device
CN201460186U (en) Adhesive lifting scaffold
CN206769526U (en) Jack up Multifunctional creeping gin pole
CN110886214B (en) Mounting and dismounting method of maintenance platform for bridge maintenance vehicle
CN202000647U (en) Base device for lifting scaffold in elevator shaft
CN107059654A (en) The compound overlength Hanging basket on front support of single cable plane and its installation method
CN210886923U (en) Maintenance system of straight pylon of double-cable-plane cable-stayed bridge
CN209779465U (en) main tower erects cable-stay bridge's string cable construction system that changes
CN106245530A (en) A kind of universal rod body CABLEWAY ERECTION SYSTEM removes engineering method
CN206800201U (en) The compound Hanging basket on front support of single cable plane
CN207244453U (en) A kind of suspension bridge light anchorage mast apparatus
CN217201523U (en) A boat crane device for narrow and small space operations such as deep well

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090107

Termination date: 20161227

CF01 Termination of patent right due to non-payment of annual fee